Athena Gold Completes Spring 2023 RC Drill Program
Athena Gold Completes Spring 2023 RC Drill Program
VACAVILLE, CA / ACCESSWIRE / July 19, 2023 / Athena Gold Corporation (OTCQB:AHNR)(CSE:ATHA) ("Athena" or the "Company") is pleased to announce that it has successfully completed the Company's Spring 2023 reverse circulation ("RC") drill program of nine (9) angle holes (see press release dated June 20, 2023). Total footage was 3,740 feet (1,140 meters) at its Excelsior Springs Project ("Excelsior Springs" or the "ES Project"), located approximately 45 miles southwest of Goldfield in Esmeralda County, Nevada.
加利福尼亚州瓦卡维尔/ACCESSWIRE/2023年7月19日/雅典娜黄金公司(场外交易代码:AHNR)(CSE:ATSA)(“雅典娜“或”公司“)很高兴地宣布,已成功完成公司2023年春季反向循环(”RC“)九(9)个角孔的钻探计划(见日期为2023年6月20日的新闻稿)。3740英尺(1140米)在其精益求精的温泉项目(“精益求精的温泉“或”ES项目“),位于内华达州埃斯梅拉达县金田西南约45英里处。
Highlights from 2022 RC Drill Programs
2022年RC演习计划亮点
- DB-23: Intercepted a 33.5 meter intercept of 5.15 g/t Au and 8.9 g/t Ag, including a 16.7- meter intercept of 10.03 g/t Au and 17.3 g/t Ag, and a 10.6 meter intercept of 15.3 g/t Au and 26.5 g/t Ag.
- DH 22-01: Intercepted 6.05 g/t Au and 17.4 g/t Ag over 27.4 meters starting at 39.5 meters, including 10.2 g/t Ag and 30.8 g/t Ag over 10.7meters. A deeper zone starting at 77.7 meters intercepted 4.97 g/t Au and 14.4 g/t Ag over 13.7 meters.
- DH 22-02: Intercepted 4.49 g/t Au and 27.3 g/t Ag over 15.2 meters starting at 41.1 meters, including 7.29 g/t Au and 44.2 g/t Ag over 9.1 meters. A deeper zone starting at 68.6 meters intercepted 1.20 g/t Au and 7.7 g/t Ag over 7.6 meters.
- DB-23:截获5.15克/吨金和8.9克/吨银的33.5米截距,其中16.7米截获10.03克/吨金和17.3克/吨银,10.6米截获15.3克/吨金和26.5克/吨银。
- NH 22-01:从39.5米开始,在27.4米处截获6.05克/吨金和17.4克/吨银,其中10.2克/吨银和30.8克/吨银在10.7米处截获。从77.7米开始的较深层在13.7米处截留了4.97克/吨金和14.4克/吨银。
- NH 22-02:从41.1米开始,在15.2米处截获4.49克/吨金和27.3克/吨银,其中7.29克/吨金和44.2克/吨银在9.1米以上截获。从68.6米开始的较深层在7.6米处截留了1.20克/吨金和7.7克/吨银。
John Power, President and CEO of Athena, said, "The primary objective of our Spring 2023 RC drill program was to determine continuity of the shallow high-grade gold mineralization encountered in 2022; with step-outs both east and west, this will further define the target zone and set the stage for additional drilling."
雅典娜首席执行官兼首席执行官总裁约翰·鲍尔说,我们2023年春季RC钻探计划的主要目标是确定2022年遇到的浅层高品位金矿化的连续性;随着东西两个方向的退出,这将进一步确定目标区,并为进一步钻探奠定基础“
"We continue to believe Excelsior Springs is emerging as one of the best advanced gold exploration projects in Nevada's Walker Lane Trend," Power added.
“我们仍然相信,Excelsior Springs正在成为内华达州Walker Lane Trend地区最先进的金矿勘探项目之一。电力增加了。
Figure 1 - RC Drilling at Excelsior Springs in June 2023.
图1-2023年6月在Excelsior Springs进行RC钻探。
Figure 2 - Table of Completed RC Drill Holes.
图2-已完成的RC钻孔表。
Developing Additional Exploration Targets
开发更多勘探目标
We have identified several robust drill targets at Excelsior Springs and continue to do field work developing additional shallow- and high-grade drill targets. Recent sampling at Contact Gulch is an example of targets being analyzed and developed. Located only 0.5 miles east of the Western Slope Zone, Contact Gulch appears to be a surface expression of a limestone cap over siltstone that could contain mineralized material. Prior sampling done while conducting geologic mapping returned anomalous gold and arsenic in rock chip samples. New rock and soil assays are also pending from this area.
