Sterling Metals Announces Results of 2022 Regional Drilling and Orion 3D Geophysical Survey at Sail Pond

Sterling Metals Announces Results of 2022 Regional Drilling and Orion 3D Geophysical Survey at Sail Pond

Sterling Metals公布了2022年在Sail Pond进行区域钻探和猎户座三维地球物理调查的结果
Accesswire ·  2023/05/08 07:35

TORONTO, ON / ACCESSWIRE / May 8, 2023 / Sterling Metals Corp. (TSXV:SAG)(OTCQB:SAGGF) ("Sterling Metals" or the "Company") is pleased to announce the completion of the Deep Orion 3D geophysical survey and report the balance of results from its 2022 drilling on the Sail Pond Silver and Base Metal Project in the Great Northern Peninsula of Newfoundland. Drilling results are from the regional exploration program focused on the North and Central Zones.

多伦多,ON/ACCESSWIRE/2023年5月8日/Sterling Metals Corp.(多伦多证券交易所股票代码:SAG)(OTCQB:SAGGF)(“英镑金属“或”公司“)很高兴地宣布深部猎户座3D地球物理调查已完成,并报告了其在纽芬兰大北部半岛的Sail Pond Silver and贱金属项目2022年钻探的结果。钻探结果来自专注于北部和中部地区的区域勘探计划。

Highlights:

重点:

Orion Survey

猎户座调查

  • Four new exploration targets discovered.
  • Favorable geology mapped to depth of 2 kilometres.
  • Strong anomaly beneath newly discovered Heimdall North Zone and SP-22-064.
  • Surveyed 1.5 km of the 14 km trend as a test before large-scale application.
  • Permits for summer drilling submitted.
  • Plans to test identified anomalies in coming months.
  • Airborne survey planned to scan entire property based on drill results.
  • 发现了四个新的勘探目标。
  • 绘制了深度为2公里的有利地质图。
  • 新发现的海姆达尔北带和SP-22-064下方有强烈异常。
  • 调查了1.5公里的14公里走势,作为大规模应用前的测试。
  • 提交了夏季钻探许可证。
  • 计划在未来几个月测试已发现的异常情况。
  • 空中勘测计划根据钻探结果扫描整个财产。

2022 Regional Exploration Results

2022年区域勘探成果

  • Intercepted wide zones of brecciated dolostones showing variably developed polymetallic mineralization along ~4 km of strike.
  • Discovery of a new mineralized system at depth, the Central Ridge Zone, which has the potential to be another pearl along the ~12 km trend, marking the fourth area of mineralization discovered on the property in two years.
  • Sail Pond North revealed new pockets of mineralization, including the highest grade to date in the area at 18.55 m downhole in SP-22-066 at 496 g/t AgEq over 0.25 m (259 g/t Ag, 1.44% Cu, 0.27% Pb, 0.26% Zn, 0.39% Sb).
  • Intervals intersected at Sail Pond North appear to be the upper portions of a larger mineralized system, exhibiting similar host geology and mineralization to the top of the Heimdall Zone.
  • Better understanding of the orientation of the structures will provide better targeting in future drill programs.
  • 沿约4公里的走向截获了显示不同发育程度的多金属矿化的角砾状白云岩的宽阔地带。
  • 在深部发现了一个新的矿化系统-中央山脊带,它有可能成为约12公里趋势上的另一颗明珠,标志着两年内在该矿区发现的第四个矿化区。
  • Sil Pond North发现了新的矿化矿块,包括该地区迄今最高品位的矿化,位于SP-22-066井下18.55米,AgEq为496g/t,超过0.25米(259 g/t Ag,1.44%Cu,0.27%Pb,0.26%Zn,0.39%Sb)。
  • 在Sail Pond North相交的区段似乎是一个更大的矿化系统的上部,显示出与Heimdall带顶部相似的寄主地质和矿化。
  • 更好地了解结构的方向将在未来的钻探计划中提供更好的目标。

Jeremy Niemi, Senior Vice President of Exploration and Evaluation stated, "During our 2022 drilling campaign at Sail Pond, the discovery of new zones of high-grade silver-copper mineralization was a cause for great satisfaction among our team. Close examination of the core revealed that our drilling may have intersected the edges of a more extensive mineralization system. This encouraged our team to deploy the best-in-class high resolution 3D geophysical survey to guide our next exploration steps towards potentially larger zones. It is fantastic that four new targets have emerged where we would expect to see larger bodies of mineralization. The targets fit very well with our regional geological interpretation; we eagerly anticipate the opportunity to drill them in the coming months. This is a very exciting time for the Sail Pond Project and the Sterling Metals team."

