share_log

ACME Lithium Completes Phase 1 Exploration Program at Bailey Lake Lithium Project in Saskatchewan, Canada

ACME Lithium Completes Phase 1 Exploration Program at Bailey Lake Lithium Project in Saskatchewan, Canada

ACME Lithium 完成了加拿大萨斯喀彻温省贝利湖锂项目的第一阶段勘探计划
newsfile ·  2023/10/03 08:30

Vancouver, British Columbia--(Newsfile Corp. - October 3, 2023) - ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") is pleased to announce that it has completed a summer exploration program at its Bailey Lake pegmatite discovery area in northeastern Saskatchewan. The program consisted of 1166 line-km of helicopter-borne tri-axial gradiometer magnetics, radiometrics, and LiDAR as well as prospecting for additional drill targets which included 336 rock samples collected for geochemical analysis.

不列颠哥伦比亚省温哥华--(Newsfile Corp.,2023 年 10 月 3 日)- ACME Lithium Inc 案例:ACME) (OTCQX:ACLHF) (“公司” 或 “ACME”)很高兴地宣布,它已经完成了萨斯喀彻温省东北部贝利湖伟晶岩发现区的夏季勘探计划。该计划包括1166线千米的直升机载三轴梯度计磁体、辐射测量和LiDAR,以及勘探其他钻探目标,其中包括为地球化学分析收集的336个岩石样本。

(Figure 1: Location of Geophysical Survey Boundary & Rock Samples Collected from the 2023 Geological Prospecting Program)

(图 1:从 2023 年地质勘探计划中收集的地球物理调查边界和岩石样本的位置)

The 3-in-1 Airborne Geophysical Survey consisting of Helicopter-borne Tri-axial Gradiometer Magnetics, Radiometrics, and LiDAR was completed over a 7975 hectare area on the Bailey Lake Property consisting of 1166 line km. The purpose of the survey was to help identify regional structural trends and localized controls of pegmatite bodies along trend of the Li-mineralization identified in the 2017 surface sampling. Preliminary data from this survey was used to aid in guiding the subsequent prospecting. Final geophysical data is pending.

由直升机载的三轴梯度计磁学、辐射测量和激光雷达组成的三合一机载地球物理调查在贝利湖地产占地7975公顷的区域上完成,包括1166线千米。该调查的目的是根据2017年地表采样中确定的锂矿化趋势,帮助确定伟晶岩体的区域结构趋势和对伟晶岩体的局部控制。本次调查的初步数据被用来帮助指导随后的勘探。最终的地球物理数据尚待确定。

The geological prospecting program included 336 rock samples (including a 5% QAQC consisting of CRM's, Coarse Blanks, and field duplicates) collected along trend of historically reported Li-bearing pegmatite samples. The samples collected from this program consisted of exposed boulder and outcrops. Mineralogical, alteration, and structural data (where possible) was also collected at these sample sites. Samples collected consisted of pegmatites / pegmatitic dykes and local country rock. All samples were submitted to SGS Canada Inc. in Lakefield, ON, for Sodium Peroxide Fusion / ICP-AES and ICP-MS analysis with a focus on Lithium, Tantalum, and Cesium.

地质勘探计划包括按照历史上报告的含锂伟晶岩样本的趋势收集的336个岩石样本(包括5%的QAQC,包括CRM、粗坯和实地副本)。从该计划中收集的样本包括裸露的巨石和露头。在这些样本地点还收集了矿物学、变化和结构数据(如有可能)。收集的样本包括伟晶岩/伟晶岩堤坝和当地的乡村岩石。所有样本均提交给位于安大略省莱克菲尔德的加拿大SGS Inc. 进行过氧化钠融合/ICP-AES和ICP-MS分析,重点是锂、钽和镉。

(Figure 2: 2m wide Pegmatite Dyke in Outcrop)

(图 2:露头中宽达 2 米的伟晶岩坝)

Geologists identified two generations of pegmatite dykes in various outcrops which have not been historically sampled. The field crew made use of a handheld Laser-Induced Breakdown Spectroscopy (LIBS) to aid in the identification of lithium bearing minerals in the field. Some samples tested with the LIBS exhibited lithium values. Geochemical lab results will be required to verify these values which are expected in Q4 2023.

