Athena Gold Announces 2023 Exploration Plans for Flagship Excelsior Springs Project in Nevada
Athena Gold Announces 2023 Exploration Plans for Flagship Excelsior Springs Project in Nevada
VACAVILLE, CA / ACCESSWIRE / May 15, 2023 / Athena Gold Corporation (OTCQB:AHNR)(CSE:ATHA) ("Athena" or the "Company") is pleased to present its 2023 exploration plans at its 100% owned Excelsior Springs Project ("Project") located approximately 45 miles southwest of Goldfield in Esmeralda County, Nevada.
加利福尼亚州瓦卡维尔/ACCESSWIRE/2023年5月15日/雅典娜黄金公司(场外交易代码:AHNR)(CSE:ATSA)(“雅典娜“或”公司“)很高兴在其100%拥有的Excelsior Springs项目上介绍其2023年的勘探计划(”项目“)位于内华达州埃斯梅拉达县戈德菲尔德西南约45英里处。
Our initial 2023 RC drill program of approximately 1,500 meters will be focused on expanding the newly discovered shallow high-grade gold in the Western Slope zone with 30 meter incremental step-outs on the indicated strike both east and west. These angle holes will be drilled due south parallel with our discovery hole DB-23.
我们最初的2023年RC钻探计划约1,500米,将专注于扩大西斜坡区新发现的浅层高品位金矿,在所指示的走向上东西两侧逐步下移30米。这些斜孔将在与我们的发现孔DB-23平行的正南方钻探。
Figure 1. Map depicting discovery holes DB-23, 22-01 and 22-02 shown with proposed step-out Drill Pad locations.
图1.描绘发现孔DB-23、22-01和22-02的地图,以及建议的分步钻台位置。
Athena completed two RC drill programs in 2022 and intersected shallow high-grade oxide gold intervals which now comprise the Western Slope Zone. A review of our 2022 RC drill highlights is summarized below.
雅典娜在2022年完成了两个RC钻探计划,并将浅层高品位氧化金矿区段相交,这些区段现在构成了西坡带。下面是对我们2022年RC演习亮点的回顾。
2022 RC Drill Program Highlights
2022年RC钻探计划要点
DB-23: Intercepted a 33.5 meter intercept of 5.15 g/t Au and 8.9 g/t Ag, including a 16.7- meter intercept of 10.03 g/t Au and 17.3 g/t Ag, and a 10.6 meter intercept of 15.3 g/t Au and 26.5 g/t Ag.
DB-23:截留了33.5米的Au和8.9 g/t的Au和8.9 g/t的Ag,其中16.7米截留了10.03 g/t的Au和17.3 g/t的Ag,10.6米的截获15.3 g/t的Au和26.5 g/t的Ag。
DH 22-01: Intercepted 6.05 g/t Au and 17.4 g/t Ag over 27.4 meters starting at 39.5 meters, including 10.2 g/t Ag and 30.8 g/t Ag over 10.7meters. A deeper zone starting at 77.7 meters intercepted 4.97 g/t Au and 14.4 g/t Ag over 13.7 meters.
卫生署22-01从39.5米开始,在27.4米处截获Au 6.05 g/t和Ag 17.4 g/t,其中10.7米截获10.2 g/t Ag和30.8 g/t Ag。从77.7米开始的较深层在13.7米处截留了4.97克/吨金和14.4克/吨银。
DH 22-02: Intercepted 4.49 g/t Au and 27.3 g/t Ag over 15.2 meters starting at 41.1 meters, including 7.29 g/t Au and 44.2 g/t Ag over 9.1 meters. A deeper zone starting at 68.6 meters intercepted 1.20 g/t Au and 7.7 g/t Ag over 7.6 meters.
卫生署22-02从41.1米开始,在15.2米处截留了4.49克/吨金和27.3克/吨银,其中9.1米以上截留了7.29克/吨金和44.2克/吨银。从68.6米开始的较深层在7.6米处截留了1.20克/吨金和7.7克/吨银。
Figure 2. A N-S Cross Section that shows all the holes within 20 meters east and west of the section line 446,830 meters east of the discovery zone.
图2.一张N-S截面图,显示了发现带以东和以西20米范围内的所有洞。
It is important to note that DB-23, 22-01 and 22-02 all intercepted the high-grade gold mineralization at shallow depths, beginning 30 meters of the ground surface. True widths of the intercepts are not known. These holes were all drilled in 2022 and yielded the best GT results in the history of the Excelsior Springs project with over 100 RC holes drilled over the last 50 years.