勘探与评估部的Jeremy Niemi,高级副总裁表示:“在我们2022年在帆塘的钻探活动中,发现了新的高品位银铜矿化带,这让我们的团队感到非常满意。对岩心的仔细检查显示,我们的钻探可能与更广泛的矿化系统的边缘相交。这鼓励了我们的团队部署一流的高分辨率3D地球物理调查,以指导我们下一步向可能更大的区域进行勘探。奇妙的是,出现了四个新的目标,我们预计会在这些目标上看到更大的矿化体。这些目标非常符合我们的区域地质解释;我们热切期待在未来几个月内有机会钻探它们。对于Sail Pond Project和Sterling Metals团队来说,这是一个非常令人兴奋的时刻。

2023 Orion Survey

2023年猎户座调查

The Deep Orion 3D Swath DCIP and MT Survey employed state-of-the-art 3D ground geophysical techniques on a priority area which includes the Heimdall and Heimdall North Zones. The survey was designed with 200 m spaced lines and readings between lines to generate a 3D interpretation of key structural controls on mineralization and to identify potential high-grade feeder zones as exploration targets. The survey utilized 3 km long lines for deep viewing measuring IP (chargeability) to locate potential sulphide mineralization bodies to 500 m depth, and MT (resistivity) to map favorable host geology to 2 km depth.

深部猎户座3D条带DCIP和MT测量在包括海姆德尔和海姆德尔北部地区在内的优先区域采用了最先进的3D地面地球物理技术。这项调查设计了200米间隔的线和线之间的读数,以生成对矿化的关键构造控制的3D解释,并确定潜在的高品位馈送带作为勘探目标。该调查利用3公里长的深视线测量IP(可充电性)来定位500m深度的潜在硫化物矿体,并利用MT(电阻率)来绘制2公里深度的有利赋存地质。

The deep-looking Orion survey uncovered several new IP anomalies and successfully mapped the favorable anticline geology of the host dolostone unit to 2 km depth. Cross-cutting north-east trending structures, potentially mineral-bearing, were also identified. In total 1.5 km of the 14 km trend at Sail Pond was surveyed as a test before covering larger sections of the property. The results of this survey have isolated four new exploration targets, including a strong IP anomaly coincident with a resistivity high discovered beneath the new Heimdall North Zone and SP-22-064. Permits for summer drilling have been submitted, and plans are underway to test these anomalies in the coming months. Additionally, an airborne geophysics survey is planned to scan the entire property based on drill results. As shown in Figure 1, the final footprint of the Orion survey was focused on the most prospective area surrounding the Heimdall and Heimdall North Zones. Two of the new targets are in proximity to the Heimdall North Zone and displayed in Figure 2.

猎户座深部调查发现了几个新的激电异常,并成功地将寄主白云岩单元的有利背斜地质填图到了2公里深。还发现了横贯东北向的构造,可能含有矿物。在Sail Pond的14公里趋势中,总共有1.5公里是在覆盖更大的区域之前进行的测试。本次调查的结果共圈定了四个新的勘探目标,包括在新的海姆达尔北带和SP-22-064下方发现的与电阻率高一致的强激电异常。夏季钻探的许可证已经提交,未来几个月测试这些异常情况的计划正在进行中。此外,还计划进行一次航空地球物理调查,根据钻探结果扫描整个房产。如图1所示,猎户座调查的最终足迹集中在Heimdall和Heimdall北区周围最有前景的区域。其中两个新目标位于Heimdall北区附近,如图2所示。

