share_log

Slave Lake Zinc Corp. Strategically Important Minerals

Slave Lake Zinc Corp. Strategically Important Minerals

奴隶湖锌公司具有重要战略意义的矿产
newsfile ·  2022/04/26 14:10

Vancouver, British Columbia--(Newsfile Corp. - April 26, 2022) - Slave Lake Zinc Corp. (CSE: SLZ) - As spring arrives in the Northwest Territories, recent developments with the federal and territorial governments have created excitement within the Company.

温哥华,不列颠哥伦比亚省-(Newsfile Corp.-2022年4月26日)-奴隶湖锌公司(CSE:SLZ))-随着西北地区春天的到来,联邦和地区政府最近的事态发展在公司内部引起了兴奋。

Slave Lake Zinc is very much looking forward to the next several months, and the coming years, with the recognition that the Company's primary exploration programs centered around zinc, with lead and copper, not to mention the precious metals, are being designated as "Strategically "important minerals by our Federal Government.

奴隶湖锌公司非常期待未来几个月和未来几年,认识到公司的主要勘探项目以锌为中心,铅和铜,更不用说贵金属,正被我们的联邦政府指定为“具有战略意义的”重要矿物。

The "Fraser Institute" in their "Annual Survey of Mining Jurisdictions" has designated Canada as the number 2 best jurisdiction in the world for investment in the mining industry. The Northwest Territories was not specifically mentioned but as Mr. Wigham stated: "Our company's interaction (Slave Lake Zinc Corp) with the decision makers and Indigenous communities in the N.W.T. has shown that it appears a new and exciting attitude has been brought forward with our mutually significant ''Collaboration Agreement" with the Northwest Territory Metis Nation and our interactions with both the Territorial Government and the other local communities within the South Slave Region of the N.W.T."

“弗雷泽研究所”在其“矿业司法管辖区年度调查”中将加拿大列为世界上第二个最适合投资采矿业的司法管辖区。没有特别提到西北地区,但正如Wigham先生所说:“我们公司(Slave Lake ZincCorp)与西北部地区的决策者和土著社区的互动表明,我们与西北地区梅蒂斯民族的‘’合作协议‘’以及我们与领土政府和西北部南部奴隶区内的其他当地社区的互动,似乎带来了一种新的令人兴奋的态度。”

With these developments and more substantial federal tax incentives the future appears to be very bright for Slave Lake Zinc and the companies O'Connor Lake Project.

有了这些发展和更实质性的联邦税收优惠,奴隶湖锌公司和奥康纳湖项目的未来似乎非常光明。

Slave Lake Zinc ("the Company") has awarded incentive stock options to Directors, Officers and a company consultant to purchase a total of 2,650,000 shares of the Company's treasury capital. These options allow the holder to purchase the shares at $0.15 per share for a period of two (2) years from the date of issue, subject to provisions of the Company stock option plan.

Slave Lake Zinc(“本公司”)已向董事、高级职员及一名公司顾问授予奖励股票期权,以购买合共2,650,000股本公司库藏资本股份。这些期权允许持有者在自发行之日起两(2)年内以每股0.15美元的价格购买股票,但须遵守公司股票期权计划的规定。

About Slave Lake Zinc

关于Slave Lake锌

Slave Lake Zinc Corp. intends to develop the potential of its O'Connor Lake property, an historic zinc lead copper property located in the Northwest Territories of Canada. The property is located south of Great Slave Lake and to the east of Osisko Metals' Pine Point project. The property was initially developed after the Second World War and subsequently abandoned in 1952 when the prices of zinc and lead collapsed post war. Slave Lake Zinc Corp. believes that it is well positioned to advance this project and to expand significantly the historic potential of the property. For more information, please visit .

