share_log

Sarama Resources – Drilling Highlights Growth Potential at Sanutura Project

Sarama Resources – Drilling Highlights Growth Potential at Sanutura Project

萨拉玛资源——钻探凸显了Sanutura项目的增长潜力
Accesswire ·  2022/12/13 19:18

Early-Stage Targets at Kenobi and Djimbake Prospects Deliver Promising Results

Kenobi和Djimbake的早期目标前景令人振奋

PERTH, AUSTRALIA and VANCOUVER, BC / ACCESSWIRE / December 13, 2022 / Sarama Resources Ltd. (" Sarama " or the " Company ") (ASX:SRR, TSX-V:SWA) is pleased to announce that exploration drilling at its 100%-owned (4) , multi-million-ounce Sanutura Project (the " Project ") has returned several encouraging near-surface intersections of new mineralisation in the south of the Tankoro Mineralised Corridor.

澳大利亚珀斯和不列颠哥伦比亚省温哥华/ACCESSWIRE/2022年12月13日/沙拉玛资源有限公司(“萨拉玛“或”公司)(澳大利亚证券交易所股票代码:SRR,多伦多证券交易所股票代码:SWA)高兴地宣布,其100%拥有的勘探钻探 (4) , 数百万盎司萨努图拉项目(“项目“)返回了几个鼓励新矿化的近地表交汇在坦科罗矿化走廊的南部。

The reported drilling totals 2,900m and was primarily focussed on testing for new mineralisation in lightly-drilled areas of the Kenobi, Djimbake and Obi Prospects. The results represent the sixth discovery of additional/extensional mineralisation since the commencement of the ongoing +50,000m drill program and continue to demonstrate the strong potential to grow the oxide component of the Project's 0.6Moz Au (Indicated) plus 2.3Moz Au (Inferred) (1) mining shape constrained Mineral Resource.

据报道,钻探总长度为2900米,主要集中在测试新矿化在科诺比、吉姆贝克和欧比地区钻探较少的地区。这些结果代表着自正在进行的+50,000米钻探计划开始以来第六次发现额外/伸展矿化,并继续显示出该项目氧化物成分的强大潜力0.6Moz Au(注明)加2.3 Moz Au(推断) (1)采矿形态受限的矿产资源。

Highlights

亮点

  • New, near-surface mineralisation intersected in the south of the Tankoro Mineralised Corridor
  • Highlighted downhole intersections from new assays include:
    • 5m @ 7.05g/t Au (incl 1m @ 25.60g/t Au) from 9m in TAA173;
    • 22m @ 1.52g/t Au from 22m in TAA278;
    • 10m @ 1.33g/t Au from 23m in TAR059;
    • 14m @ 1.20g/t Au from 10m in TAA178;
    • 6m @ 1.90g/t Au from 15m in TAA171; and
    • 6m @ 1.49g/t Au from 7m in TAA141.
  • Intersections of new mineralisation are in shallow, oxide material with high potential to add to the oxide and transition component of the Mineral Resource, currently standing at 0.2Moz Au (Indicated) plus 0.8Moz Au (Inferred) (2)
  • New mineralisation is outside the existing Mineral Resource and show clear potential to expand its footprint
  • Further results to be released in due course
  • Follow-up drilling, including greenfields exploration drilling, expected to commence in 2023
  • 新的近地表矿化在坦科罗矿化走廊南部相交
  • 来自新化验的重点井下交叉点包括:
    • 5M@7.05克/吨Au(含1M@25.60克/吨Au) 从TAA173的9米;
    • 22米@1.52g/吨Au从TAA278的22m;
    • 10M@1.33克/吨Au从TAR059的23M;
    • 14M@1.20克/吨Au从TAA178的10M;
    • 6M@1.90克/吨Au由TAA171的15M;及
    • 6M@1.49克/吨Au从TAA141的700万。
  • 的交叉点新矿化在浅的氧化物材料中具有很高的潜力添加到矿产资源的氧化物和过渡成分,目前处于0.2 Moz Au(注明)加0.8Moz Au(推断) (2)
  • 新矿化外面这个现有矿产资源和秀场清除势能扩展它的足迹
  • 进一步结果将在适当时候公布
  • 后续钻探,包括绿地勘探钻探,预计于2023年开始

Sarama's President, CEO & MD, Andrew Dinning commented:

萨拉玛首席执行官兼医学博士总裁评论道:

"These most recent drill results continue to support our view that significant potential remains to make new discoveries outside the existing Mineral Resource in the Tankoro Mineralised Corridor, which stretches over 16km in length and is up to 1.7km in width. Previously released results align with this theme, as do the strong grades and widths of mineralisation in near-surface oxide material, which together clearly show the potential for growth in the footprint and size of the Mineral Resource. We now have a number of exciting new areas to follow up and incorporate into the Mineral Resource which we plan to update after the completion and follow up of the current +50,000m drill program."