Figure1. Final Orion 3D Survey Area at the Sail Pond Project
图1。最后的猎户座3D测量区在帆船池塘项目
Figure 2. Cross section from Orion 3D survey at Heimdall North showing two of four new targets.
图2.猎户座3D测量的横截面显示了四个新目标中的两个。

Mathew Wilson, CEO of Sterling Metals stated, "Typically, numerous mining cycles and efforts from many companies working on a new discovery are required to reach the stage that has been achieved at Sail Pond. It is with great excitement that we anticipate to drill these highly encouraging anomalies which exist below the 1km footprint of Heimdall and Heimdall North. With nearly $8 million in the bank, the start of the Sail Pond drill program marks the initial phase of shareholder value creation, as we intend to undertake drilling activities at both Sail Pond and Adeline this summer."

Sterling Metals首席执行官马修·威尔逊表示:“通常情况下,要达到在Sail Pond取得的成果,需要无数的采矿周期和许多公司的努力才能达到Sail Pond的水平。我们非常兴奋地期望在Heimdall和Heimdall North的1公里范围内钻探这些非常令人鼓舞的异常。银行有近800万美元的资金,Sail Pond钻探计划的开始标志着股东价值创造的初始阶段,因为我们打算在今年夏天在Sail Pond和Adeline进行钻探活动。”

2022 Regional Exploration Results

2022年区域勘探成果

Sterling's 2022 drilling program successfully completed 34 new holes for over 7,500 m of drilling at new targets and the Heimdall Zone. Highlights of the program are the expanded mineralization at Heimdall and newly identified mineralized zone 500 m to the north. The gap between Heimdall and the new zone to the north is virtually wide open and considered very prospective, especially due to the presence of new Orion 3D targets. Targeting for the 2022 program incorporated a detailed structural interpretation by SRK and a comprehensive study by Goldspot which utilized an exploration targeting matrix of 6 geological and geophysical factors which included: presence of silver and copper mineralization at surface, prominent regional north-east trending structures in proximity (as interpreted by SRK), a warp in the argillite contact, distinct breaks in high chargeability anomalies and coincident highs in resistivity.

Sterling的2022年钻井计划成功地完成了34个新孔,在新目标和海姆达尔地区进行了超过7500米的钻井。该项目的亮点是Heimdall的扩大矿化和北部500米处新发现的矿化带。海姆达尔和北部新区之间的差距几乎是敞开的,被认为是非常有前景的,特别是由于新的猎户座3D目标的存在。2022年计划的目标包括SRK的详细构造解释和GoldSpot的全面研究,该研究利用了6个地质和地球物理因素的勘探目标矩阵,其中包括:地表存在银和铜矿化,附近突出的区域东北向构造(如SRK解释的),泥质岩接触处的翘曲,高电荷性异常的明显破裂和重合的电阻率高。

Today's results come from drillholes testing regional targets along the ~14 km of prospective strike length and focused grab sampling from regional target generation and project enhancement. Figure 3 shows a plan map of drillhole and grab sample locations. Prospecting and geological mapping was focused on several highly prospective targets that were identified using our updated exploration targeting matrix.

今天的结果来自于沿着约14公里的预期走向长度对区域目标进行钻孔测试,并从区域目标生成和项目增强中集中抓取样本。图3显示了钻孔和抓取样本位置的平面图。勘探和地质测绘的重点是利用我们最新的勘探目标矩阵确定的几个极具前景的目标。

Figure 3: Plan map showing drill hole locations and grab samples at the Sail Pond North and Central Ridge Zones
图3:显示帆塘北脊和中央脊区钻孔位置和抓取样本的平面图

Across the Sail Pond Project structural complexity is associated with the localization of polymetallic mineralization. The drilling in the Sail Pond North and Central Zone concentrated on locations with similar structural complexities where obliquely converging faults/lineaments intersect the main foliation in the area, often associated with anomalous samples. The regional targets were successful in intercepting wide zones of brecciated dolostones showing variably developed polymetallic mineralization along ~4 km of strike.

