share_log

Galway Metals Extends SW Deposit East by 191 Metres Outside of Resource With 19.1 G/t Gold Over 1.05 Metres and With 0.5 G/t Gold Over 17.0 Metres

Galway Metals Extends SW Deposit East by 191 Metres Outside of Resource With 19.1 G/t Gold Over 1.05 Metres and With 0.5 G/t Gold Over 17.0 Metres

Galway Metals将西南矿床向东延伸191米,19.1克/吨的黄金超过1.05米,超过17.0米的0.5克/吨黄金
Accesswire ·  2023/10/03 19:00

TORONTO, ON / ACCESSWIRE / October 3, 2023 / Galway Metals Inc. (TSXV:GWM)(OTCQB:GAYMF) (the "Company" or "Galway") is pleased to report drill results that expand the SW Deposit to the east at the George Murphy Zone (GMZ), and outside of the resource, at the Clarence Stream gold project in southwest New Brunswick, Canada (see figures 1 and 2). Assay results for metallurgical holes drilled at the SW Deposit have been received as well (see figure 3). Drill results from the SW deposit west end will be released in the coming weeks.

多伦多,on/ACCESSWIRE/2023年10月3日/Galway Metals Inc.(多伦多证券交易所股票代码:GWM)(场外交易代码:GAYMF)(以下简称“公司”或“Galway”)高兴地报告了钻探结果,该钻探结果将西南矿藏向东扩展到George Murphy区(GMZ),并在加拿大新不伦瑞克西南部的Clarence Stream金矿项目之外扩大(见图1和图2)。也收到了在西南矿藏钻出的冶金孔的化验结果(见图3)。西南矿藏西端的钻探结果将在未来几周内公布。

Quote from the Company

引述自《公司》

"The SW Deposit, with a previous total strike length of 3.1 kilometers, is still open for expansion to the south, north, east, and to depth," said Robert Hinchcliffe, President and CEO of Galway Metals. "The results in the Triangle area, which is outside the existing resource, indicate a vast area with potential to increase mineralization. These results to the east and north are promising and will lead to more drilling in those directions in future."

“Sw存款”,以前的总走向长度为3.1公里,仍然开放向南、北、东和深扩展。罗伯特·欣奇克利夫,总裁,高威金属公司首席执行官。“在现有资源之外的三角地区取得的成果表明,这里是一个广阔的地区,具有增加矿化的潜力。东部和北部的这些结果很有希望,未来将导致在这些方向进行更多钻探。”

Highlights include:

亮点包括:

  • The SW Deposit (GMZ) East Area has been extended 191 metres further east with hole CL-165 intersecting 19.1 grams per tonne (g/t) gold over 1.05 metres on what appears to be a new vein (Figure 1)
  • The SW Deposit (GMZ) East Area has had drilling in hole CL-170 intersect 0.5 g/t gold over 17.0 metres located just east of and outside the resource pit
  • Drilling 475 metres north of the SW Deposit pit (Adrian Zone) intersected 0.8 g/t gold over 5.5 metres and 0.7 g/t gold over 4.2 metres in hole CL-171
  • Drilling 214 metres northeast of the SW Deposit pit (Adrian Zone) intersected0.6 g/t gold over 12.0 metres in hole CL-155
  • Diamond drill core drilled for Metallurgical purposes taken along the SW Deposit has returned 12.6 g/t gold over 18.0 metres in hole MH-07 and 8.6 g/t gold over 24.3 metres in hole MH-16
  • 西南矿藏(GMZ)东区已再向东延伸191米与CL-165孔相交黄金每吨19.1克(g/t)1.05米以上在似乎是新静脉的地方(图1)
  • 西南矿体(GMZ)东区已在CL-170交汇处钻探17.0米以上0.5克/吨黄金就在资源坑的东边和外面
  • 钻探向北475米相交的西南矿坑(禤浩焯带)5.5米以上为0.8克/吨黄金,4.2米以上为0.7克/吨黄金在CL-171孔中
  • 钻探东北方向214米相交的西南矿坑(禤浩焯带)12.0米以上0.6克/吨黄金在CL-155井中
  • 为冶金目的钻探的钻石钻芯已随西南矿床返还18.0米以上12.6克/吨黄金在MH-07井和24.3米以上含金量8.6克/吨在MH-16井

George Murphy Zone East Highlights:

乔治·墨菲东区亮点:

  • Hole CL-172: 0.6 g/t gold over 6.0 metres beginning at a vertical depth of 16 metres
  • Hole CL-170: 0.5 g/t gold over 17.0 metres beginning at a vertical depth of 94 metres
    • Includes 1.5 g/t gold over 1.0 metre, 1.4 g/t gold over 1.0 metre, and 1.3 g/t g over 1.0 metre
  • **Hole CL-166: 0.6 g/t gold over 41.0 metres beginning at a vertical depth of 62 metres, 0.7 g/t gold over 4.5 metres beginning at a vertical depth of 35 metres, and 1.2 g/t gold over 3.0 metres beginning at a vertical depth of 20 metres
  • Hole CL-165: 19.1 g/t gold over 1.05 metres beginning at a vertical depth of 111 metres
    • Includes 35.8 g/t gold over 0.55 metres
  • Hole CL-159: 0.8 g/t gold over 4.75 metres beginning at a vertical depth of 207 metres
    • Includes 4.0 g/t gold over 0.5 metres
  • Hole CL-147: 0.9 g/t gold over 5.0 metres beginning at a vertical depth of 75 metres
  • CL-172孔:黄金0.6克/吨,超过6.0米从垂直深度16米开始
  • CL-170孔:17.0米以上0.5克/吨黄金从94米的垂直深度开始
    • 包括超过1.0米的1.5克/吨黄金、超过1.0米的1.4克/吨黄金和超过1.0米的1.3克/吨黄金
  • **孔CL-166:黄金0.6克/吨,超过41.0米从垂直深度62米开始,0.7克/吨黄金超过4.5米,垂直深度从35米开始,1.2克/吨黄金超过3.0米,从垂直深度20米开始
  • CL-165孔:1.05米以上19.1克/吨黄金从111米的垂直深度开始
    • 包括0.55米以上的35.8克/吨黄金
  • CL-159孔:4.75米以上0.8克/吨黄金从207米的垂直深度开始
    • 包括超过0.5米的4.0克/吨黄金
  • CL-147孔:5.0米以上0.9克/吨黄金从75米的垂直深度开始

