Smooth Rock Drills 10.98 G/t Au Over 9.2 Meters at Palmetto
Smooth Rock Drills 10.98 G/t Au Over 9.2 Meters at Palmetto
Vancouver, British Columbia--(Newsfile Corp. - September 21, 2022) - Smooth Rock Ventures Corp. (TSXV: SMRV) (OTC Pink: SMRVF) ("Smooth Rock" or the "Company") is pleased to announce drill results from its initial 2022 reverse circulation (RC) drill program at the 100% owned Palmetto Gold project, located in Esmeralda County, Nevada, within the southern portion of the Walker Lane gold trend.
温哥华,不列颠哥伦比亚省-(Newsfile Corp.-2022年9月21日)-光滑石风险投资公司。(TSXV:SMRV)(场外粉色:SMRVF) ("光滑岩石“或”公司)很高兴地宣布了其最初的2022年反循环(RC)钻探项目的钻探结果,该项目位于内华达州埃斯梅拉达县,位于Walker Lane金矿趋势的南部,拥有100%的股权。
Drill hole SRV 22-09 returned 10.98 g/t Au over 9.2 meters, from a depth of 88.4 meters, including 18.87 g/t Au over 4.6 meters, from a depth of 89.9 meters.
SRV 22-09钻孔从88.4米的深度返回超过9.2米的10.98克/吨金,其中从89.9米的深度返回超过4.6米的18.87克/吨金。
Drilling confirmed gold mineralization at Palmetto. SRV 22-09 was drilled over 32 meters west northwest of hole SRV 21-01 (see news release 6/3/2021) which returned 31.4 g/t over 6.5 meters from a depth of 85.3 meters, demonstrating the continuity and flat lying nature of the gold mineralization.
钻探证实了棕榈树的金矿成矿作用。SRV 22-09是在SRV 21-01孔(见新闻稿6/3/2021)西北偏西32米处钻探的,该孔从85.3米的深度返回了6.5米以上的31.4克/吨,显示了金矿化的连续性和平坦的性质。
Assay Table: Summary of Drill Results:
化验表:演练结果摘要:
Hole |
From (m) |
To (m) |
Length* (m) |
Assay (Au g/t) |
SRV 22-09 | 88.4 | 97.6 | 9.2 | 10.98 |
Incl. | 89.9 | 94.5 | 4.6 | 18.87 |
SRV 22-05 | 181.4 | 187.5 | 6.1 | 1.1 |
孔洞 |
从… (m) |
至 (m) |
长度* (m) |
化验 (Au g/t) |
SRV 22-09 | 88.4 | 97.6 | 9.2 | 10.98 |
包括 | 89.9 | 94.5 | 4.6 | 18.87 |
SRV 22-05 | 181.4 | 187.5 | 6.1 | 1.1 |
*Widths are drill indicated sample length as insufficient drilling has been undertaken to determine true widths at this time.
*宽度是指钻头的样本长度,因为目前还没有进行足够的钻探来确定真正的宽度。
This initial 2022 RC drill program was hampered by drill rig breakdowns, extensive technical drilling issues with ground water, loose broken ground, and the inability of the drill crew to successfully mud any of the holes in order to reach the drill holes targeted depths. A total of seven holes were drilled, with none of the seven holes achieving their targeted depths, two of the seven holes drilled were abandoned before hitting bedrock. Subsequently, in lieu of the above, the Company ended the drill program early with only a total drilled footage of 2095 feet (638.5m) of a planned 5000-7500-foot drill program.
最初的2022年RC钻探计划受到以下因素的阻碍:钻机故障、广泛的地下水技术钻探问题、松散的破碎地面,以及钻井队无法成功地泥化任何孔以达到钻孔目标深度。总共钻了七个洞,七个洞都没有达到预定的深度,七个洞中的两个在击中基岩之前被放弃了。随后,取而代之的是,该公司提前结束了钻探计划,计划的5000-7500英尺钻探计划的总钻探进尺为2095英尺(638.5米)。
Though very difficult drill conditions were encountered in all of the holes drilled by the Company, resulting in poor to nonexistent recoveries, hole collapses, and so on, very significant gold mineralization was encountered in two holes, that did not even reach the intended target. It is notable that in SRV 22-09, the hole was abandoned at 99.1 meters, less than two meters below the gold intercept. Also, notable in hole SRV 22-05, having several intervals of low-grade mineralization throughout, ending in gold mineralization at the last sampled interval at a depth of 187.5 meters and subsequently abandoned due to poor drill hole conditions.
虽然本公司所钻探的所有钻孔都遇到非常困难的钻探条件,导致回收率很低或根本不存在、钻孔坍塌等情况,但有两个钻孔遇到了非常重要的金矿化,甚至没有达到预定的目标。值得注意的是,在SRV 22-09中,该洞被遗弃在99.1米处,低于黄金截获点不到两米。此外,值得注意的是,在SRV22-05号孔,始终有几个低品位矿化区间,在187.5米深的最后一个取样区间结束于金矿化,后来由于钻探条件不佳而被放弃。
The results, though partial in nature, clearly demonstrate the presence of significant gold mineralization at the Palmetto Project. Although very difficult drill conditions were encountered throughout the drill program, the Company has gained considerable experience in determining the proper drill methods to be employed at the Project going forward.