在整个赛尔池项目中,结构的复杂性与多金属矿化的本地化有关。在帆塘北部和中部地区的钻探集中在具有相似构造复杂性的位置,即倾斜汇聚的断层/线形结构与该地区的主要面理相交,通常与异常样品有关。区域目标成功地拦截了沿约4公里走向显示不同发育程度的多金属矿化的角砾状白云岩的宽阔地带。

The regional target generation and drilling resulted in the discovery of a new mineralized system at depth, the Central Ridge Zone (Central Ridge), which has the potential to be another pearl along the ~12 km trend. Occurring in close proximity to a structural kink or jog, the Central Ridge is characterized by a wide zone of mineralized brecciated dolostone with clots of sulphides and sulfosalts. The thick veins and massive portions of the system are yet to be discovered, and the area is wide open in all directions. This marks the fourth area of mineralization discovered on the property in two years. In addition, Sail Pond North continued to reveal new pockets of mineralization, including the highest grade to date in the area at 18.55 m downhole in SP-22-066. The intervals intersected appear to be the upper portions of a larger mineralized system, exhibiting similar host geology and mineralization to the top of the Heimdall Zone. An example of core from the North and Central Zone is shown in Figure 4 & 5.

区域目标的产生和钻探导致在深部发现了一个新的成矿系统-中央山脊带(中央山脊),它有可能成为~12公里走向上的另一颗明珠。中央山脊非常接近构造扭折或折弯,其特点是广泛的矿化角砾化白云岩带和硫化物和硫酸盐凝块。该系统的厚矿脉和大片区域尚未被发现,该区域向四面八方都是开放的。这标志着两年内在该地产上发现的第四个矿化区。此外,Sail Pond North继续发现新的矿化矿块,包括SP-22-066井下18.55米的矿化,是该地区迄今最高的矿化品位。相交的区间似乎是一个更大的矿化系统的上部,显示出与Heimdall带顶部相似的寄主地质和矿化作用。图4和图5显示了来自北部和中心地带的岩芯的例子。

The mineralization at Sail Pond, especially the high-grade veins, is structurally controlled and understanding the orientation of the structures is vital to expanding zones and identifying potential new zones along preferred structural trends. The Company has completed an extensive down hole optical televiewer study to measure the orientation of high-grade veins and other structural features in important drill holes across the property. This data and the enhanced geological model will play a significant role in the targeting for the next drill programs.

Sail Pond的矿化,特别是高品位矿脉,受构造控制,了解构造的方向对于沿着优先的构造趋势扩大带和确定潜在的新带至关重要。该公司已经完成了一项广泛的井下光学电视研究,以测量整个物业重要钻孔中的高级矿脉的方向和其他结构特征。这些数据和增强的地质模型将在下一步钻探计划的目标确定中发挥重要作用。

The primary host rock for mineralization identified is a thick sequence of highly altered and often brecciated dolostone of the Cambro-Ordovician Saint George Group. Mineralization encountered to date typically consists of tetrahedrite-tennantite, chalcocite, sphalerite, galena, pyrite, and potentially additional sulfosalt minerals. Quartz veining and associated mineralization are ubiquitous throughout the dolostone unit, but included metallic mineralization is best developed in areas of combined brecciation and veining. The structural evolution and metallogenic sequencing are very complex, and mineralization has been identified in association with a multitude of structural events.

已确定的主要矿化寄主岩石是寒武纪-奥陶纪圣乔治群中一套厚实的高度蚀变且经常是角砾状的白云岩。迄今遇到的矿化通常由四方铅矿、辉铜矿、闪锌矿、方铅矿、黄铁矿以及潜在的额外硫酸盐矿物组成。白云岩单元中普遍存在石英脉状矿化和伴生矿化,但角砾岩和脉状复合矿化地区最发育包裹体金属矿化。构造演化和成矿序列非常复杂,成矿作用与多种构造事件密切相关。

Figure 4: Dolostone-hosted breccia-style sulfide mineralization in hole SP-22-066 at 18.63 - 18.71 m
图4:SP-22-066孔18.63-18.71米白云岩容矿角砾岩型硫化物矿化
Figure 5: Quartz-carbonate vein-hosted disseminated to semi-massive mineralization within host brecciated dolostone in hole SP-22-076
图5:SP-22-076孔寄主角砾白云岩中石英-碳酸盐脉状浸染状至半块状矿化

Table 1. Reported assay intervals from Sail Pond 2022 drilling.

