share_log

Vale SA | 6-K: Vale's Performance in 2Q24

Vale SA | 6-K: Vale's Performance in 2Q24

淡水河谷 | 6-K:淡水河谷在2024年第二季度的业绩
美股SEC公告 ·  07/26 16:12
Moomoo AI 已提取核心信息
Vale SA (Vale) reported a strong operational performance for the second quarter of 2024, with record-high iron ore production since 2018, mainly driven by consistent performance at the S11D mine. The company is advancing on key growth projects, including Vargem Grande and Capanema, which are expected to add 30 Mt of capacity in the next twelve months. Vale also announced a partnership within its Mega Hubs strategy, aiming to strengthen its position as a competitive direct reduction products supplier. In the Energy Transition Metals segment, operations at Sossego, Onça Puma, and Salobo have resumed, with Shaun Usmar appointed as the new CEO to lead the copper and nickel business. The B3/B4 dam decharacterization was successfully completed, with 53% of the program expected to conclude...Show More
Vale SA (Vale) reported a strong operational performance for the second quarter of 2024, with record-high iron ore production since 2018, mainly driven by consistent performance at the S11D mine. The company is advancing on key growth projects, including Vargem Grande and Capanema, which are expected to add 30 Mt of capacity in the next twelve months. Vale also announced a partnership within its Mega Hubs strategy, aiming to strengthen its position as a competitive direct reduction products supplier. In the Energy Transition Metals segment, operations at Sossego, Onça Puma, and Salobo have resumed, with Shaun Usmar appointed as the new CEO to lead the copper and nickel business. The B3/B4 dam decharacterization was successfully completed, with 53% of the program expected to conclude by year-end. Financially, Vale reported a 210% increase in net income attributable to shareholders, reaching $2,769 million, and a 3% increase in net operating revenues, totaling $9,920 million. Capital expenditures were up 10% year-over-year, and the company announced a $1.6 billion interest on capital to be paid in September 2024. The Onça Puma nickel mine and the Sossego copper mine resumed activities after environmental license reinstatements, and the Salobo 3 processing plant operations resumed following a fire incident. Vale's 2024 copper production guidance remains unchanged.
淡水河谷(Vale)在2024年第二季度表现强劲,自2018年以来铁矿石产量创下历史新高,主要由S11D矿山的持续良好表现推动。该公司正在推进关键的增长项目,包括瓦尔杆格兰德和卡帕内马,预计将在未来十二个月内增加30万吨的产能。此外,淡水河谷还宣布了与其Mega Hubs战略内的合作伙伴关系,旨在加强其作为竞争性直接还原产品供应商的地位。在能源过渡金属领域,索塞戈、Onça Puma和萨洛博的运营已经恢复,并任命肖恩·乌斯马尔(Shaun Usmar)出任新的铜和镍业务首席执行官。B3/B4水坝已经圆满完成漏斗降级项目,并预计53%的计划将于年底完成。 在财务上,淡水河谷报告归属于股东的净利润...展开全部
淡水河谷(Vale)在2024年第二季度表现强劲,自2018年以来铁矿石产量创下历史新高,主要由S11D矿山的持续良好表现推动。该公司正在推进关键的增长项目,包括瓦尔杆格兰德和卡帕内马,预计将在未来十二个月内增加30万吨的产能。此外,淡水河谷还宣布了与其Mega Hubs战略内的合作伙伴关系,旨在加强其作为竞争性直接还原产品供应商的地位。在能源过渡金属领域,索塞戈、Onça Puma和萨洛博的运营已经恢复,并任命肖恩·乌斯马尔(Shaun Usmar)出任新的铜和镍业务首席执行官。B3/B4水坝已经圆满完成漏斗降级项目,并预计53%的计划将于年底完成。 在财务上,淡水河谷报告归属于股东的净利润增长210%,达到276900万美元,净营业收入增长3%,总计992000万美元。资本支出同比增长10%,该公司宣布将于2024年9月支付16亿美元的股份息。在环保母基的铜和镍矿业务中,Onça Puma镍矿和Sossego铜矿获得了环境许可证的恢复,Salobo 3加工厂的运营也是在一场火灾事故后恢复的。淡水河谷的2024年铜产量指导仍然不变。
声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息