share_log

Canex Intersects 15.2 Metres of 1.0 G/t Gold and 6.1 Metres of 4.1 G/t Gold and Confirms New Parallel Mineralized Target at Gold Range, Arizona

Canex Intersects 15.2 Metres of 1.0 G/t Gold and 6.1 Metres of 4.1 G/t Gold and Confirms New Parallel Mineralized Target at Gold Range, Arizona

Canex与15.2米的1.0 g/t金和6.1米的4.1 g/t金相交,并确认了亚利桑那州黄金山脉的新平行矿化目标
Accesswire ·  2023/07/05 07:30

CALGARY, AB / ACCESSWIRE / July 5, 2023 / CANEX Metals Inc. ("CANEX" or the "Company") is pleased to announce results from 19 reverse circulation drill holes from multiple targets across the Gold Range Project, Arizona. This drilling has intersected strong gold mineralization within the Excelsior Zone and demonstrates a new area with good gold potential at East Excelsior, located immediately east of Excelsior.

阿肯色州卡尔加里/2023年7月5日/CANEX Metals Inc.(“CANEX”或“公司”)高兴地宣布了来自亚利桑那州Gold Range Project多个目标的19个反循环钻孔的结果。本次钻探已在Excelsior区内穿过强烈的金矿化,并在Excelsior以东的East Excelsior发现了一个具有良好金矿潜力的新区域。

Highlights

亮点

  • Hole GR23-131 at the Excelsior Zone intersected 4.1 g/t gold over 6.10 metres including a high-grade vein returning 13.3 g/t gold over 1.53 metres
  • Hole GR23-136 at the Excelsior zone intersected 1.0 g/t gold over 15.24 metres including 2.4 g/t gold over 4.57 metres
  • 5 holes tested a 200-metre strike length at the East Excelsior Target with all 5 holes returning gold mineralization, confirming the exploration potential of the system
  • The East Excelsior Target contains multiple parallel mineralized structures within a zone up to 75 metres wide
  • The East Excelsior Target is fully permitted for further drill testing, a permit amendment is underway to allow further drill testing and definition of the new WestGold discovery
  • 精益区GR23-131孔相交6.10米以上4.1克/吨黄金包括一条高等级静脉回流1.53米以上13.3克/吨黄金
  • 精益区GR23-136孔相交15.24米以上1.0克/吨黄金包括4.57米以上2.4克/吨黄金
  • 5个洞在东方精益求精目标测试了200米的走向长度所有5个洞都返回了金矿化,确认了该系统的勘探潜力
  • 东方精益求精目标包含多个平行矿化构造在最高可达75米宽
  • East Excelsior Target完全被允许进行进一步的钻探测试,一项许可修正案正在进行中,以允许进一步的钻探测试和新的WestGold发现的定义

Assay results from drill holes GR23-119 and GR23-121 to 138 have been received and are presented here. These drill holes tested the Shaft Target, the East Excelsior Target, and Excelsior. A property drill hole location map is shown in Figure 1, a drill hole map for Excelsior and East Excelsior is shown in Figure 2, and cross sections through the new East Excelsior Target are shown in Figures 3 and 4. Significant gold intersections are shown in the Table below.

已收到GR23-119和GR23-121至138号钻孔的化验结果,现将其公布。这些钻孔测试了竖井目标、东方精益目标和精益求精目标。物业钻孔位置图如图1所示,Excelsior和East Excelsior的钻孔图如图2所示,穿过新的East Excelsior Target的横截面如图3和图4所示。重要的黄金交叉点如下表所示。

Figure 1. Gold Range Property drill hole location map showing the Excelsior to WestGold trend, the Central and Lillian Zones, Shaft, and drill hole locations included in this release.

图1.黄金范围属性钻孔位置图,显示了Excelsior到WestGold趋势、中部和Lillian区、竖井和钻孔位置,包括在此版本中。

Hole GR23-131 tested a gap in the central part of the Excelsior zone and returned a high-grade gold intercept of 4.1 g/t gold over 6.1 metres including 13.3 g/t gold over 1.53 metres. The drill encountered a historic underground working immediately below this high-grade zone where no recovery was obtained over 3 metres. Hole GR23-136 was located 100 metres northeast of hole GR23-131 and returned 1.0 g/t gold over 15.24 metres including a higher-grade intercept returning 2.4 g/t gold over 4.57 metres. Holes GR23-131 to 137 successfully added and extended mineralization within the main Excelsior zone. Holes GR23-129, 130, and 138 tested the northeast and northwest extensions of the zone and did not encounter significant mineralization.