这些最新的钻探结果继续支持我们的观点,即在Tankoro矿化走廊现有矿产资源之外仍有巨大的潜力进行新发现,该走廊长16公里,宽1.7公里。之前公布的结果与这一主题相一致,近地表氧化物材料的强烈矿化品位和矿化宽度也符合这一主题,这些结果清楚地显示了矿产资源足迹和规模的增长潜力。我们现在有许多令人兴奋的新领域需要跟进,并纳入矿产资源,我们计划在当前+50,000米钻探计划完成和后续行动后对其进行更新。

Figure 1 - Tankoro Deposit Location Plan - Exploration Success in Southern Areas

图1-Tankoro矿藏定位图-南部地区的勘探成功

A Growth-Oriented Drill Program in Oxide Material

一种面向生长的氧化物材料钻削程序

Drilling Highlights Potential for Expansion of Mineral Resource Footprint

钻探突出了扩大矿产资源足迹的潜力

Results are being reported (refer Appendix A) for approximately 1,500m (30 holes) of aircore (" AC ") and 1,400m (17 holes) reverse-circulation (" RC ") drilling undertaken in Q2/Q3 2022 at the Kenobi, Djimbake and Obi Prospects in the southern extent of the Tankoro Mineralised Corridor (refer Figures 1 & 2). The drilling targeted the near-surface oxide horizon to a vertical depth of approximately 50m and highlighted downhole intersections from these holes include:

正在报告大约1500米(30个孔)的气芯的结果(请参阅附录A)。交流电“)和1,400米(17孔)反循环(”RC“)2022年第二季度/第三季度在Tankoro矿化走廊南部的Kenobi、Djimbake和Obi远景进行的钻探(参见图1和图2)。钻探的目标是近地表氧化层,垂直深度约为50米,突出这些孔的井下交叉点包括:

  • 5m @ 7.05g/t Au (incl. 1m @25.60g/t Au) from 9m in TAA173;
  • 22m @ 1.52g/t Au from 22m in TAA278;
  • 10m @ 1.33g/t Au from 23m in TAR059;
  • 14m @ 1.20g/t Au from 10m in TAA178;
  • 6m @ 1.90g/t Au from 15m in TAA171; and
  • 6m @ 1.49g/t Au from 7m in TAA141.
  • 5M@7.05克/吨Au(包括1M@25.60g/t Au);
  • 22米@1.52g/吨Au从TAA278的22m;
  • 10M@1.33克/吨Au从TAR059的23M;
  • 14M@1.20克/吨Au从TAA178的10M;
  • 6M@1.90克/吨Au由TAA171的15M;及
  • 6M@1.49克/吨Au从TAA141的700万。

Figure 2 - Plan of Drilling in Southern Extremity of Tankoro Mineralised Corridor

图2-Tankoro矿化走廊南端钻探平面图

The drilling investigated various areas within the Tankoro Mineralised Corridor where previous reconnaissance drilling, which targeted gold-in-soil anomalism, had intersected numerous discrete zones of mineralisation within a broad 1.7km-wide gold-bearing trend. Fence spacing in the area typically remains widely spaced, particularly in the eastern side of the trend where it is frequently 200-300m and up to 500m. This reflects the early-stage of the area which is generally outside the footprint of the Project's current Mineral Resource. The quality of the recent results highlights the likelihood that the Mineral Resource will be expanded into the region with further drilling.

此次钻探调查了Tankoro矿化走廊内的多个地区,此前针对土壤中黄金异常的勘测钻探曾在1.7公里宽的宽阔含金趋势内穿过多个离散的矿化带。该地区的栅栏间距通常仍然很大,特别是在趋势的东侧,那里的栅栏间距往往在200米至300米之间,最高可达500米。这反映了该地区的早期阶段,一般不在该项目目前矿产资源的足迹范围之外。近期结果的质量突出表明,随着进一步钻探,矿产资源将扩展到该地区的可能性。

Kenobi Prospect

克诺比前景展望

A portion of the recent drilling targeted the eastern side of the Tankoro Mineralised Corridor where potential exists to extend modelled lodes and to pursue targets generated by previous early-stage reconnaissance drilling within the Kenobi Prospect (refer Figures 1 & 2).

最近钻探的一部分目标是Tankoro矿化走廊东侧,那里有可能扩展模拟矿脉,并追查先前早期侦察钻探在Tankoro矿化走廊内产生的目标克诺比前景展望(请参阅图1和图2)。

Figure 3 illustrates an isolated drill fence, located approximately 300m south of the furthest drilling that informs the current Mineral Resource (also refer T1 in Figure 2). The recent drilling on this fence returned encouraging near-surface downhole intersections of 5m @ 7.05g/t Au (incl. 1m @ 25.60g/t Au) and 6m @ 1.90g/t Au which add to significant historical intersections including 10m @ 1.73g/t Au , 6m @ 1.11g/t Au and 4m @ 1.46g/t Au . Together, the results support the interpretation of 5 steeply-dipping mineralised lodes hosted within oxide material and extending to a vertical depth of approximately 60m where the mineralisation remains open. The closely-spaced nature of the lodes is expected to result in a locally attractive strip ratio which has the potential to enhance economics in any mine development scenario. Further drilling is planned to the immediate north and south of this fence to build out the interpretation for incorporation into an updated Mineral Resource estimate.

