share_log

Vital Battery Metals Inc. Commences Sting Copper Project Work Program

Vital Battery Metals Inc. Commences Sting Copper Project Work Program

Vital Battery Metals Inc. 启动 Sting Copper 项目工作计划
GlobeNewswire ·  2023/06/01 08:00

The Exploration Program encompasses 3 high priority zones over the Sting Project that will consist of prospecting, mapping and geochemical sampling

勘探方案包括Sting项目的3个高度优先区域,包括勘探、测绘和化探采样

Figure 1

图1

Vital Battery Metals Sting Copper Project 2023 Exploration Program Areas
重要的电池金属Sting铜项目2023勘探计划区

VANCOUVER, British Columbia, June 01, 2023 (GLOBE NEWSWIRE) -- Vital Battery Metals Inc. ("Vital" or the "Company") (CSE: VBAM | OTC: VBAMF | FRA: C0O) is pleased to announce, in partnership with Coast Mountain Geological Ltd. ("CMG"), that it has commenced its summer Exploration Program (the "Program") at its Sting Copper Project in northwestern Newfoundland.

温哥华,不列颠哥伦比亚省,2023年6月1日(环球通讯社)--重要的电池金属公司(“生死攸关“或”公司“)(CSE:VBAM场外交易:VBAMF法兰克福机场:C0O)很高兴地宣布,与海岸山脉地质有限公司(“CMG“),它已经开始了它的夏季探索计划(The计划“)位于纽芬兰西北部的Sting铜矿项目。

The Company has previously reported assay results of grab samples at its Sting Copper Project including 14.2% Cu, 11.6% Cu, 14.2% Cu, 13.9% Cu, with complimentary gold values ranging from 7 to 470 ppb. Vital is targeting high grade copper and precious metals in western Newfoundland on its Sting Copper Project. The mafic rocks that underlie the Jumbo Lode Prospect are part of the Bay of Islands Complex that is host to copper and copper/zinc deposits such as the York Harbour Mine, a former producer located 35 km to the south-southeast. Additionally, York Harbour Metals recently reported (news release dated April 21, 2023) final results of its Phase 4 drilling program which included a drill hole (YH22-73) that intersected 44.93 meters of 1.292% copper including 5.36 meters of 2.938% copper.

该公司此前曾报告其Sting铜矿项目的抓取样本的化验结果为14.2%铜、11.6%铜、14.2%铜、13.9%铜,赠送的金价为7至470 ppb。VITAL的Sting铜矿项目瞄准了纽芬兰西部的高品位铜和贵金属。Jumbo Lode Prospects下的镁铁质岩石是岛湾综合体的一部分,该综合体拥有铜和铜/锌矿床,例如位于东南偏南35公里处的前生产商约克港矿。此外,约克港金属公司最近(日期为2023年4月21日的新闻稿)报告了其第四阶段钻井计划的最终结果,其中包括一个钻孔(YH22-73),该钻孔与44.93米的1.292%铜包括5.36米2.938%的铜相交。

The current work Program is designed to follow-up from the previous encouraging results and to expand known mineralized zones. The Program also includes gridded prospecting, mapping and geochemical sampling to provide coverage over underlying favorable regional geology and geophysics. The three separate grids include the North Sting, Jumbo-Lode and South Sting grids. The North Sting grid covers 240 ha of ground and is draped over the NE-trending contact between mafic volcanic rocks and mafic intrusive rocks, a regionally important lineament for copper mineralization.

目前的工作计划旨在跟进先前令人鼓舞的成果,并扩大已知的矿化带。该计划还包括网格勘探、测绘和地球化学采样,以覆盖潜在的有利区域地质和地球物理。这三个独立的网格包括北斯汀、Jumbo-Lode和南斯汀网格。北斯汀格网覆盖240公顷土地,覆盖在镁铁质火山岩和镁铁质侵入岩之间的NE向接触带上,这是铜矿化的区域重要线形。

Adrian Lamoureux, Vital's Chief Executive Officer and President, comments, "Our initial exploration Program at the Sting Project yielded impressive results as high as 14.2% Cu and gold values ranging from 7 ppb to 470 ppb. Building on our previous program, we are looking forward to further exploration of high-priority targets, which we believe will continue to provide strong copper and gold values."