奴隶湖锌公司打算开发其位于加拿大西北地区的历史悠久的锌铅铜矿奥康纳湖的潜力。该地产位于大奴湖以南,Osisko Metals的Pine Point项目以东。该地产最初是在第二次世界大战后开发的,后来在1952年被遗弃,当时锌和铅的价格在战后暴跌。奴隶湖锌公司相信,它处于有利地位,可以推进这一项目,并显著扩大该地产的历史潜力。欲了解更多信息,请访问。

On Behalf of the Board of Directors,
Slave Lake Zinc Corp
.
Per:

我谨代表董事会:
奴隶湖锌公司
.
PER:

Ritch Wigham CEO & Director
Phone: 604-396-5762
Email: rwigham@zinccorp.ca

Ritch Wigham首席执行官兼董事
电话:604-396-5762
电子邮件:rwigham@zinccorp.ca

Neither the Canadian Securities Exchange nor its regulation services provider has reviewed or accepted responsibility for the adequacy or accuracy of the content of this news release

加拿大证券交易所及其监管服务提供商均未对本新闻稿内容的充分性或准确性进行审查或承担责任

Forward-Looking Statement

前瞻性陈述

Statements in this news release that are forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed here and elsewhere in both Slave Lake Zinc's periodic filings with Canadian securities regulators. When used in this news release, words such as "will", "plan", "estimate", "expect", "intend", "potential", "should," and similar expressions, are forward-looking statements. Information provided in this document is necessarily summarized and may not contain all available material information. Forward-looking statements include, without limitation, statements regarding the progress of a definitive offtake agreement, potential development and production at the Company's O'Connor Lake project, future oriented events and other statements that are not facts. Forward-looking statements are based on a few assumptions and estimates that, while considered reasonable by management based on the business and markets in which Slave Lake Zinc operates, are inherently subject to significant operational, economic and competitive uncertainties and contingencies. Such forward-looking statements should therefore be construed in light of such factors. Although Slave Lake Zinc has attempted to identify important factors that could cause actual results, performance or achievements to differ materially from those contained in the forward-looking statements, there can be other factors that cause results, performance or achievements not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate or that management's expectations or estimates of future developments, circumstances or results will materialize. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements in this news release are made as of the date of this news release, and Slave Lake Zinc disclaims any intention or obligation to update or revise such information, except as required by applicable law, and Slave Lake Zinc does not assume any liability for disclosure relating to any other company herein.

本新闻稿中的前瞻性陈述会受到各种风险和不确定因素的影响,这些风险和不确定性与Slave Lake Zinc在这里和其他地方向加拿大证券监管机构提交的定期文件中披露的具体因素有关。本新闻稿中使用的“将”、“计划”、“估计”、“期望”、“打算”、“潜在”、“应该”等词语以及类似的表述均为前瞻性陈述。本文档中提供的信息是必要的摘要,可能不包含所有可用材料信息。前瞻性陈述包括但不限于有关最终承购协议的进展、公司奥康纳湖项目的潜在开发和生产、面向未来的事件以及其他非事实的陈述。前瞻性表述基于一些假设和估计,虽然管理层基于Slave Lake Zinca运营的业务和市场认为这些假设和估计是合理的,但这些假设和估计本身就会受到重大运营、经济和竞争不确定性和或有事件的影响。因此,应根据这些因素来解读这种前瞻性陈述。尽管Slave Lake锌公司试图确定可能导致实际结果、业绩或成就与前瞻性陈述中包含的结果、业绩或成就大不相同的重要因素,但也可能有其他因素导致结果、业绩或成就与预期、估计或预期的结果、业绩或成就不符。不能保证这些信息将被证明是准确的,也不能保证管理层对未来发展、情况或结果的期望或估计将成为现实。因此,读者不应过分依赖前瞻性陈述。本新闻稿中的前瞻性陈述是截至本新闻稿发布之日作出的, 除适用法律要求外,Slave Lake Zinc不承担任何更新或修改此类信息的意图或义务,并且Slave Lake Zinc不承担任何与本协议中任何其他公司相关的披露责任。

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发