我们已经在Excelsior Springs确定了几个坚固的钻探目标,并继续进行现场工作,开发更多的浅层和高级钻探目标。最近在Contact Gulch进行的采样就是正在分析和开发的目标的一个例子。Contact Gulch位于西部斜坡地带以东仅0.5英里处,似乎是粉砂岩上的石灰岩盖子的表面表现,其中可能含有矿化物质。在进行地质填图时进行的事先采样在岩屑样品中发现了异常的金和砷。这一地区还在等待新的岩石和土壤分析结果。
Figure 3 - Contact Gulch (GPS unit at bottom of photograph for scale)
图3-Contact Gulch(比例尺照片底部的GPS单元)
All samples were shipped to American Assay Laboratories, an independent laboratory, in Reno, Nevada on July 7, 2023 for analysis. Assay results are expected in Q3-2023.
所有样本都于2023年7月7日运往内华达州里诺市的独立实验室美国化验实验室进行分析。化验结果预计将在2023年第三季度公布。
About Our Flagship Excelsior Springs Project
关于我们的旗舰项目Excelsior Springs
The Excelsior Springs Project (the "ES Project") lies within the prolific Walker Lane tectonic trend, a large northwest-trending region in western Nevada of, strike-slip and extensional fault zones. These fault zones are host to numerous gold deposits with strong district and local control of the gold mineralization. The ES Project contains numerous prospect pits, trenches, roads, surface sampling sites and 113 drill holes to date within a 300m by 3,000m wide (1,000 foot-wide and 10,000-foot-long east-west extensional zone of shearing and hydrothermal alteration. Underground workings on the two patented claims within the Project had unverified, historical production of 597,187 grams of gold (19,200 troy ounces) of gold from 18,000 tons averaging 1.2 oz (37.3 grams of gold/ton).
Excelsior Springs项目(“ES项目”)位于多产的Walker Lane构造趋势中,Walker Lane是内华达州西部一个由走滑和伸展断裂带组成的向西北方向的大型地区。这些断裂带赋存着大量金矿床,对金矿化具有较强的区域性和局部性控制作用。到目前为止,ES项目在一个300米乘3,000米宽(1,000英尺宽,10,000英尺长)的东西向剪切和热液蚀变伸展带内,包含许多潜在的矿坑、壕沟、道路、地表采样点和113个钻孔。该项目内两项专利主张的地下开采未经核实,历史上从18,000吨黄金中生产了597,187克黄金(19,200金衡盎司),平均产量为1.2盎司(37.3克黄金/吨)。
Walker Lane is experiencing a major resurgence of intense and successful exploration projects. Total gold production within the Walker Lane has amounted to 20+ million ounces ("Moz") of gold, including the following deposits at Goldfields (5 Moz), Bullfrog (2 Moz), Tonopah (2 Moz), Borealis (1 Moz), Mineral Ridge (1.5 Moz) and Comstock (8 Moz Au, 200 Moz Ag).
Walker Lane正在经历一场激烈而成功的勘探项目的重大复兴。Walker Lane的黄金总产量已达2,000万盎司(“Moz”),包括位于Goldfield(5 Moz)、BullFrog(2 Moz)、Tonopah(2 Moz)、Borealis(1 Moz)、Minory Ridge(1.5 Moz)及Comstock(8 Moz Au,200 Moz Ag)的下列矿床。
Readers are cautioned that the Company has no interest in or right to acquire any interest in any of the above-mentioned properties, other than the ES Project, and that the mineral deposits, and the results of any exploration or mining thereof, on adjacent or similar properties are not indicative of potential mineral deposits on the ES Project or any potential exploitation thereof.
敬请读者注意,除ES项目外,本公司并无于上述任何物业拥有权益,亦无权利收购任何上述物业的权益,而邻近或类似物业的矿藏及其勘探或开采结果并不代表ES项目的潜在矿藏或其任何潜在开采。
Gold mineralization discovered at the ES Project to date occurs in quartz vein stock-works and silicified zones in hornfels and calc-silicate altered country rock in a district known for porphyry dykes. The best (grades and thicknesses) in the recent past were found in oxidized and altered sediments proximal to porphyry dykes. One thick, high grade gold intercept encountered near the bottom of drill hole 22-01 is in underlying sulfide-bearing (pyrite and galena), altered sediments. The gold-mineralized stockwork and vein zones at the ES Project are shallow and each appears to have a relatively flat plunge, a favorable orientation for open pit mining.
