VANCOUVER, BC / ACCESSWIRE / May 10, 2023 / Blue Lagoon Resources Inc. (the "Company") (CSE:BLLG)(FSE:7BL)(OTCQB:BLAGF) is pleased to announce final results from the 2023 Phase I drilling program on its year-round, road accessible, Dome Mountain Gold Project, located a short 50-minute drive from Smithers, British Columbia.

温哥华,卑诗省/ACCESSWIRE/2023年5月10日/蓝色泻湖资源公司(以下简称“公司”)(CSE:BLG)(法兰克福证券交易所股票代码:7BL)(场外交易市场代码:BLAGF)高兴地宣布了2023年第一阶段钻探计划的最终结果,该项目位于距离不列颠哥伦比亚省史密瑟斯50分钟车程的全年可通公路的穹顶山黄金项目。

A total of 2909 meters of NQ diamond drilling was completed in ten (10) drill holes during the Phase 1 2023 campaign. Two of the ten holes were abandoned due to technical issues well before target depth and subsequently redrilled (Table 1). The first of these ten holes was focused on undercutting and following up on a significant intersection discovered during the 2022 drill program in drill hole DM-22-273 (see press release January 16, 2023). This intersection consisted of a wide zone of mineralized breccia and quartz-carbonate sulphide veining was intersected grading 5.49 g/t Au, 80.9 g/t Ag and 1.21% Cu over 16.55 meters (291.45 to 308.00m), including 11.02 g/t Au, 115.8 g/t Ag and 2.31% Cu over 5.65 meters (202.35 to 308.00m). This intersection was interpreted to represent the eastern extension of the Boulder Main vein.

在2023年第一阶段活动中,在十(10)个钻孔中完成了总计2909米的NQ钻石钻探。由于技术问题,十个井中有两个早在目标深度之前就被废弃了,随后又重新钻探(表1)。这十个孔中的第一个重点是在2022年钻探计划中在DM-22-273孔中发现的一个重要交叉点的底切和后续工作(见2023年1月16日的新闻稿)。该交汇点由宽阔的矿化角砾岩带和石英-碳酸盐硫化物脉组成,品位为5.49g/t Au、80.9g/t Ag和1.21%Cu16.55m(291.45~308.00m),其中Au 11.02g/t、Ag 115.8 g/t、2.31%Cu5.65m(202.35~308.00m)。这个交叉点被解释为代表博尔德主脉的东部延伸。

Follow-up drilling this year set up on the same drill pad as hole DM-22-273 and targeted strike and dip extents at approximately 50 metres centers (Figure 1).

今年的后续钻井设置在与DM-22-273孔相同的钻台上,并在中心约50米处定向走向和倾斜范围(图1)。

Table 1: Drill hole collar specifications

表1:钻孔箍规格

Hole ID

Location (UTM Zone 9 North)

Total Depth (m)

Orientation

Easting

Northing

Elevation

Azimuth

Dip

DM-23-285

(Abandoned and redrilled as 285A)

653552

6068474

1293

43.00

350

-58

DM-23-285A

653552

6068474

1293

581.00

350

-58

DM-23-286

653552

6068474

1293

362.70

338

-46

DM-23-287

653552

6068474

1293

359.00

338

-59

DM-23-288

653552

6068474

1293

358.50

5

-47

DM-23-289

653552

6068474

1293

367.70

3

-57

DM-23-290

(Abandoned and redrilled as 290A)

653552

6068474

1293

61.60

13

-46

DM-23-290A

653552

6068474

1293

316.20

16.4

-46

DM-23-291

653403

6068679

1300

205.60

6

-50

DM-23-292

653403

6068679

1300

253.50

67

-45

孔ID

位置(UTM 9区北部)

总深度(米)

定向

向东

北距

高程

方位角

浸渍

DM-23-285

(废弃并重新钻探为285A)

653552

6068474

1293

43.00

350

-58

DM-23-285A

653552

6068474

1293

581.00

350

-58

DM-23-286

653552

6068474

1293

362.70

三百三十八

-46

DM-23-287

653552

6068474

1293

359.00

三百三十八

-59

DM-23-288

653552

6068474

1293

358.50

5.

-47

DM-23-289

653552

6068474

1293

367.70

3.

-57

DM-23-290

(废弃并重新钻探为290A)

653552

6068474

1293

61.60

13个

-46

DM-23-290A

653552

6068474

1293

316.20

16.4

-46

DM-23-291

653403

6068679

1300

205.60

6.