GR23-131孔测试了Excelsior区中部的一个缺口,并返回了一个高品位黄金截获6.1米以上4.1克/吨黄金包括13.3克/吨黄金超过1.53米。钻探遇到了一个历史性的地下工作,就在这个高品位区的正下方,在那里超过3米没有取得任何开采成果。GR23-136孔位于GR23-131孔东北100米处,并返回15.24米以上1.0克/吨黄金包括更高级别的拦截返回4.57米以上2.4克/吨黄金。GR23-131至137号孔成功地在主要精益带内增加和扩展了矿化。GR23-129、130和138号孔测试了该带的东北和西北延伸,没有遇到显著的矿化。

Figure 2. Drill hole location map, Excelsior zone and East Excelsior Target.

图2.钻孔位置图、精益区和东精益区目标。

Holes GR23-122 to 128 tested parallel mineralized trends at the East Excelsior Target with 5 of the 7 test holes encountering gold mineralization. One of the zones at East Excelsior was tested along a 200-metre strike length by holes GR123 to 127, with all 5 holes returning gold mineralization and confirming the exploration potential of the target which remains open along strike. Results from this initial test include hole GR23-124 which returned 1.1 g/t gold over 4.58 metres, and hole GR23-127 which returned 0.4 g/t gold over 9.15 metres and another 2.3 g/t gold over 3.05 metres.

GR23-122至128孔测试了East Excelsior Target的平行矿化趋势,7个测试孔中有5个遇到了金矿化。东部Excelsior的其中一个区域沿着200米的走向长度进行了GR123至127孔的测试,其中所有5个洞都返回了金矿化确定沿走向敞开的目标的勘探潜力。该初始测试的结果包括返回的GR23-124孔4.58米以上1.1克/吨黄金,和返回的GR23-127号洞9.15米以上0.4克/吨黄金还有另一个3.05米以上2.3克/吨黄金。

At East Excelsior the corridor of mineralization is interpreted to contain multiple steep west dipping structures, which on Figure 4 occur within a 75 metre wide zone. There is very limited surface exposure over the area and additional drilling will be required to better understand the orientation, widths, grade, and continuity of the zone.

在East Excelsior,矿化走廊被解释为包含多个陡峭的西倾构造,如图4所示,这些构造位于75米宽的区域内。该地区的地表暴露非常有限,需要进行额外的钻探,以更好地了解该区域的方向、宽度、坡度和连续性。

Figure 3. Cross section A - A' through the East Excelsior Target showing drill holes GR123 to 125.

图3.通过East Excelsior Target的横截面A-A‘,显示钻孔GR123至125。

Figure 4. Cross section B - B' through the East Excelsior Target showing drill holes GR127 and 128.

图4.穿过East Excelsior Target的横截面B-B‘,显示钻孔GR127和128。

Highlights from reverse circulation drill holes GR23-119 and GR23-121 to 138.

反循环钻孔GR23-119和GR23-121至138的亮点。

Drill Hole

From (m)

To (m)

Width (m)*

Au g/t

GR23-123

59.44

67.06

7.62

0.3

including

59.44

60.96

1.52

1.2

GR23-123

82.3

91.44 EOH

9.14

0.2

GR23-124

85.34

89.92

4.58

1.1

including

85.34

86.87

1.53

2.9

GR23-125

28.96

32.00

3.04

0.3

GR23-126

35.05

44.20

9.141

0.3

including

38.10

39.62

1.52

1.2

GR23-126

62.48

67.06

4.58

0.2

GR23-126

134.11

135.64

1.53

0.3

GR23-127

7.62

16.76

9.14

0.2

GR23-127

28.96

32.00

3.04

0.2

GR23-127

53.34

67.06

13.721

0.3

including

54.86

64.01

9.15

0.4

GR23-127

79.25

82.30

3.05

2.3

GR23-129

42.67

44.20

1.53

0.6

GR23-130

35.05

36.58

1.53

0.4

GR23-130

76.20

79.25 EOH

3.05

0.7

including

77.72

79.25 EOH

1.52

1.3

GR23-131

30.48

36.58

6.102

4.1

including

32.00

33.53

1.53

13.3

GR23-132

48.77

50.29

1.52

1.7

GR23-133

30.48

42.67

12.19

0.7

including

33.53

36.58

3.05

2.3

GR23-133

68.58

76.2 EOH

7.62

0.2

GR23-134

33.53

42.67

9.14

0.4

GR23-135

41.15

57.91

16.76

0.5

including

51.82

56.39

4.57

1.3

GR23-136

22.86

38.10

15.24

1.0

including

25.91

30.48

4.57

2.4

GR23-137

44.20

57.91

13.71

0.4

GR23-138

85.34

86.87

1.53

0.2

钻孔

发件人(M)

至(M)

