Live Energy Minerals Corp. Reports Initial Samples Returning up to 1907 Ppm Lithium at McDermitt Lithium East Project
Live Energy Minerals Corp. Reports Initial Samples Returning up to 1907 Ppm Lithium at McDermitt Lithium East Project
Vancouver, British Columbia--(Newsfile Corp. - April 26, 2023) - Live Energy Minerals Corp. (CSE: LIVE) (OTC Pink: GTREF) ("Live Energy" or the "Company") is pleased to announce preliminary sampling results with lithium (Li) concentrations up to 1907 ppm Li at its McDermitt Lithium East Project (the "McDermitt Project"). This promising project spans 6508 acres in Nevada's McDermitt Caldera, strategically situated in the same basin as the Thacker Pass lithium deposit (see Figure 1), which is being developed by Lithium Americas Corp.
温哥华,不列颠哥伦比亚省-(Newsfile Corp.-2023年4月26日)-Live Energy Minerals Corp.(CSE:LIVE)(场外粉色:GTREF)(“Live Energy”或“公司”)我们很高兴地宣布其麦克德米特锂东项目(“麦克德米特项目”)的锂(Li)浓度高达1907ppm Li的初步采样结果。这个前景看好的项目位于内华达州麦克德米特火山口,占地6508英亩,战略位置与Thacker Pass锂矿藏(见图1)位于同一盆地,该矿藏正由Lithium America Corp.开发。
Adrian Smith, CEO of Live Energy Minerals Corp, states, "The high-grade lithium results at the McDermitt Project not only confirm the potential for substantial lithium mineralization in the area, but also emphasize the McDermitt Caldera as a highly favorable region for lithium exploration and development, due to its geological setting and proximity to the Thacker Pass deposit."
Live Energy Minerals公司首席执行官禤浩焯·史密斯表示:“麦克德米特项目的高品位锂矿结果不仅证实了该地区大量锂矿化的潜力,而且由于其地质背景和靠近萨克帕斯矿床,麦克德米特火山口是一个非常有利于锂勘探和开发的地区。”
Live Energy's preliminary sampling program involved near surface claystone (rock) and soil samples from surface and historical shallow trenches in the project area. Results demonstrated lithium levels ranging from 30 ppm to an impressive 1907 ppm Lithium, with the highest values found in the shallow trenches where intracaldera lake sediments have been exposed.
Live Energy的初步采样计划涉及项目区地表和历史浅沟的近地表粘土(岩石)和土壤样本。结果显示,锂的含量从30ppm到令人印象深刻的1907ppm,最高值出现在火山内湖沉积物裸露的浅海沟中。
The McDermitt Project is located within the McDermitt Caldera and shares similar geology with the neighboring Thacker Pass deposit. The Thacker Pass deposit is hosted in a lacustrine sequence of ash-fall tuffs and volcaniclastic rocks formed within the McDermitt Caldera basin lake post eruption. With a measured and indicated resource estimate of approximately 16.1 million tonnes of lithium carbonate equivalent, Lithium Americas Corp. is now progressing with the development of the deposit to produce an anticipated 80,000 tonnes per annum of battery-quality lithium carbonate.
麦克德米特项目位于麦克德米特火山口内,与邻近的萨克帕斯矿床具有相似的地质特征。Thacker Pass矿床赋存于麦克德米特火山口盆地湖泊喷发后形成的火山灰-凝灰岩和火山碎屑岩湖序中。锂美洲公司经测量及指示的资源估计约为1,610万吨碳酸锂当量,现正进行该矿藏的开发工作,预计每年可生产80,000吨电池级碳酸锂。
In close proximity to the Thacker Pass deposit, Live Energy's McDermitt Project spans across a remarkable 6508 acres. Following the success of preliminary sampling, the Company is planning to continue its exploration efforts with a more aggressive and comprehensive exploration program, aimed at defining and expanding lithium mineralization at the project.
Live Energy的麦克德米特项目靠近萨克山口矿藏,占地6508英亩。在初步取样成功后,本公司正计划继续其勘探工作,推行更进取及全面的勘探计划,以界定及扩大该项目的锂矿化。
For further information, visit the company website or contact:
欲了解更多信息,请访问公司网站或联系:
Adrian Smith, CEO
Live Energy Minerals Corp.
