share_log

Valhalla Metals Reports High-Grade Mineralization From Maiden Drill Program at Its Flagship Sun Project Including 21m of 6.84% CuEq

Valhalla Metals Reports High-Grade Mineralization From Maiden Drill Program at Its Flagship Sun Project Including 21m of 6.84% CuEq

Valhalla Metals报告称,其旗舰太阳项目的首次钻探计划产生了高品位矿化,其中包括2100万个 6.84% CueQ
newsfile ·  2023/10/30 08:30

Vancouver, British Columbia--(Newsfile Corp. - October 30, 2023) - Valhalla Metals Inc. (TSXV: VMXX) (OTCQB: VMXXF) ("Valhalla" or the "Company") is pleased to announce assay results from four diamond drill holes totaling 1,104 m completed during the 2023 exploration program at its flagship Sun project located in the World Class Ambler Mining District, Northwest Alaska. All four drill holes intersected multiple significant mineralized intervals and are summarized below.

温哥华,不列颠哥伦比亚省-(Newsfile Corp.-2023年10月30日)-Valhara Metals Inc.(TSXV:VMXX)(OTCQB:VMXXF)(“瓦尔哈拉“或”公司“)很高兴地宣布,在2023年勘探计划期间,在其位于阿拉斯加西北部世界级漫步者矿区的旗舰Sun项目中,完成了总计1,104米的四个钻石钻孔的化验结果。所有四个钻孔都横跨多个重要的矿化层段,总结如下。

Highlights Include:

亮点包括:

  • Sun23-01 intersected 13.7m of 3.07% CuEq* (1.24% Cu, 0.92% Pb, 3.45% Zn, 0.16 g/t Au, and 55.79 g/t Ag);
  • Sun 23-02 intersected 14.6m of 1.91% CuEq including 10.8m of 2.2% CuEq (0.69% Cu, 0.73% Pb, 2.88% Zn, 0.12 g/t Au, and 53.77 g/t Ag);
  • Sun23-03 intersected 13.8m of 3.44% CuEq including 8.7m of 4% CuEq (1.89% Cu, 1.23% Pb, 3.35% Zn, 0.29 g/t Au, and 94.36 g.t Ag);
  • Sun 23-04 intersected 21.4m of 6.84% CuEq (1.31% Cu, 3.23% Pb, 11.03% Zn, 0.24 g/t Au, and 108.31 g/t Ag) within a larger interval of 52.4m of 3.3% CuEq.
  • Sun23-01相交3.07%CuEq中的13.70万*(1.24%铜、0.92%铅、3.45%锌、0.16克/吨金、55.79克/吨银);
  • 周日23-02相交1.91%CuEq中的14.6m包括2.2%CuEq中的1080万铜0.69%、铅0.73%、锌2.88%、金0.12 g/t、银53.77 g/t;
  • Sun23-03相交3.44%CuEq中的13.8m包括4%CuEq中的870万(1.89%铜、1.23%铅、3.35%锌、0.29克/吨金、94.36克/吨银);
  • 周日23-04相交6.84%CuEq中的21.4m(1.31%铜、3.23%铅、11.03%锌、0.24g/吨金和108.31克/吨银)3.3%CuEq.

The 2023 drilling campaign was designed to test mineralization down-dip and along strike to known mineral resources and represented significant step-outs from known mineralization.

2023年的钻探活动旨在测试矿化向下倾斜和沿已知矿产资源的走向,代表着已知矿化的重大退步。

FIGURE 1: Massive sulfide from hole Sun23-004 showing a section of 21.4m of 6.84% CuEq.

图1:来自Sun23-004孔的块状硫化物显示了一段21.4米的6.84%CuEq。

Rick Van Nieuwenhuyse, Chairman said, "These are four great step-out holes demonstrating that the VMS system continues to depth with mineable grades and thicknesses of copper, zinc and precious metals. All we need to do is keep drilling to expand the known resources. If the Biden Administration wants Critical Metals, we know where to find them!"