到目前为止,在ES项目中发现的金矿化发生在角岩中的石英脉矿化和硅化带中,以及以斑岩岩脉著称的地区的钙硅酸盐蚀变围岩中。最近最好的(品位和厚度)是在斑岩岩脉附近的氧化和蚀变沉积物中发现的。在22-01号钻孔底部附近遇到的一个厚的、高品位的金拦截物位于下伏的含硫化物(黄铁矿和方铅矿)蚀变沉积物中。ES项目的金矿化网状带和脉状带较浅,每个矿带似乎都有相对平坦的倾角,这是露天采矿的有利方向。
Most historical exploration at the Excelsior Springs Project has focused on a 2.5 km (8,200 feet) long section in the central part of the historic Buster Mine zone, where mineralization was mined at or near the surface. Surface mapping in 2021 by Athena and an Induced Polarization (IP) geophysical survey conducted by Zonge International Inc. identified multiple zones of silicification correlating well with known mineralization. Several of the silicified zones defined by the IP (resistivity highs) surveys have not been tested by drilling and remain targets for future exploration.
Excelsior Springs项目的大多数历史勘探都集中在历史悠久的Buster矿区中部一段2.5公里(8,200英尺)长的区域,矿化是在地表或接近地表开采的。雅典娜2021年的地表测绘和宗格国际公司进行的激发极化(IP)地球物理测量确定了多个硅化带,这些带与已知矿化很好地关联。IP(高电阻率)测量确定的几个硅化带尚未经过钻井测试,仍是未来勘探的目标。
Based on the excellent results of Athena's two previous drilling programs, the ES Project is at an advanced stage of exploration with significant potential for one or more shallow open-pittable, oxidized gold deposits along with deeper, higher grade feeder zones similar to that encountered in drill hole 22-01 (mentioned above). In the opinion of management and its consultants, the ES Project is very promising and further exploration has the potential to expand the known high-grade oxide and sulfide gold mineralization and establish several additional gold-mineralized zones.
基于雅典娜之前两个钻探项目的出色结果,ES项目正处于勘探的后期阶段,具有巨大的潜力,可开采一个或多个浅部可露天开采的氧化型金矿,以及与上文提到的22-01号钻孔类似的更深、更高品位的给矿带。管理层及其顾问认为,ES项目非常有前景,进一步勘探有可能扩大已知的高品位氧化物和硫化物金矿化,并建立几个额外的金矿化带。
Quality Assurance and Quality Control
质量保证和质量控制
Procedures are being implemented to assure Quality Assurance Quality Control (QA/QC) of drill hole assaying at an ISO Accredited assay laboratory in Reno. All 5-footdrill hole samples are being securely stored for shipment, with chain of custody documentation through delivery to the lab. Mineralized commercial reference standards and coarse blank standards are being inserted every 20th sample in sequence to assure acceptable levels of confidence of the drill hole assays. When laboratory reports of the assays are received, QA/QC protocols are immediately augmented to ensure the precision and accuracy of the drill hole assays.
正在实施程序,以确保位于雷诺的ISO认证化验实验室的钻孔化验的质量保证质量控制(QA/QC)。所有5个脚踏孔的样品都被安全地储存起来以备运输,并通过将文件运送到实验室的过程中保存了一系列文件。矿化的商业参考标准和粗空白标准将按顺序每20个样品插入一次,以确保钻孔分析的可接受置信度。收到化验报告后,立即增加QA/QC协议,以确保钻孔化验的精确度和准确度。
As the Project advances, additional QA/QC measures will be implemented including selected duplicate check assaying on pulps and coarse rejects at a second accredited assay laboratory.
随着项目的推进,将实施更多的质量保证/质量控制措施,包括在第二个经认可的分析实验室对纸浆和粗废料进行选定的重复检查分析。
Qualified Person
有资格的人
Donald G. Strachan, Certified Professional Geologist (CPG #10376 AIPG), is a qualified person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and has reviewed the scientific and technical information that forms the basis of this press release and has approved the disclosure herein. Mr. Strachan is independent of the Company and was responsible for the site management and technical aspects of Athena's Spring 2022 drill program and the current Fall 2022 drill program.
