share_log

Silver Spruce and Its Partner, Colibri Resource, Announces Completion of Earn-in for 50% Interest in the Diamante Au-Ag Project, Sonora, Mexico

Silver Spruce and Its Partner, Colibri Resource, Announces Completion of Earn-in for 50% Interest in the Diamante Au-Ag Project, Sonora, Mexico

Silver Spruce及其合作伙伴Colibri Resource宣布完成墨西哥索诺拉Diamante Au-Ag项目50%权益的盈利收益
Accesswire ·  2023/02/13 07:03

BEDFORD, NS / ACCESSWIRE / February 13, 2023 / Silver Spruce Resources, Inc. (TSXV:SSE)(FRA:S6Q1) ("Silver Spruce" or the "Company") is pleased to report that the Company and its partner Silver Spruce Resources ("Silver Spruce") have earned a 50% ownership interest in the Diamante Gold & Silver Project ("Diamante" or "Project") located in Sonora, Mexico. Vendor Bimsa Minera SA de CV of Mexico ("Bimsa"), a privately owned Mexico based mineral exploration company, retains 50% ownership in the Property.

新泽西州贝德福德/ACCESSWIRE/2023年2月13日/银云杉资源公司(多伦多证券交易所股票代码:SSE)(FRA: S6Q1)(“Silver Spruce” 或 “公司”)欣然报告,公司及其合作伙伴银云杉资源(“银云杉”)已获得位于索诺拉的迪亚曼特金银项目(“迪亚曼特” 或 “项目”)50%的所有权,墨西哥。卖方墨西哥Bimsa Minera SA de CV(“Bimsa”)是一家总部位于墨西哥的私人矿产勘探公司,保留该物业50%的所有权。

"We are very excited to fulfill, in partnership with Colibri, the Phase 1 exploration drilling program and technical reporting to earn our combined 50% interest in Diamante. There are numerous defined drill targets and other prospective areas offering future potential for mineralization of several genetic styles with precious and base metals," said Greg Davison, Silver Spruce Vice-President Exploration and Director. "The initial drilling successfully targeted known artisanal workings with high grade Zn-Pb-Ag with Cu and Au credits. We are looking forward to ground-based geological mapping, prospecting and focused geophysics as part of the follow-up program to prioritize the next phase of drilling."

“我们很高兴能与Colibri合作完成第一阶段的勘探钻探计划和技术报告,从而获得我们在Diamante的合并50%的权益。Silver Spruce勘探副总裁兼董事Greg Davison说,有许多已确定的钻探目标和其他前景区域为未来可能使用贵金属和基本金属进行多种遗传方式的矿化。“最初的钻探成功地瞄准了采用高品位锌铅银的已知手工作业,铜和金成分。我们期待着将地面地质测绘、勘探和聚焦地球物理学作为后续计划的一部分,以优先考虑下一阶段的钻探。”

Colibri News Release (February 7th, 2023 - Select Excerpts)

Colibri 新闻稿 (2 月 7 日)第四,2023-选择摘录)

"We are extremely pleased to have completed the required exploration to earn an initial 50% of this large and highly prospective project. Diamante is located in the Sierra Madre volcanic sequence of Mexico and within a district of epithermal mineralization which hosts many producing and historic gold, silver and base metal mines. Diamante hosts many showings and the drilling completed in mid 2022, which returned very encouraging assays, was on just two of eight already-defined drill targets. We will plan to expand on these results and test the other targets in 2023 in conjunction with additional field exploration and possibly a geophysics program," said Ian McGavney, Chief Operating Officer of Colibri.

我们非常高兴地完成了所需的勘探,从而获得了这个前景广阔的大型项目的初始50%。迪亚曼特位于墨西哥的马德雷山脉火山脉中,位于超热矿化区内,那里有许多生产和历史悠久的金、银和贱金属矿。Diamante举办了许多演示,2022年中期完成的钻探结果非常令人鼓舞,仅针对八个已经确定的钻探目标中的两个。我们将计划扩展这些结果,并在2023年测试其他目标,同时进行更多的实地勘探,可能还有一项地球物理项目。,” Colibri首席运营官伊恩·麦加夫尼说。

About Diamante

关于迪亚曼特

Diamante is located within a belt of epithermal Au-Ag mineralization hosted by the Sierra Madre Occidental Volcanic Complex. Major gold mining operations in the area of the Diamante property include Alamos Golds' Los Mulatos Mine and Agnico Eagles' El India and Pinos Altos Mines. The Project is located approximately 12 kilometres ("km") northwest of Minera Alamos' Santana Au development project which is anticipated to commence commercial production within the near term. The Property is located approximately 170 km southeast of Sonora state capital Hermosillo and approximately 10 km northwest of the town of Tepoca and is accessed directly from Sonora state Highway 16.