-50

DM-23-292

653403

6068679

1300

253.50

67

-45

Figure 1

图1

Table 2: Selected significant intersections, Boulder Main, eastern extension

表2:选定的重要交叉口,Boulder Main,东部延伸

Hole ID

Intersection (m)

Grade

From

To

Length

Au (g/t)

Ag (g/t)

Cu (%)

DM-23-285A

331.05

331.47

0.42

44.20

136.0

0.524

491.00

492.00

1.00

1.31

12.1

0.059

503.00

511.00

8.00

1.80

8.4

0.050

incl

504.60

507.34

2.74

4.25

18.7

0.095

541.00

543.00

2.00

1.75

7.6

0.060

546.00

548.95

2.95

2.39

10.8

0.057

DM-23-286

330.00

331.00

1.00

6.02

83.7

0.380

DM-23-287

309.55

311.10

1.55

15.20

31.4

0.147

DM-23-288

300.51

301.50

0.99

0.95

0.8

0.010

302.54

303.77

1.23

0.97

7.4

0.033

345.05

346.10

1.05

4.55

47.3

0.077

DM-23-289

339.00

340.40

1.40

10.35

38.9

0.108

Incl

339.84

340.40

0.56

25.10

93.0

0.248

DM-23-290A

267.00

267.34

0.34

7.64

30.6

0.167

孔ID

交叉点(M)

等级

从…

长度

Au(克/吨)

银(克/吨)

CU(%)

DM-23-285A

331.05

331.47

0.42

44.20

136.0

0.524

491.00

492.00

1.00

1.31

12.1

0.059

503.00

511.00

8.00

1.80

8.4

0.050

包括

504.60

507.34

2.74

4.25

18.7

0.095

541.00

543.00

2.00

1.75

7.6

0.060

546.00

548.95

2.95

2.39

10.8

0.057

DM-23-286

330.00

331.00

1.00

6.02

83.7

0.380

DM-23-287

309.55

311.10

1.55

15.20

31.4

0.147

DM-23-288

300.51

301.50

0.99

0.95

0.8

0.010

302.54

303.77

1.23

0.97

7.4

0.033

345.05

346.10

1.05

4.55

47.3

0.077

DM-23-289

339.00

340.40

1.40

10.35

38.9

0.108

包括

339.84

340.40

0.56

25.10

93.0

0.248

DM-23-290A

267.00

267.34

0.34

7.64

30.6

0.167

NOTE: Insufficient information is available to determine true thicknesses.

注:没有足够的信息来确定真正的厚度。

The down-dip expression of the mineralization in drill hole DM-22-273 appears to be a narrow semi-massive sulphide bearing quartz vein (the Boulder Vein) in drill hole DM-23-285A. Precious metal grades here are 44.20 g/t Au and 136 g/t Ag and 0.52% Cu over 0.42 meters. Further down hole, a broader, but lower grade zone returned 1.80 g/t Au and 8.4 g/t Ag over 8.00 meters, including 4.25 g/t Au and 18.7 g/t Ag over 2.74 meters. Lower copper concentrations in this zone suggest it is not related to mineralization in DM-22-273 but may represent a zone of previously unrecognized mineralization in this structurally complex area.

DM-22-273钻孔的矿化向下表现为DM-23-285A钻孔中狭窄的含半块状硫化物的石英脉(Boulder脉)。这里的贵金属品位为44.20g/t Au和136g/t Ag,0.42米内含0.52%铜。再往下钻,在8.00米范围内,一个更宽但品位较低的矿带返回1.80克/吨金和8.4克/吨银,其中4.25克/吨金和18.7克/吨银在2.74米范围内。该带较低的铜含量表明,它与DM-22-273的矿化无关,但可能代表了这一构造复杂地区以前未发现的矿化带。

Drilling on strike to the west, drill holes DM-23-286 and DM-23-287 intersected the mineralized Boulder Vein grading 6.02 g/t Au and 83.7 g/t Ag over 1.00 meters and 15.20 g/t Au and 31.4 g/t Ag over 1.55 meters, respectively.

