share_log

Kingsview Minerals Reports Strong Gold Results at the Hubcap Project in Wawa, Ontario

Kingsview Minerals Reports Strong Gold Results at the Hubcap Project in Wawa, Ontario

Kingsview Minerals在安大略省瓦瓦的Hubcap项目公布了强劲的黄金业绩
newsfile ·  2023/07/18 07:07

Highlights include gold grades of 62.6 g/t, 30.7 g/t, and 25.0 g/t

亮点包括 62.6 g/t、30.7 g/t 和 25.0 g/t 的黄金等级

Toronto, Ontario--(Newsfile Corp. - July 18, 2023) - Kingsview Minerals Ltd. (CSE: KVM) (FSE: 0L4) (the "Company" or "Kingsview") is pleased to announce results from a field sampling program at the Hubcap Project in the active Wawa Gold Corridor of northern Ontario.

安大略省多伦多--(Newsfile Corp. ——2023 年 7 月 18 日) 金斯维尤矿业有限公司 (CSE: KVM) (FSE: 0L4) (the”公司“或”金斯维尤“)很高兴地宣布位于安大略省北部活跃的瓦瓦黄金走廊的Hubcap项目实地采样计划的结果。

The exploration carried out in the spring of 2023 is part of a multi-phase program across the 15,295-hectare property portfolio expected to take place over the summer of 2023. Current sampling results reported are focused on the Hubcap Project located immediately south of Red Pine Exploration's Wawa Gold Project where Red Pine recently reported a drill intersection of 1.32 grams of gold per tonne (g/t Au) over 100.99 metres (m).

2023年春季进行的勘探是预计将于2023年夏季进行的占地15,295公顷的房地产投资组合的多阶段计划的一部分。目前报告的采样结果集中在位于Red Pine Exploration的Wawa Gold Project以南的Hubcap项目上,Red Pine最近报告说,该项目的钻探交叉点为每吨(g/t Au)超过100.99米(m)1.32克。

Surface sampling highlights from the Hubcap Main block included: sample E5707121 from HBFS-23-004, which graded 62.60 g/t Au and 6.10 g/t of silver (Ag); sample E5707117 from HBFS-23-002, which graded 30.70 g/t Au and 5.40 g/t Ag with 1400 ppm of copper (Cu); and sample E5707119 from HBFS-23-003, which graded 25.00 g/t Au and 4.40 g/t Ag. Significant sample results are highlighted below in Table 1, and locations are shown on Figure 1 below.

来自 Hubcap Main 模块的表面采样亮点包括:来自 HBFS-23-004 的 E5707121 样本,它进行了分级 62.60 g/t Au 和 6.10 g/t 银 (Ag); 来自 HBFS-23-002 的 E5707117 样本,它已分级 30.70 g/t Au 和 5.40 g/t Ag,含有 1400 ppm 的铜 (Cu);还有来自 HBFS-23-003 的 E5707119 样本,后者进行了分级 25.00 g/t Au 和 4.40 g/t Ag。重要的样本结果在下表 1 中突出显示,位置如下面的图 1 所示。

James Macintosh, President and CEO, commented: "These results from our spring field sampling continue to provide strong evidence that the greenstones and intrusive rocks found at Hubcap resemble the regional geologic setting that has brought Red Pine Exploration so much success. The fact that 40% of the samples collected from outcrops returned gold assays in excess of 2 grams per tonne is very encouraging. We hope to replicate the success of our northern neighbour, given that the encouragingly strong gold values at Hubcap are associated with strong alteration, sulphide mineralization and structural deformation. The results provide excellent targets for our future exploration, including drill testing of the best targets we define."

总裁兼首席执行官詹姆斯·麦金托什评论道: “我们春季田间采样的这些结果继续提供有力的证据,表明在Hubcap发现的绿岩和侵入性岩石类似于为红松勘探带来巨大成功的区域地质环境。从露头采集的样本中,有40%返回的金含量超过每吨2克,这一事实非常令人鼓舞。我们希望复制我们北方邻国的成功,因为Hubcap令人鼓舞的强劲黄金价值与强烈的改变、硫化物矿化和结构变形有关。这些结果为我们未来的勘探提供了很好的目标,包括对我们定义的最佳目标进行钻探测试。”

Table 1: Kingsview Minerals Hubcap Project Field Sampling Highlights, Spring 2023**