宽度(米)*

Au g/t

GR23-123

59.44

67.06

7.62

0.3

包括

59.44

60.96

1.52

1.2

GR23-123

82.3

91.44 EOH

9.14

0.2

GR23-124

85.34

89.92

4.58

1.1

包括

85.34

86.87

1.53

2.9

GR23-125

28.96

32.00

3.04

0.3

GR23-126

35.05

44.20

9.141

0.3

包括

38.10

39.62

1.52

1.2

GR23-126

62.48

67.06

4.58

0.2

GR23-126

134.11

135.64

1.53

0.3

GR23-127

7.62

16.76

9.14

0.2

GR23-127

28.96

32.00

3.04

0.2

GR23-127

53.34

67.06

13.721

0.3

包括

54.86

64.01

9.15

0.4

GR23-127

79.25

82.30

3.05

2.3

GR23-129

42.67

44.20

1.53

0.6

GR23-130

35.05

36.58

1.53

0.4

GR23-130

76.20

79.25 EOH

3.05

0.7

包括

77.72

79.25 EOH

1.52

1.3

GR23-131

30.48

36.58

6.102.

4.1

包括

32.00

33.53

1.53

13.3

GR23-132

48.77

50.29

1.52

1.7

GR23-133

30.48

42.67

12.19

0.7

包括

33.53

36.58

3.05

2.3

GR23-133

68.58

76.2 EOH

7.62

0.2

GR23-134

33.53

42.67

9.14

0.4

GR23-135

41.15

57.91

16.76

0.5

包括

51.82

56.39

4.57

1.3

GR23-136

22.86

38.10

15.24

1.0

包括

25.91

30.48

4.57

2.4

GR23-137

44.20

57.91

13.71

0.4

GR23-138

85.34

86.87

1.53

0.2

*Drill hole intercepts, true widths have not been determined. Grades have not been capped in the averages.

*钻孔截获,实际宽度尚未确定。平均分中没有设置分数上限。

1 Composite includes 1 unmineralized interval. 2 immediately below this interval drill hit 3m of historic workings with no sample recovered. EOH = end of hole.

1复合体包括1个未成矿层段。2.紧接着在这段时间内,钻探击中了3米长的历史工作面,但没有找到任何样本。EOH=孔底。

Two holes testing the Shaft Target in the northeast part of the claim block (holes GR23-119 and 121) did not encounter significant gold mineralization.

在索赔区块东北部测试竖井目标的两个洞(GR23-119和121号洞)没有遇到重大的金矿化。

Next Steps

接下来的步骤

Results for all 24 holes from the winter 2023 drill program at Gold Range have now been received and released. A permit amendment is underway to allow further drill testing and definition of the new WestGold discovery where the Company has identified a new zone of flat dipping gold mineralization that returned 0.7 g/t gold over 35 metres at a target that could extend over an area hundreds of metres by hundreds of metres (previously released, see May 8, 2023 news release).

黄金靶场2023年冬季钻探计划的所有24个孔的结果现在已经收到并发布。一项许可证修订正在进行中,以允许对新的WestGold发现进行进一步的钻探测试和定义,在该发现中,该公司发现了一个新的平缓浸金矿化区,该矿化带的黄金储量超过35米,目标可能延伸到数百米乘数百米(之前发布的,见2023年5月8日的新闻稿)。

Recently acquired LiDar imagery, drill and surface sample assays, and field mapping data are being analysed and interpreted to further advance the ongoing targeting efforts at Gold Range. Additional field programs will be announced once finalized.

正在分析和解释最近获得的激光雷达图像、钻探和地面样本分析以及实地测绘数据,以进一步推动正在进行的Gold Range目标确定工作。其他实地计划将在最终敲定后公布。

Quality Control

质量控制

Reverse circulation drill cuttings were collected in numbered cloth sample bags from 5 foot (1.52m) intervals during drilling and were picked up from site and analyzed by Skyline Assayers and Laboratories in Tucson Arizona (which is ISO/IEC 17025 accredited). A 280g pulp was prepared and gold was assayed using a 50g fire assay with an atomic absorption finish (method FA-01-50g). Gold samples greater than 5 g/t are redone using a 50g fire assay method with a gravimetric finish (method FA-02 50g). The Company included certified reference standards, blanks, and duplicates in every sample batch and then checked to ensure proper quality assurance and quality control prior to releasing the data.

反循环钻屑在钻井过程中以5英尺(1.52米)的间隔收集在编号布样袋中,并从现场采集并由亚利桑那州图森市的Skyline Analyayers和实验室(已通过国际标准化组织/国际电工委员会17025认证)进行分析。制备了280g纸浆,并用50g火焰原子吸收光谱分析法(FA-01-50G法)测定了金的含量。大于5g/t的黄金样品用50g火试金法和重量法(FA-02 50g法)重做。该公司在每个样品批次中都包括认证的参考标准、空白和复制品,然后在发布数据之前进行检查,以确保适当的质量保证和质量控制。

About Gold Range

关于Gold Range

The Gold Range project is a new bulk-tonnage oxide-gold target located within an underexplored metamorphic terrain in Northern Arizona. CANEX controls 5 kilometres of strike length along a highly prospective district scale structure where mineralization is being defined through surface sampling, mapping, and reverse circulation drilling. The main exploration target defined by surface work is 4000 metres long by up to 500 metres wide with multiple subparallel exploration targets identified. The target zone remains open along strike under basin cover. Drilling by CANEX has returned strong results including 1 g/t gold over 59.5 metres, 1.6 g/t gold over 35.1 metres, 2.2 g/t gold over 24.4 metres, and 0.3 g/t gold over 62.5 metres.

