share_log

Satori Reports 8.74 G/t Gold Over 2.0 Metres From Fall Drilling Campaign

Satori Reports 8.74 G/t Gold Over 2.0 Metres From Fall Drilling Campaign

Satori报告秋季钻探活动超过2.0米后8.74克/吨黄金
newsfile ·  2022/11/28 09:25

Toronto, Ontario--(Newsfile Corp. - November 28, 2022) - Satori Resources Inc. (TSXV: BUD) ("Satori" or the "Company") is pleased to announce the latest drill results from the fall exploration drilling program at the 100%-owned Tartan Lake deposit near Flin Flon, Manitoba. This program focused on near surface extensions of the Main Zone and South Zone mineralization.

安大略省多伦多-(Newsfile Corp.-2022年11月28日)-萨托里资源公司。(TSXV:BUD)(《萨托里》“公司”)很高兴地宣布了马尼托巴省弗林弗隆附近100%拥有的Tartan Lake矿藏秋季勘探钻探项目的最新钻探结果。该方案侧重于主带和南带矿化的近地表延伸。

TLSZ22-24 and TLSZ22-25 were drilled in the South Zone and bracketed hole TLSZ21-05 which intersected 9.59 g/t Au over 11.75 metres. TLSZ22-25, targeting 25 metres to the east of TLSZ21-05, intersected 4.33 g/t Au over 7.0 metres and included 8.74 g/t Au over 2.0 metres. TLSZ22-24 targeted the South Zone 25 metres to the west of TLSZ21-05, intersecting a narrow zone of veining that assayed 1.99 g/t Au over a 2.5 metre interval.

TLSZ22-24和TLSZ22-25是在南区和TLSZ21-05支架孔钻进的,TLSZ21-05孔与9.59g/t Au相交,超过11.75米。TLSZ22-25,目标在TLSZ21-05以东25米处,相交7.0m以上为4.33g/t Au,2.0米以上为8.74g/t Au。TLSZ22-24的目标是TLSZ21-05以西25米处的南区,与一条狭窄的脉状区相交,该脉状区在2.5米的间隔内测定了1.99克/吨的金。

TLMZ22-23 targeted a gap in the Main Zone drill coverage near surface, intersecting a broad zone of shearing with quartz-carbonate veining that assayed 1.43 g/t Au over 13.0 metres including 4.68 g/t over 3.0 metres.

TLMZ22-23瞄准了主区钻探覆盖范围近地表的一个缺口,与广泛的剪切带和石英脉相交,在13.0米范围内检测到1.43克/吨金,其中在3.0米范围内检测到4.68克/吨金。

All holes intersected typical quartz-carbonate-tourmaline veining, and Table 1.0 summarizes the drill results from each of the 3 holes drilled.

所有的孔都与典型的石英-碳酸盐-电气石矿脉相交,表1.0总结了3个孔的钻探结果。

Jennifer Boyle, Chief Executive Officer, states that "The results continue to demonstrate the excellent discovery potential at Tartan Lake. Drilling at the South Zone continues to suggest potential to increase the mineral resources at both the South Zone, near surface, as well as the Main Zone at depth. These results, from a modest drill program, demonstrate continuity of mineralization both at Main Zone and South Zone. It also validates the considerable upside exploration potential both within the deposit area (Main Zone and South Zone), and in the surrounding under-explored property, including the newly identified large IP conductor NE of Main Zone."

首席执行官詹妮弗·博伊尔表示,结果继续显示了塔尔坦湖极好的发现潜力。南区的钻探继续表明南区、近地表和深部主区的矿产资源都有增加的潜力。这些适度的钻探计划的结果表明,主区和南区的矿化都是连续的。这也证实了矿区内(主区和南区)以及周围未被勘探的财产,包括新发现的主区大激电导体NE的可观的上行勘探潜力。

Table 1.0 - Significant Results -

表1.0--重要成果-

Hole ID   From (m) To (m) Interval (m)(1) Au (g/t)
TLMZ22-23   423.00 436.00 13.00 1.43
Including   423.00 426.00 3.00 4.68
TLSZ22-24   199.50 202.00 2.50 1.99
TLSZ22-25   174.00 181.00 7.00 4.33
  Including 179.00 181.00 2.00 8.74
孔ID 发件人(M) 至(M) 间隔(M)(1) Au(克/吨)
TLMZ22-23 423.00 436.00 13.00 1.43
包括 423.00 426.00 3.00 4.68
TLSZ22-24 199.50 202.00 2.50 1.99
TLSZ22-25 174.00 181.00 7.00 4.33
包括 179.00 181.00 2.00 8.74


(1)
Interval is measured down hole and does not reflect true width.


