share_log

CBLT Announces Assay Results From Shatford Lake (Lithium)

CBLT Announces Assay Results From Shatford Lake (Lithium)

CBLT公布了沙特福德湖(锂)的化验结果
newsfile ·  2023/07/31 19:30

Burlington, Ontario--(Newsfile Corp. - July 31, 2023) - CBLT Inc. (TSXV: CBLT) ("CBLT") is pleased to announce excerpts from the assay results from samples taken at Shatford Lake in May, 2023.

安大略省伯灵顿-(Newsfile Corp.-2023年7月31日)-CBLT Inc.(多伦多证券交易所股票代码:CBLT)(以下简称CBLT)高兴地宣布,2023年5月在沙特福德湖采集的样本的化验结果摘录。

A total of ten grab samples were collected during the most recent site visit from pegmatite outcrops along the southern shore of Shatford Lake. Rubidium is enriched in most of the recent samples, which could indicate a high degree of fractionation in the pegmatites and be used as a vector towards lithium or other rare element mineralization.

在最近的一次实地考察中,在沙特福德湖南岸的伟晶岩露头上总共收集了10个抓取样本。大多数最近的样品中都富含Rb,这可能表明伟晶岩中的分馏程度很高,并被用作锂或其他稀有元素矿化的载体。

A continuation of east-west striking pegmatites was observed south of Shatford Lake as determined by prospecting, mapping and sampling. Continuation of the larger evolved pegmatite (detailed in CBLT's February 13, 2023 press release) occurs up to 500 meters west of the shoreline occurrence in at least two 1 to 5 meter wide vein sets (map below). These vein extensions are megacrystic microcline quartz pegmatites and are petrographically similar to evolved haloes in the high grade LCT pegmatites seen at the Tanco mine and other LCT deposits in the region. These vein extensions also contain local spectacular mica series mineralization from black biotite to phlogopite, chrome mica to spectacular muscovite series.

根据勘探、测绘和取样的结果,在沙特福德湖以南观察到了东西走向的伟晶岩的延续。更大的演化伟晶岩(详见CBLT 2023年2月13日的新闻稿)继续出现在海岸线以西500米处,至少有两个1至5米宽的脉组(下图)。这些脉状伸展部分是巨晶微斜石英伟晶岩,在岩石学上类似于Tanco矿和该地区其他LCT矿床中高品位LCT伟晶岩中的演化晕。这些脉状延伸还包括局部壮观的云母系列矿化,从黑色黑云母到金云母,从铬云母到壮观的白云母系列。

Pegmatite occurrences thus far sampled in CBLT's claims contain anomalous tin, tantalum, and rubidium with local anomalous lithium. CBLT is highly encouraged by these multi-element anomalies.

到目前为止,在CBLT的索赔中采样的伟晶岩含有异常的锡、钽和Rb,以及局部的异常锂。CBLT受到这些多元素异常的高度鼓舞。

Shatford Lake and the general pegmatite area are located in the Bird River Pegmatite Field in Manitoba, three kilometers south-southwest of the Tanco Mine. CBLT recognizes the significance and importance of Sagkeeng First Nation's Traditional Land Rights in the area, and openly welcomes continued engagement with the Sagkeeng Chief and Council. CBLT has collaborated with the Province of Manitoba's Agriculture and Resource Development and the University of Manitoba to coordinate other geoscientific assistance, with assistance procured from a Ph.D. level program graduate.

沙特福德湖和一般伟晶岩区位于马尼托巴省的伯德河伟晶岩田,距离Tanco矿西南偏南3公里。CBLT认识到Sagkeeng First Nation在该地区的传统土地权的重要性和重要性,并公开欢迎继续与Sagkeeng酋长和议会接触。CBLT与马尼托巴省农业和资源开发部和马尼托巴省大学合作,协调其他地球科学援助,并从一名博士水平的项目毕业生那里获得援助。

The 2023 Program

2023年规划

The pegmatite sampled at the southeast of Shatford Lake is sub-vertical in dip and subparallel in strike to the evolved LCT pegmatites located at the Tanco Mine. Shatford pegmatite field assemblages are generally steep in dip, possibly due to insertion along favorable tensile locations that are along axial limbs in relation to the Tanco area. The steeper dip equivalent to Shatford Lake may be represented by the LCT pegmatite field located 20 kilometers to the north near Cat Lake.

在沙特福德湖东南部采集的伟晶岩倾角近垂直,走向近平行于Tanco矿演化的LCT伟晶岩。沙特福德伟晶岩田组合一般倾角较大,可能是由于沿着与Tanco地区有关的轴向肢体有利的张性位置插入的。相当于沙特福德湖的更陡峭的倾角可能代表着位于以北20公里处靠近猫湖的LCT伟晶岩场。

The main larger pegmatite should see additional work in upcoming site visits to properly delineate the fullest possible strike length in surface exposure. Numerous affiliated pegmatites near this occurrence should also be sampled in future visits. The vein sets are open to the east and west of the sampled locations on the claims.

