share_log

Recharge Resources Receives Road Construction Permit to Commence Drilling at Pocitos Lithium Salar

Recharge Resources Receives Road Construction Permit to Commence Drilling at Pocitos Lithium Salar

ReCharge Resources获得道路建设许可证,开始在Pocitos Lithium Salar钻探
GlobeNewswire ·  2022/06/29 09:05

VANCOUVER, British Columbia, June 29, 2022 (GLOBE NEWSWIRE) -- Recharge Resources Ltd. ("Recharge" or the "Company") (RR: CSE) (RECHF: OTC) (SL5: Frankfurt) is pleased to announce the company has received the road gravel permit for its "Pocitos 1" Lithium Brine project in Salta, Argentina. (See option agreement news dated March 23rd, 2022). The Pocitos community has been extremely helpful and signed a memorandum confirming our drilling program. The gravel permit Recharge required in order to mobilize a drilling rig was the last step to commence drilling the advanced stage Pocitos 1 project. Recharge is working closely with its in-country advisors on the single 450-meter production diameter well which will be positioned to confirm the continuity of lithium brines delineated during previous drill campaigns for the establishment of a NI 43-101 compliant resource.

温哥华,不列颠哥伦比亚省,2022年6月29日(环球通讯社)充值资源有限公司(“充值”或“公司”)(RR:CSE)(RECHF:OTC) (SL5:法兰克福)很高兴地宣布,该公司在阿根廷萨尔塔的“Pocitos 1”锂卤水项目已获得道路砾石许可证。(见3月23日的期权协议新闻研发,2022年)。Pocitos社区提供了极大的帮助,并签署了一份备忘录,确认了我们的钻探计划。动员钻机所需的砾石许可证补给是开始钻探高级阶段Pocitos 1项目的最后一步。ReCharge正在与其国内顾问密切合作,开发一口450米直径的生产井,该井将用于确认之前钻探活动中划定的锂卤水的连续性,以建立符合NI 43-101标准的资源。

Video of Pocitos drilling with estimated 75,000 litres per min flow rate (2018):

Pocitos钻探视频,估计流速为每分钟75,000升(2018):

CEO and director, David Greenway states, "We are moving forward quickly with our planned drilling at the Pocitos 1 lithium salar. As you can see from the video link above, and available on Youtube, the impressive flow rates were estimated upwards of 75,000 litres per min of lithium brine. With two existing dill holes in place, this new drilling will assist in establishing an NI 43-101 resource. We have benefitted greatly from an embedded geological team which has empowered us to truly hit the ground running, engage with the community and receive the appropriate permits to move the project forward."

董事首席执行官兼首席执行官大卫·格林威表示,我们正在迅速推进我们在Pocitos 1锂沙拉的钻探计划。正如你从上面的视频链接和YouTube上看到的那样,令人印象深刻的流速估计超过了每分钟75,000升锂盐水。随着两个现有的钻井孔就位,这个新的钻井将有助于建立一个NI 43-101资源。我们受益于一个嵌入的地质团队,它使我们能够真正开始工作,与社区接触,并获得适当的许可来推进该项目。“

A Media Snippet accompanying this announcement is available by clicking on the image or link below:

点击下面的图片或链接,即可获得此公告附带的媒体片段:

Fig 1 Orange triangle denotes the approximate drilling location

图1橙色三角形表示大致的钻井位置

About Pocitos 1 Lithium Brine Project

关于Pocitos 1锂卤水项目

The Pocitos Project is located approximately 10km from the township of Pocitos where there is gas, electricity, and telephone internet services. Pocitos I is approximately 800 hectares and is accessible by road. Previous exploration and development teams have spent over USD $1.5 million exploring the project, including surface sampling, trenching, TEM geophysics and drilling two 400m holes that had outstanding results. Locations for immediate follow up drilling have already been designed and identified for upcoming exploration.

Pocitos项目距离Pocitos镇约10公里,那里有天然气、电力和电话互联网服务。波西托斯一期占地约800公顷,可通过公路到达。之前的勘探和开发团队已经花费了超过150万美元来勘探该项目,包括地面采样、挖沟、瞬变电磁地球物理和钻探两个400米长的孔,取得了显著的效果。已经为即将到来的勘探设计和确定了立即进行后续钻探的地点。

Lithium values of up to 125 ppm from Laboratory analysis conducted by Alex Stewart were recorded by A.I.S. Resources Ltd during the project's first drill campaign in May 2018. AIS used a double packer in HQ Diamond drill holes drilled to a depth of 409 metres and the flow rate of the hole was estimated to exceed 75,000 Litres per minute and observed to continue for more than 5 hours. Both drill holes had exceptional brine flow rates. Recharge's plan is to sample or twin the current drill holes and drill a further two holes to work towards a NI 43-101 resource calculation.

