share_log

Kraken Energy Identifies Multiple Additional Priority Drill Targets at Apex Uranium Property, Nevada

Kraken Energy Identifies Multiple Additional Priority Drill Targets at Apex Uranium Property, Nevada

Kraken Energy 在内华达州 Apex 铀矿业确定了多个额外的优先钻探目标
newsfile ·  2023/10/17 08:00

Vancouver, British Columbia--(Newsfile Corp. - October 17, 2023) - Kraken Energy Corp. (CSE: UUSA) (OTCQB: UUSAF) (the "Company" or "Kraken") is pleased to report that the ongoing radon survey conducted at its 100%-owned Apex Uranium Property ("Apex Property" or the "Property") in Central Nevada has successfully identified multiple additional priority drill targets located on Bureau of Land Management "BLM" ground west and along trend of the historic Apex Uranium Mine.

温哥华,不列颠哥伦比亚省-(Newsfile Corp.-2023年10月17日)-克拉肯能源公司(CSE:UUSA)(场外交易代码:USAF)(“公司“或”海怪“)很高兴地报告,在其100%拥有的位于内华达州中部的Apex铀矿(”Apex铀矿“或”该矿“)正在进行的测氡工作成功地发现了位于土地管理局”BLM“地面和历史悠久的Apex铀矿西侧和沿线的多个额外优先钻探目标。

Interpretation of the recently flown VTEM and UAV magnetic surveys shows a geophysical signature associated with uranium mineralization at the Apex Mine that appears to be offset to the north where it continues trending northwest. This geophysical signature coincides with strong and consistent, recently identified radon anomalies.

对最近飞行的VTEM和无人机磁力测量的解释表明,与Apex矿的铀矿化有关的地球物理特征似乎偏北,继续向西北方向移动。这一地球物理特征与最近发现的强烈而一致的氡异常相吻合。

Highlights:

重点:

  • Strong radon anomalies coincident with geophysical signatures outlining the mineralized contact at the historic Apex Uranium Mine
  • 历史悠久的Apex铀矿强氡异常与描述矿化接触的地球物理特征相吻合
  • Over 2 km of high priority target potential has been identified on the newly staked BLM ground that follows the northwest mineralized trend from the Apex Mine
  • 根据Apex矿的西北矿化趋势,在新铺设的BLM地面上已确定超过2公里的高优先目标潜力
  • Newly defined and previously undrilled target area with projected target depths ranging from 50 m to 200 m (164 ft to 656 ft)
  • 新定义和以前未钻探的目标区,预计目标深度从50米到200米(164英尺到656英尺)
  • Notice of Intent (NOI) has been submitted to the BLM to drill up to 2,200 m (7217 ft) in 24 holes from 8 pads with an objective to commence drilling before the end of 2023
  • 已向BLM提交意向通知(NOI),将在8个衬垫的24个孔中钻至2200米(7217英尺),目标是在2023年底之前开始钻探

Matthew Schwab, CEO of Kraken, stated, "Our team's application of modern, detailed geophysical surveys and radon surveying at the Apex Property has identified an exceptional multi-layered and high priority drill target area located northwest and along trend from the historic Apex Uranium Mine. It's clear that past operators missed this potential 2.0 km long mineralized extension from the Apex Mine, which has been offset to the north as indicated by the geophysical data. The combination of geophysics and radon data is a powerful targeting tool as radon gas is a direct product from the radioactive decay of uranium.

Kraken首席执行官Matthew Schwab表示:“我们的团队在Apex矿区应用了现代、详细的地球物理测量和氡测量,发现了位于历史悠久的Apex铀矿西北部和沿线的一个特殊的多层和高优先级钻探目标区域。很明显,过去的运营商没有预料到Apex铀矿潜在的2.0公里长的矿化延伸段,地球物理数据表明,它已经向北偏移。地球物理和氡数据的结合是一个强大的定向工具,因为氡气是铀放射性衰变的直接产物。

"The fact that this new high priority drill target area is within BLM land is also very positive as the permitting timeline with the BLM should have us drilling before the end of 2023."