图3显示了一个孤立的钻探围栏,位于通知当前矿产资源的最远钻探以南约300米处(另请参阅图2中的T1)。最近在这一围栏上的钻探取得了令人鼓舞的成果,即近地表井下交汇处5M@7.05克/吨Au(包括1M@25.60克/吨Au)和6M@1.90克/吨Au它们增加了重要的历史交叉点,包括10M@1.73g/t Au , 6M@1.11克/吨Au4M@1.46克/吨Au。综上所述,结果支持对赋存于氧化物中的5个急倾斜矿化矿化矿脉的解释,这些矿化矿化延伸至垂直深度约60米,矿化保持开放。矿脉的紧密间隔性质预计将导致在当地具有吸引力的条带比,这有可能在任何矿山开发方案中提高经济效益。计划在该围栏的正北和南边进一步钻探,以便将解释纳入最新的矿产资源估算。

Figure 3 - Encouraging Results at Kenobi Prospect Set to Expand Mineral Resource (Section A-A')

图3-Kenobi Prospects将扩大矿产资源的令人鼓舞的结果(A-A‘部分)

Recent drilling also broadly targeted the southern extent of current Mineral Resource footprint where potential exists to extend selected modelled lodes to the south into a drill gap that extends approximately 480m along strike and 140m across (refer area T2 in Figure 2 and Figure 4). Mineralisation in the area is interpreted primarily as a package of steeply dipping lodes with kilometre-scale strike continuity to the north-north-east. A flat-lying, easterly dipping lode is interposed between the sub-vertical lodes, reminiscent of the lode geometries in the higher-grade sections of the Obi Prospect which delivered significant extensional exploration success in recent times (refer news release 9 August 2022).

最近的钻探还广泛地瞄准了当前矿产资源足迹的南部范围,那里有可能将选定的模拟矿脉向南扩展到沿走向延伸约480米、跨度约140米的钻孔间隙(参见图2和图4中的区域T2)。该地区的矿化主要被解释为一系列陡峭的矿脉,走向东北至东北方向具有千米级的走向连续性。一条向东倾斜的平坦矿脉夹在次垂直矿脉之间,令人想起Obi Prospects较高品位区段的矿脉几何形状,该矿段在最近取得了重大的伸展勘探成功(参见2022年8月9日的新闻稿)。

Encouraging downhole intersections of 14m @ 1.20g/t Au , 10m @ 1.33g/t Au and 6m @ 1.30g/t Au were returned in recent assay results, supporting strike extensions to several mineralised lodes into the drill gap. Historical downhole intersections of 13m @ 1.53g/t Au , 9m @ 2.27g/t Au and 14m @ 1.34g/t Au located within modelled lodes on the margin of the target area reinforce the potential for expansion of the Mineral Resource footprint into this area with further drilling.

鼓励井下交叉口14M@1.20克/吨Au , 10M@1.33克/吨Au6M@1.30克/吨Au在最近的化验结果中返回,支持走向延伸到钻探缝隙中的几个矿化矿脉。历史上的井下交汇处13M@1.53克/吨Au , 9M@2.27克/吨Au14M@1.34克/吨Au位于目标区边缘的模拟矿脉内,加强了通过进一步钻探将矿产资源足迹扩展到该地区的潜力。

Figure 4 - 3D View to North of Drill Gap at Kenobi Prospect with Clear Potential for Mineral Resource Expansion

图4--克诺比矿区钻探缺口以北的三维视图,具有明显的矿产资源扩张潜力

Djimbake Prospect

吉姆巴克前景展望

Recent drilling has also enhanced the potential of the Djimbake Prospect with encouraging downhole intersections of 22m @ 1.52g/t Au and 8m @ 1.00g/t Au (ending in mineralisation) being returned from the southern margin of the Mineral Resource (refer area T3 in Figure 2 and Figure 5).

最近的钻探也增强了吉姆巴克矿藏的潜力,鼓励井下交叉口22米@1.52g/吨Au8M@1.00g/t Au(以矿化结束)从矿产资源的南缘返回(参见图2和图5中的区域T3)。

These intersections add to historical downhole intersections in the immediate area of 29m @ 1.05g/t Au , 8m @ 1.86g/t Au , 6m @ 1.40g/t Au , pointing towards a local strengthening of grade and confirmation of an associated thickening of the mineralised lodes which together illustrate strong potential for the expansion of the current Mineral Resource footprint to the south and down-dip. The intersections in the drilled area suggest a north-westerly control to this grade-thickness accumulation which may provide guidance for future extensional exploration to the north.

这些交叉点增加了紧邻区域的历史井下交叉点29M@1.05g/t Au , 8M@1.86克/吨Au , 6M@1.40克/吨Au指出本地的品位加强及确认矿化矿脉的相关增厚,这些共同显示出目前矿产资源足迹向南及向下扩展的强大潜力。钻探区的交叉点显示了该层厚堆积的北西向控制作用,为今后向北延伸勘探提供了指导。

Figure 5 - Grade-Thickness Accumulation at Margin Mineral Resource in Djimbake Prospect (Section B-B')

图5-吉姆巴克地区边缘矿产资源的品位-厚度累积(B-B‘部分)

Exploration in Tankoro Mineralised Corridor Set to Continue in 2023

Tankoro矿化走廊勘探将于2023年继续

The reported results at early-stage targets within the Djimbake and southern Kenbobi Prospects that are well outside the footprint of the current Mineral Resource area are highly encouraging and highlight the potential for growth with further exploration drilling. The program has also successfully identified potential strike extensions to currently modelled lodes in near-surface oxide material which have the potential to add to the Mineral Resource .