董事长Rick Van Nieuwenhuyse说:“这是四个很好的突破口,表明VMS系统继续深入,铜、锌和贵金属的品位和厚度都可开采。我们所需要做的就是继续钻探,扩大已知的资源。如果拜登政府想要关键金属,我们知道到哪里去找!”

FIGURE 2: Plan view map showing historic drilling, relogged drill holes, and 2023 assay results.

图2:显示历史钻井、重新记录的钻孔和2023年化验结果的平面图。

Sun Project Work Program

SUN项目工作计划

The 2023 program included the construction of a new 24-man camp, a LiDAR and orthophotography survey over the Sun and Smucker properties, and a ground gravity survey at Sun. The Company also completed 4 drill holes for a total of 1,104m in addition to relogging 6 historic drill holes totalling 1,416m of core (Figure 2). Final analytical results and drill hole statistics are shown below in the tables.

2023年的计划包括建造一个新的24人营地,在太阳和Smucker属性上进行激光雷达和正射摄影调查,以及在太阳进行地面重力调查。此外,公司还完成了4个钻孔,共计1,104米,此外还重新录入了6个历史钻孔,总计1,416米的岩心(图2)。最终分析结果和钻孔统计数据如下表所示。

The drilling was designed to fill in gaps within inferred areas of the resource model in addition to testing the continuation of mineralization downdip and along strike. Mineralized intervals represent large step outs from known resources and range between 50m and 150m step outs. All holes confirm that mineralization does continue down-dip and along strike. Sun23-002 intersected a new thick interval of mineralization not previously identified and intersected 14.6m of 1.91% CuEq including 10.8m zone of 2.2% CuEq. Sun23-003 and Sun23-004 intersected thick zones of mineralization not previously identified in nearby holes and warrant excellent opportunity for further investigation (Figure 3).

钻探的目的是填补资源模型推断区域内的空白,并测试矿化向下和沿走向的连续性。矿化间隔代表已知资源的较大步距,范围在50米到150米之间。所有的孔都证实了矿化确实是沿着走向和向下继续的。Sun23-002与以前未发现的新的厚矿化层相交,并与1.91%CuEq的14.6m相交,包括2.2%CuEq的10.8m带状矿化。Sun23-003和Sun23-004相交的厚矿化带以前没有在附近的洞中发现,因此有很好的机会进行进一步调查(图3)。

FIGURE 3: Cross section through Sun23-002, Sun23-003, and Sun23-004 with generalized geology and assays.

图3:SUN 23-002、SUN 23-003和SUN 23-004的剖面及综合地质和化验。

TABLE 1. Select Mineralized intervals from the 2023 Sun Project Drilling.