迪亚曼特位于西方马德雷山脉火山群托管的超热金银矿化带内。迪亚曼特地产地区的主要金矿开采业务包括阿拉莫斯金业的洛斯穆拉托斯矿和阿格尼科·伊格尔斯的埃尔印度和皮诺斯阿尔托斯矿业。该项目位于阿拉莫斯矿业公司桑塔纳奥开发项目西北约12千米(“千米”)处,该项目预计将在短期内开始商业化生产。该物业位于索诺拉州首府埃莫西约东南约170公里处,位于特波卡镇西北约10公里处,可直接从索诺拉州16号州道进入。

The 1,057-hectare Diamante property is located adjacent to the Jackie property, a joint venture with Colibri, which covers 1,113 hectares, providing the company with a total of 2,170 hectares of exploration ground. Diamante hosts a number of historical showings and combined with mineralization on the Mezquite and Jackie properties exhibit the geological characteristics of epithermal low to intermediate sulfidation Ag-Au (Pb-Zn), high sulfidation Au-Cu, and potential transition zones within and peripheral to porphyry style Au-Cu defined within the system of Sillitoe (2010).

这座占地1,057公顷的迪亚曼特地产毗邻杰基地产,该地产是与科利柏的合资企业,占地1,113公顷,为该公司提供了总计2,170公顷的勘探用地。迪亚曼特拥有许多历史遗迹,再加上梅兹基特和杰基特性的矿化,表现出超热液低至中度硫化银金(Pb-Zn)、高硫化金铜以及Sillitoe(2010)系统中定义的斑岩型金铜内部和周边潜在过渡带的地质特征。

Highlights of drilling completed at the first two targets on the Diamante property during 2022 are summarized in the table below and highlighted by 257.6 g/t Ag Eq over 12.0 metres in DIA22-05 at El Pillado and 312.8 g/t Ag Eq over 9.0 metres in DIA22-16 at La Prieta.

下表总结了2022年在迪亚曼特地产前两个目标完成的钻探亮点,重点是埃尔皮拉多的 DIA22-05 12.0米以上银当量为257.6克/吨,在拉普列塔的 DIA22-16 中超过9.0米的312.8克/吨银当量。

El Pillado Target

Hole ID

From

To

Length

Au (g/t)

Ag (g/t)

Zn (%)

Pb (%)

Ag Eq (g/t)

Au Eq (g/t)

DIA22-01

27.0

37.5

10.5

0.04

9.87

0.37

0.12

35.46

0.40

DIA22-01

54.0

55.5

1.5

0.06

7.00

1.06

0.19

69.25

0.78

DIA22-01

72.0

73.5

1.5

0.03

13.50

1.52

0.66

110.35

1.24

DIA22-02

22.5

24.0

1.5

0.04

4.20

0.48

0.03

31.85

0.36

DIA22-02

43.5

54.0

10.5

0.04

6.27

0.78

0.12

51.71

0.58

includes

48.0

49.5

1.5

0.09

13.20

3.89

0.04

210.87

2.37

DIA22-02

64.5

66.0

1.5

0.03

3.60

0.83

0.04

47.84

0.54

DIA22-02

84.0

85.5

1.5

0.13

15.20

0.66

0.98

88.13

0.99

DIA22-02

84.0

85.5

1.5

0.13

15.20

0.66

0.98

88.13

0.99

DIA22-03

16.5

18.0

1.5

0.20

6.60

0.06

0.01

27.13

0.30

DIA22-04

0.0

1.5

1.5

0.03

6.00

0.75

0.14

49.54

0.56

DIA22-05

24.0

36.0

12.0

0.18

145.49

1.35

1.01

257.63

2.89

includes

24.0

30.0

6.0

0.26

184.50

1.08

0.61

278.51

3.13

includes

33.0

36.0

3.0

0.16

209.10

3.15

2.79

461.65

5.19

includes

33.0

34.5

1.5

0.31

397.00

5.87

5.31

871.62

9.79

DIA22-05

43.5

60.0

16.5

0.21

41.75

2.14

0.68

185.13

2.08

includes

45.0

51.0

6.0

0.15

87.64

4.58

1.45

367.54

4.13

includes

46.5

48.0

1.5

0.21

257.00

7.84

5.23

815.53

9.16

埃尔皮拉多目标

洞 ID

来自

长度

金 (g/t)