值得注意的是,DB-23、22-01和22-02都在浅层拦截了高品位金矿化,从地表30米开始。截获的真实宽度尚不清楚。这些孔都是在2022年钻探的,并产生了精益求精斯普林斯项目历史上最好的GT结果,在过去50年中钻了100多个RC孔。
Our recent review of all available data has confirmed the West Slope zone remains open and untested both east, west and at depth and the objective of our current program is to examine strike and potential dip continuity of the upper high-grade zone.
我们最近对所有现有数据的审查证实,西斜坡区仍然是开放的,在东西和深度上都没有测试,我们当前计划的目标是检查上层高品位区的走向和潜在的倾角连续性。
Another high-priority target for this program exists 300 meters east-south-east of the West Slope where a historic RC hole GE-14 intersected 24.3 meters at 1.09 g/t Au and 0.54 g/t Ag beginning 9.1 meters below the surface.
该方案的另一个高优先目标是在西坡东南偏东300米处,在那里,一个历史悠久的RC孔GE-14以1.09g/t Au和0.54g/t Ag相交,相交24.3米,从地表以下9.1米开始。
Follow up Core and/or RC drill programs are contemplated for later in 2023 after analysis of the results from this initial 2023 program.
在分析了最初的2023年计划的结果后,预计将在2023年晚些时候实施后续核心和/或RC钻探计划。
John Power, President and CEO of Athena commented "Our 2023 Program is intended to better delineate and expand known mineralization along strike at the Western Slope zone and further substantiate the Project as a regional-scale, intrusion-related, gold-bearing, hydrothermal system. We also hope to further understand the geology and structure of the multiple, large, flat plunging shoots of oxidized gold mineralization encountered in our 2022 drill programs."
约翰·鲍尔,总裁,雅典娜首席执行官评论道:我们的2023计划旨在更好地描述和扩大西坡带沿走向的已知矿化,并进一步证实该项目是一个区域规模的、与侵入体相关的、含金的热液系统。我们还希望进一步了解我们的2022年钻探计划中遇到的多个、大型、平坦的氧化金矿化俯冲矿芽的地质和结构。
Applicable permitting has been completed and our initial 2023 drill program is expected to commence in early June 2023 subject to final confirmation from our drill contractor. The program's drill footage and number of RC holes will be finalized prior to the start of the drill campaign.
适用许可已经完成,我们最初的2023年钻探计划预计将于2023年6月初开始,但需得到我们钻探承包商的最终确认。该计划的演练镜头和RC孔数将在演练活动开始之前敲定。
Quality Assurance and Quality Control
质量保证和质量控制
Procedures implemented during Phases 01 and 02 will be continued during Phase 03 to assure Quality Assurance Quality Control (QAQC). All drilling will be performed using reverse circulation methods with samples collected at 5-foot intervals. Representative sample splits will be securely stored for shipment, with chain of custody documentation through delivery to American Assay Laboratories, an independent ISO-certified laboratory in Reno, Nevada. Mineralized commercial reference standards and coarse blank standards will be inserted every 20th sample in sequence to assure acceptable levels of confidence of the drill hole assays. When laboratory reports of the assays are received, QAQC protocols will be immediately augmented to ensure dependability of the drill hole assays.
在01和02阶段实施的程序将在03阶段继续执行,以确保质量保证质量控制(QAQC)。全 钻探将使用反循环方法,每隔5英尺收集一次样品。代表性样本分割 将被安全地储存以供运输,以及通过交付给位于内华达州里诺市的独立ISO认证实验室美国化验实验室的监护链文件。将按顺序每隔20个样品插入矿化商业参考标准和粗空白标准,以确保钻孔分析的可接受置信度。当收到化验的实验室报告时,将立即加强QAQC规程,以确保钻孔化验的可靠性。
As the Excelsior Springs Project advances, additional QAQC measures will be implemented including selected duplicate check assaying on pulps and coarse rejects at a second accredited assay laboratory. All results will be analyzed for consistency.
随着Excelsior Springs项目的推进,将实施更多的QAQC措施,包括在第二个认可的分析实验室对纸浆和粗废料进行选定的重复检查分析。将对所有结果进行一致性分析。
Qualified Person
有资格的人
Donald G. Strachan, Certified Professional Geologist (CPG #10376 AIPG), is a qualified person as defined by NI 43-101, has reviewed the scientific and technical information that forms the basis of this press release, and has approved the disclosure herein. Mr. Strachan is independent of the Company and was responsible for the site management and technical aspects of the Program.