主要较大的伟晶岩应该会在即将到来的现场考察中看到额外的工作,以适当地描绘出地表暴露的最大可能走向长度。在今后的探访中,还应对该事件附近的许多伴生伟晶岩进行取样。静脉集通向索赔上采样位置的东面和西面。

The proximity to the Tanco Mine is important to CBLT. The Tanco Mine hosts an LCT-type pegmatite, producing cesium and tantalum. Lithium, beryllium and rubidium have previously been produced. The Tanco pegmatite has dimensions of 820m by 1,600m and up to 100m thick, and over 100 minerals have been identified in it. It was reported by The Northern Miner in April, 2022 that lithium production had resumed at the Tanco. The Northern Miner is a credible source of mining-related news; however, as the Tanco owner is a Chinese company, there is limited reliable public information available.

靠近Tanco矿对CBLT很重要。Tanco矿拥有一种LCT类型的伟晶岩,生产铯和钽。之前也曾生产过锂、铍和锶。Tanco伟晶岩的尺寸为820米乘1600米,厚度可达100米,已在其中发现了100多种矿物。据《纽约时报》报道《北方矿工》2022年4月,Tanco恢复了锂生产。《北方矿工》是与采矿有关的新闻的可靠来源;然而,由于Tanco的所有者是一家中国公司,可获得的可靠公开信息有限。

The Shatford Lake claims contain a number of pegmatite granite fields within mafic volcanic assemblages which are often exposed as higher topographic lineaments in the Shatford area and also throughout the Bird River/Winnipeg River region. The regional geology indicates the presence of a similar structural emplacement and extensional structural environment for emplacement of LCT-bearing pegmatites in many locations including Shatford Lake.

沙特福德湖主张在基性火山组合中包含许多伟晶花岗岩区域,这些区域在沙特福德地区和整个伯德河/温尼伯河地区经常暴露为更高的地形线条。区域地质表明,包括沙特福德湖在内的许多地区都存在类似的构造侵位和伸展构造环境,为含LCT伟晶岩的侵位提供了条件。

The potential for more prolific LCT style pegmatites is commonly found near favourable structural environments along these mafic-granitic contacts. The Tanco pegmatite itself is hosted by a large massive amphibolite and possible mafic intrusive protolith that likely offered favorable tensile conditions during LCT evolution and insertion into the region's country rock masses. Further investigations of CBLT's claims are warranted to explore for additional evolved pegmatite fields given the proximity to the Tanco Mine.

沿着这些镁铁质-花岗岩接触带,通常在有利的构造环境附近发现更多LCT类型伟晶岩的潜力。Tanco伟晶岩本身赋存于一个巨大的块状角闪岩和可能的镁铁质侵入原岩中,这些原岩可能在LCT演化和插入该地区的乡村岩体期间提供了有利的拉伸条件。鉴于靠近Tanco矿,有必要对CBLT的主张进行进一步调查,以探索更多演化的伟晶岩田。

It was estimated in 1991 that Tanco had lithium reserves of 7.3 million tonnes at 2.76% Li2O (GSWA Mining Bulletin No. 22, page 66). This is a historical third-party estimate and CBLT has no information as to the methodology used to calculate this estimate or whether it was carried out under the supervision of a Qualified Person, as that term is defined in NI43-101. Readers are cautioned not to rely upon this estimate.

1991年估计Tanco的锂储量为730万吨,Li2O含量为2.76%(GSWA矿业公报第22期,第66页)。这是一个历史的第三方估计,CBLT没有关于用于计算该估计的方法的信息,也不知道它是否在合格人员的监督下进行,该术语的定义在NI43-101。告诫读者不要依赖这一估计。

Samples were analyzed by AGAT Labs in Mississauga, Ontario, an independent accredited lab, by sodium peroxide fusion with an ICP-OES or ICP-MS finish. Samples were analysed for 57 elements. Readers are cautioned that surface samples are random by nature and may not accurately reflect the entirety of the mineralization at Shatford Lake.

样品由位于安大略省密西索加的AGAT实验室进行分析,该实验室是一家独立认可的实验室,通过过氧化钠熔融与电感耦合等离子体发射光谱或电感耦合等离子体质谱仪完成分析。对样品进行了57种元素的分析。提醒读者,地表样本本质上是随机的,可能不能准确地反映沙特福德湖的全部矿化。

Jessica Daniel, P.Geo., a CBLT independent director, is overseeing the Shatford Lake programs and is the Qualified Person under NI43-101 for this press release.