银 (g/t)

锌 (%)

铅 (%)

银当量 (g/t)

Au Eq (g/t)

DIA22-01

27.0

37.5

10.5

0.04

9.87

0.37

0.12

35.46

0.40

DIA22-01

54.0

55.5

1.5

0.06

7.00

1.06

0.19

69.25

0.78

DIA22-01

72.0

73.5

1.5

0.03

13.50

1.52

0.66

110.35

1.24

DIA22-02

22.5

24.0

1.5

0.04

4.20

0.48

0.03

31.85

0.36

DIA22-02

43.5

54.0

10.5

0.04

6.27

0.78

0.12

51.71

0.58

包括

48.0

49.5

1.5

0.09

13.20

3.89

0.04

210.87

2.37

DIA22-02

64.5

66.0

1.5

0.03

3.60

0.83

0.04

47.84

0.54

DIA22-02

84.0

85.5

1.5

0.13

15.20

0.66

0.98

88.13

0.99

DIA22-02

84.0

85.5

1.5

0.13

15.20

0.66

0.98

88.13

0.99

DIA22-03

16.5

18.0

1.5

0.20

6.60

0.06

0.01

27.13

0.30

DIA22-04

0.0

1.5

1.5

0.03

6.00

0.75

0.14

49.54

0.56

DIA22-05

24.0

36.0

12.0

0.18

145.49

1.35

1.01

257.63

2.89

包括

24.0

30.0

6.0

0.26

184.50

1.08

0.61

278.51

3.13

包括

33.0

36.0

3.0

0.16

209.10

3.15

2.79

461.65

5.19

包括

33.0

34.5

1.5

0.31

397.00

5.87

5.31

871.62

9.79

DIA22-05

43.5

60.0

16.5

0.21

41.75

2.14

0.68

185.13

2.08

包括

45.0

51.0

6.0

0.15

87.64

4.58

1.45

367.54

4.13

包括

46.5

48.0

1.5

0.21

257.00

7.84

5.23

815.53

9.16

Table 1: 2022 Drill Results at Diamante Project

表 1:Diamante 项目 2022 年的钻探结果

DIA22-05

78.0

81.0

3.0

0.17

26.60

4.19

1.05

276.87

3.11

includes

78.0

79.5

1.5

0.27

35.80

6.91

1.60

443.58

4.98

DIA22-05

99.0

100.5

1.5

0.25

1.90

0.08

0.04

29.35

0.33

DIA22-05

118.5

120.0

1.5

0.04

12.20

0.43

0.34

46.96

0.53

DIA22-06

6.0

10.5

4.5

0.06

28.73

0.24

0.52

61.39

0.69

includes

6.0

7.5

1.5

0.07

60.40

0.20

1.21

113.45

1.27

DIA22-08

130.5

132.0

1.5

0.93

2.20

0.03

0.02

87.20

0.98

DIA22-09

117.0

120.0

3.0

0.11

19.85

0.50

0.09

56.65

0.64

La Prieta Target

Hole ID

From

To

Length

Au (g/t)

Ag (g/t)

Zn (%)

Pb (%)

Ag Eq (g/t)

Au Eq (g/t)