Adrian North Highlights:

禤浩焯北方亮点:

  • Hole CL-171: 0.8 g/t gold over 5.5 metres beginning at a vertical depth of 111 metres and including 6.1 g/t gold over 0.5 metres, and 0.7 g/t gold over 4.2 metres beginning at a vertical depth of 179 metres, including 4.0 g/t gold over 0.5 metres
  • CL-171孔:5.5米以上0.8克/吨黄金从111米的垂直深度开始,并包括超过0.5米的6.1克/吨黄金,以及4.2米以上0.7克/吨黄金从179米的垂直深度开始,包括0.5米以上的4.0克/吨黄金

Adrian Highlights:

禤浩焯亮点:

  • Hole CL-144: 0.6 g/t gold over 6.0 metres and 4.4g/t gold over 1.5 metres including 11.7 g/t gold over 0.5 metres, starting at vertical depths of 104 metres and 312 metres, respectively
  • Hole CL-155: 0.6 g/t gold over 12.0 metres and 0.6 g/t gold over 3.0 metres, starting at vertical depths of 255 metres and 206 metres, respectively
  • 孔CL-144:0.6 黄金超过6.0克/吨 和1.5米以上的4.4克/吨黄金,包括0.5米以上11.7克/吨黄金,分别由104米和312米的垂直深度开始
  • 孔CL-155:0.6 黄金超过12.0克/吨3米和0.6克/吨黄金,分别从255米和206米的垂直深度开始

**previously released- not in resource

**先前发布-不在资源中

Results Indicate the SW Deposit is Open East and NE
The Adrian north drill intersections are important because they illustrate there are significant gold intersections located 475 metres from the existing block model. These drill intersections are well north and east of the Triangle area where Galway is attempting to fill in the area between the new Stewart Zone discovery and the existing resource area. Drilling in the Triangle area has returned intersections such as 8.0 g/t gold over 9.5 metres, 3.9 g/t gold over 6.0 metres, 4.1 g/t gold over 10.25 metres, and 8.6 g/t gold over 2.0 metres along 1,380 metres. These intersections are not included in the existing resource and are interpreted to dip towards veins in the SW Deposit that are dipping the same way; the Sawyer Brook fault (the main accretionary structure on the property that controls most mineralization) is located there; the area of the triangle is 180% larger than the SW Deposit. The intersection of 0.6g/t gold over 12.0 metres in hole CL-155 is located well into the Triangle area.

结果表明,西南矿体为东西向开放矿体
禤浩焯北钻探交叉口很重要,因为它们表明,在距离现有区块模型475米的地方有重要的黄金交叉口。这些钻探交叉点位于三角地区的北部和东部,高威正试图填补新的斯图尔特区和现有资源区之间的区域。三角区域中的钻探返回了交叉点,例如9.5米以上8.0克/吨黄金黄金3.9克/吨,超过6.0米10.25米以上4.1克/吨黄金,以及2.0米以上含金量8.6克/吨沿着1380米。这些交汇处不包括在现有的资源中,并被解释为倾向于西南矿床中的脉体,这些矿脉呈相同的倾角;索耶溪断裂(控制大多数矿化的财产上的主要增生构造)位于那里;三角形的面积比西南矿体大180%。的交集12.0米以上0.6克/吨黄金在孔CL-155中正好位于三角形区域内。

The drill results east of GMZ include 19.1 g/t gold over 1.05 metres, and 0.5 g/t gold over 17.0 metres. These results indicate that the deposit is open in that direction. Previously released results of 0.6 g/t gold over 41.0 metres (CL-166), and 2.0 g/t gold over 14.0 metres (CL-164) were returned after the resource was completed and would also widen and extend the GMZ resource east.

GMZ以东的钻探结果包括1.05米以上19.1克/吨黄金,黄金每吨0.5克,超过17.0米。这些结果表明,矿床在该方向上是开放的。之前发布的结果黄金0.6克/吨,超过41.0米(CL-166),以及14.0米以上2.0克/吨黄金(CL-164)在资源完成后归还,还将扩大和向东延伸GMZ资源。

Drilling for Metallurgical Testing and Ore Sorting
Diamond drilling was undertaken to retrieve PQ-sized core (i.e. big core - 85 mm diameter) at Clarence Stream for use in studies to determine the amenability of the mineralization for pre-concentration on site via ore sorting and for metallurgical testing. The first assay results from the new SW Deposit have been received from the metallurgical core holes. No MET work has been conducted on this new deposit. The Clarence Stream work is designed to check five different areas to confirm if conventional cyanide will liberate good recoveries and if gravity recoveries are adequate.

