share_log

ION Energy Announces Impressive Results at Urgakh Naran

ION Energy Announces Impressive Results at Urgakh Naran

ION Energy 在 Urgakh Naran 宣布业绩令人印象
newsfile ·  2022/12/07 09:00

Toronto, Ontario--(Newsfile Corp. - December 7, 2022) - ION Energy Limited (TSXV: ION) (OTCQB: IONGF) (FSE: 5YB) ("ION" or the "Company"), Mongolia's first lithium brine explorer and developer, is very pleased to share drilling results and an update on exploration at the Urgakh Naran Lithium Project in Mongolia.

安大略省多伦多-(Newsfile Corp.-2022年12月7日)-ION Energy Limited(多伦多证券交易所股票代码:IONGF)(多伦多证券交易所股票代码:5YB)(“离子“或”公司),蒙古第一家锂卤水勘探商和开发商,非常高兴地分享钻探结果和蒙古Urgakh Naran锂项目的最新勘探情况。

Highlights:

重点:

  • Successfully completed the drilling of three lithological diamond core drill holes for a total depth of 954m
  •  Notable two metre drill core results include:
    • UNDH-01: 123m at 278ppm lithium from 122m, with maximum lithium reported at 832ppm over 2m;
    • UNDH-02: 100m at 362ppm lithium from 65m, with maximum lithium at 601ppm over 2m; and
    • UNDH-03: 71.4m at 360ppm lithium from 3.6m with maximum lithium at 911ppm over 2m.
  • Completed drilling of two hydrological test wells for testing of basin brines. The third test well is currently being completed
  • 顺利完成总深度954米的3个岩性金刚石岩心钻孔
  • 值得注意的两米钻芯成果包括:
    • 联合国开发计划署-01:123m,锂含量278ppm,高于122m,最大锂含量为832ppm,超过2m;
    • Undh-02:100m,锂含量362ppm,65米,最大锂含量601ppm,超过2m;以及
    • 联合国开发计划署-03:71.4m,360ppm锂,高于3.6m,最大锂超过2m,911ppm。
  • 完成了两口水文测试井的钻探,以测试盆地卤水。第三口测试井目前正在完工。

"The Company is extremely pleased with the drilling results obtained from the recently completed exploration diamond core drilling program. Results have indicated a lithium pregnant basin with significant potential for insitu brine at relatively shallow depths. The Company is now completing its third hydrological test well with brine sampling to commence across all three wells in the coming months. The Urgakh Naran Basin is over 17,000 ha in size and is showing the potential to host significant brine accumulations in close proximity to the national electric grid and critical development infrastructure," said Ali Haji, CEO & Director of ION Energy. "With the world experiencing notable supply constraints in much-needed lithium resources, ION Energy continues to move quickly to help address this global issue."

“本公司对最近完成的钻探钻石岩心钻探计划取得的钻探结果感到非常满意。结果表明,一个含锂盆地在相对较浅的深度具有巨大的原地卤水潜力。本公司目前正在完成第三口水文测试井,并将在未来几个月开始对所有三口井进行卤水采样。乌尔加克纳兰盆地面积超过17,000公顷,在靠近国家电网和关键开发基础设施的地方显示出蕴藏大量卤水的潜力。”离子能源首席执行官兼董事首席执行官Ali·阿吉表示。“随着世界面临急需的锂资源的显著供应限制,ION Energy继续迅速采取行动,帮助解决这一全球问题."

Figure 1: Drill location map at the Urgakh Naran Lithium Project, Mongolia.

图1:蒙古Urgakh Naran锂项目钻探位置图。

Figure 2. UNDH-01 Lithium Results, Urgakh Naran, Mongolia.

图2.联合国开发计划署-01锂结果,蒙古乌尔嘎克·那兰。

Figure 3. UNDH-02 Lithium Results, Urgakh Naran, Mongolia.

图3.联合国开发计划署-02锂结果,蒙古乌尔嘎克·那兰。

Figure 4. UNDH-03 Lithium Results, Urgakh Naran, Mongolia.

图4.联合国开发计划署-03锂的结果,蒙古乌尔嘎克·那兰。

Figure 5. UNDH-03, Urgakh Naran, Dorngovi, Mongolia.

图5.联合国发展与发展组织-03,蒙古多恩戈维乌尔加克纳兰。

Figure 6. UNWH-03 Drilling, Urgakh Naran, Mongolia.

