share_log

Gold Springs Resource Continues to Expand the South Jumbo Deposit

Gold Springs Resource Continues to Expand the South Jumbo Deposit

Gold Springs Resource 继续扩大南巨型矿床
Accesswire ·  2023/10/23 09:25

VANCOUVER, BC / ACCESSWIRE / October 23, 2023 / Gold Springs Resource Corp. (the "Company" or "GRC") (TSX:GRC)(OTCQB:GRCAF) reports positive assay results from the South Jumbo Resource area of its Gold Springs project located in the USA, on the border of Nevada and Utah.

不列颠哥伦比亚省温哥华/ACCESSWIRE/2023 年 10 月 23 日/ Gold Springs Resource Corp.(“公司” 或 “GRC”)(多伦多证券交易所股票代码:GRC)(场外交易代码:GRCAF)报告 阳性化验结果 来自其位于美国、内华达州和犹他州交界处的金泉项目的 South Jumbo Resource 区域。

Highlights include:

亮点包括:

  • 1.93 g/t gold equivalent over 1.5 meters and
    0.58 g/t gold equivalent over 7.6 meters and
    1.24 g/t gold equivalent over 1.6 meters in hole E-22-023
  • 1.10 g/t gold equivalent over 6.1 meters and.
    0.96 g/t gold equivalent over 3.0 meters and
    0.57 g/t gold equivalent over 6.1 meters in hole E-22-022
  • 1.30 g/t gold equivalent over 1.5 meters in hole E-22-024
  • 1.93 g/t 1.5 米以上的黄金当量以及
    7.6 米以上的金当量为 0.58 克/吨,以及
    1.24 g/t 洞里超过 1.6 米的金当量 E-22-023
  • 1.10 g/t 超过 6.1 米的黄金当量和。
    3.0 米以上的金当量为 0.96 克/吨,以及
    0.57 g/t 的黄金当量超过 6.1 米 E-22-022
  • 1.30 g/t 在洞里超过 1.5 米处的金当量 E-22-024

Gold equivalent based on US$1,800/oz gold, US$25/oz silver and 50% for silver recovery.

黄金当量按每盎司1,800美元黄金、25美元/盎司白银和50%的白银回收率计算。

Antonio Canton, President, and CEO, stated:

安东尼奥·坎顿,总裁兼首席执行官 声明:

"We are pleased by these new positive results, which extend the gold mineralization encountered in hole E-22-020 (1.05 g/t AuEq over 4.6 meters and 0.74 g/t AuEq over 26 meters) and thus expand our South Jumbo deposit 200 meters further north where it remains open (see GRC's press release dated August 12, 2022).

“我们对这些新的积极结果感到高兴,这些结果延续了在 E-22-020 洞中遇到的金矿化 (1.05 g/t aueQ 结束了 4.6 米0.74 g/t aueQ 结束了 26 米)从而扩大我们的 South Jumbo 矿床 再往北 200 米 它仍然处于开放状态(参见GRC于2022年8月12日发布的新闻稿)。

Add this 200 meters northward expansion of the Jumbo South deposit to the 425 meters southward expansion of the Jumbo North deposit in a higher-grade structural block, and we are convinced of the significant potential of the 5-kilometer-long Jumbo Trend to host a large gold deposit (see GRC press release dated October 16, 2023).

添加这个 向北扩展 200 米 从 Jumbo South 矿床到 向南扩展 425 米 Jumbo North 矿床位于 更高等级的结构方块,我们坚信长达5千米的Jumbo Trend拥有大型金矿的巨大潜力(见GRC于2023年10月16日发布的新闻稿)。

The South Jumbo and the North Jumbo resources, with 524,000 ounces of gold and 8,811,000 ounces of silver, already arethe two largest of our six existing M&I resources according to our latest resource estimate based on drilling up to 2021 and without results from 2022-2023 (see detailed table below and GRC's press release dated June 13, 2022, concerning our last mineral resource estimate).

South Jumbo 和 North Jumbo 资源,以及 524,000 盎司黄金 8,811,000 盎司的白银, 已经是了 两个最大的 在我们现有的六个中 M&I 资源 根据我们最新的资源估计 以2021年之前的钻探为基础 而且没有2022-2023年的结果(参见下表和GRC于2022年6月13日发布的关于我们最新矿产资源估算的新闻稿)。

It's also worth bearing in mind, when analyzing Gold Springs' true potential, that the 5+ km Jumbo Trend covers less than 5% of our nearly 8000 ha large gold project."