冶金试验和矿石分选钻探
在Clarence Stream进行了钻石钻探,以获取PQ大小的岩心(即大岩心--85毫米直径),以用于研究确定矿化的适宜性,以便通过矿石分选现场预选和进行冶金测试。来自新的钨矿床的第一个分析结果已经从冶金芯孔中收到。在这个新的矿藏上还没有进行任何MET工作。克拉伦斯溪流的工作旨在检查五个不同的区域,以确认常规氰化物是否会释放出良好的回收率,以及重力恢复是否足够。

Intersections from the PQ core include: 12.6 g/t gold over 18.0 metres (Richard Zone) and 8.6 gold Au over 24.3 metres (GMZ west). Other intersections are 1.3 g/t gold over 16.0 metres plus 0.6 g/t gold over 15.0 metres (Richard Zone), 1.4 g/t gold over 14.0 metres (GMZ), 1.0 g/t gold over 11.0 metres plus 24.8 g/t gold over 1.0 metres (GMZ), and 1.5 g/t gold over 42.9 metres (Adrian Zone). Drill holes were drilled in the vicinity of specific existing drill holes that provided a range of assays from low-grade to high-grade.

来自PQ核心的交叉点包括:18.0米以上12.6克/吨黄金(理查德·泽恩)24.3米以上的黄金和8.6金(GMZ West)。其他交叉口是16.0米以上的1.3g/t黄金加上15.0米以上的0.6g/t黄金(理查德区),14.0米以上的1.4g/t黄金(GMZ),11.0米以上的1.0g/t黄金加上1.0米以上的24.8g/t黄金(GMZ),以及42.9米以上的1.5g/t黄金(禤浩焯区)。在特定的现有钻孔附近钻了钻孔,这些钻孔提供了从低品位到高品位的一系列分析。

For results of all holes that Galway has drilled at Clarence Stream, go to Galway's website at .

有关高威在克拉伦斯溪钻探的所有孔的结果,请访问高威的网站:。

New Brunswick Junior Mining Assistance Program
Galway would like to acknowledge financial support from the New Brunswick Junior Mining Assistance Program, which partially funded drilling of the SW Deposit.

新不伦瑞克初级采矿援助计划
高威感谢新不伦瑞克初级采矿援助计划的财政支持,该计划为西南矿藏的钻探提供了部分资金。

Clarence Stream Geology and Mineralization
Clarence Stream deposits can be characterized as intrusion-related, quartz-vein hosted gold deposits. They contain elevated levels of bismuth and arsenopyrite in multiple quartz veins, with significant antimony in the South and North Zones and tungsten in the vicinity. The Zones contain multiple zones of quartz veining with sulfides and sericite alteration. In general, mineralization at Clarence Stream consists of 10-70% quartz stockworks and veins with 1-5% fine pyrite plus pyrrhotite plus arsenopyrite in sericite altered sediments. The South and North Zones also contain stibnite. Locally there is up to 10% sphalerite and semi-massive galena veinlets. The 3.1 km trend that hosts the SW Deposit is associated with a mineralized mafic intrusive locally - similar to the South Zone. A more complete description of Clarence Stream's geology and mineralization can be found at .

克拉伦斯河地质与成矿
克拉伦斯溪金矿床可被描述为与侵入岩有关的石英脉型金矿。它们在多个石英脉中含有高水平的铋和毒砂,在南带和北带有大量的锑,在附近有钨。这些带中含有多条石英脉与硫化物和绢云母蚀变。克拉伦斯溪的矿化一般由10-70%的石英网脉和1-5%的细黄铁矿+绢云母蚀变沉积物中的磁黄铁矿+毒砂组成。南带和北带也含有辉锑矿。当地有高达10%的闪锌矿和半大块方铅矿细脉。赋存西南矿床的3.1公里走向与局部矿化镁铁质侵入岩有关-类似于南带。有关克拉伦斯溪地质和矿化的更完整描述,请访问。

The Stewart Zone intersections are located in sediments between two intrusions and mineralization is controlled by fault structures. It was originally drilled to test a modest 61 ppb soil anomaly that coincided with a strong linear magnetic low, and is in quartz veining with associated 1-3% pyrite, pyrrhotite, and arsenopyrite, very similar to other mineralization in the area. It is located close to the contact with a granite and appears to parallel the contact with multiple veins, at 15 degrees along strike (horizontally - almost north-south) - following a line of soil anomalies, and dipping 40 degrees east toward Adrian. There is also evidence that a second set of veins are in a different orientation, running NE-SW along magnetic lows with corresponding soil anomalies. This is a similar setting, and with similar geochemical/geophysical signatures, as all the other intrusion-related gold deposits and discoveries at Clarence Stream.

斯图尔特带交界处位于两个侵入体之间的沉积物中,成矿受断裂构造控制。它最初是为了测试与强线性低磁场重合的适度61 ppb的土壤异常,位于石英脉中,伴生1-3%的黄铁矿、磁黄铁矿和毒砂,与该地区的其他矿化非常相似。它位于靠近花岗岩接触面的地方,似乎与接触处有多条矿脉平行,沿走向(水平方向-几乎是南北走向)15度,沿着一条土壤异常线,向东向禤浩焯倾斜40度。也有证据表明,第二组矿脉处于不同的方向,沿着磁低走向NE-西南方向,并伴随着相应的土壤异常。这是一个类似的环境,具有相似的地球化学/地球物理特征,与克拉伦斯溪的所有其他与侵入岩有关的金矿和发现的金矿床和发现的金矿相似。