Gold Range项目是一个新的大吨位氧化金目标,位于亚利桑那州北部一个未被勘探的变质地带。CANEX控制着沿着一个极具远景的地区规模构造的5公里走向长度,该构造正在通过地表采样、测绘和反循环钻探确定矿化。地面工作确定的主要勘探目标是4000米长、500米宽,并确定了多个次平行勘探目标。目标区域在盆地覆盖下沿走向保持开放。CANEX的钻探获得了强劲的结果,包括超过59.5米的1克/吨黄金,超过35.1米的1.6克/吨黄金,超过24.4米的2.2克/吨黄金,以及超过62.5米的0.3克/吨黄金。

About CANEX Metals

关于CANEX Metals

CANEX Metals (TSX.V:CANX) is a Canadian junior exploration company with a new gold discovery at the Gold Range Project in Northern Arizona, and high grade silver and gold mineralization at the Gibson property in British Columbia. CANEX is led by an experienced management team which has made three notable porphyry and bulk tonnage discoveries in North America and is sponsored by Altius Minerals (TSX: ALS) a large shareholder of the Company.

CANEX Metals(多伦多证券交易所股票代码:CANX)是一家加拿大初级勘探公司,在亚利桑那州北部的Gold Range Project发现了新的金矿,在不列颠哥伦比亚省的Gibson矿发现了高品位的银和金矿。CANEX由经验丰富的管理团队领导,该团队在北美发现了三个著名的斑岩和散装吨位,并由本公司的大股东Altius Minerals(多伦多证券交易所股票代码:ALS)赞助。

Dr. Shane Ebert P.Geo., is the Qualified Person for CANEX Metals and has approved the technical disclosure contained in this news release.

Shane Ebert P.Geo博士是CANEX Metals的合格人士,并已批准本新闻稿中包含的技术披露。

"Shane Ebert",
Shane Ebert, President/Director

《谢恩·埃伯特》,
谢恩·埃伯特,总裁/董事

For Further Information Contact:

欲了解更多信息,请联系:

Shane Ebert at 1.250.964.2699 or
Jean Pierre Jutras at 1.403.233.2636
Web:

肖恩·埃伯特电话:1.250.964.2699或
让·皮埃尔·朱特拉斯报1.403.233.2636
网页:

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所及其监管服务提供商(该术语在多伦多证券交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

Except for the historical and present factual information contained herein, the matters set forth in this news release, including words such as "expects", "projects", "plans", "anticipates" and similar expressions, are forward-looking information that represents management of CANEX Metals Inc. internal projections, expectations or beliefs concerning, among other things, future operating results and various components thereof or the economic performance of CANEX. The projections, estimates and beliefs contained in such forward-looking statements necessarily involve known and unknown risks and uncertainties, which may cause CANEX's actual performance and financial results in future periods to differ materially from any projections of future performance or results expressed or implied by such forward-looking statements. These risks and uncertainties include, among other things, those described in CANEX's filings with the Canadian securities authorities. Accordingly, holders of CANEX shares and potential investors are cautioned that events or circumstances could cause results to differ materially from those predicted. CANEX disclaims any responsibility to update these forward-looking statements.

除本文包含的历史和现在的事实信息外,本新闻稿中陈述的事项,包括“预期”、“项目”、“计划”、“预期”和类似表述,均为前瞻性信息,代表CANEX Metals Inc.管理层的内部预测、预期或信念,除其他外,涉及CANEX的未来经营业绩及其各个组成部分或经济表现。这些前瞻性陈述中包含的预测、估计和信念必然涉及已知和未知的风险和不确定因素,这可能会导致CANEX未来的实际业绩和财务结果与此类前瞻性陈述明示或暗示的对未来业绩或结果的任何预测大不相同。这些风险和不确定性包括CANEX向加拿大证券管理机构提交的文件中描述的风险和不确定性。因此,CANEX股票的持有者和潜在投资者被告诫,事件或情况可能导致结果与预期的大不相同。CANEX不承担更新这些前瞻性陈述的任何责任。

SOURCE: CANEX Metals Inc.

来源:CANEX Metals Inc.


View source version on accesswire.com:
在accesswire.com上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发