在分析金泉的真正潜力时,还值得记住的是 5 公里以上 Jumbo Trend 占地近 8000 公顷的面积不到 5% 大型黄金项目。”

South Jumbo

South Jumb

The South Jumbo resource extends over 1,000 meters along strike based on drilling up to 2021 and is located at the southern end of the +5 kilometer-long Jumbo Trend which is defined by a very strong and well-developed CSAMT high resistivity anomaly.

South Jumbo 资源扩展 超过 1,000 米 以2021年之前的钻探为基础,位于钻探的南端 +5 千米长的 Jumbo Trend 其定义是非常强大且发达的CSAMT高电阻率异常。

The drill holes E-22-020 through E-22-024 extend this gold-bearing system 200 meters to the north and include the higher-grade material of 1.05 g/t gold equivalent over 4.6 meters and 0.74 g/t gold equivalent over 26 meters in hole E-22-020 and 1.1 g/t gold equivalent over 6.1 meters found in hole E-22-022.

从 E-22-020 到 E-22-024 的钻孔 将这个含金系统向北延伸 200 米 并包括在 E-22-020 洞中发现的超过 4.6 米的 1.05 克/吨金当量和超过 26 米的 0.74 克/吨金当量的高品位材料,以及在 E-22-022 洞中发现的 1.1 克/吨金当量超过 6.1 克/吨。

Future drilling will focus on continuing to expand the gold mineralization to the north.

未来的钻探将侧重于继续将金矿化范围扩大到北部。

Summary of drill intercepts

演习截获摘要

Hole ID

From
(m)

To
(m)

Thickness (m)

Au
g/t

Ag
g/t

AuEq
g/t

E-22-021

137.2

141.7

4.5

0.44

6.2

0.48

and

169.2

173.7

4.5

0.51

4.5

0.54

and

181.4

189

7.6

0.34

6.2

0.38

and

211.8

214.9

3.1

0.71

1.6

0.72

E-22-022

134.1

140.2

6.1

1.07

3.9

1.10

and

202.7

205.7

3

0.93

4.4

0.96

and

213.4

219.5

6.1

0.55

3

0.57

E-22-023

166.1

167.6

1.5

1.92

1.8

1.93

and

196.6

204.2

7.6

0.57

1.5

0.58

and

256

257.6

1.6

1.22

2.2

1.24

E-22-024

163.1

164.6

1.5

1.29

2

1.30

Hole ID

来自
(m)


(m)

厚度 (m)

Au
g/t

Ag
g/t

auEQ
g/t

E-22-021

137.2

141.7

4.5

0.44

6.2

0.48

169.2

173.7

4.5

0.51

4.5

0.54

181.4

189

7.6

0.34

6.2

0.38

211.8

214.9

3.1

0.71

1.6

0.72

E-22-022

134.1

140.2

6.1

1.07

3.9

1.10

202.7

205.7

3

0.93

4.4

0.96

213.4

219.5

6.1

0.55

3

0.57

E-22-023

166.1

167.6

1.5

1.92

1.8

1.93

196.6

204.2

7.6

0.57

1.5

0.58

256

257.6

1.6

1.22

2.2

1.24

E-22-024

163.1

164.6

1.5

1.29

2

1.30

True thickness is estimated to be 60-100% of reported length. Gold equivalent based on US$1,800/oz gold, US$25/oz silver, and 50% for silver recovery.

实际厚度估计为报告长度的60-100%。黄金当量按每盎司1,800美元黄金、25美元/盎司白银和50%的白银回收率计算。

Drill Hole Table

钻孔表

Hole ID

Target

Easting UTM
NAD 27 Z11

Northing

Elevation
(m)

Azimuth

Inclination

TD
(m)

E-22-021

South Jumbo

760629

4196881

1923

320

-45

225.6

E-22-022

South Jumbo

760598

4196925

1977

320

-45

259.1

E-22-023

South Jumbo

760594

4196967

1983

320

-45

272.8

E-22-024

South Jumbo

760495

4196900

1983

90

-45

213.4

Hole ID

目标

东方 UTM
和 27 Z11

北方

海拔
(m)

Azimuth

倾角

TD
(m)

E-22-021

South Jumb

760629

4196881

1923

320

-45

225.6

E-22-022

South Jumb

760598

4196925

1977

320

-45

259.1

E-22-023

South Jumb

760594

4196967

1983

320

-45

272.8

E-22-024

South Jumb

760495

4196900

1983

90

-45

213.4

South and North Jumbo Resources
based on drilling to 2021 and without results from 2022-2023

