こたまこ
liked
$Direxion Daily NVDA Bull 2X Shares(NVDU.US$ $NVIDIA(NVDA.US$ $Tesla(TSLA.US$
ラッセル2000下がっている時はやはり強いですね✌️
ラッセル2000下がっている時はやはり強いですね✌️
9
こたまこ
liked
こたまこ
liked
$ASICS(7936.JP$
I feel like I'm being at the mercy of chilled balls that have been put in moderately, and I'm no longer chasing the upper price, so be careful.
I feel like I'm being at the mercy of chilled balls that have been put in moderately, and I'm no longer chasing the upper price, so be careful.
Translated
4
こたまこ
liked
$ASICS(7936.JP$
Tomorrow hasn't come yet, but it seems tough for the delivery price to rise from here on out.
I wonder if I have no choice but to hedge with sales if I win the PO.
Or rather, is it better to wait and see in the first place when it seems good to go in?
There is an additional loss of -2 yen after the screenshot.
I'm glad I had insurance with Nikkei Leva, but I regret that holding it until the delivery date was an outrage.
Will they keep up until the financial results are settled, or will they change positions while watching the flow from tomorrow? Do you want to make up for it by buying and selling (no longer meaningful)
The material that bothered me for a while was ready.
Everyone, make a very careful investment
Tomorrow hasn't come yet, but it seems tough for the delivery price to rise from here on out.
I wonder if I have no choice but to hedge with sales if I win the PO.
Or rather, is it better to wait and see in the first place when it seems good to go in?
There is an additional loss of -2 yen after the screenshot.
I'm glad I had insurance with Nikkei Leva, but I regret that holding it until the delivery date was an outrage.
Will they keep up until the financial results are settled, or will they change positions while watching the flow from tomorrow? Do you want to make up for it by buying and selling (no longer meaningful)
The material that bothered me for a while was ready.
Everyone, make a very careful investment
Translated
![After ASICS PO](https://sgsnsimg.moomoo.com/sns_client_feed/183127349/20240729/24e100d887eff0116226ab785511908a.jpg/thumb?area=105&is_public=true)
4
こたまこ
liked
$CleanSpark(CLSK.US$
However, the rise and fall will be repeated for a while![]()
It's better to prepare steadily during the fall![]()
There are times when $15 is split, so be sure to prepare in that case![]()
Because mining stocks will accelerate![]()
![]()
![]()
Has everyone who has been following since the beginning been able to buy it properly?![]()
However, the rise and fall will be repeated for a while
It's better to prepare steadily during the fall
There are times when $15 is split, so be sure to prepare in that case
Because mining stocks will accelerate
Has everyone who has been following since the beginning been able to buy it properly?
Translated
7
こたまこ
liked
The opening ceremony of Russia's first “green” hydrogen test site was held on 7/16 in Yuzhno-Sakhalinsk, the capital of Russia's Sakhalin Oblast. The test targets are production, transportation, storage, and use of hydrogen using Russian domestic technology. We aim for future practical application through testing.
At the test site, hydrogen is separated from water by electrolysis using solar panels. The first phase will generate 5 cubic meters of hydrogen per hour, and the plan is to expand the capacity to 30 cubic meters per hour in the second phase. First Vice Minister Pavel Sorokin of the Ministry of Energy expressed confidence that the operation of the test site shows that Russia has global technology in the field of hydrogen production (Tass 7/16).
Along with the opening, 4 projects were launched. The first project is an autonomous power supply to mobile phone base stations along scattered roads. There are dozens of such base stations in Sakhalin Oblast, and over 400 throughout Russia. Instead of diesel power generation and monthly delivery of diesel fuel, an autonomous hydrogen power plant will be created here.
The second is the transition from diesel power generation to green hydrogen power generation systems in villages isolated from the surroundings and difficult to access, and the third is a state of emergency in critical infrastructure,...
At the test site, hydrogen is separated from water by electrolysis using solar panels. The first phase will generate 5 cubic meters of hydrogen per hour, and the plan is to expand the capacity to 30 cubic meters per hour in the second phase. First Vice Minister Pavel Sorokin of the Ministry of Energy expressed confidence that the operation of the test site shows that Russia has global technology in the field of hydrogen production (Tass 7/16).
Along with the opening, 4 projects were launched. The first project is an autonomous power supply to mobile phone base stations along scattered roads. There are dozens of such base stations in Sakhalin Oblast, and over 400 throughout Russia. Instead of diesel power generation and monthly delivery of diesel fuel, an autonomous hydrogen power plant will be created here.
The second is the transition from diesel power generation to green hydrogen power generation systems in villages isolated from the surroundings and difficult to access, and the third is a state of emergency in critical infrastructure,...
Translated
5
こたまこ
liked
10
こたまこ
liked
$USD/JPY(USDJPY.FX$ huh? that's crazy, huh?
Translated
3