表1.报告的Sail Pond 2022钻井的化验间隔。

Drillhole

Zone

From (m)

To (m)

Length (m)*

AgEq (g/t)

Ag (g/t)

Cu (%)

Pb (%)

Zn (%)

Sb (%)

SP-22-066

North

18.55

18.8

0.25

496

259

1.44

0.27

0.26

0.39

and

25.5

25.75

0.25

101

48

0.32

0.12

0.067

0.078

SP-22-067

North

No Significant Results

SP-22-068

North

3.5

4.15

0.65

340.3

181

0.99

0.31

0.19

0.22

SP-22-069

North

36

37

1

119

60

0.26

0.32

0.35

0.061

inc

36

36.5

0.5

161.3

75

0.32

0.55

0.66

0.086

and

122

122.25

0.25

115.7

69

0.27

0.096

0.061

0.076

SP-22-070

North

16

22.25

6.25

24.2

13.5

0.052

0.051

0.042

0.013

inc

16

16.27

0.27

96

43

0.16

0.22

0.67

0.041

and

99.06

99.89

0.83

96.4

49

0.16

0.15

0.52

0.045

and

123.5

124

0.5

130

65

0.22

0.24

0.70

0.067

SP-22-071

North

65.75

66.25

0.5

284.1

124

0.50

1.26

1.35

0.15

inc

65.75

66

0.25

322.4

150

0.62

1.62

0.83

0.202

and

107.14

107.6

0.46

79.1

41

0.15

0.24

0.26

0.039

SP-22-072

North

No Significant Results

SP-22-073

Central

46

46.5

0.5

108.2

60

0.27

0.078

0.071

0.084

56.35

56.6

0.25

183.5

95

0.53

0.035

0.084

0.16

SP-22-074

Central

95.2

95.9

0.7

86.5

40

0.24

0.09

0.196

0.07

and

121.1

121.4

0.3

97

52

0.27

0.045

0.05

0.078

and

123.25

123.55

0.3

150

65

0.36

0.51

0.48

0.093

SP-22-075

Central

No Significant Results

SP-22-076

Central

31.5

34

2.5

84.7

38.8

0.22

0.25

0.15

0.059

inc

31.5

32

0.5

260.2

124

0.84

0.072

0.18

0.22

and

57

73

16

24.1

12.3

0.063

0.032

0.029

0.018

inc

62.5

63

0.5

110.2

59

0.29

0.14

0.058

0.085

inc

66

66.5

0.5

287.7

152

0.80

0.22

0.13

0.24

inc

72

72.25

0.25

202

106

0.56

0.27

0.12

0.14

and

127

128

1

193

42

0.19

0.78

3.07

0.0092

SP-22-077

Central

108.9

109.15

0.25

152.2

72

0.36

0.25

0.56

0.089

SP-22-078

Central

40.35

41.85

1.5

94.7

48.3

0.18

0.53

0.13

0.05

inc

40.81

41.18

0.37

263.8

136

0.47

1.92

0.082

0.14

钻孔

分带

发件人(M)

至(M)

长度(米)*

AgEq(克/吨)

银(克/吨)

CU(%)

PB(%)

锌(%)

SB(%)

SP-22-066

18.55

18.8

0.25

四百九十六

259

1.44

0.27

0.26

0.39

25.5

25.75

0.25

101

48

0.32

0.12

0.067

0.078

SP-22-067

没有显著的结果

SP-22-068

3.5

4.15

0.65

340.3

181

0.99

0.31

0.19

0.22

SP-22-069

36

37

1

119

60

0.26

0.32

0.35

0.061

Inc.

36

36.5

0.5

161.3

75

0.32

0.55

0.66

0.086

一百二十二

122.25

0.25

115.7

69

0.27

0.096

0.061

0.076

SP-22-070

16年

22.25

6.25

24.2

13.5

0.052

0.051

0.042

0.013

Inc.

