share_log

BCM Intercepts 510 Ft @ 0.66% Cu in Phase 3 Drilling at Thompson Knolls Greenfield Cu-Au Porphyry Project, Utah, USA

BCM Intercepts 510 Ft @ 0.66% Cu in Phase 3 Drilling at Thompson Knolls Greenfield Cu-Au Porphyry Project, Utah, USA

BCM 在美国犹他州 Thompson Knolls Greenfield Cu-Au Porphyry 项目的第三阶段钻探中截获了 510 英尺 @ 0.66% 的铜
Accesswire ·  2023/05/24 07:00

VANCOUVER, BC / ACCESSWIRE / May 24, 2023 / BCM Resources Corp ("B" or "Company") is pleased to update its shareholders on the progress at Thompson Knolls (TK) greenfield Cu-Au-Ag-Mo porphyry project in southwestern Utah, USA. Phase 3 drilling at TK (see Company previous NR BCM Resources Corp. | News)envisaged drilling of seven core holes. "B" reports that, to date, four drill holes have been completed. Assay results have been received for three of these drillholes (TK7, TK8, and TK9). The highlight of the assay results is a significant mineral intercept of 510 ft (155.4 m) @ 0.66% Cu, 0.12 g/t Au, and 7.4 g/t Ag in drillhole TK8, with 8 sample intervals containing values greater than 1% Cu over 80 ft (24.3 m).

不列颠哥伦比亚省温哥华/ACCESSWIRE/2023 年 5 月 24 日/ BCM Resources Corp(“B” 或 “公司”)很高兴向股东通报位于美国犹他州西南部的Thompson Knolls(TK)绿地Cu-Au-Ag-Mo斑岩项目的最新进展。TK的第三阶段钻探(见公司之前的NR BCM Resources Corp. | 新闻)设想钻探七个核心孔。“B” 报告说,迄今为止,已经完成了四个钻孔。其中三个钻孔(TK7、TK8 和 TK9)的化验结果已经收到。分析结果的亮点是大量的矿物截获量 钻孔 TK8 中的 510 英尺(155.4 m)@ 0.66% 铜、0.12 g/t Au 和 7.4 g/t Ag,8 个样本间隔在 80 英尺(24.3 m)内含大于 1% Cu 的值

President & CEO Dr. Sergei Diakov stated, "I am very excited about this very encouraging mineralized intercept in drillhole TK8 as it indicates significant potential for the TK project to host a sizable copper-gold porphyry system with skarn mineralization. We continue testing TK project potential focusing our exploration porphyry Cu expertise to vector-in on the discovery of the greenfield porphyry system copper core."

总裁兼首席执行官谢尔盖·迪亚科夫博士表示: 我对TK8钻孔中这种非常令人鼓舞的矿化拦截感到非常兴奋,因为它表明TK项目具有巨大的潜力,可以容纳一个具有矽卡岩矿化的庞大铜金斑岩系统。我们将继续测试TK项目的潜力,将我们的勘探斑岩铜专业知识集中在发现绿地斑岩系统铜芯上。”

Summary of Drillhole TK8

Drillhole TK8 摘要

TK8 was collared between TK3 and TK5 drillholes (see map BCM Resources Corp. | News). It was drilled vertically, reaching a downhole depth of 3,062.5 ft (933.45 m). The hole was designed to test the north-western flank of the TK magnetic anomaly and continuity of mineralization from TK3. At 1,915 ft (583.7 m) depth, TK8 intercepted mineralized diopside-marble skarn oxidized to a 2,040 ft (621.8 m) depth and then encountered primary magnetite-chalcopyrite mineralization that was documented for an extended interval from 2,040 ft (621.8 m) to 3,050 ft (929.6 m), a total of 1,010 ft (307.8 m). Sampling returned assay results averaging 0.40% Cu, 0.08 g/t Au and 4.92 g/t Ag, including a more intensely mineralized interval from 2,040 ft (621.8 m) to 2,550 ft (777.2 m) of total 510 ft (155.4 m) @ 0.66% Cu, 0.12 g/t Au and 7.4 g/t Ag, with 8 sample intervals containing values greater than 1% Cu over 80 ft (24.3 m).