表1。从2023年太阳项目钻探中选择矿化层段。

Hole From (m) To (m) Length (m) CuEq% Cu% Pb% Zn% Au g/t Ag g/t
Sun23-01 175.58 189.32 13.7 3.07 1.24 0.92 3.45 0.16 55.79
including
178.92 189.32 10.4 3.11 1.27 1.03 3.36 0.17 56.97
178.92 182.71 3.8 4.58 1.47 1.92 5.62 0.22 98.78
175.58 177.33 1.8 5.49 2.13 1.05 7.06 0.19 95.17
Sun23-02 89.06 94.31 5.25 1.29 0.61 0.32 1.22 0.11 24.35
Sun23-02 106.92 110.07 3.15 1.63 0.77 0.09 2.01 0.12 9.61
Sun23-02 117.26 131.89 14.63 1.91 0.63 0.61 2.40 0.11 43.8
including
121.1 131.89 10.79 2.22 0.69 0.73 2.88 0.12 53.77
Sun23-02 162.77 164.48 1.71 1.46 0.70 0.32 1.26 0.21 25.26
Sun23-02 170.07 171.69 1.62 1.71 1.16 0.13 0.74 0.32 17.42
Sun23-02 290.24 290.77 0.53 2.29 1.35 0.30 1.58 0.34 23.27
Sun23-02 295.67 297.8 2.13 1.93 1.33 0.17 0.84 0.31 21.82
Sun23-03 218.21 222.34 4.13 5.71 1.02 2.15 9.92 0.25 77.19
Sun23-03 225.82 239.68 13.86 3.44 1.66 0.98 3.03 0.22 72.23
including
225.82 236.8 10.98 3.74 1.77 1.11 3.27 0.25 84.32
225.82 234.56 8.74 3.99 1.89 1.23 3.35 0.29 94.36
Sun23-04 125.31 177.69 52.4 3.30 0.82 1.47 4.89 0.14 49.62
including
125.31 146.69 21.4 6.84 1.31 3.23 11.03 0.24 108.31
156.69 177.69 21.0 1.03 0.51 0.36 0.89 0.08 12.11
156.69 167.69 11 1.21 0.59 0.44 1.07 0.09 14.31
孔洞 发件人(M) 至(M) 长度(米) CuEq% CU% PB% 锌含量% Au g/t AG g/t
周日23-01 175.58 189.32 13.7 3.07 1.24 0.92 3.45 0.16 55.79
包括
178.92 189.32 10.4 3.11 1.27 1.03 3.36 0.17 56.97
178.92 182.71 3.8 4.58 1.47 1.92 5.62 0.22 98.78
175.58 177.33 1.8 5.49 2.13 1.05 7.06 0.19 95.17
周日23-02 89.06 94.31 5.25 1.29 0.61 0.32 1.22 0.11 24.35
周日23-02 106.92 110.07 3.15 1.63 0.77 0.09 2.01 0.12 9.61
周日23-02 117.26 131.89 14.63 1.91 0.63 0.61 2.40 0.11 43.8
包括
121.1 131.89 10.79 2.22 0.69 0.73 2.88 0.12 53.77
周日23-02 162.77 164.48 1.71 1.46 0.70 0.32 1.26 0.21 25.26
周日23-02 170.07 171.69 1.62 1.71 1.16 0.13 0.74 0.32 17.42
周日23-02 290.24 290.77 0.53 2.29 1.35 0.30 1.58 0.34 23.27
周日23-02 295.67 297.8 2.13 1.93 1.33 0.17 0.84 0.31 21.82
周日23-03 218.21 222.34 4.13 5.71 1.02 2.15 9.92 0.25 77.19
周日23-03 225.82 239.68 13.86 3.44 1.66 0.98 3.03 0.22 72.23
包括
225.82 236.8 10.98 3.74 1.77 1.11 3.27 0.25 84.32
225.82 234.56 8.74 3.99 1.89 1.23 3.35 0.29 94.36
周日23-04 125.31 177.69 52.4 3.30 0.82 1.47 4.89 0.14 49.62
包括
125.31 146.69 21.4 6.84 1.31 3.23 11.03 0.24 108.31
156.69 177.69 21.0 1.03 0.51 0.36 0.89 0.08 12.11
156.69 167.69 11.11 1.21 0.59 0.44 1.07 0.09 14.31

*CuEq = (((Cu%) x $Cu x 22.0462)*0.91 + ((Pb%) x $Pb x 22.0462)*0.8 + ((Zn%) x $Zn x 22.0462)*0.91 + (Au(g/t)/$Au*31.1034768)*0.59 + (Ag(g/t)/$Ag*31.1034768)*0.35))/($Cu*22.0462); Commodity prices: $Cu = US$3.00/lb., $Pb = US$1.00/lb; $Zn = US$1.10/lb; $Au = US$1,700/oz., and Ag = US$20.00/oz.; Recoveries assumed to be 91% Cu, 80% Pb, 91% Zn, 59% Au, 35% Ag and were multiplied for each respective metal. Recoveries are based on the technical report titled "Technical Report on the Sun Project, Brooks Range, Alaska, USA filed on Sedar by the Company on May 18, 2022 and modelled after the recoveries of the neighboring Arctic VMS deposit Feasibility Study; Factors: 22.0462 = Cu% to lbs. per %, 31.1034768 = Au g/t to g per troy oz, and 31.1034768 = Ag g/t to g per troy oz.