杰西卡·Daniel,P.Geo,CBLT独立董事,负责沙福德湖项目,是以下合格人员NI43-101为了这篇新闻稿。

CONTACT INFORMATION
Peter M. Clausi
CEO and Director
1 416 890 1232
pclausi@cbltinc.com
@ClausiPeter

联系信息
彼得·M·克劳西
首席执行官兼董事
1 416 890 1232
邮箱:pClausi@cbltinc.com
@ClausiPeter

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所风险交易所及其监管服务提供商(该术语在多伦多证券交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

This news release contains certain statements that constitute forward-looking statements as they relate to CBLT and its management. Forward-looking statements are not historical facts but represent management's current expectation of future events, and can be identified by words such as "believe", "expects", "will", "intends", "plans", "projects", "anticipates", "estimates", "should", "continues" and similar expressions. Although management believes that the expectations represented in such forward-looking statements are reasonable, there can be no assurance that they will prove to be correct or will come to pass.

本新闻稿包含与CBLT及其管理相关的前瞻性陈述。前瞻性陈述不是历史事实,而是代表管理层目前对未来事件的预期,可以通过“相信”、“预期”、“将”、“打算”、“计划”、“项目”、“预期”、“估计”、“应该”、“继续”等词语来识别。尽管管理层认为这些前瞻性陈述中的预期是合理的,但不能保证它们将被证明是正确的或将成为现实。

By their nature, forward-looking statements include assumptions and are subject to inherent risks and uncertainties that could cause actual future results, conditions, actions or events to differ materially from those in the forward-looking statements. If and when forward-looking statements are set out in this new release, CBLT will also set out the material risk factors or assumptions used to develop the forward-looking statements. Except as expressly required by applicable securities laws, CBLT assumes no obligation to update or revise any forward-looking statements. The future outcomes that relate to forward-looking statements may be influenced by many factors, including but not limited to; SARS-CoV-2; reliance on key personnel; the performance of the Ciscom Corp. leadership team; shareholder and regulatory approvals; the ability of Powerstone's team to receive a receipt for its prospectus and to achieve a listing of its common shares on a Canadian stock exchange; First Nations and other local communities; jurisdictional risk; risks of future legal proceedings; income tax matters; availability and terms of financing; distribution of securities; commodities pricing; environmental issues; forest fires and other natural phenomena; rising costs related to inflation; effect of market interest on price of securities; failing to identify an economically viable mineral deposit; and, potential dilution.

就其性质而言,前瞻性陈述包括假设,并受到内在风险和不确定因素的影响,这些风险和不确定因素可能导致未来的实际结果、条件、行动或事件与前瞻性陈述中的结果、条件、行动或事件大不相同。如果在这一新的新闻稿中陈述了前瞻性陈述,CBLT还将陈述用于制定前瞻性陈述的重大风险因素或假设。除非适用的证券法明确要求,否则CBLT不承担更新或修改任何前瞻性陈述的义务。与前瞻性陈述有关的未来结果可能受到许多因素的影响,包括但不限于:SARS-CoV-2;对关键人员的依赖;Ciscom Corp.领导团队的表现;股东和监管机构的批准;Powerstone团队收到招股说明书收据并使其普通股在加拿大证券交易所上市的能力;原住民和其他当地社区;司法风险;未来法律诉讼的风险;所得税问题;融资的可用性和条款;证券分销;大宗商品定价;环境问题;森林火灾和其他自然现象;与通胀相关的成本上升;市场利率对证券价格的影响;未能找到经济上可行的矿藏;以及潜在的稀释。

CBLT's operations could be significantly adversely affected by the effects of a widespread global outbreak of a contagious disease, including the recent outbreak of illness caused by COVID-19. It is not possible to accurately predict the impact COVID-19 will have on operations and the ability of others to meet their obligations, including uncertainties relating to the ultimate geographic spread of the virus, the severity of the disease, the duration of the outbreak, and the length of travel and quarantine restrictions imposed by governments of affected countries. In addition, a significant outbreak of contagious diseases in the human population could result in a widespread health crisis that could adversely affect the economies and financial markets of many countries, resulting in an economic downturn that could further affect operations and the ability to finance its operations.

传染病的全球大范围暴发的影响,包括最近新冠肺炎引起的疾病暴发,可能会对CBLT的业务产生重大不利影响。无法准确预测新冠肺炎将对运营和其他国家履行义务的能力产生的影响,包括与病毒最终地理传播有关的不确定性、疾病的严重性、疫情爆发的持续时间以及受影响国家政府实施的旅行和检疫限制的长度。此外,传染性疾病在人口中的大规模暴发可能导致广泛的健康危机,这可能对许多国家的经济和金融市场造成不利影响,从而导致经济衰退,从而可能进一步影响业务活动和为业务提供资金的能力。

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发