Review by Qualified Person, Quality Control and Reports - Clarence Stream
The Mineral Resource estimates for the North and South Zones were prepared by Mr. Reno Pressacco, P.Geo, SLR Principal Geologist. The Mineral Resource estimate for the Southwest Deposit was prepared under the supervision of Ms. Valerie Wilson, M.Sc., P.Geo., SLR Managing Principal Geologist. Mr. Pressacco and Ms. Wilson are Independent Qualified Persons as defined by NI 43-101 and have read and approved the scientific and technical content of this news release as it relates to the updated Mineral Resource estimates. Michael Sutton, P.Geo., Director and VP of Exploration for Galway Metals, is the Qualified Person who supervised the preparation of the scientific and technical disclosure of the Clarence Stream portion of this news release on behalf of Galway Metals Inc. All core, chip/boulder samples, and soil samples are assayed by Activation Laboratories, located at 41 Bittern Street, Ancaster, Ontario, Canada, Agat Laboratories, located at 5623 McAdam Road, Mississauga Ontario, Canada L4Z 1N9 and 35 General Aviation Road, Timmins, ON P4P 7C3, and/or Swastika Laboratories situated in Swastika, ON. All four labs have ISO/IEC 17025 accreditation. All core is under watch from the drill site to the core processing facility. All samples are assayed for gold by Fire Assay, with gravimetric finish, and other elements assayed using ICP. The Company's QA/QC program includes the regular insertion of blanks and standards into the sample shipments, as well as instructions for duplication. Standards, blanks and duplicates are inserted at one per 20 samples. Approximately five percent (5%) of the pulps and rejects are sent for check assaying at a second lab with the results averaged and intersections updated when received. Core recovery in the mineralized zones has averaged 99%.

由合格人员审核、质量控制和报告-Clarence Stream
北部和南部地区的矿产资源估算由SLR首席地质学家雷诺·普雷萨科先生(P.Geo)编制。西南矿藏矿产资源评估是在SLR管理首席地质学家Valerie Wilson,M.Sc,P.Geo女士的监督下编制的。普雷萨科先生和威尔逊女士是NI 43-101定义的独立合格人士,他们已阅读并批准了本新闻稿中与最新矿产资源估计相关的科学和技术内容。董事P.Geo兼高威金属勘探副总裁Michael Sutton是代表高威金属公司监督本新闻稿Clarence Stream部分科学技术披露准备工作的合格人员。所有岩心、芯片/巨石样本和土壤样本都由位于加拿大安大略省安卡斯特Bittern Street 41号的Activation实验室、位于加拿大安大略省密西索加麦克亚当路5623号的Agat实验室、加拿大蒂明斯通用航空路35号L4Z 1N9和位于P4P 7C3的Swastika实验室进行分析。所有四个实验室都获得了国际标准化组织/国际电工委员会17025认证。从钻探现场到岩芯加工设施,所有的岩芯都处于监视之下。所有样品都用火试金法进行金的测定,并用重量法测定,其他元素用电感耦合等离子体法进行测定。公司的质量保证/质量控制计划包括在样品装运中定期插入空白和标准,以及复制说明。每20个样品中插入一个标准品、空白和复制品。大约5%(5%)的纸浆和废品被送往第二个实验室进行检查分析,结果取平均值,并在收到交叉点时更新。矿化带的岩心回收率平均为99%。

About the Company
Galway Metals is focused on creating significant per share value through the exploration and sustainable development of its two 100%-owned projects in Canada: Clarence Stream, a new high-grade gold district in SW New Brunswick, and Estrades, the former-producing, high-grade, gold-rich polymetallic VMS mine in the northern Abitibi of western Quebec. Galway's activities will be conducted while respecting the environment and communities in which it operates. Galway is well capitalized. The Company began trading on January 4, 2013, after its successful spinout to existing shareholders from Galway Resources following the completion of the US$340 million sale of that company. With substantially the same management team and Board of Directors, Galway Metals is keenly intent on creating similar value as it had with Galway Resources.

关于本公司
高威金属专注于通过勘探和可持续发展其在加拿大的两个100%拥有股份的项目来创造显著的每股价值:新不伦瑞克西南部新的高品位金矿地区Clarence Stream和位于魁北克西部Abitibi北部的以前生产的高品位富金多金属VMS矿Eestrades。高威的活动将在尊重其运营所在的环境和社区的同时进行。高威资本充足。该公司于2013年1月4日开始交易,此前高威资源完成了3.4亿美元的出售,成功地将该公司剥离给了现有股东。高威金属拥有基本相同的管理团队和董事会,热衷于创造与高威资源类似的价值。

Should you have any questions and for further information, please contact (toll free):
Galway Metals Inc.
Robert Hinchcliffe
President & Chief Executive Officer
1-800-771-0680
Website:
Email: info@galwaymetalsinc.com

如果您有任何问题和进一步的信息,请联系(免费):
高威金属公司
罗伯特·辛奇克利夫
总裁&首席执行官
1-800-771-0680
网站:
电子邮件:info@galwaymetalsinc.com

Look us up on Facebook, Twitter or LinkedIn

在Facebook、Twitter或LinkedIn上查找我们

CAUTIONARY STATEMENT: Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

警示性声明:多伦多证券交易所及其监管服务提供商(该术语在多伦多证券交易所的政策中定义)均不对本新闻稿的充分性承担责任。任何证券交易所、证券委员会或其他监管机构均未批准或不批准本报告所载信息。

This news release contains forward-looking information, which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes statements made herein with respect to, among other things, the Company's objectives, goals or future plans, potential corporate and/or property acquisitions, exploration results, potential mineralization, exploration and mine development plans, timing of the commencement of operations, and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, exploration results being less favourable than anticipated, capital and operating costs varying significantly from estimates, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, risks associated with the defence of legal proceedings and other risks involved in the mineral exploration and development industry, as well as those risks set out in the Company's public disclosure documents filed on SEDAR. Although the Company believes that management's assumptions used to develop the forward-looking information in this news release are reasonable, including that, among other things, the Company will be able to identify and execute on opportunities to acquire mineral properties, exploration results will be consistent with management's expectations, financing will be available to the Company on favourable terms when required, commodity prices and foreign exchange rates will remain relatively stable, and the Company will be successful in the outcome of legal proceedings, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information contained herein, whether as a result of new information, future events or otherwise, except as required by applicable securities laws.