16年

16.27

0.27

96

43

0.16

0.22

0.67

0.041

99.06

99.89

0.83

96.4

49

0.16

0.15

0.52

0.045

123.5

124

0.5

130

65

0.22

0.24

0.70

0.067

SP-22-071

65.75

66.25

0.5

284.1

124

0.50

1.26

1.35

0.15

Inc.

65.75

66

0.25

322.4

一百五十

0.62

1.62

0.83

0.202

107.14

107.6

0.46

79.1

41

0.15

0.24

0.26

0.039

SP-22-072

没有显著的结果

SP-22-073

中环

46

46.5

0.5

108.2

60

0.27

0.078

0.071

0.084

56.35

56.6

0.25

183.5

95

0.53

0.035

0.084

0.16

SP-22-074

中环

95.2

95.9

0.7

86.5

40岁

0.24

0.09

0.196

0.07

121.1

121.4

0.3

九十七

52

0.27

0.045

0.05

0.078

123.25

123.55

0.3

一百五十

65

0.36

0.51

0.48

0.093

SP-22-075

中环

没有显著的结果

SP-22-076

中环

31.5

34

2.5

84.7

38.8

0.22

0.25

0.15

0.059

Inc.

31.5

32位

0.5

260.2

124

0.84

0.072

0.18

0.22

57

73

16年

24.1

12.3

0.063

0.032

0.029

0.018

Inc.

62.5

63

0.5

110.2

59

0.29

0.14

0.058

0.085

Inc.

66

66.5

0.5

287.7

一百五十二

0.80

0.22

0.13

0.24

Inc.

72

72.25

0.25

202

106

0.56

0.27

0.12

0.14

127

128

1

一百九十三

42

0.19

0.78

3.07

0.0092

SP-22-077

中环

108.9

109.15

0.25

152.2

72

0.36

0.25

0.56

0.089

SP-22-078

中环

40.35

41.85

1.5

94.7

48.3

0.18

0.53

0.13

0.05

Inc.

40.81

41.18

0.37

263.8

136

0.47

1.92

0.082

0.14

*Mineralized intervals may not reflect the true width of the zones.

*矿化间隔可能不能反映地带的真实宽度。

Table 2. Reported Sail Pond drillhole locations and orientations.

表2.报告的帆池钻孔位置和方位。

Hole ID

Easting

Northing

Elevation (m)

Azimuth

Dip

Final Depth (m)

Target

SP-22-066

578619

5661414

53.51

300

-45

250

North Zone

SP-22-067

578854

5661279

67

300

-45

241

North Zone

SP-22-068

578379

5661369

49.68

300

-45

217

North Zone

SP-22-069

578864

5662287

74.32

290

-45

233

North Zone

SP-22-070

578961

5662481

77

290

-45

232

North Zone

SP-22-071

578960

5662476

77

50

-60

523

North Zone

SP-22-072

579112

5662528

74

290

-50

251

North Zone

SP-22-073

577263

5659118

70

300

-45

215

Central Zone

SP-22-074

577276

5658982

65

300

-45

197

Central Zone

SP-22-075

577324

5658837

50

300

-45

179

Central Zone

SP-22-076

577202

5659144

76

120

-45

133

Central Zone

SP-22-077

577202

5659144

76

120

-54

131

Central Zone

SP-22-078

577202

5659144

76

100

-50

121

Central Zone

孔ID

向东

北距

高程(米)

方位角

浸渍

最终深度(M)