在2018年5月该项目的第一次钻探活动中,A.I.S.Resources Ltd记录了Alex Stewart进行的实验室分析得出的高达125ppm的锂值。AIS在总部钻至409米深的钻石钻孔中使用了双封隔器,钻孔的流速估计超过每分钟75,000升,并观察到持续了5个多小时。这两个钻孔都有超乎寻常的盐水流速。ReCharge的计划是对当前的钻孔进行采样或成对钻孔,并再钻两个孔,以实现NI 43-101资源计算。

Qualified Person

有资格的人

Phillip Thomas, BSc Geol, MBusM, FAusIMM, MAIG, MAIMVA, (CMV), a Qualified Person as defined under NI 43-101 regulations, has reviewed the technical information that forms the basis for portions of this news release, and has approved the disclosure herein.

Phillip Thomas,BSC Geol,MBusM,FAusIMM,MAIG,MAIMVA,(CMV),根据NI 43-101法规定义的合格人员,已审查了构成本新闻稿部分基础的技术信息,并批准了本新闻稿的披露。

About Recharge Resources

关于充值资源

Recharge Resources is a Canadian mineral exploration company focused on exploring and developing the production of high-value battery metals to create green, renewable energy to meet the demands of the advancing electric vehicle and fuel cell vehicle market.

ReCharge Resources是一家加拿大矿产勘探公司,专注于探索和开发高价值电池金属的生产,以创造绿色、可再生能源,以满足不断发展的电动汽车和燃料电池汽车市场的需求。

On Behalf of the Board of Directors,

我谨代表董事会:

"David Greenway"

《大卫·格林威》

David Greenway, CEO

大卫·格林威,首席执行官

For further information, please contact:

如需更多信息,请联系:

Recharge Resources Ltd.
Mr. Joel Warawa
Phone: 778-588-5473
E-Mail: info@recharge-resources.com
Website: recharge-resources.com

充电资源有限公司。
Joel Warawa先生
电话:778-588-5473
电子邮件:邮箱:info@reCharge-resource ces.com
网址:ReCharge-resource ces.com

Neither the Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of this release.

加拿大证券交易所及其监管服务提供商(该术语在CSE的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

Disclaimer for Forward-Looking Information
Certain statements in this release are forward-looking statements, which reflect the expectations of management regarding Recharge's intention to continue to identify potential transactions and make certain corporate changes and applications. Forward looking statements consist of statements that are not purely historical, including any statements regarding beliefs, plans, expectations or intentions regarding the future. Such statements are subject to risks and uncertainties that may cause actual results, performance or developments to differ materially from those contained in the statements. No assurance can be given that any of the events anticipated by the forward-looking statements will occur or, if they do occur, what benefits Recharge will obtain from them. These forward-looking statements reflect managements' current views and are based on certain expectations, estimates and assumptions which may prove to be incorrect. A number of risks and uncertainties could cause actual results to differ materially from those expressed or implied by the forward-looking statements, including Recharge's results of exploration or review of properties that Recharge does acquire. These forward-looking statements are made as of the date of this news release and Recharge assumes no obligation to update these forward-looking statements, or to update the reasons why actual results differed from those projected in the forward-looking statements, except in accordance with applicable securities laws.

对前瞻性信息的免责声明
本新闻稿中的某些陈述是前瞻性陈述,反映了管理层对ReCharge公司继续识别潜在交易并进行某些公司变革和应用的期望。前瞻性陈述由非纯粹历史性的陈述组成,包括有关对未来的信念、计划、期望或意图的任何陈述。此类陈述会受到风险和不确定因素的影响,这些风险和不确定因素可能会导致实际结果、业绩或发展与陈述中包含的内容大不相同。不能保证前瞻性陈述中预期的任何事件都会发生,或者如果发生了,充值将从这些事件中获得什么好处。这些前瞻性陈述反映了管理层的当前观点,并基于某些预期、估计和假设,这些预期、估计和假设可能被证明是不正确的。许多风险和不确定因素可能导致实际结果与前瞻性陈述中明示或暗示的结果大相径庭,包括ReCharge公司对其确实收购的物业的勘探或审查结果。这些前瞻性陈述是在本新闻稿发布之日作出的,ReCharge没有义务更新这些前瞻性陈述,也没有义务更新实际结果与前瞻性陈述中预测的结果不同的原因,除非符合适用的证券法。


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发