DIA22-10

48.0

54.0

6.0

0.46

56.88

1.06

0.53

165.47

1.86

includes

49.5

51.0

1.5

0.87

125.00

2.82

1.45

383.75

4.31

DIA22-11

54.0

55.5

1.5

0.15

4.50

0.16

0.09

28.25

0.32

DIA22-12

51.0

52.5

1.5

0.18

4.80

0.22

0.08

33.71

0.38

DIA22-13

49.5

51.0

1.5

0.31

53.70

1.49

0.39

165.09

1.85

DIA22-14

52.5

55.5

3.0

0.59

16.50

0.46

0.23

98.14

1.10

DIA22-15

36.0

37.5

1.5

0.54

0.25

0.01

0.00

48.70

0.55

DIA22-16

1.5

10.5

9.0

2.48

56.70

0.28

0.71

312.84

3.51

includes

1.5

6.0

4.5

3.87

75.43

0.08

0.97

453.26

5.09

DIA22-16

18.0

19.5

1.5

0.83

18.80

0.68

0.38

136.90

1.54

DIA22-16

36.0

46.5

10.5

0.63

38.49

1.61

0.64

192.52

2.16

includes

37.5

39.0

1.5

1.36

139.00

8.74

2.88

772.12

8.67

DIA22-17

30.0

43.5

13.5

0.56

38.48

1.76

0.76

196.95

2.21

includes

30.0

34.5

4.5

0.94

103.17

4.96

2.19

494.61

5.56

DIA22-05

78.0

81.0

3.0

0.17

26.60

4.19

1.05

276.87

3.11

包括

78.0

79.5

1.5

0.27

35.80

6.91

1.60

443.58

4.98

DIA22-05

99.0

100.5

1.5

0.25

1.90

0.08

0.04

29.35

0.33

DIA22-05

118.5

120.0

1.5

0.04

12.20

0.43

0.34

46.96

0.53

DIA22-06

6.0

10.5

4.5

0.06

28.73

0.24

0.52

61.39

0.69

包括

6.0

7.5

1.5

0.07

60.40

0.20

1.21

113.45

1.27

DIA22-08

130.5

132.0

1.5

0.93

2.20

0.03

0.02

87.20

0.98

DIA22-09

117.0

120.0

3.0

0.11

19.85

0.50

0.09

56.65

0.64

拉普瑞塔目标

洞 ID

来自

长度

金 (g/t)

银 (g/t)

锌 (%)

铅 (%)

银当量 (g/t)

Au Eq (g/t)

直径 22-10

48.0

54.0

6.0

0.46

56.88

1.06

0.53

165.47

1.86

包括

49.5

51.0

1.5

0.87

125.00

2.82

1.45

383.75

4.31

直径 22-11

54.0

55.5

1.5

0.15

4.50

0.16

0.09

28.25

0.32

直径 22-12

51.0

52.5

1.5

0.18

4.80

0.22

0.08

33.71

0.38

直径 22-13

49.5

51.0

1.5

0.31

53.70

1.49

0.39

165.09

1.85

直径 22-14

52.5

55.5

3.0

0.59

16.50

0.46

0.23

98.14

1.10

直径 22-15

36.0

37.5

1.5

0.54

0.25

0.01

0.00

48.70

0.55

直径 22-16

1.5

10.5

9.0

2.48

56.70

0.28

0.71

312.84

3.51

包括

1.5

6.0

4.5

3.87

75.43

0.08

0.97

453.26

5.09

直径 22-16

18.0

19.5

1.5

0.83

18.80

0.68

0.38

136.90

1.54

直径 22-16

36.0

46.5

10.5

0.63

38.49

1.61

0.64

192.52

2.16

包括

37.5

39.0

1.5

1.36

139.00

8.74

2.88

772.12

8.67

直径 22-17

30.0

43.5

13.5

0.56

38.48

1.76

0.76

196.95

2.21

包括

30.0

34.5

4.5

0.94

103.17

4.96

2.19

494.61

5.56

Table 1 continued: 2022 Drill Results at Diamante Project

表 1 续:2022 年迪亚曼特项目的钻探结果

DIA22-17

54.0

57.0

3.0

0.45

1.35

0.04

0.00

43.14

0.48

DIA22-17

72.0

75.0

3.0

0.26

18.65

0.15

0.07

51.50

0.58

DIA22-18

33.0

42.0

9.0

0.55

15.28

0.38

0.16

87.76

0.99

includes

37.5

40.5

3.0

1.07

38.80

0.63

0.35

175.81

1.98

DIA22-18

48.0

51.0

3.0

0.48

11.35

0.08

0.03

59.14

0.66

DIA22-19

10.5

13.5

3.0

1.36

86.80

1.69

0.91

317.91

3.57

includes

12.0

13.5

1.5

2.11

139.00

2.79

1.24

500.06

5.62

DIA22-19

39.0

45.0

6.0

0.64

11.20

0.31

0.21

89.84

1.01

DIA22-19

48.0

49.5

1.5

0.32

7.60

0.24

0.16

52.76

0.59

*Au and Ag equivalents were calculated using metal prices of US$1660 per ounce Au, US$18.65 per ounce Ag, US$1.32 per pound Zn, and US$0.83 per pound Pb; Lengths are intersection length. True widths are not known.
直径 22-17