这一新的高优先级钻探目标区域位于BLM土地范围内,这一事实也是非常积极的,因为BLM的许可时间表应该会让我们在2023年底之前进行钻探。

Figure 1: Radon Anomalies at Apex Uranium Property on BLM Ground

图1:BLM地面Apex铀矿的氡异常

About the Apex Property:

关于Apex属性:

The Apex Uranium Mine was Nevada's largest past-producing uranium mine which produced ~106,000 pounds of U3O8 in the 1950s at an average mining grade of ~0.25% U3O8. Historic drilling results include results of up to 3.1 m (10 ft) at 1.33% U3O8, 34.1 m (112 ft) at 0.37% U3O8 and 15.2 m (50 ft) at 0.51% U3O8.

Apex铀矿是内华达州最大的过去生产的铀矿,生产了约10.6万磅的铀3.O8.在20世纪50年代,平均采矿品位约为0.25%U3.O8.。历史性的钻探结果包括在1.33%U的条件下钻探长达3.1米(10英尺)的结果3.O8.,34.1米(112英尺),0.37%U3.O8.和15.2m(50英尺)(0.51%U3.O8.

References

参考文献

1 Uranium Deposits of the World USA and Latin America, by Franz J. Dahlkamp (1965, pg 291).
2 Nevada Bureau Mines File 60000269, Report on Mines of Apex Minerals Corporation 1957, by Harry H. Hughes, Mining Geologist.
3 EPRI Report EA-498 "Uranium Price Formation" (1977, pg 2-19).
4 Nevada Bureau Mines File 38900096, Transverse Section Through Drilled Orebody, Apex Minerals Corp 1959, by Harry Hughes, Mining Geologist.
5 Nevada Bureau Mines File 38900084, Plan map of underground workings, sampling, and drill holes at the Apex mine 1959, by Harry Hughes, Mining Geologist.

1《世界美国和拉丁美洲的铀矿床》,Franz J.Dahlkamp(1965,第291页)。
2.内华达州矿务局文件60000269,关于Apex矿业公司1957年的矿藏报告,由矿业地质学家哈里·H·休斯著。
3.EPRI报告EA-498“铀价形成”(1977,第2-19页)。
4.4内华达州矿务局文件38900096,横截面穿过已钻矿体,Apex Minerals Corp,1959年,由矿业地质学家哈里·休斯著。
5.内华达州矿务局文件38900084,井下工作平面图,采样和钻孔在1959年,由哈里·休斯,矿业地质学家。

Technical Information:

技术信息:

All scientific and technical information in this news release has been prepared by or reviewed and approved by Matthew Schwab, P.Geo., President and CEO of the Company, and Garrett Ainsworth, P.Geo., Chairman of the Company. Each of Mr. Schwab and Mr. Ainsworth is a Qualified Person for the purposes of National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

本新闻稿中的所有科学技术信息均由公司首席执行官兼首席执行官马修·施瓦布和公司董事长加勒特·安斯沃思准备或审阅和批准。施瓦布先生和安斯沃思先生均符合《国家文书43-101-矿产项目披露标准》的要求。

The data disclosed in this news release is related to historical drilling results. Kraken has not undertaken any independent investigation of the sampling, nor has it independently analyzed the results of the historical exploration work in order to verify the results. Kraken considers these historical drill results relevant as the Company is using this data as a guide to plan exploration programs. The Company's current and future exploration work includes verification of the historical data through drilling.

本新闻稿披露的数据与历史钻探结果有关。Kraken没有对抽样进行任何独立调查,也没有为了核实结果而对历史勘探工作的结果进行独立分析。Kraken认为这些历史钻探结果是相关的,因为公司正在使用这些数据作为计划勘探计划的指南。公司目前和未来的勘探工作包括通过钻井核实历史数据。

About Kraken Energy Corp.:

关于克拉肯能源公司:

Kraken Energy Corp. is a new energy company advancing its portfolio of high-grade uranium properties in the Unites States. The Company is advancing its 100%-owned Apex Uranium Property, located 280 km (174 miles) east from Reno, Nevada which is recognized as Nevada's largest past-producing uranium mine. The Company has additionally entered into an option agreement to earn 100% of the Garfield Hills Uranium Property. The past-producing Garfield Hills Uranium Property covers 1,238 ha (3,060 acres) and is located 19 km (12 miles) east of Hawthorne in Mineral County, Nevada. Kraken Energy has also recently staked the Huber Hills Uranium Property, located 136 km (85 miles) north of Elko, Nevada which covers 1,044 ha (2,580 acres) and encompasses the historic Race Track open pit mine. The Company has recently entered into an option agreement to earn 75% of the Harts Point Uranium Property. The Harts Point Uranium Property covers 2,622 ha (6,480 acres) and is located 49 km (30 miles) northwest of Monticello in San Juan County, Utah.

