share_log

ACME Lithium Commences TW-1 Pumping Test at Clayton Valley Nevada Lithium Brine Project

ACME Lithium Commences TW-1 Pumping Test at Clayton Valley Nevada Lithium Brine Project

ACME Lithium 开始在内华达州克莱顿谷锂盐水项目进行 TW-1 抽水测试
newsfile ·  2023/08/01 08:30

Carson City, Nevada--(Newsfile Corp. - August 1, 2023) - ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") is pleased to report that the Company has commenced pumping test activities at test well TW-1 at its Clayton Valley Nevada lithium brine project. The well is the only permitted deep well known to currently exist in the northern portion of Clayton Valley.

内华达州卡森城-(Newsfile Corp.-2023年8月1日)-Acme Li Inc.(CSE:Acme)(OTCQX:ACLHF)本公司(“本公司”或“ACME”)欣然报告,本公司已开始在其内华达州克莱顿谷锂卤水项目的测试井TW-1进行抽水测试活动。这口井是目前已知的唯一一口位于克莱顿山谷北部的允许深井。

Data generated from the pumping test will be used to assess hydraulic properties, brine chemistry of the Lower Gravel Unit (LGU) aquifer and to examine the potential concentration and extractability of economic lithium brine in the LGU.

抽水试验产生的数据将用于评估下砾石单元(LGU)含水层的水力特性、卤水化学,并检查LGU中经济的锂卤水的潜在浓度和可采掘能力。

TW-1 was drilled and installed by Harris-Earth Drilling in accordance with Nevada Division of Minerals DMRE well permit W0017. The well was successfully drilled and installed to the target depth of 1,820 feet bgs. Preliminary Phase 1 and Phase 2 data suggest the perforated casing of TW-1 captures approximately 500 feet of potential ore-grade lithium brine aquifer hosted in the LGU. The LGU is the basal gravel overlaying bedrock in Clayton Valley.

TW-1由哈里斯-地球钻探公司根据内华达州矿业部DMRE油井许可证W0017进行钻探和安装。该油井已成功钻探并安装到1,820英尺BGS的目标深度。第一阶段和第二阶段的初步数据表明,TW-1的穿孔套管捕获了LGU中潜在的矿级锂卤水含水层约500英尺。LGU是覆盖在克莱顿山谷基岩上的底部砾石。

The results of the TW-1 pumping test and response propagated to the DH-1A-grouted in vibrating wire piezometer array, will be used to assess the potential volume of lithium enriched brine and extractability of the brine from the LGU aquifer through pumping. The assessment of extractable brine volume and concentration of lithium in the brine will be used to infer if a lithium resource potentially exists at the ACME project. Brine samples from the pumping test discharge will be submitted to multiple laboratories for chemical analysis and potential bench-scale testing for Direct Lithium Extraction (DLE) and processing. The TW-1 pumping test, data and laboratory analyses are scheduled to be completed by end of August 2023.

TW-1抽水试验的结果和响应传播到DH-1A型振弦式压力计阵列,将被用来评估富锂卤水的潜在体积和通过抽水从LGU含水层中提取卤水的能力。对可提取卤水体积和卤水中锂浓度的评估将用于推断ACME项目是否可能存在锂资源。抽水试验排放的卤水样品将被提交给多个实验室进行化学分析,并可能进行直接锂提取(DLE)和加工的小规模测试。TW-1抽水测试、数据和实验室分析计划于2023年8月底完成。

ACME's Clayton Valley Nevada lithium brine project is contiguous to the northwest of Albemarle's Silver Peak lithium deposit which has been in production since 1966 and is one of the only lithium producing regions in the United States.

Acme的内华达州克莱顿山谷锂卤水项目毗邻Albemarle的Silver Peak锂矿藏的西北部,该矿藏自1966年开始生产,是美国仅有的锂产区之一。

William Feyerabend, Certified Professional Geologist and Mathew Banta, Certified Professional Hydrogeologist are qualified persons as defined by NI 43-101 and have supervised the preparation of the scientific and technical information that forms the basis for this news release.