这些结果虽然不全面,但清楚地表明在棕榈树项目中存在显著的金矿化。尽管在整个钻探计划中遇到了非常困难的钻探条件,但公司在确定项目未来将采用的适当钻探方法方面获得了相当多的经验。
The Company is presently analyzing and sourcing a more appropriate type of drill rig and drill contractor and/or a combination there of, to drill at the Palmetto Project successfully and efficiently. The Company is planning a follow up drill program in later 2022 or early 2023, subject to drill contractor availability.
公司目前正在分析和寻找更合适类型的钻机和钻探承包商和/或它们的组合,以成功和高效地在Palmetto项目进行钻探。该公司计划在2022年晚些时候或2023年初进行后续钻探计划,具体取决于钻探承包商的可用性。
Sampling Methodology, Chain of Custody, Quality Control and Quality Assurance
抽样方法、监管链、质量控制和质量保证
All sampling was conducted under the supervision of the Company's project geologists and the chain of custody from the drill to the sample preparation facility was continuously monitored. A blank or certified reference material was inserted approximately every tenth sample. The Palmetto samples were delivered to American Assays Laboratories' certified laboratory facilities in Sparks, NV. The samples were crushed, pulverized and the sample pulps digested and analyzed for gold using fire assay fusion and a 50g gravimetric finish. Intensely altered samples used a 2 kg pulp screened to 100 microns. Duplicate assay on screen undersize. Assay of entire oversize fraction.
所有采样都是在公司项目地质学家的监督下进行的,从钻探到样品制备设施的保管链受到持续监测。大约每十个样品中就会插入一份空白或认证的标准物质。棕榈树样本被送往位于内华达州斯帕克斯的美国分析实验室的认证实验室设施。样品被粉碎、粉碎,样品纸浆被消化,并使用火试熔法和50g重量法完成金的分析。强烈改变的样本使用了2公斤的纸浆,筛分到100微米。屏幕上重复的化验结果尺寸较小。整个超大体积分数的测定。
The scientific and technical content and interpretations contained in this news release have been reviewed, verified and approved by E. Gauthier, geol., Eng (OIQ) an independent Qualified Person as defined by NI 43-101, Standards of Disclosure for Mineral Projects.
本新闻稿中包含的科学技术内容和解释已由E.Gauier,Geol.,Eng(OIQ)审查、核实和批准,OIQ是NI 43-101《矿产项目披露标准》定义的独立合格人员。
About Smooth Rock and the Palmetto Project.
关于光滑石和棕榈树计划。
Smooth Rock Ventures Corp. is a mineral development company focused on high-grade gold past producing regions in the Americas that have seen limited modern exploration and host the potential for significant discoveries. The Company's flagship project is the 100% owned Palmetto Gold Project consisting of 116 unpatented mining claims in Esmerelda County, Nevada. The Palmetto Gold Project hosts a current NI 43-101 compliant Inferred resource, having had significant exploration work completed to date by numerous companies including, Newmont Gold, Phelps Dodge Corp, Romarco Minerals, and most recently by ML Gold Corp. The initial "Discovery Hole" in 1988, was drilled by Phelps Dodge and bonanza gold-silver veins were subsequently drilled by Romarco Minerals in 1997-2002.
Smooth Rock Ventures Corp.是一家矿产开发公司,专注于高品位黄金过去在美洲的产区,这些地区的现代勘探有限,拥有重大发现的潜力。该公司的旗舰项目是内华达州埃斯梅莱达县拥有100%所有权的棕榈树黄金项目,其中包括116个未获专利的采矿权。Palmetto Gold Project拥有目前符合NI 43-101标准的推断资源,迄今已有多家公司完成了重大勘探工作,其中包括Newmont Gold、菲尔普斯·道奇公司、Romarco Minerals,最近的公司是ML Gold Corp.。1988年,菲尔普斯·道奇钻探了最初的“发现洞”,Romarco Minerals于1997-2002年钻探了丰富的金银矿脉。
ON BEHALF OF THE BOARD
我代表董事会
"Christos Doulis"
《克里斯托斯·多利斯》
________________________
________________________
Christos Doulis
克里斯托斯·多利斯
Chief Executive Officer and Director
董事首席执行官兼首席执行官
FOR FURTHER INFORMATION PLEASE CONTACT: Smooth Rock Ventures Corp.
(TEL) - (647) 924-1083, (FAX) - (888) 909-1033
Email: info@smoothrockventures.com Website:
欲了解更多信息,请联系:Smooth Rock Ventures Corp.
(电话)-(647)924-1083,(传真)-(888)909-1033
电子邮件:电子邮箱:info.com.com.cn网站:
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
多伦多证券交易所创业板交易所及其监管服务提供商(该术语在多伦多证券交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。
To view the source version of this press release, please visit
要查看本新闻稿的源版本,请访问