TK8 是在 TK3 和 TK5 钻孔之间钻孔的(见地图 BCM Resources Corp. | 新闻)。它是垂直钻探的,井下深度达到3,062.5英尺(933.45米)。该洞旨在测试TK磁异常的西北侧以及TK3矿化的连续性。在1,915英尺(583.7米)的深度,TK8拦截了氧化至2,040英尺(621.8米)深度的矿化透辉石大理石硅卡,然后遇到了初级磁铁矿-黄铜矿矿化,这种矿化间隔从2,040英尺(621.8米)到3,050英尺(929.6米),总长为1,010英尺(307.8米)。采样返回的化验结果平均为 0.40% 铜、0.08 g/t Au 和 4.92 g/t Ag,包括从 2,040 英尺(621.8 米)到 2,550 英尺(777.2 米)的更强烈的矿化间隔 510 英尺(155.4 m)@ 0.66% Cu、0.12 g/t Au 和 7.4 g/t Ag,8 个样本间隔在 80 英尺(24.3 m)内含的值大于 1% Cu。

Summary of Drillhole TK7

Drillhole TK7 摘要

Drillhole TK7 was drilled vertically to a depth of 1,230 ft (375 m) and located SSW of hole TK3 which was drilled vertically to a depth of 2,641 ft (805 m) and designed to test the strong part of the TK magnetic anomaly. It reached a quartz-monzonite porphyry intrusion at 1,321 ft (402.6 m) carrying weak quartz-chalcopyrite mineralization in numerous thin quartz pyrite-chalcopyrite veinlets and rare quartz stockworks. Typical alteration developed includes: i) weak potassic (biotite-K-feldspar); ii) propylitic (chlorite) with magnetite, and; iii) patchy argillic alteration. Copper grades in the sampled interval from 2,060 ft (627.9 m) to the bottom returned low copper metal values below 0.1%.

TK7钻孔垂直钻到1,230英尺(375米)的深度,位于TK3孔的SSW,该孔垂直钻到2641英尺(805米)的深度,旨在测试TK磁异常的坚固部分。它到达了位于1,321英尺(402.6米)处的石英蒙生石斑岩入侵,在许多薄的石英黄铁矿-黄铜矿脉脉和稀有石英库存中携带了微弱的石英-黄铜矿矿化作用。开发的典型改变包括:i) 弱钾(Biotite-k-Feldspar);ii)带有磁铁矿的丙基(亚氯酸盐),以及;iii)斑片状的粘土改变。从2,060英尺(627.9米)到底部的采样区间内,铜的等级返回的低铜金属值低于0.1%。

Summary of Drillhole TK9

Drillhole TK9 摘要

Drillhole TK9 located ESE of TK6 1,923 ft (586 m) away was drilled to a depth of 2,322.5 ft (707.9 m) and designed to test the northern edge of the TK magnetic anomaly in carbonate rocks. It encountered strongly silicified marbleized dolomites and limestones with some patchy quartz-magnetite-hematite breccia mineralization. Assay results were low copper grades below 0.1% Cu.

位于 1,923 英尺(586 米)外的 TK6 ESE 的 Drillhole TK9 被钻到了 2,322.5 英尺(707.9 米)的深度,旨在测试碳酸盐岩中TK磁异常的北部边缘。它遇到了强烈硅化的大理石白云岩和石灰岩,还有一些零星的石英-磁铁矿-赤铁矿角砾岩矿化。化验结果是铜品位低于 0.1%。

Summary of Drillhole TK10

Drillhole TK10 摘要

This drill hole was located ESE of TK9 1,585 ft (483 m) away to test the northern edge of the TK anomaly similarly to TK9. It was drilled vertically to a depth of 3,633 ft (1.107 m) in dolomitized marbles with no visual mineralization.

这个钻孔位于 TK9 1585 英尺(483 米)外的 ESE,用于测试 TK 异常的北部边缘,类似于 TK9。它是在白云石化的大理石中垂直钻探到3,633英尺(1.107米)的深度,没有视觉矿化。

Drilling continues.

钻探仍在继续。

The Company is currently actively advancing hole TK14 which is strategically located between holes TK3a and TK6. Hole TK14 is designed to test the north-western extension of the TK magnetic anomaly both in carbonate rocks and underlying quartz-monzonite intrusion. Mineralized skarn lithologies have been intersected in TK14 so far and drilling is proceeding.