表 1:Kingsview Minerals Hubcap 项目实地采样亮点,2023 年春季**

Field ID Sample Easting (m) Northing (m) Au (g/t) Ag (g/t) Cu (ppm)
HBFS-23-001A E5707114 667083 5311217 13.60 3.50 457
HBFS-23-001B E5707115 667083 5311217 3.73 0.70 53
HBFS-23-001C E5707116 667083 5311217 2.45 0.70 68
HBFS-23-002A E5707117 667084 5311220 30.70 5.40 20
HBFS-23-002B E5707118 667084 5311220 4.35 2.60 1400
HBFS-23-003A E5707119 667088 5311217 25.00 4.40 69
HBFS-23-003B E5707120 667088 5311217 4.15 1.00 118
HBFS-23-004 E5707121 667085 5311185 62.60 6.10 15
HBFS-23-008B E5707130 666667 5310725 0.33 0.25 169
HBFS-23-010B E5707133 666795 5311302 2.04 0.25 481
字段 ID 示例 东方 (m) 北方 (m) 金 (g/t) 银 (g/t) 铜 (ppm)
HBFS-23-001A E5707114 667083 5311217 13.60 3.50 457
HBFS-23-001B E5707115 667083 5311217 3.73 0.70 53
HBFS-23-001C E5707116 667083 5311217 2.45 0.70 68
HBFS-23-002A E5707117 667084 5311220 30.70 5.40 20
HBFS-23-002B E5707118 667084 5311220 4.35 2.60 1400
HBFS-23-003A E5707119 667088 5311217 25.00 4.40 69
HBFS-23-003B E5707120 667088 5311217 4.15 1.00 118
HBFS-23-004 E5707121 667085 5311185 62.60 6.10 15
HBFS-23-008B E5707130 666667 5310725 0.33 0.25 169
HBFS-23-010B E5707133 666795 531302 2.04 0.25 481

**All sample values are from grab samples which by their nature are not representative of overall grades of mineralized areas. Readers are cautioned to not place undue reliance on the assay values reported in the table above. The 10 samples above are part of a suite of 22 samples collected and assayed. Assay values for the samples not reported ranged from trace to approximately 0.3 g/t gold.

**所有样本值均来自采集样本,从本质上讲,这些样本并不代表矿化区域的总体品位。提醒读者不要过分依赖上表中报告的化验值。上面的10个样本是收集和分析的22个样本的一部分。未报告的样本的化验值从痕量到大约0.3 g/t的金不等。


Figure 1: 2023 Spring Hubcap Surface Sample Locations


图 1:2023 年 Spring Hubcap 表面样品位置

Next Steps at Hubcap Project

Hubcap 项目的后续步骤

The Company has an extensive exploration plan to follow up on high-priority targets at the 2,200-hectare Hubcap Project.

该公司制定了广泛的勘探计划,以跟进占地2200公顷的Hubcap项目的高优先目标。

  • Surface Exploration at Hubcap - Field and channel sampling to better understand over 30 additional exploration targets identified at Hubcap.

  • IP Survey - Carry out an IP survey over previously cut grid lines at East Hubcap to help vector exploration and drilling efforts.

  • Re-Logging and Sampling Historic Core - Examine and review all historic core available and sample any overlooked intervals potentially mineralized to help build a better understanding of the historic work.

  • Drill Program - Initiate drilling at Hubcap utilizing the results of the surface, exploration, IP survey and re-analysis of the historic work.

  • Hubcap 的地表探索- 现场和信道采样 为了更好地理解 在 Hubcap 又确定了 30 个勘探目标。

  • 知识产权调查 -对East Hubcap先前切断的网格线进行知识产权调查,以帮助矢量勘探和钻探工作。

  • 重新记录和采样历史核心- 检查和审查所有可用的历史核心,并采样任何被忽视的潜在矿化间隔,以帮助更好地了解历史工作。

  • 演习计划 -利用地表、勘探、知识产权调查和对历史工作的重新分析的结果,开始在Hubcap进行钻探。

Qualified Person

合格人员

Bruce Durham, P.Geo., is a Qualified Person, as that term is defined by Canadian regulatory guidelines under NI 43-101, and has read and approved the technical information contained in this press release.

Bruce Durham,P.Geo.,是合格人员,该术语由加拿大监管准则根据NI 43-101定义,并已阅读并批准了本新闻稿中包含的技术信息。

About Kingsview Minerals Ltd.

关于金斯威矿业有限公司

Kingsview is a mineral exploration company focused on its gold and base metal exploration properties, including the flagship 13,056-hectare Echum Project and the 2,239-hectare Hubcap Project, both located in the active Wawa Gold Corridor in Ontario, Canada. The Company's properties are surrounded by advanced infrastructure in a well-developed mining district. Kingsview will draw on its strong technical team with significant exploration success to advance its properties. Learn more: .