注册专业地质学家(CPG#10376 AIPG)Donald G.Strachan是NI 43-10376定义的合格人员,他已审阅了构成本新闻稿基础的科学和技术信息,并批准了本新闻稿的披露。Strachan先生是独立于公司的,负责该计划的现场管理和技术方面。
About Athena Gold Corporation
关于雅典娜黄金公司
Athena is engaged in the business of mineral exploration and the acquisition of mineral property assets. Its objective is to locate and develop economic precious and base metal properties of merit and to conduct additional exploration drilling and studies on the Project.
雅典娜从事矿产勘探和收购矿产资产的业务。其目标是寻找和开发有价值的经济、贵金属和贱金属资产,并对该项目进行额外的勘探、钻探和研究。
For further information about Athena Gold Corporation and our Excelsior Springs Gold project, please visit .
有关雅典娜黄金公司和我们的Excelsior Springs黄金项目的更多信息,请访问。
On Behalf of the Board of Directors
我谨代表董事会
John Power
Chief Executive Officer and President
约翰·鲍尔
首席执行官兼总裁
Contacts:
联系人:
Jason Libenson
President and CCO
Castlewood Capital Corporation
1(647)-534-9884
Email: jason@castlewoodcapital.ca
贾森·利本森
总裁与中国共产党
卡斯特尔伍德资本公司
1(647)-534-9884
电子邮件:jason@Castlewood capal.ca
John Power
Phone: John Power, 707-291-6198
Email: info@athenagoldcorp.com
约翰·鲍尔
电话:约翰·鲍尔,707-291-6198
电子邮件:info@athenagoldcorp.com
Cautionary Statement to U.S. Investors
对美国投资者的警示声明
This press release references NI 43-101, which differs from the requirements of U.S. securities laws. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects.
本新闻稿编号为NI 43-101,与美国证券法的要求不同。NI 43-101是加拿大证券管理人制定的一项规则,为发行人对有关矿产项目的科学和技术信息进行的所有公开披露建立了标准。
The United States Securities and Exchange Commission ("SEC") permits mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can legally extract or produce. Pursuant to SEC Industry Guide 7 under the United States Securities Act of 1933, as amended, a "final" or "bankable" feasibility study is required to report reserves. Currently Athena has not delineated "reserves" on any of its properties. Athena cannot be certain that any deposits at its properties will ever be confirmed or converted into SEC Industry Guide 7 or any successor rule or regulation compliant "reserves". Investors are cautioned not to assume that any part or all of the historic Buster Mine gold zone will ever be confirmed or converted into reserves or that it can be economically or legally extracted.
美国证券交易委员会(“美国证券交易委员会”)允许矿业公司在提交给美国证券交易委员会的文件中只披露公司可以合法开采或生产的矿藏。根据修订后的1933年《美国证券法》下的《美国证券交易委员会行业指南7》,需要进行一份“最终”或“可银行”的可行性研究报告,以报告储备情况。目前,雅典娜还没有在其任何一处房产上划定“保护区”。雅典娜无法确定其物业内的任何存款是否会被确认或转换为“美国证券交易委员会”行业指南7或任何后续规则或法规所遵循的“储备”。告诫投资者,不要以为历史悠久的巴斯特金矿区的任何部分或全部都会得到确认或转换为储量,或者可以经济或合法地开采出来。
The SEC has adopted amendments to its disclosure rules to modernize the mineral property disclosure requirements for issuers whose securities are registered with the SEC under the United States Securities Exchange Act of 1934, as amended. These amendments became effective February 25, 2019, with compliance required for the first fiscal year beginning on or after January 1, 2021, and historical property disclosure requirements for mining registrants that were included in SEC Industry Guide 7, which was rescinded from and after such date and replaced with disclosure requirements known as S-K 1300.
美国证券交易委员会已经通过了对其披露规则的修正案,以使其证券根据修订后的1934年美国证券交易法在美国证券交易委员会登记的发行人的矿业权披露要求现代化。这些修正案于2019年2月25日生效,要求从2021年1月1日或之后开始的第一个财年遵守《美国证券交易委员会行业指南7》中针对矿业注册人的历史财产披露要求,该指南在该日期及之后被撤销,取而代之的是名为S-K1300的披露要求。
Forward Looking Statements
前瞻性陈述
This press release contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian and U.S. securities laws. All statements, other than statements of historical fact, included herein including, without limitation, statements regarding future exploration plans and the completion of a phase 2 drill program at the Project, future results from exploration, and the anticipated business plans and timing of future activities of the Company, are forward-looking statements. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are typically identified by words such as: "believes", "will", "expects", "anticipates", "intends", "estimates", "plans", "may", "should", "potential", "scheduled", or variations of such words and phrases and similar expressions, which, by their nature, refer to future events or results that may, could, would, might or will occur or be taken or achieved. In making the forward-looking statements in this press release, the Company has applied several material assumptions, including without limitation, that there will be investor interest in future financings, market fundamentals will result in sustained precious metals demand and prices, the receipt of any necessary permits, licenses and regulatory approvals in connection with the future exploration and development of the Company's projects in a timely manner, QAQC procedures at the Project were followed, the availability of financing on suitable terms for the exploration and development of the Company's projects and the Company's ability to comply with environmental, health and safety laws.
