Slave Lake Zinc Initiates Summer Lithium Exploration Program to Expand "Critical Metals" Project
Slave Lake Zinc Initiates Summer Lithium Exploration Program to Expand "Critical Metals" Project
Vancouver, British Columbia--(Newsfile Corp. - July 25, 2023) - Slave Lake Zinc Corp. (CSE: SLZ) (the "Company") is pleased to announce the commencement of its anticipated summer Lithium exploration program, as previously announced on July 17, 2022. This program marks a significant step towards enhancing the Company's "critical metals" project.
不列颠哥伦比亚省温哥华--(Newsfile Corp.,2023年7月25日)——Slave Lake Zinc Corp.(CSE: SLZ)(以下简称 “公司”)欣然宣布,其预期的夏季锂勘探计划已启动,该计划已于2022年7月17日宣布。该计划标志着朝着加强公司的 “关键金属” 项目迈出了重要一步。
The summer exploration program will begin with a focus on conducting reconnaissance prospecting and sampling within a 15 square kilometer area located west of the original headframe, where many pegmatite showings are mapped. The initial fieldwork will target a pegmatite dyke swarm within this region, where northwest trending pegmatites are found to intrude all other rock units. The Company's property is part of the regional-scale Yellowknife Lithium initiative, with the east arm of Great Slave Lake providing the only separation of SLZ from known lithium bearing pegmatites in this extensive lithium corridor. Slave Lake Zinc has engaged Aurora Geosciences of Yellowknife as their experienced geological consultants. CEO Ritch Wigham will accompany Aurora Geosciences during this phase of exploration.
夏季勘探计划首先将侧重于在原始头架以西的15平方公里的区域内进行侦察、勘探和采样,那里绘制了许多伟晶岩露出的地图。最初的实地考察将针对该地区内的伟晶岩堤群,那里发现向西北走向的伟晶岩会侵入所有其他岩石单元。该公司的财产是区域规模的Yellowknife Lithium计划的一部分,在这条宽阔的锂走廊中,大奴湖的东臂是SLZ与已知的含锂伟晶岩的唯一分离。Slave Lake Zinc聘请了耶洛奈夫的Aurora Geosciences作为他们经验丰富首席执行官里奇·威格姆将在这个勘探阶段陪同Aurora Geosciences。
Aurora Geosciences, with over 30 years of experience in the North, is the sole exploration team based in the region, offering a comprehensive suite of exploration services required for discovery. Their involvement in this project enhances the potential for success.
Aurora Geosciences在北方拥有超过30年的经验,是该地区唯一的勘探团队,提供探索所需的全套勘探服务。他们参与这个项目增加了成功的可能性。
In preparation for the exploration program, Slave Lake Zinc has compiled and diligently studied historic (pre-1954) assessment reports, drill logs, government publications and university theses. The Company's reviews have identified numerous occurrences of pegmatites mapped and noted with no further exploration, which will be sampled as a matter of priority during this exploration program.
为了准备勘探计划,Slave Lake Zinc汇编并认真研究了历史(1954年之前)的评估报告、钻探日志、政府出版物和大学论文。该公司的审查发现,在没有进一步勘探的情况下绘制了许多伟晶岩,并记录了这些伟晶岩,将在本次勘探计划中作为优先事项对这些伟晶岩进行采样。
The SLZ property lies on the projected southward extension of the Yellowknife Lithium corridor, which has been explored primarily on the North shore of Great Slave Lake. Descriptions of numerous pegmatites in the O'Connor Lake area have indicated showings of very coarse-grained material with large crystals of tourmaline, muscovite, and plagioclase.
SLZ的房产位于预计向南延伸的耶洛奈夫锂走廊上,该走廊主要在大奴隶湖的北岸进行探索。对奥康纳湖地区许多伟晶岩的描述表明,这些物质颗粒非常粗糙,里面有电气石、白云母和斜长石的大晶体。
CEO Ritch Wigham expressed his enthusiasm about the recent developments, stating, "These significant developments add a further dimension to the Company's existing critical metals pursuit in the South Slave region on the projected southern extension of the Yellowknife Lithium corridor. We are excited about the potential to add lithium to our critical metals portfolio."