本新闻稿包含前瞻性信息,不包含历史事实。前瞻性信息涉及风险、不确定因素和其他因素,可能导致实际事件、结果、业绩、前景和机会与此类前瞻性信息明示或暗示的内容大不相同。本新闻稿中的前瞻性信息包括本公司的目标、目标或未来计划、潜在的公司和/或财产收购、勘探结果、潜在的矿化、勘探和矿山开发计划、开始运营的时间以及对市场状况的估计等方面的陈述。可能导致实际结果与此类前瞻性信息大不相同的因素包括,但不限于,勘探结果不如预期,资本和运营成本与估计值大不相同,延迟获得或未能获得所需的政府、环境或其他项目批准,政治风险,与未来所需融资的可获得性和成本有关的不确定因素,股票市场变化,通货膨胀,汇率变化,商品价格波动,项目开发延迟,与法律诉讼辩护相关的风险,以及矿产勘探和开发行业涉及的其他风险。以及公司在SEDAR上提交的公开披露文件中列出的风险。尽管本公司相信管理层用来开发本新闻稿中前瞻性信息的假设是合理的,包括但不限于,公司将能够识别并执行收购矿产的机会,勘探结果将与管理层的预期一致,必要时公司将以有利的条件获得融资,商品价格和汇率将保持相对稳定,公司将在法律诉讼中胜诉,但不应过度依赖这些信息,这些信息仅适用于本新闻稿发布之日。而且不能保证这样的事件将在公开的时间范围内发生,或者根本不会发生。除非适用的证券法要求,否则公司不会因为新信息、未来事件或其他原因而更新或修改本文中包含的任何前瞻性信息,也不承担任何义务。

Table 1: Drill Result Highlights

表1:演练结果要点

Hole ID

From

(m)

To

(m)

Intercept

(m)

TW

(m)