本新闻稿包含适用于加拿大和美国证券法的前瞻性陈述和前瞻性信息(统称为“前瞻性陈述”)。除有关历史事实的陈述外,本文中包含的所有陈述,包括但不限于有关未来勘探计划和项目第二阶段钻探计划的完成、勘探的未来结果以及公司未来活动的预期业务计划和时间的陈述,均为前瞻性陈述。尽管该公司相信这样的陈述是合理的,但它不能保证这种预期将被证明是正确的。前瞻性表述通常用“相信”、“将”、“预期”、“预期”、“打算”、“估计”、“计划”、“可能”、“应该”、“潜在”、“预定”或这些词语和短语的变体以及类似的表述来识别,这些词语的性质是指可能、可能、将、可能或将发生或将发生或将采取或实现的未来事件或结果。在本新闻稿中做出前瞻性陈述时,公司应用了几个重大假设,包括但不限于,投资者对未来融资的兴趣、市场基本面将导致贵金属需求和价格持续增长、与公司未来项目勘探和开发相关的任何必要许可证、许可证和监管批准的及时收到、项目的QAQC程序得到遵守、公司项目勘探和开发以合适条款获得融资,以及公司遵守环境、健康和安全法律的能力。
The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in forward-looking statements as a result of various factors, including, operating and technical difficulties in connection with mineral exploration and development activities, actual results of exploration activities, the estimation or realization of mineral reserves and mineral resources, the inability of the Company to obtain the necessary financing required to conduct its business and affairs, as currently contemplated, the timing and amount of estimated future production, the costs of production, capital expenditures, the costs and timing of the development of new deposits, requirements for additional capital, future prices of precious metals, changes in general economic conditions, changes in the financial markets and in the demand and market price for commodities, lack of investor interest in future financings, accidents, labor disputes and other risks of the mining industry, delays in obtaining governmental approvals, permits or financing or in the completion of development or construction activities, risks relating to epidemics or pandemics such as COVID-19, including the impact of COVID-19 on the Company's business, financial condition and results of operations, changes in laws, regulations and policies affecting mining operations, title disputes, the inability of the Company to obtain any necessary permits, consents, approvals or authorizations, including of the Canadian Securities Exchange, the timing and possible outcome of any pending litigation, environmental issues and liabilities, and other factors and risks that are discussed in the Company's periodic filings with the SEC and disclosed in the final long form prospectus of the Company dated August 31, 2021.
公司提醒投资者,公司的任何前瞻性陈述都不是对未来结果或业绩的保证,实际结果可能由于各种因素而与前瞻性陈述中的结果大不相同,这些因素包括与矿产勘探和开发活动有关的经营和技术困难、勘探活动的实际结果、对矿产储量和矿产资源的估计或变现、公司无法获得开展目前预期的业务和事务所需的必要融资、估计未来产量的时间和数量、生产成本、资本支出、开发新矿藏的成本和时机、额外资本的要求、这些风险包括:贵金属的未来价格;总体经济状况的变化;金融市场以及大宗商品的需求和市场价格的变化;投资者对未来融资缺乏兴趣;事故、劳资纠纷和采矿业的其他风险;在获得政府批准、许可或融资或完成开发或建设活动方面的延误;与流行病或流行病有关的风险,如新冠肺炎对公司业务的影响;财务状况和经营业绩;影响采矿业务的法律、法规和政策的变化;所有权纠纷;公司无法获得任何必要的许可、同意、批准或授权。这些风险包括加拿大证券交易所的风险、任何未决诉讼的时间和可能的结果、环境问题和责任,以及公司在提交给美国证券交易委员会的定期报告中讨论的其他因素和风险,这些因素和风险在公司日期为2021年8月31日的最终详细招股说明书中有所披露。
Readers are cautioned not to place undue reliance on forward-looking statements. The Company undertakes no obligation to update any of the forward-looking statements in this press release or incorporated by reference herein.
告诫读者不要过度依赖前瞻性陈述。本公司没有义务更新本新闻稿中的任何前瞻性陈述,也没有义务通过引用将其并入本新闻稿。
SOURCE: Athena Gold Corp.
资料来源:雅典娜黄金公司