Kingsview是一家矿产勘探公司,专注于其黄金和贱金属勘探物业,包括占地13,056公顷的旗舰Echum项目和占地2,239公顷的Hubcap项目,均位于加拿大安大略省活跃的瓦瓦黄金走廊。该公司的物业周围环绕着先进的基础设施,位于发达的矿区。Kingsview将利用其强大的技术团队来开发其物业,这些团队在勘探方面取得了重大成功。了解更多:.

For more information, please contact investor relations at investors@kingsviewminerals.ca.

欲了解更多信息,请通过 investors@kingsviewminerals.ca 联系投资者关系部。

On Behalf of the Board of Directors,

代表董事会,

James Macintosh
President and CEO

詹姆斯·麦金托什
总裁兼首席执行官

Neither the Canadian Securities Exchange nor its regulation services provider has reviewed or accepted responsibility for the adequacy or accuracy of this press release.

加拿大证券交易所及其监管服务提供商均未对本新闻稿的充分性或准确性进行审查或承担责任。

This press release contains forward-looking statements. Forward-looking statements involve known and unknown risks, uncertainties and assumptions and accordingly, actual results and future events could differ materially from those expressed or implied in such statements. You are hence cautioned not to place undue reliance on forward-looking statements. Forward-looking statements include words or expressions such as "proposed", "will", "subject to", "near future", "in the event", "would", "expect", "prepared to" and other similar words or expressions. All statements other than statements of present or historical fact are forward-looking statements and include but are not limited to statements regarding the potential that the projects will yield any precious metals in future exploration programs and the Company's ability to advance its properties.

本新闻稿包含前瞻性陈述。前瞻性陈述涉及已知和未知的风险、不确定性和假设,因此,实际结果和未来事件可能与此类陈述中表达或暗示的结果和未来事件存在重大差异。因此,提醒您不要过分依赖前瞻性陈述。前瞻性陈述包括诸如 “提议”、“将”、“待于”、“不久的将来”、“在事件中”、“将”、“期望”、“准备好” 等词语或表达方式以及其他类似的词语或表达方式。除现状或历史事实陈述外,所有陈述均为前瞻性陈述,包括但不限于关于这些项目在未来勘探计划中产生任何贵金属的可能性以及公司开发其财产的能力的陈述。

Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is based on assumptions made in good faith and believed to have a reasonable basis. Such assumptions include the Company's ability to implement a drill program on the projects, that the Company will have sufficient funds available to it and that the Company will continue to be able to retain skilled personnel. Factors that could cause future results or events to differ materially from current expectations expressed or implied by the forward-looking statements include general business, economic, competitive, political and social uncertainties; the state of capital markets; there being no assurance that any future exploration program on the projects will result in mineral resources; the inability of the Company to raise sufficient funds and/or retain necessary personnel to conduct its operations; the impact on the business, operations and financial condition of the Company resulting from the announcement of the purchase of the projects; the impact that the recovery post COVID-19 may have on precious metals; failure to realize the anticipated benefits of the transaction described in this press release; other unforeseen events, developments, or factors causing any of the aforesaid expectations, assumptions, and other factors ultimately being inaccurate or irrelevant; and any risks associated with the ongoing COVID-19 pandemic.

如果公司表达或暗示对未来事件或业绩的期望或信念,则此类期望或信念基于真诚做出的假设,并被认为有合理的依据。这些假设包括公司有能力在这些项目上实施钻探计划,公司将有足够的资金可用,以及公司将继续能够留住熟练的人才。可能导致未来业绩或事件与前瞻性陈述所表达或暗示的当前预期存在重大差异的因素包括一般业务、经济、竞争、政治和社会的不确定性;资本市场状况;无法保证未来任何项目勘探计划都会产生矿产资源;公司无法筹集足够的资金和/或留住必要的人员来开展运营;对业务、运营和财务状况的影响公司因宣布收购这些项目;COVID-19 之后的复苏可能对贵金属产生的影响;未能实现本新闻稿中描述的交易的预期收益;其他不可预见的事件、事态发展或导致上述任何预期、假设和其他因素最终不准确或无关的因素;以及与持续的 COVID-19 疫情相关的任何风险。

You can find further information with respect to these and other risks in filings made with the Canadian securities regulatory authorities that are available on the Company's SEDAR profile page at . The Company disclaims any obligation to update or revise these forward-looking statements, except as required by applicable law.

您可以在向加拿大证券监管机构提交的文件中找到有关这些风险和其他风险的更多信息,这些文件可在公司的SEDAR简介页面上找到。除非适用法律要求,否则公司不承担任何更新或修改这些前瞻性陈述的义务。

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发