Au

g/t

Zone

CL-86

54.5

55.5

1.0

0.9

0.6

GMZ

CL-133

173.0

174.0

1.0

1.0

North of Adrian

CL-137

237.0

237.5

0.5

0.5

Exploration East

CL-140

107.0

108.0

1.0

0.8

Exploration East

CL-143

330.5

332.0

1.5

0.6

Exploration East

CL-144

120.0

126.0

6.0

4.1

0.6

GMZ

144.0

145.0

1.0

0.7

0.7

GMZ

331.5

333.0

1.5

1.0

1.0

GMZ

360.5

362.0

1.5

1.0

4.4

GMZ

including

361.5

362.0

0.5

0.3

11.7

GMZ

CL-147

72.0

73.0

1.0

0.8

0.7

GMZ East

90.0

95.0

5.0

3.8

0.9

GMZ East

109.0

110.0

1.0

0.8

0.9

GMZ East

113.0

114.5

1.5

1.1

0.8

GMZ East

133.1

134.3

1.2

0.9

0.6

GMZ East

CL-151

293.0

294.5

1.5

0.4

Adrian East

CL-153

223.0

224.0

1.0

0.7

Adrian East

CL-154

146.0

148.0

2.0

1.4

1.0

GMZ East

170.0

171.0

1.0

0.7

2.6

GMZ East

181.8

182.4

0.6

0.4

0.9

GMZ East

204.4

205.9

1.5

1.1

0.6

GMZ East

CL-155

281.0

284.0

3.0

0.6

Adrian East

341.0

342.5

1.5

0.5

Adrian East

347.0

359.0

12.0

0.6

Adrian East

CL-157

200.0

200.5

0.5

0.4

New GMZ South

201.5

202.0

0.5

0.5

New GMZ South

214.0

215.0

1.0

0.9

New GMZ South

219.4

223.2

3.8

0.8

New GMZ South

222.7

223.2

0.5

2.3

New GMZ South

CL-159

215.4

220.2

4.8

0.8

New GMZ South

including

219.7

220.2

0.5

4.0

New GMZ South

CL-160

220.4

220.9

0.5

0.3

0.4

New GMZ South

CL-161

56.0

57.5

1.5

0.9

1.1

GMZ East

CL-162

258.3

258.8

0.5

0.3

0.5

GMZ East

263.2

263.7

0.5

0.3

0.7

GMZ East

277.6

278.1

0.5

0.3

0.6

GMZ East

332.8

334.4

1.6

0.9

2.6

GMZ East

CL-163

117.8

118.3

0.5

0.3

0.5

New GMZ East

277.1

278.9

1.8

1.1

1.5

GMZ East

279.4

280.5

1.2

0.7

0.6

GMZ East

CL-164

76.0

90.0

14.0

11.6

2.0**

GMZ East

including

76.0

77.0

1.0

0.8

6.0**

GMZ East

including

89.0

90.0

1.0

0.8

14.2**

GMZ East

94.0

95.0

1.0

0.8

0.5**

GMZ East

98.0

99.0

1.0

0.8

0.4**

GMZ East

102.0

104.0

2.0

1.7

0.4**

GMZ East

CL-165

113.3

114.3

1.1

19.1

New GMZ South

including

113.3

113.8

0.6

35.8

New GMZ South

115.3

115.8

0.5

0.4

New GMZ South

181.0

182.5

1.5

0.6

GMZ East

CL-166

48.5

53.0

4.5

3.4

0.7 **

GMZ East

86.0

127.0

41.0

31.2

0.6**

GMZ East

including

86.0

87.0

1.0

0.8

2.3**

GMZ East

including

102.5

105.5

3.0

2.3

1.6**

GMZ East

169.0

172.0

3.0

2.3

1.2**

GMZ East

403.0

404.5

1.5

0.9

CL-167

356.5

357.0

0.5

1.0

Adrian East

359.0

359.5

0.5

0.5

Adrian East

CL-168

109.0

110.0

1.0

0.7

1.1

GMZ East

120.5

122.0

1.5

1.1

4.2

GMZ East

359.5

360.0

0.5

0.4

1.4

GMZ East

CL-169

177.0

178.0

1.0

0.0

1.4

North of Adrian

181.4

182.6

1.3

0.0

0.7

North of Adrian

CL-170

81.5

84.5

3.0

2.6

1.6

GMZ East

134.0

151.0

17.0

14.7

0.5

GMZ East

including

135.0

136.0

1.0

0.9

1.5

GMZ East

including

139.0

140.0

1.0

0.9

1.4

GMZ East

including

141.0

142.0

1.0

0.9

1.3

GMZ East

CL-171

27.0

28.0

1.0

0.5

North of Adrian

50.5

52.0

1.5

0.6

North of Adrian

135.8

140.0

4.2

0.7

North of Adrian

including

135.8

136.3

0.5

1.6

North of Adrian

including

139.5

140.0

0.5

4.0

North of Adrian

220.5

226.0

5.5

0.8

North of Adrian

including

220.5

221.0

0.5

6.1

North of Adrian

229.5

230.5

1.0

0.5

North of Adrian

CL-172

23.0

29.0

6.0

5.2

0.6

GMZ East

135.8

140.0

4.2

3.6

0.7

GMZ East

孔ID

从…

(M)

(M)

拦截

(M)

TW

(M)