54.0

57.0

3.0

0.45

1.35

0.04

0.00

43.14

0.48

直径 22-17

72.0

75.0

3.0

0.26

18.65

0.15

0.07

51.50

0.58

直径 22-18

33.0

42.0

9.0

0.55

15.28

0.38

0.16

87.76

0.99

包括

37.5

40.5

3.0

1.07

38.80

0.63

0.35

175.81

1.98

直径 22-18

48.0

51.0

3.0

0.48

11.35

0.08

0.03

59.14

0.66

直径 22-19

10.5

13.5

3.0

1.36

86.80

1.69

0.91

317.91

3.57

包括

12.0

13.5

1.5

2.11

139.00

2.79

1.24

500.06

5.62

直径 22-19

39.0

45.0

6.0

0.64

11.20

0.31

0.21

89.84

1.01

直径 22-19

48.0

49.5

1.5

0.32

7.60

0.24

0.16

52.76

0.59

*金和银当量是使用每盎司金1660美元、每盎司银18.65美元、每磅锌1.32美元和每磅铅0.83美元的金属价格计算得出的;长度是交叉长度。真正的宽度尚不清楚。

Table 1 continued: 2022 Drill Results at Diamante Project

表 1 续:2022 年迪亚曼特项目的钻探结果

Terms of Agreement

协议条款

Colibri, by way of its Mexico subsidiary Yaque Minerales Sa de CV, entered into an earn-in agreement which was announced February 2021 with Bimsa to purchase up to 100% of Diamante. The Diamante project was then placed into a new company called BIMCOL Minera SA de CV. Fifty percent of the shares in BIMCOL were then placed into trust on behalf of Yaque Minerales (to be released upon completion of the first phase of the agreement).

Colibri通过其墨西哥子公司Yaque Minerales Sa de CV与Bimsa签订了一项收益协议,该协议于2021年2月宣布,将收购迪亚曼特高达100%的股份。然后,迪亚曼特项目被委托给了一家名为BIMCOL Minera SA de CV的新公司。然后,代表Yaque Minerales将BIMCOL的50%股份存入信托(将在协议第一阶段完成后发行)。

Silver Spruce completed the execution of its Definitive Agreement and upon acceptance by the Toronto Stock Exchange (TSX), to earn its initial 25% interest in the Property, the Company agreed to pay Colibri an initial cash amount of $75,000 USD directed to the Vendor's $100,000 USD initial property payment whereupon Silver Spruce and Yaque each will hold a 25% interest in the Property and manage the Property as equal partners ("Partners").

Silver Spruce完成了其最终协议的执行,在多伦多证券交易所(TSX)接受后,为了获得该物业的初始25%权益,该公司同意向Colibri支付7.5万美元的初始现金,用于支付卖方的10万美元初始财产付款,届时Silver Spruce和Yaque将分别持有该物业25%的权益,并以平等合伙人(“合伙人”)的身份管理该财产。

Silver Spruce will be the designated operator of the Property during the earn-in period with the Vendor. The Company will manage the program via a Project Oversight Committee with Colibri.

在卖方的盈利期内,Silver Spruce将成为该物业的指定运营商。该公司将通过与Colibri合作的项目监督委员会管理该计划。

To earn its initial 50% of the Diamante project, Silver Spruce and Yaque also agreed to design, permit and drill a minimum of 2,000 metres on the Property within 24 months from the Execution Date of Yaque's final agreement with the Vendor; including any requisite exploration leading to the drill program, submit a final drilling report to meet NI 43-101 reporting guidelines and pay approved exploration costs at a ratio of Silver Spruce (75%) and Yaque (25%). The 75% portion paid by Silver Spruce included field exploration, lab costs for samples, road & pad building and drilling. The Partners will pay to the Vendor 50% of the bi-annual property taxes and surface rights payments.