报告的结果在早期目标在吉姆巴克和肯博比南部,远在目前矿产资源区足迹之外的前景是高度鼓舞人心,突出增长潜力随着进一步的勘探钻探。该计划还包括成功识别了近地表氧化物材料中当前模拟矿脉的潜在走向延伸它们有可能成为添加到矿产资源 .

Drilling is currently paused until 2023 and with all assays from the Q2/Q3 2022 program now returned, the Company is currently compiling results and incorporating these in its planning for further drilling of its highest priority targets around the Mineral Resource. A number of regional exploration targets will also be tested in the upcoming programs.

钻探目前暂停至2023年,随着2022年第二季度/第三季度计划的所有化验结果现已返回,本公司目前正在汇编结果,并将这些结果纳入其对矿产资源周围最优先目标的进一步钻探计划中。一些区域勘探目标也将在即将到来的计划中进行测试。

Appendices

附录

To access the appendices referred to in this announcement please click on the links below

要访问本公告中提到的附录,请点击以下链接

Appendix A: Summary of Recently Drilled Results

附录A:最近钻探结果摘要

Appendix B: References to Previous ASX Disclosure

附录B:参考以前的ASX披露

Appendix C: JORC Code (2012 Edition) - Table 1 Information

附录C:JORC代码(2012年版)-表1信息

For further information, please contact:

如需更多信息,请联系:

Company Activities

Media Enquiries

Andrew Dinning or Paul Schmiede

Sarama Resources Ltd

Angela East

Media & Capital Partners

e: info@saramaresources.com

t: +61 8 9363 7600

e: Angela.east@mcpartners.com.au

t: +61 428 432 025

公司活动

媒体问询

安德鲁·丹宁保罗·施米德

萨拉马资源有限公司

安吉拉·伊斯特

媒体与资本合作伙伴

电子邮箱:info@saramaresource ces.com

t: +61 8 9363 7600

电子邮件:Angela.East@mcpartners.com.au

t: +61 428 432 025

ABOUT SARAMA RESOURCES LTD

关于萨拉马资源有限公司

Sarama Resources Ltd (ASX:SRR, TSX-V:SWA) is a West African focused gold explorer/developer with substantial landholdings in south-west Burkina Faso. Sarama is focused on maximising the value of its strategic assets and advancing its key projects towards development.

莎拉玛资源有限公司(ASX:SRR, 多伦多证券交易所-V:SWA)是一家专注于西非的金矿勘探商/开发商,在布基纳法索西南部拥有大量土地。萨拉马专注于使其战略资产的价值最大化,并推动其关键项目走向发展。

Sarama's 100%-owned (4)Sanutura Project is principally located within the prolific Houndé Greenstone Belt in south-west Burkina Faso and is the exploration and development focus of the Company. The Project hosts the Tankoro and Bondi Deposits which have a combined Mineral Resource of 0.6Moz gold (Indicated) plus 2.3Moz gold (Inferred) (1) .

萨拉玛的100%拥有 (4)萨努图拉项目主要位于布基纳法索西南部多产的Houndé绿岩带内,是公司勘探和开发的重点。该项目拥有Tankoro和Bondi矿藏,这两个矿藏的综合矿产资源为0.6Moz金(注明) 2.3Moz黄金(推断) (1) .

Together, the deposits present a potential mine development opportunity featuring an initial, long-life CIL project which may be established and paid for by the significant oxide Mineral Resource base.

总而言之,这些矿藏提供了一个潜在的矿山开发机会,其中包括一个初步的、寿命长的CIL项目,该项目可能由重要的氧化物矿物资源基地建立并支付费用。

Sarama has built further optionality into its portfolio including an approximate 470km2 exploration position in the highly prospective Banfora Belt in south-western Burkina Faso. The Koumandara Project hosts several regional-scale structural features and trends of gold-in-soil anomalism extending for over 25km along strike.

Sarama在其投资组合中增加了进一步的选择,包括在布基纳法索西南部极具前景的Banfora带约470平方公里的勘探位置。库曼达拉项目拥有几个区域规模的构造特征和土壤中黄金异常的趋势,沿着走向延伸超过25公里。

Sarama also holds an approximate 18% participating interest in the Karankasso Project Joint Venture (" JV ") which is situated adjacent to the Company's Sanutura Project in Burkina Faso and is a JV between Sarama and Endeavour Mining Corp (" Endeavour ") in which Endeavour is the operator of the JV. In February 2020, an updated Mineral Resource estimate of 709koz gold (3) was declared for the Karankasso Project JV.