Au

克/吨

分带

CL-86

54.5

55.5

1.0

0.9

0.6

GMZ

CL-133

173.0

174.0

1.0

1.0

禤浩焯以北

CL-137

237.0

237.5

0.5

0.5

探索东方

CL-140

107.0

108.0

1.0

0.8

探索东方

CL-143

330.5

332.0

1.5

0.6

探索东方

CL-144

120.0

126.0

6.0

4.1

0.6

GMZ

144.0

145.0

1.0

0.7

0.7

GMZ

331.5

333.0

1.5

1.0

1.0

GMZ

360.5

362.0

1.5

1.0

4.4

GMZ

包括

361.5

362.0

0.5

0.3

11.7

GMZ

CL-147

72.0

73.0

1.0

0.8

0.7

GMZ东区

90.0

95.0

5.0

3.8

0.9

GMZ东区

109.0

110.0

1.0

0.8

0.9

GMZ东区

113.0

114.5

1.5

1.1

0.8

GMZ东区

133.1

134.3

1.2

0.9

0.6

GMZ东区

CL-151

293.0

294.5

1.5

0.4

禤浩焯东

CL-153

223.0

224.0

1.0

0.7

禤浩焯东

CL-154

146.0

148.0

2.0

1.4

1.0

GMZ东区

170.0

171.0

1.0

0.7

2.6

GMZ东区

181.8

182.4

0.6

0.4

0.9

GMZ东区

204.4

205.9

1.5

1.1

0.6

GMZ东区

CL-155

281.0

284.0

3.0

0.6

禤浩焯东

341.0

342.5

1.5

0.5

禤浩焯东

347.0

359.0

12.0

0.6

禤浩焯东

CL-157

200.0

200.5

0.5

0.4

新GMZ南

201.5

202.0

0.5

0.5

新GMZ南

214.0

215.0

1.0

0.9

新GMZ南

219.4

223.2

3.8

0.8

新GMZ南

222.7

223.2

0.5

2.3

新GMZ南

CL-159

215.4

220.2

4.8

0.8

新GMZ南

包括

219.7

220.2

0.5

4.0

新GMZ南

CL-160

220.4

220.9

0.5

0.3

0.4

新GMZ南

CL-161

56.0

57.5

1.5

0.9

1.1

GMZ东区

CL-162

258.3

258.8

0.5

0.3

0.5

GMZ东区

263.2

263.7

0.5

0.3

0.7

GMZ东区

277.6

278.1

0.5

0.3

0.6

GMZ东区

332.8

334.4

1.6

0.9

2.6

GMZ东区

CL-163

117.8

118.3

0.5

0.3

0.5

新GMZ东区

277.1

278.9

1.8

1.1

1.5

GMZ东区

279.4

280.5

1.2

0.7

0.6

GMZ东区

CL-164

76.0

90.0

14.0

11.6

2.0**

GMZ东区

包括

76.0

77.0

1.0

0.8

6.0**

GMZ东区

包括

89.0

90.0

1.0

0.8

14.2**

GMZ东区

94.0

95.0

1.0

0.8

0.5**

GMZ东区

98.0

99.0

1.0

0.8

0.4**

GMZ东区

102.0

104.0

2.0

1.7

0.4**

GMZ东区

CL-165

113.3

114.3

1.1

19.1

新GMZ南

包括

113.3

113.8

0.6

35.8

新GMZ南

115.3

115.8

0.5

0.4

新GMZ南

181.0

182.5

1.5

0.6

GMZ东区

CL-166

48.5

53.0

4.5

3.4

0.7**

GMZ东区

86.0

127.0

41.0

31.2

0.6**

GMZ东区

包括

86.0

87.0

1.0

0.8

2.3**

GMZ东区

包括

102.5

105.5

3.0

2.3

1.6**

GMZ东区

169.0

172.0

3.0

2.3

1.2**

GMZ东区

403.0

404.5

1.5

0.9

CL-167

356.5

357.0

0.5

1.0

禤浩焯东

359.0

359.5

0.5

0.5

禤浩焯东

CL-168

109.0

110.0

1.0

0.7

1.1

GMZ东区

120.5

122.0

1.5

1.1

4.2

GMZ东区

359.5

360.0

0.5

0.4

1.4

GMZ东区

CL-169

177.0

178.0

1.0

0.0

1.4

禤浩焯以北

181.4

182.6

1.3

0.0

0.7

禤浩焯以北

CL-170

81.5

84.5

3.0

2.6

1.6

GMZ东区

134.0

151.0

17.0

14.7

0.5

GMZ东区

包括

135.0

136.0

1.0

0.9

1.5

GMZ东区

包括

139.0

140.0

1.0

0.9

1.4

GMZ东区

包括

141.0

142.0

1.0

0.9

1.3

GMZ东区

CL-171

27.0

28.0

1.0

0.5

禤浩焯以北

50.5

52.0

1.5

0.6

禤浩焯以北

135.8

140.0

4.2

0.7

禤浩焯以北

包括

135.8

136.3

0.5

1.6

禤浩焯以北

包括

139.5

140.0

0.5

4.0

禤浩焯以北

220.5

226.0

5.5

0.8

禤浩焯以北

包括

220.5

221.0

0.5

6.1

禤浩焯以北

229.5

230.5

1.0

0.5

禤浩焯以北

CL-172

23.0

29.0

6.0

5.2

0.6

GMZ东区

135.8

140.0

4.2

3.6

0.7

GMZ东区

Table 2: Drill Result Highlights Metallurgical Holes

表2:钻探结果突出冶金孔

Hole ID

From

(m)

To

(m)

Intercept

(m)

TW

(m)

Au

g/t

Zone

MH-07

123.0

126.0

3.0

2.1

2.1

Richard

144.5

145.5

1.0

0.7

1.1

Richard

152.0

158.0

6.0

4.2

2.4

Richard

168.0

186.0

18.0

12.5

12.6 (8.9)

Richard

incl

169.5

170.0

0.5

0.3

233.0 (100)

Richard

incl

179.0

179.5

0.5

0.3

59.9

Richard

incl

179.5

180.0

0.5

0.3

90.1

Rich(ard

MH-09

49.0

64.0

15.0

14.3

0.6

Richard

74.0

90.0

16.0

15.3

1.3

Richard

incl

75.0

76.0

1.0

1.0

7.9

Richard

incl

80.0

81.0

1.0

1.0

4.7

Richard

MH-16

69.0

93.3

24.3

16.5

8.6 (7.6)

GMZ

incl

87.0

90.0

3.0

2.0

46.1 (38.0)

GMZ

MH-21

68.0

82.0

14.0

11.9

1.4

GMZ

incl

68.0

69.0

1.0

0.9

5.7

GMZ

incl

75.0

76.0

1.0

0.9

4.0

GMZ

MH-19

32.0

43.0

11.0

8.1

1.0

GMZ

incl

39.0

39.9

0.9

0.7

2.5

GMZ

incl

42.0

43.0

1.0

0.7

2.9

GMZ

57.0

60.0

3.0

2.2

1.7

GMZ

67.0

68.0

1.0

0.7

24.8

GMZ

MH-22

60.1

103.0

42.9

29.8

1.5

Adrian

incl

84.0

85.0

1.0

0.7

4.8

Adrian

incl

92.0

93.0

1.0

0.7

7.7

Adrian

incl

97.0

98.0

1.0

0.7

8.6

Adrian

incl

100.0

101.0

1.0

0.7

8.1

Adrian

108.0

111.5

3.5

2.4

0.6

Adrian

161.0

164.0

3.0

2.1

0.5

Adrian

孔ID

从…

(M)

(M)

拦截

(M)

TW

(M)

Au

克/吨

分带

MH-07

123.0

126.0

3.0

2.1

2.1

理查德

144.5

145.5

1.0

0.7

1.1

理查德

152.0

158.0

6.0

4.2

2.4

理查德

168.0

186.0

18.0

12.5

12.6(8.9)

理查德

包括

169.5

170.0

0.5

0.3

233.0(100)

理查德

包括

179.0

179.5

0.5

0.3

59.9

理查德

包括

179.5

180.0

0.5

0.3

90.1

富足(标准)

MH-09

49.0

64.0

15.0

14.3

0.6

理查德

74.0

90.0

16.0

15.3

1.3

理查德

包括

75.0

76.0

1.0

1.0

7.9

理查德

包括

80.0

81.0

1.0

1.0

4.7

理查德

MH-16

69.0

93.3

24.3

16.5

8.6(7.6)

GMZ

包括

87.0

90.0

3.0

2.0

46.1(38.0)