VITAL首席执行官禤浩焯·拉莫罗表示:“我们在斯汀项目的初步勘探项目取得了令人印象深刻的结果,铜含量高达14.2%,金矿价值从7 ppb到470 ppb不等。在之前项目的基础上,我们期待着进一步勘探高优先级目标,我们相信这些勘探项目将继续提供强劲的铜和黄金价值。”

The Jumbo-Lode area has historically compelling copper anomalies which surround and extend from the Jumbo, Red Love and Lode 9 mineral showings. The team will infill, expand upon, and verify the historical results, as well as test the eastern contact between mafic volcanic/intrusive rocks for copper anomalies. The South Sting grid provides coverage over the same lineament further south, where no record of exploration work exists.

Jumbo-Lode地区历史上拥有引人注目的铜异常,这些异常围绕着Jumbo、Red Love和Lode 9矿藏,并从这些矿藏延伸而来。该小组将补充、扩大和验证历史结果,并测试镁铁质火山/侵入岩之间的东部接触是否有铜异常。南斯汀网格覆盖了更南边的同一条线,那里没有勘探工作的记录。

Figure 1 - Vital Battery Metals Sting Copper Project 2023 Exploration Program Areas

图1-重要电池金属Sting铜项目2023勘探计划区域

Qualified Person
The technical information in this presentation have been reviewed and approved by an Independent Qualified Person defined by National Instrument 43-101 Derrick Strickand P.Geo.

有资格的人
本演示文稿中的技术信息已由National Instrument 43-101 Derrick Strickand P.Geo定义的独立合格人员审核和批准。

The qualified person has not verified the information on the York Harbour Mine and the information disclosed is not necessarily indicative of mineralization on the Sting Copper Project.

该合资格人士并未核实有关约克港矿场的资料,而所披露的资料并不一定表示Sting铜矿项目的矿化情况。

About Vital Battery Metals Inc.
Vital Battery Metals Inc. (CSE: VBAM |OTC: VBAMF | FRA: C0O) is a mineral exploration company dedicated to the development of strategic projects comprised of battery, base and precious metals in stable jurisdictions. The Company is working to advance its Schofield Lithium, Dickson Lake Lithium, Sting Copper Project, and Vent Copper-Gold Projects.

关于重要的电池金属公司
重要的电池金属公司(CSE:VBAM|OTC:VBAMF|FRA:C0O)是一家矿产勘探公司,致力于在稳定的司法管辖区开发由电池、贱金属和贵金属组成的战略项目。该公司正在努力推进其斯科菲尔德锂、迪克森湖锂、斯汀铜矿项目和文特铜金矿项目。

The Schofield Lithium Project covers 8,824 hectares and is adjacent to Brunswick Exploration's Hearst Lithium Project. The Schofield Lithium Project is located ~60 km south of Hearst, Ontario.

斯科菲尔德锂项目占地8824公顷,毗邻布伦瑞克勘探公司的赫斯特锂项目。斯科菲尔德锂项目位于安大略省赫斯特以南约60公里处。

The Dickson Lake Lithium Project covers 464 single-cell mining claims and approximately 9,780 hectares and is near a Brunswick Exploration Lithium Project, Imagine Lithium's Jackpot Deposit and Rock Tech's Georgia Lake Deposit.

迪克森湖锂项目涵盖464个单单元采矿项目,占地约9,780公顷,靠近Brunswick勘探锂项目、Imagine Lithium的大奖矿藏和Rock Tech的乔治亚湖矿藏。

The Sting Copper Project covers approximately 12,700 hectares and hosts multiple historic Newfoundland and Labrador Government documented mineral occurrences and is located within a 50 km corridor known for significant volcanogenic massive sulfide (VMS), copper quartz vein lode and low sulphation epithermal gold showings. The Vent Copper-Gold project covers 1,562 hectares in British Columbia. Vital continues to evaluate value-add assets to bolster its project portfolio.