Sarama还在Karankasso项目合资企业中持有约18%的参与权益(“合资企业“),毗邻公司在布基纳法索的Sanutura项目,是Sarama和Endeavour矿业公司的合资企业(”奋进号“),奋进是合资企业的运营商。2020年2月,最新的矿产资源估计为709科兹黄金 (3)被宣布为卡兰卡索项目JV。

The Company's Board and management team have a proven track record in Africa and a strong history in the discovery and development of large-scale gold deposits. Sarama is well positioned to build on its current success with a sound strategy to surface and maximise the value of its property portfolio.

公司董事会和管理团队在非洲拥有良好的业绩记录,并在大型金矿的发现和开发方面拥有深厚的历史。Sarama处于有利地位,将在目前成功的基础上,制定合理的战略,使其房地产投资组合的价值浮出水面并实现最大化。

Sanutura Project - An Already Large Mineral Resource with Potential to Grow

萨努图拉项目--一个已经很大、很有发展潜力的矿产资源

The Company's primary focus is its 100%-owned (4) Sanutura Project, which hosts a large Mineral Resource of 0.6Moz Au (Indicated) plus 2.3Moz Au (Inferred) (1) and covers an area of 1,420km 2 . The Project occupies a commanding position along 70km of strike in the prolific Houndé Belt (refer Figure 6), Burkina Faso's pre-eminent gold belt.

该公司的主要重点是其100%拥有的 (4)萨努图拉项目,该项目拥有大量的矿产资源0.6Moz Au(注明)加2.3 Moz Au(推断) (1)占地1,420公里 2。该项目占据着沿线的制高点70公里的罢工在多产的Houndé腰带(参见图6),布基纳法索卓越的黄金腰带。

The Project lies 60km south of Endeavour Mining's Houndé Mine (5Moz Au); 120km south of Fortuna Silver's high-grade Yaramoko Mine (1Moz Au), and 140km south of Endeavour Mining's Mana Mine (5Moz Au), highlighting the significant gold endowment of the Houndé Belt (refer Appendix B). Endeavour Mining's Bantou Project (1.5Moz Au Inferred Mineral Resource (5) ) is located only 6km from the bulk of the Sanutura Project's main deposit, which illustrates the gold camp scale of endowment of the immediate area.

该项目位于奋进矿业的Houndé矿(5莫兹金)以南60公里、Fortuna Silver的高品位Yaramoko矿(1莫兹金)以南120公里、奋进矿业的玛纳矿(5莫兹金)以南140公里,突出了Houndé带的重要黄金资源(见附录B)。奋进矿业的板头项目(1.5Moz Au推断矿产资源 (5))距离萨努图拉项目的主要矿藏只有6公里,这说明了资金营规模在紧邻的区域。

The Project has significant growth potential and the primary objective of the current +50,000m drill program is to increase the existing 0.2Moz Au (Indicated) plus 0.8Moz Au (Inferred) (2) pit shell constrained oxide and transition component of the Project's Mineral Resource to further underwrite and enhance the economics of mine development.

该项目具有巨大的增长潜力,目前+5万米钻井计划的主要目标是增加现有的0.2 Moz Au(注明)加0.8Moz Au(推断) (2)矿场壳牌限制了该项目矿产资源的氧化物和过渡成分,以进一步承保和提高矿山开发的经济性。

The recent drill program has generally focused on shallow additional and extensional targets throughout the well-mineralised corridor, where mineralisation has been drill-defined for a semi-continuous strike length of 16km and where potential exists to expand the Mineral Resource at shallow depths in oxide material .

最近的钻探计划一般集中在整个良好矿化走廊的浅层额外和伸展目标,那里的矿化已经被钻探确定为半连续的。走向长度为16公里在哪里?氧化物材料中浅层矿产资源的开发潜力 .