首席执行官里奇·威格姆(Ritch Wigham)对最近的事态发展表示热情,他说:“这些重大进展为公司在预计的耶洛奈夫锂走廊南部延伸部分在南奴隶地区现有的关键金属追求增添了新的维度。我们对有可能在我们的关键金属产品组合中增加锂感到兴奋。”
The Slave Lake Zinc team is committed to delivering positive outcomes from the summer Lithium exploration program and looks forward to providing updates on the progress made in the coming weeks.
Slave Lake Zinc团队致力于从夏季锂勘探计划中取得积极成果,并期待在未来几周内提供有关进展的最新信息。
Slave Lake Zinc has closed a non-brokered private placement pursuant to which it has issued 2,000,000 units of the Company's securities at a price of $0.05 per unit for gross proceeds totalling $100,000. Each unit is comprised of one common share and one share purchase warrant, where each warrant entitles the holder to purchase one additional common share at a price of $0.12 per share for two years. The securities issued pursuant to the private placement and any shares to be issued on the exercise of warrants are restricted from trading until November 26, 2023. The net proceeds from the private placement will be used for general working capital.
Slave Lake Zinc已完成非经纪私募配售,据此,该公司以每单位0.05美元的价格发行了200万单位的公司证券,总收益总额为100,000美元。每个单位由一股普通股和一份股票购买权证组成,每份认股权证使持有人有权在两年内以每股0.12美元的价格再购买一股普通股。根据私募发行的证券以及行使认股权证而发行的任何股票在2023年11月26日之前的交易受到限制。私募的净收益将用于一般营运资金。
Three insiders of the Company purchased a total of 800,000 units for proceeds to the Company of $40,000, which comprises 40.0% of the total amount raised. The participation by such insiders is considered a "related-party transaction" within the meaning of Multilateral Instrument 61-101 - Protection of Minority Security Holders in Special Transactions ("MI 61-101"). The Company has relied on exemptions from the formal valuation and minority shareholder approval requirements of MI 61-101 contained in sections 5.5(a) and 5.7(1)(a) of MI 61-101 in respect of related party participation in the placement as neither the fair market value (as determined under MI 61-101) of the subject matter of, nor the fair market value of the consideration for, the transaction, insofar as it involved the related party, exceeded 25% of the Company's market capitalization (as determined under MI 61-101). The Company's board of directors and specifically the independent members of the board, as applicable, reviewed and approved the private placement subscriptions by the insiders. The Company did not file a material change report more than 21 days before the expected closing of the private placement as the date of closing was not previously known.
该公司的三位内部人士共购买了80万个单位,向公司收取了40,000美元的收益,占筹集总额的40.0%。此类内部人士的参与被视为多边文书61-101——在特殊交易中保护少数证券持有人(“MI 61-101”)所指的 “关联方交易”。公司依赖MI 61-101第5.5 (a) 和5.7 (1) (a) 节中关于关联方参与配售的MI 61-101的正式估值和少数股东批准要求的豁免,因为该交易标的的的的的公允市场价值(根据MI 61-101确定)和涉及关联方的交易对价的公允市场价值均不超过该交易的25% 公司的市值(根据MI 61-101确定)。公司董事会,特别是董事会的独立成员(如适用)审查并批准了内部人士的私募认购。由于此前尚不清楚收盘日期,公司在私募预计结束前21天没有提交重大变更报告。
About Slave Lake Zinc
关于《奴隶湖锌》
Slave Lake Zinc Corp. is a company that aims to unlock the potential of its O'Connor Lake property, a historic site rich in zinc, lead, and copper, situated in Canada's Northwest Territories. This property, found to the south of the Great Slave Lake and east of the Pine Point project, was initially developed post-World War II. However, it was abandoned in 1952 due to the collapse of zinc and lead prices after the war. Slave Lake Zinc Corp. is confident in its abilities to progress this project and significantly enhance the historic potential of the property. More information is available at .