*CuEq=(Cu%)x$Cux 22.0462)*0.91+((Pb%)x$Pbx 22.0462)*0.8+((Zn%)x$Zx22.0462)*0.91+(Au(g/t)/$Au*31.1034768)*0.59+(Ag(g/t)/$Ag*31.1034768)*0.35))/($Cu*22.0462);商品价格:$Cu=3美元/磅,$铅=1美元/磅;$锌=1.1美元/磅;Au=1,700美元/盎司,Ag=20.00美元/盎司;假设回收率为91%的铜、80%的铅、91%的锌、59%的金、35%的银,并对每种金属进行倍增。回收基于公司于2022年5月18日在Sedar提交的题为“美国阿拉斯加州Brooks Range太阳项目的技术报告”的技术报告,该报告仿照邻近北极VMS矿床的回收可行性研究;因素:22.0462=铜%至磅。每%,31.1034768=每金衡盎司金衡盎司的金克/吨至每金衡盎司的银克/吨至每金衡盎司的银克/吨。

TABLE 2. Collar Locations for reported drill holes.

表2。报告的钻孔的卡箍位置。

Drill Hole Easting Northing Elevation (m) Azimuth Dip Length (m) Step Out Range* (m)
Sun23-01 411741 7440896 713 300 -80 254.51 70-75
Sun23-02 412391 7441875 906 300 -85 357.84 120-150
Sun23-03 411717 7440757 713 300 -80 295.35 70-100
Sun23-04 411664 7440812 691 310 -80 196.29 50-100
钻孔 向东 北距 高程(米) 方位角 浸渍 长度(米) 跳出范围*(M)
周日23-01 411741 7440896 七百一十三 300个 -80 254.51 70-75
周日23-02 412391 7441875 906 300个 -85 357.84 120-150
周日23-03 411717 7440757 七百一十三 300个 -80 295.35 70-100
周日23-04 411664 7440812 六百九十一 310 -80 196.29 50-100

*Step Out Range refers to the approximate distance of each drill hole to the two closest drill holes.

*跳出范围指每个钻孔到最近的两个钻孔的大致距离。

Sampling Methodology, Chain of Custody, Quality Control and Quality Assurance

抽样方法、监管链、质量控制和质量保证

All sampling was conducted under the supervision of the Company's Project Manager. Ore zone samples were delivered to the ALS Laboratories in Fairbanks, AK and further shipped via airplane to the ALS preparation facility in Reno, NV. Non-mineralized intervals were delivered to the ALS Laboratories in Fairbanks, AK and further shipped via boat to the ALS preparation facility in Vancouver, BC. A chain of custody was received for all samples upon delivery to ALS Laboratories in Fairbanks. The samples were analyzed as 1⁄2 HQ core and mineralized intervals averaged between 1-1.5m in length and non-mineralized intervals averaged approximately 3m in length. Samples were crushed, pulverized and then analyzed using industry standard analytical methods including a 4-Acid ICP-MS 48 multielement package and a four-acid digestion method for high-grade copper, zinc, lead, and silver samples in Vancouver BC. Gold was analyzed on a 30 g aliquot by fire assay with an AAS finish. Three QA/QC samples (one standard reference material (SRM), one duplicate, and one blank) selected by the logging geologist were inserted into every batch of 20 samples. Duplicate sample ID tags are stapled into core boxes at start of the sample interval. Coarse barren marble landscaping, crushed rock was used as the blank material. Four SRM's were used in 2023, ranging in accepted copper values of 1.21% to 3.82%, zinc values of 0.05ppm to 17.45%, lead values of 0.5% to 12%, silver values of 10 to 294 ppm, and gold values of 4.96 ppm. Ms. Caroline Vallat, P.Geo., from GeoSpark Consulting Inc. conducted an independent QAQC review, which returned overall strong accuracy and precision of the analytical results. The ALS North American analytical laboratories are accredited by the Standards Council of Canada (SCC) for specific tests listed in our Scopes of Accreditation to ISO/IEC 17025:2005 - General Requirements for the Competence of Testing and Calibration Laboratories. Blank, duplicate and certified reference materials were inserted into the sample stream by the laboratory.