图6.UNWH-03钻探,蒙古乌尔嘎克·纳兰。

All technical information disclosed in this press release has been reviewed and approved by Khurelbaatar Lamzav, P.Geo., an independent consultant to the Company and a "Qualified Person" under National Instrument 43-101.

本新闻稿中披露的所有技术信息都经过了KhurelbatalLamzav,P.Geo的审查和批准,他是公司的独立顾问,也是National Instrument 43-101规定的“合格人员”。

About ION Energy Ltd.

关于ION Energy Ltd.

ION Energy Ltd. (TSXV: ION) (OTCQB: IONGF) (FSE: 5YB) is committed to exploring and developing Mongolia's lithium salars. ION's flagship, 81,000+ hectare Baavhai Uul lithium brine project, represents the largest and first lithium brine exploration licence award in Mongolia. ION also holds the 29,000+ hectare Urgakh Naran highly prospective Lithium Brine licence in Dorngovi Province in Mongolia. ION is well-poised to be a key player in the clean energy revolution, positioned well to service the world's increased demand for lithium. Information about the Company is available on its website, , or under its profile on SEDAR at .

ION Energy Ltd.(多伦多证券交易所股票代码:ION)(OTCQB:IONGF)(多伦多证券交易所股票代码:5YB)致力于勘探和开发蒙古的锂沙拉。ION的旗舰项目Baavhai Uul锂卤水项目占地81,000多公顷,是蒙古最大也是第一个锂卤水勘探许可证获得者。ION还持有蒙古多恩戈维省29,000多公顷的Urgakh Naran极具前景的锂卤水许可证。ION已做好充分准备,将成为清洁能源革命的关键参与者,很好地满足世界对锂日益增长的需求。有关该公司的信息可在其网站上获取,或在SEDAR上的简介下获取,网址为。

For further information:

有关更多信息,请访问:

COMPANY CONTACT: Ali Haji, ali@ionenergy.ca, 647-871-4571

公司联系人:Ali·阿吉电子邮件:Ali

MEDIA CONTACT: Siloni Waraich, siloni@ionenergy.ca, 416-432-4920

媒体联系人:Siloni Waraich,siloni@ion energy.ca,416-432-4920

Cautionary Note Regarding Forward-Looking Information

关于前瞻性信息的注意事项

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

多伦多证券交易所创业板交易所及其监管服务提供商(该术语在多伦多证券交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

Information set forth in this news release contains forward-looking statements. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company's objectives, goals or future plans, statements, potential mineralization, exploration and development results, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Important factors that could cause actual results to differ materially from ION Energy's expectations include, among others, uncertainties relating to availability and costs of financing needed in the future, changes in equity markets, risks related to international operations, the actual results of current exploration activities, delays in the development of projects, conclusions of economic evaluations and changes in project parameters as plans continue to be refined as well as future prices of lithium, and ability to predict or counteract potential impact of COVID-19 coronavirus on factors relevant to the Company's business. There can be no assurance that forward-looking statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

本新闻稿中的信息包含前瞻性陈述。前瞻性陈述包括描述公司未来计划、目标或目标的估计和陈述,包括公司或管理层预期将出现的情况或结果的表述。前瞻性陈述可以用“相信”、“预期”、“预期”、“估计”、“可能”、“将”或“计划”等术语来识别。由于前瞻性陈述以假设为基础,涉及未来的事件和情况,因此它们本身就具有内在的风险和不确定性。虽然这些陈述是基于公司目前掌握的信息,但公司不能保证实际结果将符合管理层的期望。前瞻性信息涉及的风险、不确定性和其他因素可能导致实际事件、结果、业绩、前景和机会与此类前瞻性信息明示或暗示的情况大不相同。本新闻稿中的前瞻性信息包括但不限于公司的目标、目标或未来计划、声明、潜在矿化、勘探和开发结果、对矿产资源的估计、勘探和矿山开发计划、开始运营的时间和对市场状况的估计。可能导致实际结果与ION Energy的预期大不相同的重要因素包括,除其他外,与未来所需融资的可获得性和成本有关的不确定性、股票市场的变化、与国际运营有关的风险、当前勘探活动的实际结果、项目开发的延迟、经济评估的结论、随着计划的不断完善而发生的项目参数变化,以及未来的锂价格。, 以及预测或应对新冠肺炎冠状病毒对与公司业务相关的因素的潜在影响的能力。不能保证前瞻性陈述将被证明是准确的,实际结果和未来事件可能与此类陈述中预期的大不相同。因此,读者不应过分依赖前瞻性陈述。

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发