为了获得迪亚曼特项目最初50%的股份,Silver Spruce和Yaque还同意在Yaque与卖方签订最终协议之日起24个月内在该物业上进行至少2,000米的设计、许可和钻探;包括钻探计划前的任何必要勘探,提交最终钻探报告以符合北爱尔兰43-101报告准则,并按银云杉(75%)和雅克(25%)的比例支付经批准的勘探费用。Silver Spruce支付的75%部分包括实地勘探、样品实验室费用、道路和护地建设以及钻探。合作伙伴将向供应商支付半年财产税和地表权付款的50%。

With completion of the initial earn-in, Silver Spruce and Yaque together will become equal joint venture partners with the Vendor in BIMCOL Minera ("BIMCOL"), a private Mexico company holding the concessions, pay to the Vendor 50% of the bi-annual property taxes and surface rights payments and pay approved pro rata exploration costs at a ratio of Silver Spruce (50%) and Yaque (50%). Now that Yaque Minerales has earned/purchased fifty percent of the shares of BIMCOL (the holder of Diamante) the project will be operated by Colibri/Silver Spruce. BIMCOL will have four Directors, two representatives from Bimsa and two from Colibri/Silver Spruce with the Chairperson from Colibri holding the ability to break a tie vote.

初始收益完成后,Silver Spruce和Yaque将与持有特许权的墨西哥私营公司BIMCOL Minera(“BIMCOL”)的供应商成为平等的合资伙伴,向卖方支付半年财产税和地表权付款的50%,并按银云杉(50%)和雅克(50%)的比例支付经批准的按比例勘探成本。现在,Yaque Minerales已经获得/购买了BIMCOL(Diamante的持有者)50%的股份,该项目将由Colibri/Silver Spruce运营。BIMCOL将有四名董事,两名来自Bimsa的代表和两名来自Colibri/Silver Spruce的代表,来自Colibri的主席有能力打破平局。

Yaque will have an exclusive period of six months to purchase the remaining 50% of BIMCOL by paying the Vendor either of: i) US$2.1 million or ii) US$1.45 million and the grant of a 2% net smelter royalty (NSR) on the project.

Yaque将有六个月的专属期限购买BIMCOL剩余的50%股份,方法是向卖方支付:i) 210万美元或ii) 145万美元以及该项目2%的净冶炼厂特许权使用费(NSR)。

Should Yaque elect to exercise its right to purchase the remaining 50% of BIMCOL, Yaque will also grant Silver Spruce the option to purchase one-half of its additional ownership for one-half of the cost for a period not to exceed six (6) months from the date Yaque elects to exercise its right and Yaque will provide three (3) months notice to Silver Spruce for the purchase due date within the first three (3) months of the option period.

如果Yaque选择行使收购BIMCOL剩余50%股份的权利,Yaque还将授予Silver Spruce以成本的一半购买其额外所有权的选择权,自Yaque选择行使权利之日起不超过六(6)个月,Yaque将在期权期的前三(3)个月内向Silver Spruce发出三(3)个月的收购到期日通知。

Going Forward

向前迈进

Silver Spruce, Colibri and its partners currently are reviewing all project data and determining the next steps to be taken on the project. Plans will be released as they are finalized.

Silver Spruce、Colibri及其合作伙伴目前正在审查所有项目数据,并确定该项目下一步将采取的步骤。计划将在最终确定后发布。

Qualified Person - Colibri Resource

合格人员-Colibri Resource

Jamie Lavigne, P. Geo and a Director for Colibri is a Qualified Person as defined in NI 43-101 and has reviewed and approved the technical information in this press release.

根据NI 43-101的定义,Jamie Lavigne、P. Geo和Colibri的董事是合格人士,并已审查并批准了本新闻稿中的技术信息。

Qualified Person - Silver Spruce Resources

合格人员-银云杉资源

Greg Davison, PGeo, Silver Spruce VP Exploration and Director, is the Company's internal Qualified Person for the Diamante Project and has reviewed the technical content of this press release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"), under TSX guidelines.

PGeo、Silver Spruce勘探副总裁兼董事Greg Davison是公司迪亚曼特项目的内部合格人员,根据多伦多证券交易所的指导方针,根据国家仪器43-101矿业项目披露标准(“NI 43-101”),审查了本新闻稿的技术内容。

About Silver Spruce Resources Inc.