所有抽样均在公司项目经理的监督下进行。矿带样品被运送到位于阿肯色州费尔班克斯的ALS实验室,然后通过飞机进一步运往位于内华达州里诺的ALS准备设施。非矿化区段被运送到位于阿肯色州费尔班克斯的ALS实验室,然后通过船只进一步运往位于不列颠哥伦比亚省温哥华的ALS准备设施。所有样品在被送到费尔班克斯的肌萎缩侧索硬化症实验室后,都收到了保管链。样品分析为1⁄2 HQ岩芯,矿化间隔平均长1-1.5米,非矿化间隔平均长约3米。样品被粉碎、粉碎,然后使用行业标准分析方法进行分析,包括4酸电感耦合等离子体质谱48多元素分析方法和温哥华BC高品位铜、锌、铅和银样品的四酸消解方法。金在30克等份上用火焰分析和原子吸收光谱分析。将测井地质学家选择的三个QA/QC样品(一个标准参考物质(SRM)、一个复制样品和一个空白样品)插入每批20个样品中。重复的样本ID标签在样本间隔开始时被装订到芯盒中。采用粗糙贫瘠的大理石造景,碎石作为空白材料。2023年使用了四个SRM,可接受的铜值在1.21%到3.82%之间,锌值在0.05ppm到17.45%之间,铅价在0.5%到12%之间,银价在10ppm到294ppm之间,金价在4.96ppm。来自GeoSpark Consulting Inc.的Caroline Vallat,P.Geo女士进行了一项独立的QAQC审查,结果显示分析结果总体上具有很高的准确性和精密度。ALS北美分析实验室通过了加拿大标准委员会(SCC)的认证,可进行符合国际标准化组织/国际电工委员会17025:2005年测试和校准实验室能力一般要求的认可范围中列出的具体测试。实验室将空白、复制和认证的标准物质放入样品流中。

Ambler Access Road Update

Ambler Access Road更新

The United States Bureau of Land Management ("BLM") has filed the draft Supplemental Environmental Impact Statement ("SEIS") for the AAP on its website and was recorded on the federal register on October 20, 2023. The draft SEIS is open for a 60-day public comment period, until December 19, 2023. Public Comments can be made from the Documents page of the website listed above. The BLM reconfirmed they anticipate a final SEIS is expected in the first quarter of 2024, and a Record of Decision within the second quarter of 2024.

美国土地管理局(BLM)已在其网站上为AAP提交了补充环境影响说明书(SEIS)草案,并于2023年10月20日记录在联邦登记册上。SEIS草案的公开评议期为60天,截止日期为2023年12月19日。公众意见可从上述网站的文件页面提出。BLM再次确认,他们预计最终的SEIS预计将在2024年第一季度公布,并在2024年第二季度内做出决定。

The Proposed Ambler Mining District Industrial Access Road was originally analyzed in the March 2020 Final EIS and authorized in a Record of Decision (ROD) issued in July 2020. Litigation commenced with lawsuits from multiple parties in August and October 2020. In February 2022, the Department of the Interior requested a voluntary remand from the U.S. District Court for Alaska. The Court granted the request in May 2022, returning the matter to BLM to carry out additional supplemental work in response to the lawsuits. The BLM has prepared the Draft Supplemental EIS to ensure compliance with applicable laws, including NEPA, FLPMA, NHPA, and ANILCA.

拟议的Ambler矿区工业通道最初在2020年3月的最终环境影响报告书中进行了分析,并在2020年7月发布的决定记录(Rod)中获得批准。诉讼始于2020年8月和10月,来自多方的诉讼。2022年2月,内政部请求美国阿拉斯加地区法院自愿还押。法院于2022年5月批准了这一请求,将此事发回BLM,以开展额外的补充工作,以回应诉讼。BLM已经编制了补充环境影响报告书草案,以确保遵守适用的法律,包括《国家环境政策法》、《反海外腐败法》、《国家健康法》和《环境保护法》。

Qualified Person

有资格的人

Ms. Bonnie Broman, CPG, Vice President, Exploration for Valhalla Metals Inc., is a Qualified Person as defined under National Instrument 43-101 standards. Ms. Broman has verified the data disclosed in this press release, including the sampling, ‎analytical and test data underlying the technical information and has approved this press release.