Figure 6 - Sanutura Project Location Plan

图6-Sanutura项目位置图

FOOTNOTES

脚注

  1. Mineral Resource estimate for Sanutura Project - 9.4Mt @ 1.9g/t Au for 0.6Moz Au (Indicated) plus 52.7Mt @ 1.4g/t Au for 2.3Moz (Inferred), reported at cut-off grades ranging 0.2-1.6g/t Au, reflecting the mining methods and processing flowsheets assumed to assess the likelihood of the Mineral Resources to have reasonable prospects for eventual economic extraction. The effective date of the Company's Mineral Resource estimate is 16 November 2021. For further information regarding the Mineral Resource estimate refer to the technical report titled "NI 43-101 Independent Technical Report Sanutura Project, South-West Burkina Faso", dated 7 February 2022 and prepared by Paul Schmiede, Rindra Le Grange and Fred Kock, and the Company's ASX Prospectus dated 11 March 2022. Paul Schmiede is an employee of Sarama. Ms Le Grange and Mr Kock are employees of Cube Consulting Pty Ltd and Orway Mineral Consultants Pty Ltd respectivley and are considered to be independent of Sarama. The technical report is available under Sarama's profile on SEDAR at and the ASX Prospectus is available under Sarama's profile on ASX at .
  2. Oxide & transition component of the Mineral Resource for Sanutura Project - 3.2Mt @ 1.6g/t Au for 0.2Moz Au (Indicated) plus 23.4Mt @ 1.1g/t Au for 0.8Moz Au (Inferred), reported above cut-off grades of 0.2g/t Au and 0.3g/t Au for oxide and transition material respectively.
  3. Mineral Resource estimate for Karankasso Project - 12.74Mt @ 1.73g/t Au for 709koz Au (effective date of December 31, 2019), disclosed on 24 February 2020 by Semafo Inc ("Semafo", since acquired by Endeavour Mining Corp. "Endeavour"). For further information regarding that Mineral Resource estimate, refer to the news release "Semafo: Bantou Project Inferred Resources Increase to 2.2Moz" dated 24 February 2020 and Semafo: Bantou Project NI43-101 Technical Report - Mineral Resource Estimate" dated 3 April 2020 and the Company's ASX Prospectus dated 11 March 2022. The news release and technical report are available under Semafo's and Endeavour's profile on SEDAR at and the ASX Prospectus is available under Sarama's profile on ASX at . The Mineral Resource estimate was fully prepared by, or under the supervision of Semafo. Sarama has not independently verified Semafo's mineral Resource Estimate and takes no responsibility for its accuracy. Semafo, and now Endeavour, is the operator of the Karankasso Project JV and Sarama is relying on their Qualified Persons' assurance of the validity of the Mineral Resource estimate. Additional technical work has been undertaken on the Karankasso Project since the effective date but Sarama is not in a position to quantify the impact of this additional work on the Mineral Resource estimate referred to above.
  4. The Government of Burkina Faso has processed the requisite documents to facilitate the grant of the new, full-term Tankoro 2 and Djarkadougou 2 Exploration Permits (the " Permits ") and subsequently issued the invitation to pay the permit issuance fees (the " Fees ") and the Fees were paid within the requisite 10-day timeline. Following the payment of the Fee, the issuance of the Permit's arrêté and related paperwork becomes an administrative process during which time the Company may undertake work on the Tankoro 2 and Djarkadougou 2 Properties. The Company expects the arrêtés and related paperwork to be issued in due course. The properties, hosting the Tankoro and Bondi Deposits respectively, were formerly known as Tankoro and Djarkadougou, but have been renamed as part of the process of re-issuing the respective Permits.
  5. Endeavour Mining's Bantou Project Mineral Resource - 38.4Mt @ 1.2g/t Au for 1.5Moz Au (Inferred). This is the aggregate of the Mineral Resource listing for the Bantou and Bantou Nord Deposits which are located within the Bantou Project. Data is sourced from Semafo: Bantou Project NI43-101 Technical Report - Mineral Resource Estimate" dated 3 April 2020. The technical report are available under Endeavour's profile on SEDAR at .
  1. Sanutura项目的矿产资源评估-0.6Moz Au(指示)9.4Mt@1.9g/t Au加上2.3Moz(推断)52.7Mt@1.4g/t Au,报告的截止品位为0.2-1.6g/t Au,反映了为评估矿产资源最终具有合理经济开采前景的可能性而假设的采矿方法和加工流程。本公司矿产资源评估的生效日期为2021年11月16日。有关矿产资源评估的进一步资料,请参阅由Paul Schmiede、Rindra Le Grange和Fred Kock于2022年2月7日撰写的题为“NI 43-101布基纳法索西南部Sanutura项目独立技术报告”的技术报告,以及本公司日期为2022年3月11日的ASX招股说明书。保罗·施米德是萨拉马的一名员工。Le Grange女士和Kock先生分别为Cube Consulting Pty Ltd和奥威矿产咨询有限公司的员工,并被视为独立于Sarama。该技术报告可在SARAMA的SEDAR简介下查阅,ASX招股说明书可在SALAMA的简介下查阅,网址为。
  2. 萨努图拉项目矿产资源的氧化物和过渡组分-0.2Moz Au(指示)3.2Mt@1.6g/t Au加上0.8Moz Au(推断)23.4Mt@1.1g/t Au,报告的氧化物和过渡物质的截止品位分别为0.2g/t Au和0.3g/t Au。
  3. Karankasso项目的矿产资源估计--709koz Au的12.74Mt@1.73g/t Au(生效日期为2019年12月31日),由Semafo Inc.(以下简称Semafo)于2020年2月24日披露,之后被Endeavour Mining Corp.收购。“奋进”)。有关矿产资源评估的更多信息,请参阅2020年2月24日发布的新闻稿“Semafo:板头项目推断资源量增至2.2莫兹”、2020年4月3日发布的“Semafo:板头项目NI43-101技术报告-矿产资源估计”和本公司于2022年3月11日发布的ASX招股说明书。新闻稿和技术报告可在SEDAR上的Semafo和Endeavour简介下获得,ASX招股说明书可在ASX上的Sarama简介下查阅,网址为:。矿产资源估算完全由Semafo编制,或在其监督下编制。Sarama尚未独立核实Semafo的矿产资源估计,也不对其准确性负责。Semafo,现在是Endeavour,是Karankasso项目合资企业的运营商,Sarama依赖于其合格人员对矿产资源估计有效性的保证。自生效之日起,已就Karankasso项目开展了额外的技术工作,但Sarama无法量化这项额外工作对上文提到的矿产资源估计数的影响。
  4. 布基纳法索政府已经处理了必要的文件,以便利发放新的、完整期限的Tankoro 2和Djarkadougou 2号勘探许可证(“许可证“),并随后发出支付许可证发放费的邀请(”费用支付费用后,许可证的Arrêté和相关文件的发放成为一个行政程序,在此期间公司可以承担Tankoro 2和Djarkadougou 2号物业的工作。公司预计Arrêtés和相关文件将在适当时候发出。分别存放Tankoro和Djarkadougou矿藏的物业以前称为Tankoro和Djarkadougou,但已作为重新发放各自许可证过程的一部分重新命名。
  5. 奋进矿业的板头项目矿产资源-38.4Mt@1.2g/t Au,1.5 Moz Au(推断)。这是位于Bantou项目内的Bantou和Bantou Nord矿藏的矿产资源清单的汇总。数据来源于Semafo:Bantou项目NI43-101技术报告-矿产资源评估“,日期为2020年4月3日。该技术报告可在SEDAR上的Endeavour简介下获得,网址为:。