向西钻进,DM-23-286和DM-23-287钻孔分别与1.00米以上品位6.02 g/t Au和83.7 g/t Ag、1.55米以上15.20 g/t Au和31.4 g/t Ag矿化大岩脉相交。

To the east, drill hole DM-23-288 did intersect a zone of veining approximately 56 metres east at a similar depth as in hole DM-22-273, although the breccia was not developed in this location. Gold and silver grades were only weakly anomalous with a best of 1.48 g/t Au and 18.1 g/t Ag over 0.52 metres. Below this, two samples returned strong silver (and copper) values with concentrations of 97.2 g/t Ag (0.371% Cu) and 233 g/t Ag (1.640% Cu). These are related to narrow disseminated zones of a dark grey sulphide, identified as tennantite based on geochemistry. These zones are rather unique as compared to typical vein character and mineralogy of the Boulder Vein. Narrow tennantite veining was noted in the intersection in drill hole 273. Drill hole DM-23-289 drilled to undercut DM-23-238 intersected a deformed quartz -carbonate sulphide vein which returned 1.4 meters running 10.35 g/t Au, 38.9 g/t Ag and 0.108 Cu% (including 25.10 g/t Au and 93.0 g/t Ag over 0.56 meters). This intercept in the Boulder Vein is significant as it confirms 350 meters of additional strike length along the Boulder Vein east of the current resource model (see figure 2). Drill hole DM-23-290A, drilled to intersect the structure another 50 meters east, cut a narrow quartz-carbonate-sulphide vein grading 7.64 g/t Au and 30.6 g/t Ag over 0.34 meters.

在东面,DM-23-288号钻孔确实与DM-22-273号孔有一个向东约56米的脉状带相交,其深度与DM-22-273号孔相似,尽管角砾岩不是在这个位置发育的。金银品位只有微弱异常,最好的金银品位分别为1.48g/t Au和18.1g/t Ag,超过0.52米。在此之下,两个样品返回了高银(和铜)值,浓度分别为97.2g/t Ag(0.371%铜)和233g/t Ag(1.640%铜)。它们与一种深灰色硫化物的狭窄浸染带有关,根据地球化学性质,这种硫化物被鉴定为锡矿。与Boulder矿脉的典型矿脉特征和矿物学相比,这些带是相当独特的。在273号钻孔的交叉口发现了狭窄的铅锌矿矿脉。DM-23-289钻孔与变形的石英碳酸盐硫化物矿脉相交,该矿脉产出1.4m,含金量10.35g/t,含银量38.9g/t,含铜0.108%(其中含金量25.10g/t,含银量93.0g/t)。Boulder矿脉的这一截距意义重大,因为它证实了沿当前资源模型以东的Boulder矿脉有350米的额外走向长度(见图2)。DM-23-290A钻孔向东再钻50米与构造相交,在0.34米范围内切割出品位7.64克/吨金和30.6克/吨银的狭窄石英-碳酸盐-硫化物矿脉。

Drill hole DM-23-291 was planned to test an interpreted area of the Boulder Main vein that was not included in the current vein model. A vein was intersected in historical drill hole D89-05 which graded 6.89 g/t Au and 41.6 g/t Ag within altered host rocks. Additional < 5g/t Au mineralization was selectively sampled within the alteration zone. Sampling of DM-23-291 only returned spotty low grade precious metal values within the expected zone. At depth, a better mineralized vein was encountered returning 3.52 g/t Au and 57.3 g/t Ag over 3.00 meters. It is unclear whether this vein represented the Boulder Footwall vein or may possibly be part of the Boulder East structures.

计划在DM-23-291钻孔中测试未包括在当前静脉模型中的Boulder主脉的解释区域。历史钻孔D89-05相交于蚀变围岩中品位6.89g/t的Au和41.6g/t的Ag。在蚀变带内还选择性地采集了

Though there is insufficient infill drilling at this time, it is reasonable to assume, based on drilling, that the strike length and down-dip extent of the Boulder Vein Resource could be doubled by infill drilling. The current resource (news release Feb 3, 2022) discloses a mineral resource of 45,000 Au and 250,000 Ag in the measured category, 173,000 oz Au and 876,000 oz Ag in the indicated category and 16,000 oz Au and 71,000 oz Ag in the inferred category.

尽管目前没有足够的加密钻井,但根据钻井,可以合理地假设,通过加密钻井,Boulder矿脉资源的走向长度和下倾程度可能会翻一番。当前资源(2022年2月3日新闻稿)披露了一种矿产资源测量类别为45,000金和250,000银,指示类别为173,000盎司Au和876,000盎司银推断类别中的16,000盎司金和71,000盎司银。

Figure 2 Long section showing existing Boulder Vein Resource (measured and indicated resource blocks) and recent drilling. Black arrows showing strike length and dip depth on the resource and red arrows show length along strike and down dip added by recent drilling. Area in green denotes 2023 Phase 1 drilling.