该公司目前正在积极推进位于TK3a洞和TK6洞之间的TK14洞。TK14洞旨在测试碳酸盐岩和潜在的石英蒙生岩入侵中TK磁异常的西北延伸。到目前为止,矿化矽卡岩性已经在TK14中相交,钻探正在进行中。

TK is located approximately 210 km southwest of Rio Tinto's giant Bingham Canyon porphyry copper-molybdenum-gold mine and smelter complex near Salt Lake City, Utah.

TK位于力拓巨型宾厄姆峡谷斑岩铜钼金矿和冶炼厂综合体西南约210公里处,靠近犹他州盐湖城。

Qualified Person and QAQC

合格人员和 QAQC

Mr. Richard R. Redfern, M.Sc., and Certified Professional Geologist, a Company "qualified person" for the purposes of National Instrument 43-101, has verified and approved the information contained in this news release. Core sampling was conducted on 10-ft mineralized intervals with standards and "blank" samples inserted in every 10 batches of samples for quality control procedures.

理学硕士、注册专业地质学家理查德·雷德芬先生是National Instrument 43-101所指的 “合格人士”,他已经验证并批准了本新闻稿中包含的信息。岩心采样以10英尺的矿化间隔进行,每10批样品中插入标准品和 “空白” 样品,以进行质量控制程序。

About BCM Resources Corporation

关于 BCM 资源公司

BCM Resources Corporation is a diversified Canadian mineral exploration company focused on the continued exploration of the Thompson Knolls Porphyry Cu-Au-Ag-Mo project. BCM also controls perspective Copper, Gold, and Molybdenum exploration projects in British Columbia. BCM Resources is managed by experienced and successful board members and technical advisors. For further information, including area maps, sections, and photos, please visit our website at or contact us by e-mail at info@bcmresources.com.

BCM Resources Corporation是一家多元化的加拿大矿产勘探公司,专注于Thompson Knolls Porphyry Cu-Au-Ag-Mo项目的持续勘探。BCM还控制着不列颠哥伦比亚省的远景铜、金和钼勘探项目。BCM Resources 由经验丰富、成功的董事会成员和技术顾问管理。如需更多信息,包括区域地图、路段和照片,请访问我们的网站或发送电子邮件至 info@bcmresources.com 联系我们。

ON BEHALF OF BCM RESOURCES CORP.

代表 BCM RESOURCES CORP.

Sergei Diakov
President & CEO

谢尔盖·迪亚科夫
总裁兼首席执行官

For further information, please contact:

欲了解更多信息,请联系:

Investor relations 604-646-0144 ext. 222
info@bcmresources.com

投资者关系 604-646-0144 分机 222
info@bcmresources.com

Caution Concerning Forward-Looking Statements:

关于前瞻性陈述的注意事项:

This news release and related texts and images on BCM Resource Corporation's website contain certain "forward-looking statements" including, but not limited to, statements relating to interpretation of mineralization potential, drilling and assay results, future exploration work, and the anticipated results of this work. Forward-looking statements are statements that are not historical facts and are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metals prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical, governmental, social, or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the company's projects; uncertainties involved in the interpretation of sampling and drilling results and other tests; the possibility that required permits and access agreements may not be obtained in a timely manner; risk of accidents, equipment breakdowns or other unanticipated difficulties or interruptions, and; the possibility of cost overruns or unanticipated expenses in these exploration programs.

本新闻稿以及BCM Resource Corporation网站上的相关文字和图片包含某些 “前瞻性陈述”,包括但不限于与矿化潜力解释、钻探和分析结果、未来勘探工作以及这项工作的预期结果有关的陈述。前瞻性陈述是指非历史事实的陈述,存在各种风险和不确定性,这些风险和不确定性可能导致实际事件或结果与前瞻性陈述中反映的事件或结果存在重大差异,包括但不限于:与金属价格波动相关的风险;与及时筹集足够资金以可接受的条件为计划工作提供资金有关的不确定性;天气、后勤、技术、政府、社会或其他因素导致的计划工作发生变化;工作结果可能无法达到预期,也无法实现公司项目的预期潜力;对取样和钻探结果以及其他测试的解释所涉及的不确定性;可能无法及时获得所需的许可证和准入协议;发生事故、设备故障或其他意想不到的困难或中断的风险,以及;这些勘探计划可能出现成本超支或意想不到的费用。

SOURCE: BCM Resources Corporation

来源: BCM 资源公司


View source version on accesswire.com:
在 accesswire.com 上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发