唐纳德·G·斯特拉坎,注册专业地质学家(CPG****10376 AIPG),是国家仪器43-10376定义的合格人员-《矿产项目信息披露标准》(“NI 43-101”),并已审查了构成本新闻稿基础的科学和技术信息,并已批准在此披露。Strachan先生独立于公司,负责雅典娜2022年春季演练计划和当前2022年秋季演练计划的现场管理和技术方面的工作。
About Athena Gold Corporation
关于雅典娜黄金公司
Athena is engaged in the business of mineral exploration and the acquisition of mineral property assets. Its objective is to locate and develop economic precious and base metal properties of merit and to conduct additional exploration drilling and studies on the Project.
雅典娜从事矿产勘探和收购矿产资产的业务。其目标是寻找和开发有价值的经济、贵金属和贱金属资产,并对该项目进行额外的勘探、钻探和研究。
For further information about Athena Gold Corporation and our Excelsior Springs Gold project, please visit .
有关雅典娜黄金公司和我们的Excelsior Springs黄金项目的更多信息,请访问。
On Behalf of the Board of Directors
我谨代表董事会
John Power
Chief Executive Officer and President
约翰·鲍尔
首席执行官兼总裁
Contact:
联系方式:
Phone: John Power, 707-291-6198
Email: info@athenagoldcorp.com
电话:约翰·鲍尔,707-291-6198
电子邮件:info@athenagoldcorp.com
Cautionary Statement to U.S. Investors
对美国投资者的警示声明
This press release references NI 43-101, which differs from the requirements of U.S. securities laws. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects.
本新闻稿编号为NI 43-101,与美国证券法的要求不同。NI 43-101是加拿大证券管理人制定的一项规则,为发行人对有关矿产项目的科学和技术信息进行的所有公开披露建立了标准。
The United States Securities and Exchange Commission ("SEC") permits mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can legally extract or produce. Pursuant to SEC Industry Guide 7 under the United States Securities Act of 1933, as amended, a "final" or "bankable" feasibility study is required to report reserves. Currently Athena has not delineated "reserves" on any of its properties. Athena cannot be certain that any deposits at its properties will ever be confirmed or converted into SEC Industry Guide 7 or any successor rule or regulation compliant "reserves". Investors are cautioned not to assume that any part or all of the historic Buster Mine gold zone will ever be confirmed or converted into reserves or that it can be economically or legally extracted.
美国证券交易委员会(“美国证券交易委员会”)允许矿业公司在提交给美国证券交易委员会的文件中只披露公司可以合法开采或生产的矿藏。根据修订后的1933年《美国证券法》下的《美国证券交易委员会行业指南7》,需要进行一份“最终”或“可银行”的可行性研究报告,以报告储备情况。目前,雅典娜还没有在其任何一处房产上划定“保护区”。雅典娜无法确定其物业内的任何存款是否会被确认或转换为“美国证券交易委员会”行业指南7或任何后续规则或法规所遵循的“储备”。告诫投资者,不要以为历史悠久的巴斯特金矿区的任何部分或全部都会得到确认或转换为储量,或者可以经济或合法地开采出来。
The SEC has adopted amendments to its disclosure rules to modernize the mineral property disclosure requirements for issuers whose securities are registered with the SEC under the United States Securities Exchange Act of 1934, as amended. These amendments became effective February 25, 2019, with compliance required for the first fiscal year beginning on or after January 1, 2021, and historical property disclosure requirements for mining registrants that were included in SEC Industry Guide 7, which was rescinded from and after such date and replaced with disclosure requirements known as S-K 1300.
美国证券交易委员会已经通过了对其披露规则的修正案,以使其证券根据修订后的1934年美国证券交易法在美国证券交易委员会登记的发行人的矿业权披露要求现代化。这些修正案于2019年2月25日生效,要求从2021年1月1日或之后开始的第一个财年遵守《美国证券交易委员会行业指南7》中针对矿业注册人的历史财产披露要求,该指南在该日期及之后被撤销,取而代之的是名为S-K1300的披露要求。
Forward Looking Statements
前瞻性陈述
This press release contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian and U.S. securities laws. All statements, other than statements of historical fact, included herein including, without limitation, statements regarding future exploration plans and the completion of a phase 2 drill program at the Project, future results from exploration, and the anticipated business plans and timing of future activities of the Company, are forward-looking statements. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are typically identified by words such as: "believes", "will", "expects", "anticipates", "intends", "estimates", "plans", "may", "should", "potential", "scheduled", or variations of such words and phrases and similar expressions, which, by their nature, refer to future events or results that may, could, would, might or will occur or be taken or achieved. In making the forward-looking statements in this press release, the Company has applied several material assumptions, including without limitation, that there will be investor interest in future financings, market fundamentals will result in sustained precious metals demand and prices, the receipt of any necessary permits, licenses and regulatory approvals in connection with the future exploration and development of the Company's projects in a timely manner, QAQC procedures at the Project were followed, the availability of financing on suitable terms for the exploration and development of the Company's projects and the Company's ability to comply with environmental, health and safety laws.