CAUTION REGARDING FORWARD LOOKING INFORMATION

有关前瞻性信息的警告

Information in this news release that is not a statement of historical fact constitutes forward-looking information. Such forward-looking information includes, but is not limited to, statements regarding the Company's future exploration and development plans, the potential for the Sanutura and Karankasso Projects to host economic mineralisation, the potential to expand the existing estimated Mineral Resources at the Sanutura Project (including the present oxide and transition component), the potential to extend and add to existing mineralisation at the Kenobi and Djimbake Prospects, , the potential for development of a mine at the Sanutura Project, the potential for the receipt of regulatory approvals and the timing and prospects for the issuance of the arrêtés for the Tankoro 2 and Djarkadougou 2 Exploration Permits by the Government of Burkina Faso. Actual results, performance or achievements of the Company may vary from the results suggested by such forward-looking statements due to known and unknown risks, uncertainties and other factors. Such factors include, among others, that the business of exploration for gold and other precious minerals involves a high degree of risk and is highly speculative in nature; Mineral Resources are not mineral reserves, they do not have demonstrated economic viability, and there is no certainty that they can be upgraded to mineral reserves through continued exploration; few properties that are explored are ultimately developed into producing mines; geological factors; the actual results of current and future exploration; changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company's publicly filed documents.

本新闻稿中不是对历史事实的陈述的信息构成前瞻性信息。该等前瞻性信息包括但不限于有关本公司未来的勘探及开发计划、Sanutura及Karankasso项目承载经济矿化的潜力、扩大Sanutura项目现有估计矿产资源(包括目前的氧化物及过渡成分)的潜力、扩大及增加Kenobi及Jimbake现有矿化的潜力、Sanutura项目开发矿山的潜力、收到监管机构批准的可能性,以及布基纳法索政府就Tankoro 2及Djarkadougou 2勘探许可证发出Arrêté的时间及前景。由于已知和未知的风险、不确定性和其他因素,公司的实际结果、业绩或成就可能与这些前瞻性陈述所暗示的结果大不相同。该等因素包括(但不限于)黄金及其他贵重矿物的勘探业务涉及高风险及高度投机性;矿产资源并非矿产储量,并未证明其经济可行性,且不能肯定透过持续勘探而提升为矿产储量;已勘探的矿产最终开发为可生产矿山的资产寥寥无几;地质因素;目前及未来勘探的实际结果;计划持续评估中的项目参数变化,以及公司公开提交的文件中所披露的那些因素。

There can be no assurance that any mineralisation that is discovered will be proven to be economic, or that future required regulatory licensing or approvals will be obtained. However, the Company believes that the assumptions and expectations reflected in the forward-looking information are reasonable. Assumptions have been made regarding, among other things, the Company's ability to carry on its exploration activities, the sufficiency of funding, the timely receipt of required approvals, the price of gold and other precious metals, that the Company will not be affected by adverse political and security-related events, the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain further financing as and when required and on reasonable terms. Readers should not place undue reliance on forward-looking information.

不能保证所发现的任何矿化将被证明是经济的,或未来所需的监管许可或批准将会获得。然而,公司认为前瞻性信息中反映的假设和预期是合理的。这些假设包括(但不限于)公司进行勘探活动的能力、资金的充足性、所需批准的及时收到、黄金和其他贵金属的价格、公司不会受到不利的政治和安全相关事件的影响、公司以安全、高效和有效的方式运营的能力以及公司在需要时以合理的条件获得进一步融资的能力。读者不应过分依赖前瞻性信息。

Sarama does not undertake to update any forward-looking information, except as required by applicable laws.

除非适用法律要求,SARAMA不承诺更新任何前瞻性信息。

QUALIFIED PERSONS' STATEMENT

合资格人士声明

Scientific or technical information in this disclosure that relates to the preparation of the Mineral Resource estimate for the Sanutura Project is based on information compiled or approved by Paul Schmiede. Paul Schmiede is an employee of Sarama Resources Ltd and is a Fellow in good standing of the Australasian Institute of Mining and Metallurgy. Paul Schmiede has sufficient experience which is relevant to the commodity, style of mineralisation under consideration and activity which he is undertaking to qualify as a Qualified Person under National Instrument 43-101. Paul Schmiede consents to the inclusion in this news release of the information, in the form and context in which it appears.