目标

SP-22-066

578619

5661414

53.51

300个

-45

250个

北区

SP-22-067

578854

5661279

67

300个

-45

二百四十一

北区

SP-22-068

578379

5661369

49.68

300个

-45

217

北区

SP-22-069

578864

5662287

74.32

二百九十

-45

二百三十三

北区

SP-22-070

578961

5662481

77

二百九十

-45

二百三十二

北区

SP-22-071

578960

5662476

77

50

-60

523

北区

SP-22-072

579112

5662528

74

二百九十

-50

251

北区

SP-22-073

577263

5659118

70

300个

-45

215

中心区

SP-22-074

577276

5658982

65

300个

-45

197

中心区

SP-22-075

577324

5658837

50

300个

-45

179

中心区

SP-22-076

577202

5659144

76

120

-45

一百三十三

中心区

SP-22-077

577202

5659144

76

120

-54

131

中心区

SP-22-078

577202

5659144

76

100个

-50

一百二十一

中心区

Option Grant

期权授予

In addition, the Company announces that it has granted an aggregate of 6,280,000 options to purchase common shares of the Company exercisable at a price of $0.15 per common share for a period of two (2) years to directors, officers, and consultants of the Company. The common shares issuable upon exercise of the options are subject to a four month hold period from the original date of grant.

此外,公司还宣布,已向公司董事、高级管理人员和顾问授予总计6,280,000份购买公司普通股的期权,可按每股普通股0.15美元的价格行使,为期两(2)年。行使购股权时可发行的普通股,自最初授予之日起有四个月的持有期。

Silver Equivalent Calculation

银当量计算

Silver equivalent (Ag Eq) values were calculated using the following formula:

银当量(Ag Eq)值使用以下公式计算:

[(Ag_oz*$USAg_price/oz)+(Cu_lb*$USCu_price/lb)+(Pb_lb*$USPb price/lb)+(Sb lb*$USSb_price/lb)+(Zn_lb*$USZn_price/lb)]/$USAg_price/oz.

[(Ag_oz*$USAg_price/oz)+(Cu_lb*$USCu_price/lb)+(Pb_lb*$USPb价格/磅)+(SB lb*$USSb_price/lb)+(Zn_lb*$USZn_price/lb)]/$USAg_price/oz.

Silver equivalent grade calculations are based on the current spot metal prices and are provided for comparative purposes only. This approach reflects the polymetallic nature of the mineralization.

银等值品位计算基于当前现货金属价格,仅供比较之用。这种方法反映了矿化的多金属性质。

Recovery factors of 100% have been assumed for all metals. Metallurgical tests will be required to establish recovery levels for each element reported. Metal spot prices as at the close of the London Metals Exchange April 6th, 2023 were applied and include: Ag - $US 24.90/oz; Cu - $US4.02/lb; Zn - $US1.28/lb; Pb - $US 0.96/lb. The Sb - $US 5.74/lb price applied was sourced from Argus Media, a recognized provider of energy and commodity price benchmarks.

所有金属的回收率都被假定为100%。将需要进行冶金测试,以确定所报告的每种元素的回收水平。截至2023年4月6日伦敦金属交易所收盘时的金属现货价格包括:银-24.90美元/盎司;铜-4.02美元/磅;锌-1.28美元/磅;铅-0.96美元/磅。SB-5.74美元/磅的价格来自Argus Media,一家公认的能源和大宗商品价格基准提供商。

Qualified Person

有资格的人

Jeremy Niemi, P.Geo., Senior Vice President of Exploration and Evaluation for Sterling Metals has reviewed and approved the technical information presented herein.

Sterling Metals勘探与评估部的Jeremy Niemi,P.Geo,高级副总裁审阅并批准了本文提供的技术信息。

Laboratory Technical Note

实验室技术说明

Analytical services were provided by SGS Canada Inc., which is an independent, CALA-accredited analytical services firm registered to ISO 17025 standard. Drill core was halved by sawing at the Sterling core facility and half-core samples were securely stored at the facility until being delivered to SGS Grand Falls site by commercial transport. Samples were crushed to 75% passing 2 mm, split to 250g, and pulverized to 85% passing 75 microns. Multi-element analyses, including base metals, were conducted on pulverized material using the ICP-AES method for 34 elements. Laboratory over-limits analysis methods were applied as required. A systematic QAQC protocol was employed that includes systematic insertion in the sample stream of certified reference materials and blank samples, plus analysis of duplicate pulp splits and core splits.