Email: adrian@liveenergyminerals.com
Phone: 604-687-2038
首席执行官禤浩焯·史密斯
Live Energy Minerals Corp.
电子邮件:禤浩焯@liveenergyminals.com
电话:604-687-2038
Follow Us:
跟我们来:
Facebook -
Linkedin -
Twitter -
脸书--
领英--
推特-
Disclosure
披露
Adrian Smith, P.Geo., is a Qualified Person ("QP") as defined by National Instrument 43-101 for the McDermitt Project. The QP is a member in good standing of the Engineers and Geoscientists of British Columbia (EGBC) and is a registered Professional Geoscientist (P.Geo.). Mr. Smith has reviewed and approved the technical information disclosed above.
禤浩焯史密斯,P.Geo,是国家仪器43-101为麦克德米特项目定义的合格人员(“QP”)。QP是不列颠哥伦比亚省工程师和地球科学家协会(EGBC)信誉良好的成员,也是注册的专业地球科学家(P.Geo.)。史密斯先生已审查并批准了上述披露的技术信息。
Preliminary sampling comprised three samples and averaged 656 ppm lithium. The samples were collected in 8.5" x 12' polyethylene bags and sent to MS Analytical in Langley, BC. Due to the preliminary nature of geochemical rock sampling, certified reference material ("standards") or blank materials ("blanks") were not inserted into the sample sequences in the field, although internal samples were inserted into the sample sequence at MS Analytical. MS Analytical's QAQC procedures consisted of introducing a variety of standards and blanks and completing normal run pulp and preparation duplicates. Rock samples were crushed to 70% passing 2mm, then a representative split was taken and pulverized to 85% passing 75micron. Multi-Element analysis was performed using by ICP-230 multi-acid digestion, 34 element analysis with an ICP-ES finish.
初步抽样包括三个样本,平均锂含量为656ppm。样品被收集在8.5英寸x 12英寸的聚乙烯袋中,并被送往位于不列颠哥伦比亚省兰利的MS Analytical。由于岩石地球化学取样的初步性质,尽管在MS Analytical的样品序列中插入了内部样品,但现场样品序列中没有插入经认证的标准物质(“标准”)或空白材料(“空白”)。MS Analytical的QAQC程序包括引入各种标准和空白,并完成正常运行的纸浆和制剂复制。将岩石样品粉碎到70%,直径为2 mm,然后进行有代表性的劈裂,粉碎到85%,粒度为75微米。多元素分析采用电感耦合等离子体-230多酸消化,34种元素分析采用电感耦合等离子体发射光谱仪完成。
Forward-Looking Statements
前瞻性陈述
Statements included in this announcement, including statements concerning our plans, intentions, and expectations, which are not historical in nature are intended to be, and are hereby identified as "forward-looking statements". Forward-looking statements may be identified by words including "anticipates", "believes", "intends", "estimates", "expects" and similar expressions. The Company cautions readers that forward-looking statements, including without limitation those relating to the Company's future operations and business prospects, are subject to certain risks and uncertainties that could cause actual results to differ materially from those indicated in the forward-looking statements. Readers are advised to rely on their own evaluation of such risks and uncertainties and should not place undue reliance on forward-looking statements. Any forward-looking statements are made as of the date of this news release, and the Company assumes no obligation to update the forward-looking statements, except in accordance with the applicable laws.
本公告中包含的非历史性陈述,包括与我们的计划、意图和预期有关的陈述,旨在成为前瞻性陈述,特此确认为“前瞻性陈述”。前瞻性陈述可以用包括“预期”、“相信”、“打算”、“估计”、“预期”和类似表述的词语来识别。公司提醒读者,前瞻性陈述,包括但不限于与公司未来运营和业务前景有关的陈述,会受到某些风险和不确定因素的影响,这些风险和不确定因素可能会导致实际结果与前瞻性陈述中所述的大不相同。建议读者依靠自己对此类风险和不确定性的评估,不应过度依赖前瞻性陈述。任何前瞻性陈述都是在本新闻稿发布之日作出的,公司不承担更新前瞻性陈述的义务,除非依照适用的法律。
For further information, please contact us at info@liveenergyminerals.com.
欲了解更多信息,请发送电子邮件至info@liveenergyminals.com与我们联系。
To view the source version of this press release, please visit
要查看本新闻稿的源版本,请访问