地质学家在历史上尚未采样的不同露头中发现了两代伟晶岩堤坝。现场工作人员使用手持式激光诱导击穿光谱仪(LIBS)来帮助识别野外含锂矿物。一些使用LIBS测试的样品显示出锂值。需要通过地球化学实验室的结果来验证这些值,预计这些值将在2023年第四季度公布。

(Figure 3: Pegmatite Boulder at Bailey Lake Property)

(图 3:Bailey Lake Property 的伟晶岩巨石)

Property Highlights:

物业亮点:

  • The large claim block contains multiple indications of LCT pegmatites with anomalous lithium grades.
  • Historical reported sampling by Gem Oil includes up to 3950 ppm Li in the Bailey Lake region.
  • Historical reported sampling by the Saskatchewan Geological Survey includes results up to 3470 ppm Li at Misaw Lake region to the east of Bailey Lake.
  • Till sampling in the region by the Saskatchewan Geological Survey reported numerous sites with elevated lithium and lithium pegmatite associated elements.
  • 大型索赔区块包含多种迹象,表明锂等级异常的 LCT 伟晶岩。
  • 宝石石油公司历史报告的采样包括贝利湖地区高达3950 ppm Li。
  • 萨斯喀彻温省地质调查局报告的历史采样包括贝利湖以东的米索湖地区高达3470 ppm Li的结果。
  • 直到萨斯喀彻温省地质调查局对该地区的采样报告说,许多地点的锂和锂伟晶岩相关元素含量较高。

Saskatchewan is a highly prospective region for critical mineral development. The Government of Saskatchewan recently announced an expansion to its existing investment and innovation incentive programs to include eligible lithium projects with the aim to become one of the best resource development jurisdictions in the world.

萨斯喀彻温省是一个非常有前景的关键矿产开发地区。萨斯喀彻温省政府最近宣布扩大其现有的投资和创新激励计划,将符合条件的锂项目包括在内,目的是成为世界上最好的资源开发管辖区之一。

Qualified Person

合格人员

Mr. Dane A. Bridge, P.Geol., a "Qualified Person" (as defined in NI 43-101 -Standards for Disclosure for Mineral Projects) and a Senior Consultant to the Company, has reviewed and approved the technical disclosures in this news release.

Dane A. Bridge,P.Geol. 先生是 “合格人士”(定义见NI 43-101——矿产项目披露标准),也是公司的高级顾问,他已经审查并批准了本新闻稿中的技术披露。

About ACME Lithium Inc.

关于 ACME Lithium Inc.

Led by an experienced team, ACME Lithium is a mineral exploration Company focused on acquiring, exploring, and developing battery metal projects in partnership with leading technology and commodity companies. ACME has acquired or is under option to acquire a 100-per-cent interest in projects located in Clayton Valley and Fish Lake Valley, Esmeralda County Nevada, at Shatford, Birse, and Cat-Euclid Lakes in southeastern Manitoba, and at Bailey Lake in northern Saskatchewan.

ACME Lithium 是一家矿产勘探公司,由经验丰富的团队领导,专注于与领先的科技和大宗商品公司合作收购、勘探和开发电池金属项目。ACME已经收购或可以选择收购位于内华达州埃斯梅拉达县克莱顿谷和鱼湖谷、曼尼托巴省东南部的沙特福德、比尔斯和卡特-欧几里德湖以及萨斯喀彻温省北部的贝利湖的项目的100%权益。

On behalf of the Board of Directors

代表董事会

Steve Hanson
Chief Executive Officer, President and Director
Telephone: (604) 564-9045
info@acmelithium.com

史蒂夫·汉森
首席执行官、总裁兼董事
电话:(604) 564-9045
info@acmelithium.com

For Investor Inquiries:
Anthony Simone
Simone Capital
Telephone: (416) 881-5154
asimone@simonecapital.ca