分析服务由SGS Canada Inc.提供,这是一家独立的、经CALA认可的分析服务公司,注册于ISO 17025标准。在Sterling核心设施中,钻芯被锯成两半,半个核心样品被安全地储存在该设施中,直到通过商业运输送到SGS Grand Falls现场。样品粉碎到75%,通过2 mm,分成250g,粉碎到85%,通过75微米。用电感耦合等离子体原子发射光谱仪对粉末状物质进行了34种元素的多元素分析,其中包括贱金属。按要求应用实验室超限分析方法。采用了系统的QAQC方案,包括在认证标准物质和空白样品的样品流中系统地插入,以及对复制的纸浆裂解和核心裂解进行分析。

About Sterling Metals

关于Sterling Metals

Sterling Metals (TSXV: SAG and OTCQB: SAGGF) is a mineral exploration company focused on Canadian exploration opportunities. The Company is currently advancing its 100% owned Sail Pond Project located in the Great Northern Peninsula of Newfoundland and recently acquired the Adeline Project in Labrador. The 13,500 ha Sail Pond Project is a brand-new discovery, first discovered in 2016 with no drilling prior and consists of high grade, silver, copper, lead and zinc associated with quartz-carbonate veining, brecciated dolostone, and 100% sulfosalt veining. The 29,700 ha Adeline Project is a mid-stage exploration project covering an entire sediment-hosted copper belt, with demonstrated potential for important new copper discoveries with significant silver credits. Both projects are easily accessible by road with nearby services and a 30-min flight from one another.

Sterling Metals(多伦多证券交易所股票代码:SAG和OTCQB股票代码:SAGGF)是一家专注于加拿大勘探机会的矿产勘探公司。该公司目前正在推进其位于纽芬兰北部大半岛的100%拥有的Sail Pond项目,最近还收购了拉布拉多的Adeline项目。13500公顷的帆塘项目是一个全新的发现,于2016年首次发现,之前没有钻探,由与石英碳酸盐脉、角砾岩白云岩和100%硫酸盐矿脉有关的高品位银、铜、铅和锌组成。29,700公顷的Adeline项目是一项中期勘探项目,涵盖整个以沉积物为主的铜矿带,具有发现重要的新铜矿的潜力,并拥有可观的银矿储量。这两个项目都很容易从公路上到达,附近有服务,彼此之间只有30分钟的飞行时间。

For more information, please contact: Sterling Metals Corp.

欲了解更多信息,请联系:Sterling Metals Corp.

Mathew Wilson, President & CEO Tel: (416) 643-3887

总裁首席执行官马修·威尔逊电话:(416)643-3887

Email: info@sterlingmetals.ca

电子邮件:info@sterlingmetals.ca

Website:

网站:

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所创业板交易所及其监管服务提供商(该术语在多伦多证券交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

This news release contains certain "forward-looking information" within the meaning of applicable securities laws. Forward looking information is frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "may", "will", "would", "potential", "proposed" and other similar words, or statements that certain events or conditions "may" or "will" occur. These statements are only predictions. Forward-looking information is based on the opinions and estimates of management at the date the information is provided, and is subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. For a description of the risks and uncertainties facing the Company and its business and affairs, readers should refer to the Company's Management's Discussion and Analysis. The Company undertakes no obligation to update forward-looking information if circumstances or management's estimates or opinions should change, unless required by law. The reader is cautioned not to place undue reliance on forward-looking information.

本新闻稿包含适用证券法所指的某些“前瞻性信息”。前瞻性信息的特点常常是“计划”、“预期”、“项目”、“打算”、“相信”、“预期”、“估计”、“可能”、“将”、“将”、“可能”、“建议”和其他类似的词语,或某些事件或条件“可能”或“将”发生的陈述。这些声明只是预测。前瞻性信息以提供信息之日管理层的意见和估计为基础,会受到各种风险、不确定因素和其他因素的影响,这些因素可能会导致实际事件或结果与前瞻性信息中预测的大不相同。关于公司及其业务和事务面临的风险和不确定因素的描述,读者应参考公司管理层的讨论和分析。除非法律要求,否则如果情况或管理层的估计或意见发生变化,公司不承担更新前瞻性信息的义务。告诫读者不要过度依赖前瞻性信息。

SOURCE: Sterling Metals Corp.

资料来源:Sterling Metals Corp.


View source version on accesswire.com:
在accesswire.com上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发