银云杉资源公司简介

Silver Spruce Resources Inc. is a Canadian junior exploration company which has signed Definitive Agreements to acquire 100% of the Melchett Lake Zn-Au-Ag project in northern Ontario, 100% interest in the Mystery Au project near recent discoveries by Sokoman Minerals Corp. and New Found Gold Corp. among others in the Exploits Subzone Gold Belt, Newfoundland and Labrador, 100% interest in the Pino de Plata Ag project located 15 kilometres west of Coeur Mining's Palmarejo Mine in western Chihuahua, Mexico and up to 50% interest in Colibri Resource's Diamante Au-Ag project located from 5 kilometres to 15 kilometres northwest from Minera Alamos's Nicho deposit in Sonora, Mexico. Silver Spruce recently signed a 50:50 joint venture agreement with Colibri on the nearby Jackie Au project. Silver Spruce Resources Inc. continues to investigate opportunities that Management has identified or that have been presented to the Company for consideration.

Silver Spruce Resource Inc. 是一家加拿大初级勘探公司,已签署最终协议,收购安大略省北部梅尔切特湖Zn-Au-Ag项目100%的股权,索科曼矿业公司和新发现黄金公司最近发现的神秘金矿项目的100%权益,以及位于Coeur Minings以西15公里处的Pino de Plata Ag项目的100%权益位于墨西哥奇瓦瓦州西部的帕尔马雷霍矿以及 Colibri Resource 旗下的 Diamante Au-Ag 高达 50% 的权益项目位于墨西哥索诺拉州阿拉莫斯矿业公司的 Nicho 矿床西北 5 公里至 15 公里处。Silver Spruce最近与Colibri就附近的Jackie Au项目签署了 50:50 的合资协议。Silver Spruce Resource Inc. 继续调查管理层已经发现或已提交公司考虑的机会。

Contact:

联系人:

Silver Spruce Resources Inc.

银云杉资源公司

Greg Davison, PGeo, Vice-President Exploration and Director
(250) 521-0444
gdavison@silverspruceresources.com

Greg Davison,PGeo,勘探副总裁兼董事
(250) 521-0444
gdavison@silverspruceresources.com

Michael Kinley, CEO
(902) 402-0388
mkinley@silverspruceresources.com

首席执行官迈克尔·金利
(902) 402-0388
mkinley@silverspruceresources.com

info@silverspruceresources.com

info@silverspruceresources.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所风险投资交易所及其监管服务提供商(该术语在多伦多证券交易所风险交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

Notice Regarding Forward-Looking Statements

关于前瞻性陈述的通知

This news release contains "forward-looking statements," Statements in this press release which are not purely historical are forward-looking statements and include any statements regarding beliefs, plans, expectations or intentions regarding the future, including but not limited to, statements regarding the private placement.

本新闻稿包含 “前瞻性陈述”,本新闻稿中不纯粹是历史陈述是前瞻性陈述,包括有关未来信念、计划、预期或意图的任何陈述,包括但不限于有关私募的陈述。

Actual results could differ from those projected in any forward-looking statements due to numerous factors. Such factors include, among others, the inherent uncertainties associated with mineral exploration and difficulties associated with obtaining financing on acceptable terms. We are not in control of metals prices and these could vary to make development uneconomic. These forward-looking statements are made as of the date of this news release, and we assume no obligation to update the forward-looking statements, or to update the reasons why actual results could differ from those projected in the forward-looking statements. Although we believe that the beliefs, plans, expectations and intentions contained in this press release are reasonable, there can be no assurance that such beliefs, plans, expectations or intentions will prove to be accurate.

由于多种因素,实际结果可能与任何前瞻性陈述中的预测有所不同。除其他外,这些因素包括与矿产勘探相关的固有不确定性,以及难以以可接受的条件获得融资。我们无法控制金属价格,这些价格可能会有所不同,从而使发展变得不经济。这些前瞻性陈述是截至本新闻稿发布之日作出的,我们没有义务更新前瞻性陈述,也没有义务更新实际业绩可能与前瞻性陈述中预测的结果不同的原因。尽管我们认为本新闻稿中包含的信念、计划、期望和意图是合理的,但无法保证这些信念、计划、期望或意图会被证明是准确的。

SOURCE: Silver Spruce Resources Inc.

来源:银云杉资源公司


View source version on accesswire.com:
在 accesswire.com 上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发