投资者查询:
安东尼西蒙尼
西蒙妮资本
电话:(416) 881-5154
asimone@simonecapital.ca

Neither the CSE nor its regulations service providers accept responsibility for the adequacy or accuracy of this news release. This news release contains certain statements which may constitute forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur and in this news release include but are not limited to the attributes of, timing for and expected benefits to be derived from exploration, drilling or development at ACME's project properties. Information inferred from the interpretation of drilling, sampling and other technical results may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. ACME's project location adjacent to or nearby lithium projects does not guarantee exploration success or that mineral resources or reserves will be defined on ACME's properties. Exploration, development, and activities conducted by regional companies provide assistance and additional data for exploration work being completed by ACME. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from the Company's operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Unless otherwise indicated, the market and industry data contained herein is based upon information from industry and other publications and the knowledge and experience of management. While we believe that this data is reliable, market and industry data is subject to variations and cannot be verified with complete certainty due to limits on the availability and reliability of raw data, the voluntary nature of the data gathering process and other limitations and uncertainties inherent in any statistical survey. We have not independently verified any of the data from third-party sources referred to in this news release or ascertained the underlying assumptions relied upon by such sources. All technical and scientific disclosure pertaining to our mineral property interests in this news release have been reviewed by a Qualified Person, meaning an individual who is an engineer or geoscientist with at least five years of experience in mineral exploration, mine development or operation or mineral project assessment, or any combination of these; has experience relevant to the subject matter of the mineral project and the technical report; and is a member or licensee in good standing of a professional association.

CSE及其监管服务提供商均不对本新闻稿的充分性或准确性承担责任。本新闻稿包含某些可能构成适用证券法所指的前瞻性信息的陈述(“前瞻性陈述”)。前瞻性陈述不是历史事实的陈述,通常但并非总是用 “预期”、“计划”、“预期”、“相信”、“打算”、“估计”、“项目”、“潜在” 和类似的表达方式来标识,或者事件或条件 “将”、“将”、“可能” 或 “应该” 发生,在本新闻稿中,包括但不限于 ACME项目物业的勘探、钻探或开发的属性、时机和预期收益。从对钻探、取样和其他技术结果的解释中推断出的信息也可以被视为前瞻性陈述,因为它构成了对项目实际开发时间和是否实际开发时可能出现的内容的预测。ACME的项目位置与锂项目相邻或附近,并不能保证勘探成功,也不能保证矿产资源或储量将在ACME的房产上确定。区域公司开展的勘探、开发和活动为ACME正在完成的勘探工作提供了援助和其他数据。这些前瞻性陈述受到各种风险和不确定性的影响,这些风险和不确定性可能导致实际事件或结果与前瞻性陈述中反映的事件或结果存在重大差异,包括但不限于:与金属价格波动相关的风险;与及时筹集足够资金以按可接受的条件为计划的工作提供资金相关的不确定性;天气、物流、技术或其他因素导致的计划工作发生变化;工作结果可能无法达到预期;以及意识到公司财产的潜在价值;发生事故、设备故障和劳资纠纷或其他意想不到的困难或中断的风险;工作计划中可能出现成本超支或意外支出;公司运营造成的环境污染或破坏风险以及其他风险和不确定性。任何前瞻性陈述仅代表截至其发表之日,除非适用的证券法另有要求,否则公司不承担更新任何前瞻性陈述的任何意图或义务,无论是由于新信息、未来事件或业绩还是其他原因。除非另有说明,否则此处包含的市场和行业数据基于来自行业和其他出版物的信息以及管理层的知识和经验。尽管我们认为这些数据是可靠的,但由于原始数据的可用性和可靠性的限制、数据收集过程的自愿性质以及任何统计调查固有的其他限制和不确定性,市场和行业数据可能会有所不同,无法完全确定地进行验证。我们尚未独立验证本新闻稿中提及的来自第三方来源的任何数据,也未确定此类来源所依赖的基本假设。本新闻稿中与我们的矿产权益有关的所有技术和科学披露均已由合格人员审查,即工程师或地球科学家,在矿产勘探、矿山开发或运营或矿产项目评估或其任何组合方面至少有五年的经验;具有与矿产项目主题和技术报告相关的经验;并且是专业协会的成员或被许可人。

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发