Slave Lake Zinc Announces Corporate Update and Exploration of Lithium Potential in Northwest Territories
Slave Lake Zinc Announces Corporate Update and Exploration of Lithium Potential in Northwest Territories
Vancouver, British Columbia--(Newsfile Corp. - July 17, 2023) - Slave Lake Zinc Corp. (CSE: SLZ) (the "Company") Slave Lake Zinc is excited to share its corporate update and announce its exploration plans for lithium potential in Canada's Northwest Territories. The company is currently designing its summer exploration program and is eagerly anticipating the sampling of pegmatite formations on its property for potential lithium content. This project could potentially add to the company's already important critical metals project in the region.
温哥华,不列颠哥伦比亚省-(Newsfile Corp.-2023年7月17日)-Slave Lake Zinc Corp.(CSE:SLZ)(“公司”)欣喜地分享了公司最新情况,并宣布了在加拿大西北地区勘探锂潜力的计划。该公司目前正在设计夏季勘探计划,并热切期待在其地产上对伟晶岩层进行采样,以确定潜在的锂含量。该项目可能会增加该公司在该地区本已重要的关键金属项目。
The company's geologists and advisors have identified numerous significant pegmatite formations from historic mapping conducted on the maiden O'Connor Lake MWK claims from the 1950s. These formations have been mapped over several hundreds of meters. This historical mapping was conducted in conjunction with the then-company, American Yellowknife Mines, which was establishing production for zinc/lead at O'Connor Lake prior to operations halting due to poor metals prices in the early 1950s.
该公司的地质学家和顾问从20世纪50年代以来对未开垦的奥康纳湖MWK地区进行的历史测绘中发现了许多重要的伟晶岩层。这些构造已经被绘制了数百米的地图。这份历史地图是与当时的美国黄刀矿业公司合作进行的,该公司在20世纪50年代初因金属价格低迷而停产之前,在奥康纳湖建立了锌/铅的生产。
Slave Lake Zinc plans to dispatch a field team to conduct initial reconnaissance mapping and sampling of the pegmatites noted in the historic reports. This effort will focus on O'Connor Lake and specifically the extensive claims established by Slave Lake Zinc during the 2022 season. These claims cover all the historic mapped areas from the original MWK claims and the areas of historic mapping of known pegmatite showings.
奴隶锌湖计划派遣一个野外小组对历史报告中提到的伟晶岩进行初步勘测、测绘和取样。这项工作将集中在奥康纳湖,特别是奴隶湖锌在2022年赛季建立的广泛主张。这些主张涵盖了MWK原始主张中的所有历史测绘区域,以及已知伟晶岩显示的历史测绘区域。
The O'Connor Lake property is located immediately south of the Yellowknife Pegmatite Belt, and the company believes that the property is simply an extension to the south of this pegmatite corridor. Government geologists suggest the host rocks in the O'Connor Lake area are similar to the granitic intrusive complex in the Hearne Channel-Beaulieu River area on the north side of Great Slave Lake.
奥康纳湖地产位于黄刀伟晶岩带的正南方,该公司认为,该地产只是伟晶岩走廊向南的延伸。政府地质学家认为,奥康纳湖地区的寄主岩石类似于大奴湖北侧赫恩海峡-博留河地区的花岗岩侵入杂岩。
The map below illustrates the current location of some of the projects claiming to have lithium-bearing pegmatite on their properties within the north of the East Arm of Great Slave Lake. It also shows the location of O'Connor Lake, Slave Lake Zinc's property. The Yellowknife Pegmatite Belt is currently under active exploration by some of the companies on this map.
下面的地图显示了一些项目的当前位置,这些项目声称在大奴湖东臂以北的土地上有含锂的伟晶岩。它还显示了奥康纳湖的位置,奴隶湖锌的财产。这张地图上的一些公司目前正在积极勘探黄刀伟晶岩带。
Figure 1
图1
About Slave Lake Zinc
关于Slave Lake锌
Slave Lake Zinc Corp. is a company that aims to unlock the potential of its O'Connor Lake property, a historic site rich in zinc, lead, and copper, situated in Canada's Northwest Territories. This property, found to the south of the Great Slave Lake and east of the Pine Point project, was initially developed post-World War II. However, it was abandoned in 1952 due to the collapse of zinc and lead prices after the war. Slave Lake Zinc Corp. is confident in its abilities to progress this project and significantly enhance the historic potential of the property. More information is available at .
