$UUE(0310.MY$
Short-term investments to play with foreign exchange are the best, and stocks are long-term investments 😁
Short-term investments to play with foreign exchange are the best, and stocks are long-term investments 😁
Translated
2
$SNS(0259.MY$
It turns out that the boss came here for a short time to vote like this 😂
Run as many times as you can. If I don't want to, I'll change to
It turns out that the boss came here for a short time to vote like this 😂
Run as many times as you can. If I don't want to, I'll change to
Translated
2
$UUE(0310.MY$
The game has just started, so don't be afraid of the backstage being stable.
Long-standing stocks.
The game has just started, so don't be afraid of the backstage being stable.
Long-standing stocks.
Translated
2
$UUE(0310.MY$
?$#@$ Fatt Engineering Sdn Bhd, a wholly-owned subsidiary of UUE Holdings Bhd, recently obtained two contracts to install underground cables and accessories, with a total value of RM26.93 million after making a strong appearance in the ACE market of Bursa Malaysia.
In a filing from the Bursa Malaysia today, the group said the contracts were awarded by Komasi Enginerring Sdn Bhd and Sutera Utama Sdn Bhd respectively for the installation, testing and commissioning of 11kV aluminum XLPE underground cables and fittings for asset development (North Zone), Tenaga Nasional Bhd.
Both contracts have a period of 730 days from the effective date, with the option of extending them for another 365 days.
“Once the contracts come into effect, these contracts are expected to contribute positively to the company's earnings per share and net assets during the contract period,” the group said.
?$#@$ Fatt Engineering Sdn Bhd, a wholly-owned subsidiary of UUE Holdings Bhd, recently obtained two contracts to install underground cables and accessories, with a total value of RM26.93 million after making a strong appearance in the ACE market of Bursa Malaysia.
In a filing from the Bursa Malaysia today, the group said the contracts were awarded by Komasi Enginerring Sdn Bhd and Sutera Utama Sdn Bhd respectively for the installation, testing and commissioning of 11kV aluminum XLPE underground cables and fittings for asset development (North Zone), Tenaga Nasional Bhd.
Both contracts have a period of 730 days from the effective date, with the option of extending them for another 365 days.
“Once the contracts come into effect, these contracts are expected to contribute positively to the company's earnings per share and net assets during the contract period,” the group said.
Translated
10
$UUE(0310.MY$
I bought a few thousand tablets in a row yesterday. What am I afraid of, I just play for a long time
I bought a few thousand tablets in a row yesterday. What am I afraid of, I just play for a long time
Translated
5
2
$UUE(0310.MY$
It's been 5 minutes and it's about to take off 🛫
It's been 5 minutes and it's about to take off 🛫
Translated
1
1
$FSBM(9377.MY$ Boss, you're still sleeping 😂
Translated
1
$CEB(5311.MY$ Quick fight quick decision
Translated
1
3
$UUE(0310.MY$ 1 yuan is not a dream 😁
Translated
3