注册专业地质学家威廉·费耶阿本德和注册专业水文地质学家马修·班塔是NI 43-101定义的合格人员,并监督构成本新闻稿基础的科学和技术信息的准备工作。

About ACME Lithium Inc.

ACME Lithium公司简介

Led by an experienced team, ACME Lithium is a mineral exploration Company focused on acquiring, exploring, and developing battery metal projects in partnership with leading technology and commodity companies. ACME has acquired or is under option to acquire a 100-per-cent interest in projects located in Clayton Valley and Fish Lake Valley, Esmeralda County Nevada, at Shatford, Birse, and Cat-Euclid Lakes in southeastern Manitoba, and at Bailey Lake in northern Saskatchewan.

ACME锂是一家矿产勘探公司,由经验丰富的团队领导,与领先的技术和大宗商品公司合作,专注于收购、勘探和开发电池金属项目。Acme已收购或正在选择收购位于内华达州埃斯梅拉达县克莱顿山谷和鱼湖谷、马尼托巴省东南部的Shatford、Birse和Cat-Euclid Lake以及萨斯喀彻温省北部的Bailey Lake的项目的100%权益。

On behalf of the Board of Directors

我谨代表董事会

Steve Hanson
Chief Executive Officer, President and Director
Telephone: (604) 564-9045
info@acmelithium.com

史蒂夫·汉森
总裁和董事首席执行官
电话:(604)564-9045
邮箱:Info@acmelithium.com

For Investor Inquiries
Anthony Simone
Simone Capital
Telephone: (416) 818-5154
asimone@simonecapital.ca

供投资者查询
安东尼·西蒙
西蒙尼资本
电话:(416)818-5154
邮箱:asimone@simonecapital.ca

Neither the CSE nor its regulations service providers accept responsibility for the adequacy or accuracy of this news release. This news release may contain forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur and in this news release include but are not limited to the attributes of, timing for and expected benefits to be derived from exploration, drilling or development at ACME's project properties. Information inferred from the interpretation of drilling, sampling and other technical results may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. ACME's project location adjacent to or nearby lithium projects does not guarantee exploration success or that mineral resources or reserves will be defined on ACME's properties. Exploration, development, and activities conducted by regional companies provide assistance and additional data for exploration work being completed by ACME. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from the Company's operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise.

CSE及其法规服务提供商均不对本新闻稿的充分性或准确性承担责任。本新闻稿可能包含适用证券法(“前瞻性声明”)所指的前瞻性信息。前瞻性陈述是指不是历史事实的陈述,通常但不总是由“预期”、“计划”、“预期”、“相信”、“打算”、“估计”、“项目”、“潜在”和类似的表述,或事件或条件“将”、“将”、“可能”、“可能”或“应该”发生的陈述,在本新闻稿中包括但不限于从勘探中获得的属性、时机和预期收益。在ACME项目物业进行钻探或开发。从对钻探、采样和其他技术结果的解释中推断出的信息也可被视为前瞻性陈述,因为它构成了对项目实际开发时以及是否开发时可能发现的情况的预测。Acme的项目位置与锂项目相邻或附近,并不能保证勘探成功,也不能保证矿产资源或储量将在ACME的属性中确定。区域公司进行的勘探、开发和活动为ACME正在完成的勘探工作提供了帮助和额外的数据。这些前瞻性表述受各种风险和不确定因素的影响,可能导致实际事件或结果与前瞻性表述中反映的情况大不相同,包括但不限于:与金属价格波动有关的风险;与及时以可接受的条件筹集足够资金为计划工作提供资金有关的不确定因素;天气、后勤、技术或其他因素导致计划工作发生变化;工作结果不能达到预期并实现公司财产的预期潜力的可能性;事故、设备故障和劳资纠纷或其他意想不到的困难或中断的风险;工作计划中成本超支或意外支出的可能性;公司运营造成环境污染或损害的风险以及其他风险和不确定性。任何前瞻性表述仅在作出之日发表,除适用的证券法可能要求外,公司不承担任何更新任何前瞻性表述的意图或义务,无论是由于新信息、未来事件或结果或其他原因。

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发