GMZ

MH-21

68.0

82.0

14.0

11.9

1.4

GMZ

包括

68.0

69.0

1.0

0.9

5.7

GMZ

包括

75.0

76.0

1.0

0.9

4.0

GMZ

MH-19

32.0

43.0

11.0

8.1

1.0

GMZ

包括

39.0

39.9

0.9

0.7

2.5

GMZ

包括

42.0

43.0

1.0

0.7

2.9

GMZ

57.0

60.0

3.0

2.2

1.7

GMZ

67.0

68.0

1.0

0.7

24.8

GMZ

MH-22

60.1

103.0

42.9

29.8

1.5

禤浩焯

包括

84.0

85.0

1.0

0.7

4.8

禤浩焯

包括

92.0

93.0

1.0

0.7

7.7

禤浩焯

包括

97.0

98.0

1.0

0.7

8.6

禤浩焯

包括

100.0

101.0

1.0

0.7

8.1

禤浩焯

108.0

111.5

3.5

2.4

0.6

禤浩焯

161.0

164.0

3.0

2.1

0.5

禤浩焯

** previously released; VG = visible gold. 0.38 g/t Au was used for the bottom cut-off; True widths are unknown if not noted; Drill holes CL-156, 158 did not return any significant values; (---)=cut value (cut to 100 g/t Richard and 70 g/t GMZ)

**之前发布;VG=可见黄金。使用0.38 g/t Au作为底部截止值;如果不注明,则实际宽度未知;CL-156、158孔未返回任何有意义的值;(-)=切割值(切至100 g/t Richard和70 g/t GMZ)

Table 2: Drill Hole Coordinates

表2:钻孔坐标

Hole ID

Azimuth

Dip

Easting

Northing

Depth

CL-86

320

-45

654352

5022390

162

CL-133

325

-45

654355

5023273

356

CL-137

0

-45

656125

5023098

350

CL-140

135

-45

656125

5023098

350

CL-143

320

-45

656042

5023381

377

CL-144

319

-61.5

654650

5022615

411

CL-147

315

-55

654715

5022675

348

CL-150

318

-45

654660

5022386

411

CL-151

315

-68

654585

5022820

479

CL-153

315

-67

654360

5022880

443

CL-154

315

-60

654762

5022704

366

CL-155

315

-45

654360

5022880

428

CL-156

120

-78

654835

5022675

81

CL-157

300

-78

654835

5022675

282

CL-158

315

-57

654630

5022880

416

CL-159

260

-71

654835

5022675

315

CL-160

290

-70

654835

5022675

351

CL-161

315

-70

654715

5022675

326

CL-162

308

-72

654932

5022733

390

CL-163

325

-66

654932

5022733

357

CL-164

315

-45

654715

5022675

368

CL-165

290

-76

654932

5022733

324

CL-166

338

-45

654715

5022675

419

CL-167

45

-90

654575

5022880

432

CL-168

338

-58

654715

5022675

380

CL-169

325

-55

654355

5023273

377

CL-170

323

-45

654789

5022695

251

CL-171

331

-55

654270

5023269

327

CL-172

323

-45

654750

5022750

302

MH-07

278

-85

653467

5021486

188

MH-09

120

-45

653461

5021593

104

MH-16

293

-64

654245.6

5022186

111

MH-21

314

-51.5

654329

5022323

94.5

MH-19

180

-45

654433.4

5022579

95

MH-22

142

-66

654425

5022910

170

孔ID

方位角

浸渍

向东

北距

水深

CL-86

320

-45

654352

5022390

一百六十二

CL-133

325

-45

654355

5023273

三百五十六

CL-137

0

-45

656125

5023098

350

CL-140

一百三十五

-45

656125

5023098

350

CL-143

320

-45

656042

5023381

377

CL-144

三一九

-61.5

654650

5022615

411

CL-147

315

-55

654715

5022675

三百四十八

CL-150

三一八

-45

654660

5022386

411

CL-151

315

-68

654585

5022820

四百七十九

CL-153

315

-67

654360

5022880

443

CL-154

315

-60

654762

5022704

366

CL-155

315

-45

654360

5022880

四百二十八

CL-156

120

-78

654835

5022675

八十一

CL-157

300个

-78

654835

5022675

282

CL-158

315

-57

654630

5022880

四百一十六

CL-159

二百六十

-71

654835

5022675

315

CL-160

二百九十

-70

654835

5022675

351

CL-161

315

-70

654715

5022675

三百二十六

CL-162

三百零八

-72

654932

5022733

390

CL-163

325

-66

654932

5022733

三五七

CL-164

315

-45

654715

5022675

368

CL-165

二百九十

-76

654932

5022733

324

CL-166

三百三十八

-45

654715

5022675

四百一十九

CL-167

45

-90

654575

5022880

432

CL-168

三百三十八

-58

654715

5022675

三百八十

CL-169

325

-55

654355

5023273

377

CL-170

323

-45

654789

5022695

251

CL-171

三三一

-55

654270

5023269

327

CL-172

323

-45

654750

5022750

三百零二

MH-07

二百七十八

-85

653467

5021486

188

MH-09

120

-45

653461

5021593

104

MH-16

293

-64

654245.6

5022186

111

MH-21

314

-51.5

654329

5022323

94.5

MH-19

180

-45

654433.4

5022579

95

MH-22

一百四十二

-66

654425

5022910

一百七十

SOURCE: Galway Metals Inc.

资料来源:高威金属公司


View source version on accesswire.com:
在accesswire.com上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发