奴隶湖锌公司是一家旨在释放其奥康纳湖资产潜力的公司,奥康纳湖位于加拿大西北部,是一个富含锌、铅和铜的历史遗迹。这处位于大奴湖以南、Pine Point项目以东的地产最初是在二战后开发的。但由于战后锌和铅价格暴跌,它在1952年被遗弃。奴隶湖锌公司相信自己有能力推进这一项目,并显著增强该地产的历史潜力。有关更多信息,请访问。
On Behalf of the Board of Directors,
Slave Lake Zinc Corp.
Per:
Ritch Wigham CEO & Director
Phone: 604-396-5762
Email: rwigham@zinccorp.ca
我谨代表董事会:
奴隶湖锌公司。
PER:
Ritch Wigham首席执行官兼董事
电话:604-396-5762
电子邮件:rwigham@zinccorp.ca
Neither the Canadian Securities Exchange nor its regulation services provider has reviewed or accepted responsibility for the adequacy or accuracy of the content of this news release
加拿大证券交易所及其监管服务提供商均未对本新闻稿内容的充分性或准确性进行审查或承担责任
Forward Looking Statement
前瞻性陈述
Statements in this news release that are forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed here and elsewhere in both Slave Lake Zinc's periodic filings with Canadian securities regulators. When used in this news release, words such as "will", "plan", "estimate", "expect", "intend", "potential", "should," and similar expressions, are forward-looking statements. Information provided in this document is necessarily summarized and may not contain all available material information. Forward-looking statements include, without limitation, statements regarding the progress of a definitive offtake agreement, potential development and production at the Company's O'Connor Lake project, future oriented events and other statements that are not facts. Forward-looking statements are based on a few assumptions and estimates that, while considered reasonable by management based on the business and markets in which Slave Lake Zinc operates, are inherently subject to significant operational, economic, and competitive uncertainties and contingencies. Such forward-looking statements should therefore be construed in light of such factors. Although Slave Lake Zinc has attempted to identify important factors that could cause actual results, performance or achievements to differ materially from those contained in the forward-looking statements, there can be other factors that cause results, performance or achievements not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate or that management's expectations or estimates of future developments, circumstances or results will materialize. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements in this news release are made as of the date of this news release, and Slave Lake Zinc disclaims any intention or obligation to update or revise such information, except as required by applicable law, and Slave Lake Zinc does not assume any liability for disclosure relating to any other company
本新闻稿中的前瞻性陈述会受到各种风险和不确定因素的影响,这些风险和不确定性与Slave Lake Zinc在这里和其他地方向加拿大证券监管机构提交的定期文件中披露的具体因素有关。本新闻稿中使用的“将”、“计划”、“估计”、“期望”、“打算”、“潜在”、“应该”等词语以及类似的表述均为前瞻性陈述。本文档中提供的信息是必要的摘要,可能不包含所有可用材料信息。前瞻性陈述包括但不限于有关最终承购协议的进展、公司奥康纳湖项目的潜在开发和生产、面向未来的事件以及其他非事实的陈述。前瞻性陈述基于一些假设和估计,虽然管理层根据Slave Lake Zinc经营的业务和市场认为这些假设和估计是合理的,但这些假设和估计本身就会受到重大运营、经济和竞争不确定性和意外事件的影响。因此,应根据这些因素来解读这种前瞻性陈述。尽管Slave Lake锌公司试图确定可能导致实际结果、业绩或成就与前瞻性陈述中包含的结果、业绩或成就大不相同的重要因素,但也可能有其他因素导致结果、业绩或成就与预期、估计或预期的结果、业绩或成就不符。不能保证这些信息将被证明是准确的,也不能保证管理层对未来发展、情况或结果的期望或估计将成为现实。因此,读者不应过分依赖前瞻性陈述。本新闻稿中的前瞻性陈述是截至本新闻稿发布之日作出的,除适用法律要求外,Slave Lake Zincc没有任何更新或修改此类信息的意图或义务,Slave Lake Zincc不承担与任何其他公司相关的披露责任
To view the source version of this press release, please visit
要查看本新闻稿的源版本,请访问