南方和北方巨型资源
基于截至2021年的钻探结果,而2022-2023年没有结果

Mineral Resource Estimate NI 43-101 Technical Report - Gold Springs Project, Utah-Nevada, USA"
dated July 11, 2022, with an effective date of June 13, 2022

矿产资源估算 NI 43-101 技术报告——美国犹他州-内华达州金泉项目”
日期为2022年7月11日,生效日期为2022年6月13日


Category


Deposit

$1,800 Pit Constrained - 0.25 g/t gold cutoff

Tonnes (1000s)

Gold

Silver

g/t

Troy oz

g/t

Troy oz

Measured

South Jumbo

6,457

0.55

114,558

5.99

1,243,721

Indicated

South Jumbo

5,657

0.55

100,007

4.67

848,739

Measured

North Jumbo

15,752

0.47

240,037

10.88

5,509,666

Indicated

North Jumbo

5,509

0.39

69,433

6.82

1,208,618

Total Measured & Indicated

524,035

8,810,744

Inferred

South Jumbo

2,929

0.38

35,474

2.99

281,905

Inferred

North Jumbo

1,725

0.38

20,864

4.51

250,229


类别


存款

1,800 美元 Pit Joundepted-0.25 克/吨黄金截止价

吨 (1000 秒)

黄金

g/t

特洛伊奥兹

g/t

特洛伊奥兹

已测量

South Jumb

6,457

0.55

114,558

5.99

1,243,721

已指明

South Jumb

5,657

0.55

100,007

4.67

848,739

已测量

北方巨宝

15,752

0.47

240,037

10.88

5,509,666

已指明

北方巨宝

5,509

0.39

69,433

6.82

1,208,618

测量和指示的总数

524,035

8,810,744

推断

South Jumb

2,929

0.38

35,474

2.99

281,905

推断

北方巨宝

1,725

0.38

20,864

4.51

250,229

Qualified Person

合格人员

Randall Moore, VP of Gold Springs Resource Corp., is the Company's designated Qualified Person for this news release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects. He has approved the scientific or technical information in this release and has verified the data disclosed in this release for its geological reasonableness, checked all the inputs and verified the analytical data through an analysis of the blanks and standards submitted with the drill-chip samples.

根据国家仪器43-101矿业项目披露标准的定义,金泉资源公司副总裁兰德尔·摩尔是该公司本新闻稿的指定合格人物。他批准了本新闻稿中的科学或技术信息,并验证了本新闻稿中披露的数据的地质合理性,检查了所有输入内容,并通过分析随钻芯片样本提交的空白和标准来验证分析数据。

Quality Assurance and Quality Control

质量保证和质量控制

Approximately 7 kg of RC chips were sent to the laboratory for each 1.52 meters drill interval. Standards and blanks are submitted into the sample stream at the rate of 15% for QA/QC purposes. In addition, the laboratory also includes duplicates of samples, standards and blanks. The results of these check assays are reviewed prior to the release of data. All RC sample assays are also reviewed for their geological context and checked against the drill logs.

每钻孔间隔 1.52 米,大约有 7 千克的 RC 芯片被送到实验室。出于质量保证/质量控制的目的,标准和空白以15%的比率提交到样本流中。此外,实验室还包括样品、标准和空白的副本。在发布数据之前,将对这些检查分析的结果进行审查。所有RC样本分析还要根据其地质背景进行审查,并对照钻探日志进行检查。

Assay Method

测定方法

Assays were performed in Reno, Nevada by ALS Geochemical, an ISO 9001:2000 certified and independent laboratory. Gold was analyzed by fire assay of a 30-gram sample with an AAS finish with samples assaying greater than 5 g/t re-assayed using a 30-gram sample and a gravity finish. Silver is analyzed by a four-acid leach ICP method.

化验由经ISO 9001:2000 认证的独立实验室ALS Geochemical在内华达州里诺进行。金是通过对30克的样品进行火化分析的,样品含量大于5 g/t,使用30克的样品和重力表面进行重新测定。银通过四酸浸出ICP方法进行分析。

About Gold Springs Resource Corp.

关于金泉资源公司

Gold Springs Resource Corp. (TSX: GRC and OTCQB: GRCAF) is focused on the exploration and expansion of the gold and silver resources of its Gold Springs project located on the border of Nevada and Utah, USA. The project is situated in the prolific Great Basin of Western USA, one of the best mining jurisdictions in the world.