Sting铜矿项目占地约12,700公顷,拥有多个历史悠久的纽芬兰和拉布拉多政府记录的矿藏,位于一条50公里长的走廊内,以重要的火山成因块状硫化物(VMS)、铜石英脉脉和低硫酸盐浅成热液金矿而闻名。文特铜金项目位于不列颠哥伦比亚省,占地1,562公顷。VITAL继续评估增值资产,以支持其项目组合。

For more information, visit

如需更多信息,请访问

On Behalf of the Board of Directors

我谨代表董事会

Adrian Lamoureux
Chief Executive Officer, Director
+1 (604) 229-9772
info@vitalbatterymetals.com

禤浩焯·拉穆鲁
董事首席执行官
+1(604)229-9772
邮箱:info@vitalbatterymetals.com

Disclaimer for Forward-Looking Information

对前瞻性信息的免责声明

This news release contains certain forward-looking statements within the meaning of applicable securities laws. All statements that are not historical facts, including without limitation, statements regarding future estimates, plans, programs, forecasts, projections, objectives, assumptions, expectations or beliefs of future performance, including statements regarding the Project acquisition bringing a low-risk opportunity, the Company building a strong battery metals portfolio with low-risk opportunities that positively impact the Company and its shareholders and the Company providing an initial work plan are "forward-looking statements." Forward-looking statements in this news release include, but are not limited to, statements with respect to the Sting Copper Project and its mineralization potential; the Company's objectives, goals or future plans with respect to the Sting Copper Project; the commencement of drilling or exploration programs in the future; the completion and anticipated results of the Program. These forward-looking statements reflect the expectations or beliefs of management of the Company based on information currently available to it. Forward-looking statements are subject to a number of risks and uncertainties, including those detailed from time to time in filings made by the Company with securities regulatory authorities, which may cause actual outcomes to differ materially from those discussed in the forward-looking statements. These factors should be considered carefully and readers are cautioned not to place undue reliance on such forward-looking statements. The forward-looking statements and information contained in this news release are made as of the date hereof and the Company undertakes no obligation to update publicly or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities laws.

本新闻稿包含适用证券法所指的某些前瞻性陈述。所有非历史事实的陈述,包括但不限于关于未来估计、计划、计划、预测、预测、目标、假设、预期或对未来业绩的信念的陈述,包括有关项目收购带来低风险机会、公司建立具有对公司及其股东积极影响的强大电池金属组合以及公司提供初步工作计划的陈述,均属“前瞻性陈述”。本新闻稿中的前瞻性陈述包括但不限于有关Sting铜矿项目及其矿化潜力的陈述;公司有关Sting铜矿项目的目标、目标或未来计划;未来钻探或勘探计划的开始;该计划的完成情况和预期结果。这些前瞻性陈述反映了根据公司目前掌握的信息对公司管理层的期望或信念。前瞻性陈述会受到许多风险和不确定因素的影响,包括公司不时向证券监管机构提交的文件中详细说明的风险和不确定因素,这些风险和不确定性可能会导致实际结果与前瞻性陈述中讨论的大不相同。应仔细考虑这些因素,并告诫读者不要过度依赖此类前瞻性陈述。本新闻稿中包含的前瞻性陈述和信息是截至本新闻稿发布之日作出的,公司没有义务公开更新或修改任何前瞻性陈述或信息,除非适用的证券法要求公开更新或修改任何前瞻性陈述或信息,无论是由于新信息、未来事件还是其他原因。

The Canadian Securities Exchange (CSE) does not accept responsibility for the adequacy or accuracy of this release.

加拿大证券交易所(CSE)不对本新闻稿的充分性或准确性承担责任。

A photo accompanying this announcement is available at

这一公告附带的照片可在以下网址查阅


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发