Kraken Energy Corp.是一家新能源公司,正在推进其在美国的高品位铀矿资产组合。该公司正在推进其100%拥有的Apex铀矿,该铀矿位于内华达州里诺以东280公里(174英里),被公认为内华达州最大的过去生产的铀矿。此外,该公司还签订了一项期权协议,以获得加菲尔德山铀矿的100%权益。过去生产的加菲尔德山铀矿占地1238公顷(3060英亩),位于内华达州矿产县霍桑以东19公里(12英里)处。Kraken Energy最近还收购了胡伯山铀矿,该铀矿位于内华达州埃尔科以北136公里(85英里)处,占地1,044公顷(2,580英亩),包括历史悠久的Race Track露天矿。该公司最近签订了一项期权协议,将获得Harts Point铀矿75%的权益。Harts Point铀矿占地2622公顷(6480英亩),位于犹他州圣胡安县蒙蒂塞洛西北49公里(30英里)处。

For more information about the Company, please visit; .

欲了解更多有关该公司的资料,请浏览;。

On Behalf of the Board of Kraken Energy Corp.:

我代表克拉肯能源公司董事会:

Matthew Schwab
President & Chief Executive Officer

马修·施瓦布
总裁&首席执行官

Corporate Office:
Suite 907 - 1030 West Georgia Street
Vancouver, British Columbia
V6E 2Y3
T: (604) 628-2669

公司办公室:
西乔治亚街907-1030号套房
温哥华,不列颠哥伦比亚省
V6E 2Y3
电话:(604)628-2669

For investor relations inquiries, contact:
Kin Communications Inc.
T: (604) 684-6730
E: uusa@kincommunications.com

如需投资者关系咨询,请联系:
KIN通信公司
电话:(604)684-6730
电子邮箱:uusa@kiniciations.com

This news release contains forward-looking information which is subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ from those projected in the forward-looking statements. Forward-looking statements in this press release include our plans for exploration at the properties. These forward-looking statements are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. Risks that could change or prevent these statements from coming to fruition include changing costs for mining and processing; increased capital costs; the timing and content of upcoming work programs; geological interpretations based on drilling that may change with more detailed information; potential process methods and mineral recoveries assumption based on limited test work and by comparison to what are considered analogous deposits that with further test work may not be comparable; the availability of labour, equipment and markets for the products produced; and despite the current expected viability of the project, conditions changing such that the minerals on our property cannot be economically mined, or that the required permits to build and operate the envisaged mine can be obtained. The forward-looking information contained herein is given as of the date hereof and the Company assumes no responsibility to update or revise such information to reflect new events or circumstances, except as required by law.

本新闻稿包含前瞻性信息,这些信息受到各种风险、不确定因素和其他因素的影响,这些因素可能导致实际事件或结果与前瞻性陈述中预测的不同。本新闻稿中的前瞻性陈述包括我们在这些物业的勘探计划。这些前瞻性陈述会受到各种风险、不确定因素和其他因素的影响,这些因素可能会导致实际事件或结果与前瞻性信息中预测的大不相同。可能改变或阻止这些陈述取得成果的风险包括:采矿和加工成本的变化;资本成本增加;即将出台的工作计划的时间和内容;基于钻探的地质解释可能随更详细的信息而变化;潜在的加工方法和矿物回收率假设;基于有限的测试工作以及与被视为类似矿藏的假设相比,这些矿藏在进一步的测试工作中可能无法进行比较;生产的产品可获得劳动力、设备和市场;尽管目前预计该项目具有可行性,但条件发生了变化,使得我们财产上的矿物不能进行经济开采,或者获得建造和运营设想中的矿场所需的许可证。本文中包含的前瞻性信息是截至本文发布之日的前瞻性信息,公司不承担更新或修改此类信息以反映新事件或新情况的责任,除非法律另有要求。

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发