Gold Springs Resource Corp.(多伦多证券交易所股票代码:GRC,场外交易代码:GRCAF)专注于勘探和扩建其位于美国内华达州和犹他州边境的金泉项目的金银资源。该项目位于美国西部多产的大盆地,是世界上最好的采矿管辖区之一。

Gold Springs Resource Corp. Contact:

金泉资源公司联系方式:

Antonio Canton, President and CEO
acanton@goldspringsresource.com

安东尼奥·坎顿,总裁兼首席执行官
acanton@goldspringsresource.com

Forward-Looking Statements

前瞻性陈述

Certain statements contained herein constitute "forward-looking information" under applicable Canadian securities laws ("forward-looking statements"). Forward-looking statements look into the future and provide an opinion as to the effect of certain events and trends on the business. Forward-looking statements herein may include words such as "creating", "believe", "would", "continue", "will", "promising", "should", and similar expressions and includes the statement relating to the significant potential of the Jumbo Trend. These forward-looking statements are based on current expectations and entail various risks and uncertainties. Actual results may materially differ from expectations if known and unknown risks or uncertainties affect our business or if our estimates or assumptions prove inaccurate. Factors that could cause results or events to differ materially from current expectations expressed or implied by the forward-looking statements, include, but are not limited to, risks of the mineral exploration industry which may affect the advancement of the Gold Springs project, including possible variations in mineral resources, grade, recovery rates, metal prices, capital and operating costs, and the application of taxes; availability of sufficient financing to fund planned or further required work in a timely manner and on acceptable terms; availability of equipment and qualified personnel, failure of equipment or processes to operate as anticipated, changes in project parameters, including water requirements for operations, as plans continue to be refined; regulatory, environmental and other risks of the mining industry more fully described in the Company's Annual Information Form and continuous disclosure documents, which are available on SEDAR+ at . The assumptions made in developing the forward-looking statements include: the accuracy of current resource estimates and the interpretation of drill, metallurgical testing and other exploration results; the continuing support for mining by local governments in Nevada and Utah; the availability of equipment and qualified personnel to advance the Gold Springs project; execution of the Company's existing plans and further exploration and development programs for Gold Springs, which may change due to changes in the views of the Company or if new information arises which makes it prudent to change such plans or programs.Readers are cautioned not to place undue reliance on the forward-looking statements contained in this press release. Except as required by law, the Company assumes no obligation to update or revise any forward-looking statement, whether as a result of new information, future events or any other reason. Unless otherwise indicated, forward-looking statements in this press release describe the Company's expectations as of the date hereof.

根据适用的加拿大证券法,此处包含的某些陈述构成 “前瞻性信息”(“前瞻性陈述”)。前瞻性陈述展望未来,并就某些事件和趋势对业务的影响提供意见。此处的前瞻性陈述可能包括诸如 “创造”、“相信”、“会”、“继续”、“将”、“承诺”、“应该” 等词语以及类似的表达方式,包括与Jumbo Trend的巨大潜力有关的陈述。这些前瞻性陈述基于当前的预期,包含各种风险和不确定性。如果已知和未知的风险或不确定性影响我们的业务,或者如果我们的估计或假设被证明不准确,则实际业绩可能与预期存在重大差异。可能导致结果或事件与前瞻性陈述所表达或暗示的当前预期存在重大差异的因素包括但不限于矿产勘探行业可能影响金泉项目进展的风险,包括矿产资源、品位、回收率、金属价格、资本和运营成本以及税收适用方面的可能变化;是否有足够的资金及时以可接受的条件为计划或进一步需要的工作提供资金;可用性设备和合格人员、设备或流程未能按预期运行、项目参数的变化,包括运营用水需求,因为计划不断完善;公司的年度信息表和持续披露文件更全面地描述了采矿业的监管、环境和其他风险,这些文件可在SEDAR+上查阅 。在制定前瞻性陈述时所做的假设包括:当前资源估算的准确性以及对钻探、冶金测试和其他勘探结果的解释;内华达州和犹他州地方政府对采矿的持续支持;推进金泉项目的设备和合格人员的可用性;公司现有计划以及金泉进一步勘探和开发计划的执行,这些计划可能会因公司观点的变化或出现新信息而发生变化因此,谨慎地更改此类计划或计划。提醒读者不要过分依赖本新闻稿中包含的前瞻性陈述。除非法律要求,否则公司没有义务更新或修改任何前瞻性陈述,无论是由于新信息、未来事件还是任何其他原因。除非另有说明,否则本新闻稿中的前瞻性陈述描述了公司截至本文发布之日的预期。

SOURCE: Gold Springs Resources Corporation

来源: 金泉资源公司


View source version on accesswire.com:
在 accesswire.com 上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发