(1)
井距是井下测量的,并不反映真实宽度。

There is insufficient information to estimate true width at this time.

目前没有足够的信息来估计真正的宽度。

Wes Hanson P.Geo., Director of Satori, is the qualified person who has reviewed and approved the contents of this press release.

董事的Wes Hanson P.Geo是审阅和批准本新闻稿内容的合格人员。

ABOUT SATORI RESOURCES INC. (TSXV: BUD)

关于Satori Resources Inc.(TSXV:BUD)

Satori is a Toronto-based mineral exploration and development company whose primary property is expanding the resource at the past producing Tartan Lake Gold Mine Project, located in the prolific Flin Flon Greenstone Belt, Manitoba.

Satori是一家总部位于多伦多的矿产勘探和开发公司,其主要资产是扩大过去生产塔尔坦湖金矿项目的资源,该项目位于马尼托巴省多产的Flin Flon Greenstone带。

The Tartan Lake Project (2,670 Ha.) is located approximately 12 kilometres northeast of Flin Flon, Manitoba, and includes the Tartan Lake Mine (1986-1989) which produced 36,000 ounces of gold before the mine was shut down due to, in part, the price of gold falling below USD$390. Remaining infrastructure includes: an indicated resource estimate of 240,000 ounces averaging 6.32 g/t Au (see news release February 23, 2017), an all-season access road, grid connected power supply, mill, mechanical, warehouse and office buildings, tailing impoundment and a 2,100 metre decline and developed underground mining galleries to a depth of 300 metres from surface. Gold mineralization is associated with anastomosing quartz-carbonate veins hosted in east-west striking, steeply dipping shear zones up to 30 metres in width. The veins vary from several centimetres to several metres in width and gold grades vary from 1.0 to +100 g/t. Satori believes the mineral resources of the project are currently limited by drill coverage.

塔尔坦湖项目(2670公顷)位于马尼托巴省Flin Flon东北约12公里处,包括Tartan Lake矿(1986-1989年),该矿在关闭之前生产了36,000盎司黄金,部分原因是金价跌破390美元。剩余的基础设施包括:指示资源量估计为240,000盎司,平均为6.32克/吨Au(见2017年2月23日新闻稿),一条全季通路,并网供电、工厂、机械、仓库和办公楼,尾矿库和下坡处2,100米,并开发地下采矿走廊至地表300米深。金矿化与赋存于东西走向的陡峭剪切带中的网状石英-碳酸盐矿脉有关,剪切带宽度可达30米。矿脉的宽度从几厘米到几米不等,黄金品位从1.0克/吨到+100克/吨不等。Satori认为,该项目的矿产资源目前受到钻探覆盖范围的限制。

FOR FURTHER INFORMATION, PLEASE CONTACT:

欲了解更多信息,请联系:

Jennifer Boyle, B.A., LL.B.
President and Chief Executive Officer
Satori Resources Inc.
(416) 904-2714
jennifer@capexgroupinc.com

詹妮弗·博伊尔,B.A.,LL.B.
总裁与首席执行官
萨托里资源公司。
(416) 904-2714
邮箱:jennifer@capexgroupinc.com

Mr. Pete Shippen
Chair, Satori Resources Inc.
(416) 930-7711
pjs@extramedium.ca

皮特·希彭先生
主席,Satori Resources Inc.
(416) 930-7711
邮箱:pjs@exmedium.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所创业板交易所及其监管服务提供商(该术语在多伦多证券交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

CAUTION REGARDING FORWARD-LOOKING INFORMATION

有关前瞻性信息的警告

This news release of Satori contains statements that constitute "forward-looking statements." Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause Satori's actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements.

Satori公司的这篇新闻稿包含了构成“前瞻性陈述”的陈述。此类前瞻性陈述涉及已知和未知的风险、不确定性和其他因素,可能导致Satori的实际结果、业绩或成就或行业发展与此类前瞻性陈述明示或暗示的预期结果、业绩或成就大不相同。

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发