本公开中与编制Sanutura项目矿产资源评估有关的科学或技术信息基于Paul Schmiede编制或批准的信息。Paul Schmiede是Sarama Resources Ltd的雇员,也是澳大拉西亚矿业和冶金研究所的资深研究员。Paul Schmiede拥有与所考虑的商品、矿化类型及活动相关的足够经验,以符合国家文书43-101的资格。Paul Schmiede同意在本新闻稿中以信息出现的形式和背景包含信息。

Scientific or technical information in this disclosure that relates to exploration activities at the Sanutura Project is based on information compiled or approved by Guy Scherrer. Guy Scherrer is an employee of Sarama Resources Ltd and is a member in good standing of the Ordre des Géologues du Québec and has sufficient experience which is relevant to the commodity, style of mineralisation under consideration and activity which he is undertaking to qualify as a Qualified Person under National Instrument 43-101. Guy Scherrer consents to the inclusion in this disclosure of the information, in the form and context in which it appears.

本公开中涉及Sanutura项目勘探活动的科学或技术信息基于Guy Scherrer汇编或批准的信息。Guy Scherrer是Sarama Resources Ltd的雇员,是Ordre des GÉLOOUES DU QUÉBEC的一名信誉良好的成员,并拥有与他正在考虑的商品、矿化类型和活动相关的足够经验,以符合国家仪器43-101的资格。Guy Scherrer同意将信息以其出现的形式和背景包括在本披露中。

Scientific or technical information in this disclosure that relates to the quotation of the Karankasso Project's Mineral Resource estimate and exploration activities is based on information compiled by Paul Schmiede. Paul Schmiede is an employee of Sarama Resources Ltd and is a Fellow in good standing of the Australasian Institute of Mining and Metallurgy. Paul Schmiede has sufficient experience which is relevant to the commodity, style of mineralisation under consideration and activity which he is undertaking to qualify as a Qualified Person under National Instrument 43-101. Paul Schmiede consents to the inclusion in this disclosure of the information, in the form and context in which it appears. Paul Schmiede and Sarama have not independently verified Semafo's (now Endeavour's) Mineral Resource estimate and take no responsibility for its accuracy.

本披露中与Karankasso项目矿产资源评估和勘探活动的报价有关的科学或技术信息是基于Paul Schmiede汇编的信息。Paul Schmiede是Sarama Resources Ltd的雇员,也是澳大拉西亚矿业和冶金研究所的资深研究员。Paul Schmiede拥有与所考虑的商品、矿化类型及活动相关的足够经验,以符合国家文书43-101的资格。Paul Schmiede同意将信息以其出现的形式和背景包括在本披露中。Paul Schmiede和Sarama尚未独立核实Semafo(现在是Endeavour)的矿产资源估计,也不对其准确性负责。

COMPETENT PERSONS' STATEMENT

主管人员的声明

The Mineral Resource estimates referred to in this disclosure were first disclosed in accordance with ASX Listing Rule 5.8 in the Company's ASX Prospectus dated 11 March 2022. The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX Prospectus and that all material assumptions and technical parameters underpinning the estimates in the ASX Prospectus continue to apply and have not materially changed.

本披露所指的矿产资源估计乃根据本公司日期为二零二二年三月十一日的澳交所招股章程第5.8条首次披露。本公司确认,并不知悉任何对澳交所招股章程所载资料有重大影响的新资料或数据,而支持澳交所招股章程所载估计的所有重大假设及技术参数继续适用,且并无重大改变。

The new Exploration Results reported in this disclosure are based on, and fairly represent, information and supporting documentation prepared by Guy Scherrer. Guy Scherrer is an employee of Sarama Resources and a member of the Ordre des Géologues du Québec. Guy Scherrer has provided his prior written consent as to the form and context in which the new Exploration Results and the supporting information are presented in this disclosure.

本公开中报告的新勘探结果基于Guy Scherrer准备的信息和支持文件,并具有公正性。盖伊·谢勒是萨拉马资源公司的一名员工,也是GÉLOOUES DU QUÉBEC的成员。Guy Scherrer已就新勘探结果和支持信息在本披露中呈现的形式和背景提供了他事先的书面同意。

The previously reported Exploration Results referred to in this disclosure were first disclosed in accordance with ASX Listing Rule 5.7 in the Company's ASX disclosure listed in Appendix B. The Company confirms that it is not aware of any new information or data that materially affects the information included in those previous items of disclosure.

本披露所指之先前呈报之勘探结果乃根据本公司于附录B所载ASX披露内的ASX上市规则5.7首次披露。本公司确认并不知悉有任何新资料或数据对该等先前披露事项所载资料有重大影响。

This announcement has been authorised by the Board of Sarama Resources.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

此公告已获Sarama Resources董事会授权。

多伦多证券交易所风险交易所及其监管服务提供商(该术语在多伦多证券交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

SOURCE: Sarama Resources Ltd.

资料来源:萨拉马资源有限公司


View source version on accesswire.com:
在accesswire.com上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发