share_log

Bitdeer Technologies | 6-K: Report of foreign private issuer [Rules 13a-16 and 15d-16]

Bitdeer Technologies | 6-K: Report of foreign private issuer [Rules 13a-16 and 15d-16]

Bitdeer Technologies | 6-K:外国发行人报告
美股SEC公告 ·  2024/11/08 05:10

Moomoo AI 已提取核心信息

Bitdeer announced significant progress in its ASIC technology development with the launch of SEALMINER A2 mining machines in October 2024. The new A2 models achieve 226 TH/s for air-cooling and 446 TH/s for hydro-cooling versions, both with 16.5 J/TH efficiency. The company has commenced mass production with secured capacity for approximately 18 EH/s of A2 units.The SEALMINER A1 production is advancing with 3.7 EH/s of machines scheduled for manufacturing and delivery by January 2025, including 0.4 EH/s already manufactured and 1.7 EH/s in production. The company also reported successful tape-out of the SEAL03 chip with an expected efficiency of 10 J/TH. In October, Bitdeer's self-mining operations produced 174 Bitcoins, while total hash rate under management reached 18.0 EH/s.Infrastructure expansion continues across multiple sites, with the Tydal, Norway 40 MW phase 1 on track for December 2024 energization. The Rockdale, Texas 100 MW hydro-cooling conversion faces a one-month delay due to dock workers' strike, now expected for completion in Q1 2025. The Bhutan 500 MW project remains on schedule with primary substation completion expected by Q1 2025.
Bitdeer announced significant progress in its ASIC technology development with the launch of SEALMINER A2 mining machines in October 2024. The new A2 models achieve 226 TH/s for air-cooling and 446 TH/s for hydro-cooling versions, both with 16.5 J/TH efficiency. The company has commenced mass production with secured capacity for approximately 18 EH/s of A2 units.The SEALMINER A1 production is advancing with 3.7 EH/s of machines scheduled for manufacturing and delivery by January 2025, including 0.4 EH/s already manufactured and 1.7 EH/s in production. The company also reported successful tape-out of the SEAL03 chip with an expected efficiency of 10 J/TH. In October, Bitdeer's self-mining operations produced 174 Bitcoins, while total hash rate under management reached 18.0 EH/s.Infrastructure expansion continues across multiple sites, with the Tydal, Norway 40 MW phase 1 on track for December 2024 energization. The Rockdale, Texas 100 MW hydro-cooling conversion faces a one-month delay due to dock workers' strike, now expected for completion in Q1 2025. The Bhutan 500 MW project remains on schedule with primary substation completion expected by Q1 2025.
Bitdeer宣布其ASIC科技发展取得重大进展,计划于2024年10月推出SEALMINER A2矿机。新的A2型号的气冷版达到226 TH/s,水冷版达到446 TH/s,效率均为16.5 J/TH。该公司已开始大规模生产,确保了大约18 EH/s的A2单位产能。SEALMINER A1的生产正在推进,预计到2025年1月将制造和交付3.7 EH/s的机器,其中已有0.4 EH/s投入生产,1.7 EH/s在生产中。该公司还报告了SEAL03芯片成功流片,预计效率为10 J/TH。在10月份,Bitdeer的自挖矿作业生产了174个比特币,而管理下的总哈希率达到了18.0 EH/s。基础设...展开全部
Bitdeer宣布其ASIC科技发展取得重大进展,计划于2024年10月推出SEALMINER A2矿机。新的A2型号的气冷版达到226 TH/s,水冷版达到446 TH/s,效率均为16.5 J/TH。该公司已开始大规模生产,确保了大约18 EH/s的A2单位产能。SEALMINER A1的生产正在推进,预计到2025年1月将制造和交付3.7 EH/s的机器,其中已有0.4 EH/s投入生产,1.7 EH/s在生产中。该公司还报告了SEAL03芯片成功流片,预计效率为10 J/TH。在10月份,Bitdeer的自挖矿作业生产了174个比特币,而管理下的总哈希率达到了18.0 EH/s。基础设施扩展在多个地点持续进行,挪威Tydal的40 MW第一阶段预计将在2024年12月供电。德克萨斯州Rockdale的100 MW水冷转换因码头工人罢工推迟一个月,现预计在2025年第一季度完成。不丹500 MW项目进展顺利,预计在2025年第一季度完成主要变电站。
声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息