Slave Lake Zinc Corp. 是一家旨在释放其位于加拿大西北地区的奥康纳湖房产的潜力的公司,该物业是一处富含锌、铅和铜的历史遗址。该物业位于大奴隶湖以南和派恩波因特项目以东,最初是在第二次世界大战后开发的。但是,由于战后锌和铅价格暴跌,它于1952年被放弃。Slave Lake Zinc Corp. 对其推进该项目并显著增强该物业的历史潜力的能力充满信心。更多信息可在以下网址获得。
On Behalf of the Board of Directors,
代表董事会,
Slave Lake Zinc Corp.
Per:
Ritch Wigham CEO & Director
Phone: 604-396-5762
Email: rwigham@zinccorp.ca
奴隶湖锌业公司。
每个:
Ritch Wigham 首席执行官兼董事
电话:604-396-5762
电子邮件:rwigham@zinccorp.ca
Neither the Canadian Securities Exchange nor its regulation services provider has reviewed or accepted responsibility for the adequacy or accuracy of the content of this news release.
加拿大证券交易所及其监管服务提供商均未对本新闻稿内容的充分性或准确性进行审查或承担责任。
Forward Looking Statement
前瞻性声明
Statements in this news release that are forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed here and elsewhere in both Slave Lake Zinc's periodic filings with Canadian securities regulators. When used in this news release, words such as "will", "plan", "estimate", "expect", "intend", "potential", "should," and similar expressions, are forward-looking statements. Information provided in this document is necessarily summarized and may not contain all available material information. Forward-looking statements include, without limitation, statements regarding the progress of a definitive offtake agreement, potential development and production at the Company's O'Connor Lake project, future oriented events and other statements that are not facts. Forward-looking statements are based on a few assumptions and estimates that, while considered reasonable by management based on the business and markets in which Slave Lake Zinc operates, are inherently subject to significant operational, economic, and competitive uncertainties and contingencies. Such forward-looking statements should therefore be construed in light of such factors. Although Slave Lake Zinc has attempted to identify important factors that could cause actual results, performance or achievements to differ materially from those contained in the forward-looking statements, there can be other factors that cause results, performance or achievements not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate or that management's expectations or estimates of future developments, circumstances or results will materialize. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements in this news release are made as of the date of this news release, and Slave Lake Zinc disclaims any intention or obligation to update or revise such information, except as required by applicable law, and Slave Lake Zinc does not assume any liability for disclosure relating to any other company.
本新闻稿中的前瞻性陈述受此处和Slave Lake Zinc向加拿大证券监管机构提交的定期文件中披露的具体因素有关的各种风险和不确定性的影响。在本新闻稿中使用时,诸如 “将”、“计划”、“估计”、“期望”、“打算”、“潜力”、“应该” 和类似表达方式之类的词语均为前瞻性陈述。本文档中提供的信息必须是摘要的,可能不包含所有可用的重要信息。前瞻性陈述包括但不限于关于最终承购协议进展的陈述、公司奥康纳湖项目的潜在开发和生产、面向未来的活动以及其他非事实的陈述。前瞻性陈述基于一些假设和估计,尽管管理层根据Slave Lake Zinc运营的业务和市场认为这些假设和估计是合理的,但本质上会受到重大的运营、经济和竞争不确定性和突发事件的影响。因此,应根据这些因素来解释此类前瞻性陈述。尽管Slave Lake Zinc试图确定可能导致实际业绩、业绩或成就与前瞻性陈述中包含的业绩或成就存在重大差异的重要因素,但可能还有其他因素导致业绩、业绩或成就不如预期、估计或预期。无法保证此类信息会被证明是准确的,也无法保证管理层对未来发展、情况或结果的期望或估计会实现。因此,读者不应过分依赖前瞻性陈述。本新闻稿中的前瞻性陈述自本新闻稿发布之日起作出,除非适用法律要求,否则Slave Lake Zinc不承担任何更新或修改此类信息的意图或义务,Slave Lake Zinc对与任何其他公司有关的披露不承担任何责任。
To view the source version of this press release, please visit
要查看本新闻稿的源版本,请访问