本新闻稿包含适用于加拿大和美国证券法的前瞻性陈述和前瞻性信息(统称为“前瞻性陈述”)。除有关历史事实的陈述外,本文中包含的所有陈述,包括但不限于有关未来勘探计划和项目第二阶段钻探计划的完成、勘探的未来结果以及公司未来活动的预期业务计划和时间的陈述,均为前瞻性陈述。尽管该公司相信这样的陈述是合理的,但它不能保证这种预期将被证明是正确的。前瞻性表述通常用“相信”、“将”、“预期”、“预期”、“打算”、“估计”、“计划”、“可能”、“应该”、“潜在”、“预定”或这些词语和短语的变体以及类似的表述来识别,这些词语的性质是指可能、可能、将、可能或将发生或将发生或将采取或实现的未来事件或结果。在本新闻稿中做出前瞻性陈述时,公司应用了几个重大假设,包括但不限于,投资者对未来融资的兴趣、市场基本面将导致贵金属需求和价格持续增长、与公司未来项目勘探和开发相关的任何必要许可证、许可证和监管批准的及时收到、项目的QAQC程序得到遵守、公司项目勘探和开发以合适条款获得融资,以及公司遵守环境、健康和安全法律的能力。
The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in forward-looking statements as a result of various factors, including, operating and technical difficulties in connection with mineral exploration and development activities, actual results of exploration activities, the estimation or realization of mineral reserves and mineral resources, the inability of the Company to obtain the necessary financing required to conduct its business and affairs, as currently contemplated, the timing and amount of estimated future production, the costs of production, capital expenditures, the costs and timing of the development of new deposits, requirements for additional capital, future prices of precious metals, changes in general economic conditions, changes in the financial markets and in the demand and market price for commodities, lack of investor interest in future financings, accidents, labor disputes and other risks of the mining industry, delays in obtaining governmental approvals, permits or financing or in the completion of development or construction activities, risks relating to epidemics or pandemics such as COVID-19, including the impact of COVID-19 on the Company's business, financial condition and results of operations, changes in laws, regulations and policies affecting mining operations, title disputes, the inability of the Company to obtain any necessary permits, consents, approvals or authorizations, including of the Canadian Securities Exchange, the timing and possible outcome of any pending litigation, environmental issues and liabilities, and other factors and risks that are discussed in the Company's periodic filings with the SEC and disclosed in the final long form prospectus of the Company dated August 31, 2021.
公司提醒投资者,公司的任何前瞻性陈述都不是对未来结果或业绩的保证,实际结果可能由于各种因素而与前瞻性陈述中的结果大不相同,这些因素包括与矿产勘探和开发活动有关的经营和技术困难、勘探活动的实际结果、对矿产储量和矿产资源的估计或变现、公司无法获得开展目前预期的业务和事务所需的必要融资、估计未来产量的时间和数量、生产成本、资本支出、开发新矿藏的成本和时机、额外资本的要求、这些风险包括:贵金属的未来价格;总体经济状况的变化;金融市场以及大宗商品的需求和市场价格的变化;投资者对未来融资缺乏兴趣;事故、劳资纠纷和采矿业的其他风险;在获得政府批准、许可或融资或完成开发或建设活动方面的延误;与流行病或流行病有关的风险,如新冠肺炎对公司业务的影响;财务状况和经营业绩;影响采矿业务的法律、法规和政策的变化;所有权纠纷;公司无法获得任何必要的许可、同意、批准或授权。这些风险包括加拿大证券交易所的风险、任何未决诉讼的时间和可能的结果、环境问题和责任,以及公司在提交给美国证券交易委员会的定期报告中讨论的其他因素和风险,这些因素和风险在公司日期为2021年8月31日的最终详细招股说明书中有所披露。
Readers are cautioned not to place undue reliance on forward-looking statements. The Company undertakes no obligation to update any of the forward-looking statements in this press release or incorporated by reference herein, except as otherwise required by law.
告诫读者不要过度依赖前瞻性陈述。除非法律另有要求,否则公司不承担更新本新闻稿中的任何前瞻性陈述或通过引用将其并入本新闻稿的义务。
SOURCE: Athena Gold Corp.
资料来源:雅典娜黄金公司