图2长段显示了现有的Boulder矿脉资源(已测量和指示的资源区块)和最近的钻探。黑色箭头显示资源上的走向长度和倾角深度,红色箭头表示最近钻井增加的走向和向下倾角的长度。绿色区域表示2023年第一阶段钻探。

QUALITY ASSURANCE AND CONTROL

质量保证和控制

Core selected for sampling was cut in half with a core saw with one half bagged for shipping. Strict chain of custody storing, and shipping protocol was maintained. All core preparation and analyses were completed by Activation Laboratories Ltd. located in Kamloops, BC. Core was crushed, split, and pulverized with 250 grams passing 200 mesh. Each sample was analyzed for gold by fire assay with ICP-OES finish (Act Labs Code 1A2-ICP) and for multi-elements by 4-acid total digestion ICP with OES finish. (Act Labs Code 1F2) Any gold overlimits (>30 ppm Au) were analyzed by gravimetric fire assay (Act Labs Code 1A3). Standards and blanks were inserted by Company staff. The drilling and sampling program was managed and supervised by Company personnel and under the direction of Ted Vanderwart, P.Geo.

选择取样的岩芯被切成两半,用岩心锯将一半装袋运输。严格的保管、储存和运输协议都得到了维护。所有的核心准备和分析都由位于不列颠哥伦比亚省坎卢普斯的激活实验室有限公司完成。芯子被粉碎、劈裂和粉碎,250克通过200目。每个样品都用火焰试金法和四酸消解电感耦合等离子体光学法(Act Labs Code1A2-ICP)进行金分析。(ACT实验室代码1F2)任何黄金超标(>30ppm Au)均采用重量火试剂法(ACT实验室代码1A3)进行分析。标准和空白由公司工作人员填写。钻井和取样计划由公司人员管理和监督,并在Ted Vanderwart的指导下进行,P.Geo.

The scientific and technical disclosure in this news release was approved by William Cronk, P.Geo, a Qualified Person as defined in NI 43-101 and a consultant to the Company.

本新闻稿中的科技披露得到了威廉·克朗克的批准,P.Geo,NI 43-101中定义的合格人员和公司的顾问。

For further information, please contact:

如需更多信息,请联系:

Rana Vig
President and Chief Executive Officer
Telephone: 604-218-4766
Email: rana@ranavig.com

拉娜·维格
总裁与首席执行官
电话:604-218-4766
电子邮件:raa@ranavig.com

The CSE has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

CSE未对本新闻稿的充分性或准确性进行审查,也不承担任何责任。

Statement Regarding Forward-Looking Information: This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that Blue Lagoon Resources Inc. (the "Company") expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include results of exploration activities may not show quality and quantity necessary for further exploration or future exploitation of minerals deposits, volatility of gold and silver prices, and continued availability of capital and financing, permitting and other approvals, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

关于前瞻性信息的陈述:本新闻稿包括某些可被视为“前瞻性陈述”的陈述。本新闻稿中除有关历史事实的陈述外,涉及Blue Lagoon Resources Inc.(以下简称“公司”)预期发生的事件或发展的所有陈述均为前瞻性陈述。前瞻性陈述是指不是历史事实的陈述,一般但并非总是以“预期”、“计划”、“预期”、“相信”、“打算”、“估计”、“项目”、“可能”和类似的表述,或事件或条件“将”、“将”、“可能”、“可能”或“应该”发生。尽管公司认为这些前瞻性陈述中表达的预期是基于合理的假设,但这些陈述并不能保证未来的业绩,实际结果可能与前瞻性陈述中的结果大不相同。可能导致实际结果与前瞻性表述大相径庭的因素包括:勘探活动的结果可能没有显示进一步勘探或未来开采矿藏所需的质量和数量、金银价格的波动、资本和融资的持续可获得性、许可和其他批准以及一般经济、市场或商业状况。请投资者注意,任何此类陈述都不是对未来业绩的保证,实际结果或发展可能与前瞻性陈述中预测的大不相同。前瞻性陈述是基于公司管理层在陈述发表之日的信念、估计和意见。除非适用的证券法要求,否则公司没有义务在管理层的信念、估计或意见或其他因素发生变化时更新这些前瞻性陈述。

SOURCE: Blue Lagoon Resources Inc.

资料来源:蓝色泻湖资源公司。


View source version on accesswire.com:
在accesswire.com上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发