Valhara Metals Inc.勘探副总裁总裁女士,CPG Bonnie Broman女士,是National Instrument 43-101标准所定义的合格人员。布罗曼女士已经核实了本新闻稿中披露的数据,包括作为技术信息基础的抽样、‎分析和测试数据,并批准了本新闻稿。

About Valhalla Metals

关于瓦尔哈拉金属公司

Valhalla Metals Inc. is a mineral exploration and development company focused on the advancement of its mineral projects towards feasibility. Valhalla's flagship project is the Sun copper-zinc-lead-gold-silver VMS projects located in Ambler Mining District, Northwest Alaska. The Company also owns the Smucker project, a high-quality copper-zinc-lead-gold-silver VMS project located in the Ambler Mining District, Northwest Alaska. Valhalla Metals Inc. shares trade on the TSX-V under the ticker symbol VMXX and OTCQB under the ticker symbol VMXXF. For more information about Valhalla, please visit our website at .

Valhara Metals Inc.是一家矿产勘探和开发公司,专注于推进其矿产项目的可行性。瓦尔哈拉的旗舰项目是位于阿拉斯加西北部安布勒矿区的太阳铜锌铅金银VMS项目。该公司还拥有位于阿拉斯加西北部安布勒矿区的高质量铜锌铅金银VMS项目Smacker项目。Valhara Metals Inc.的股票在多伦多证交所交易,股票代码为VMXX,OTCQB的股票代码为VMXXF。有关瓦尔哈拉的更多信息,请访问我们的网站。

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act") or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.

本新闻稿不构成在美国出售或邀请购买任何证券的要约。这些证券没有也不会根据修订后的《1933年美国证券法》(以下简称《美国证券法》)或任何州证券法进行登记,除非根据《美国证券法》和适用的州证券法登记,或获得此类登记豁免,否则不得在美国境内或向美国公民发行或出售证券。

For more information on the Company, please contact Valhalla Metals Inc.

欲了解更多有关该公司的信息,请联系瓦尔哈拉金属公司。

Sorin Posescu, Chief Executive Officer
Email: invest@valhallametals.com

首席执行官索林·波塞斯库
电子邮件:Invest@valharametals.com

Forward-Looking Statements:

前瞻性陈述:

This news release contains forward-looking statements and forward-looking information within the meaning of applicable securities laws. The use of any of the words "expect", "anticipate", "continue", "estimate", "objective", "ongoing", "may", "will", "project", "should", "believe", "plan", "plans", "intends" and similar expressions are intended to identify forward-looking information or statements. The forward-looking statements and information are based on certain key expectations and assumptions made by the Company. Although the Company believes that the expectations and assumptions on which such forward-looking statements and information are based, are reasonable, undue reliance should not be placed on the forward-looking statements and information because the Company can give no assurance that they will prove to be correct. Since forward-looking statements and information address future events and conditions, by their very nature they involve inherent risks and uncertainties. Actual results could differ materially from those currently anticipated due to a number of factors and risks. Such factors include, among others, the following risks: the need for additional financing; operational risks associated with mineral exploration; fluctuations in commodity prices; title matters; and the additional risks identified in the annual information form of the Company or other reports and filings with the TSX-V and applicable Canadian securities regulators. Readers are cautioned that the foregoing list of factors is not exhaustive. The forward-looking statements included in this news release are expressly qualified by this cautionary statement. The forward-looking statements and information contained in this news release are made as of the date hereof and the Company undertakes no obligation to update publicly or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities laws.

本新闻稿包含符合适用证券法的前瞻性陈述和前瞻性信息。使用“预期”、“预期”、“继续”、“估计”、“目标”、“正在进行”、“可能”、“将”、“项目”、“应该”、“相信”、“计划”、“计划”、“打算”和类似措辞中的任何一个,都是为了识别前瞻性信息或陈述。前瞻性陈述和信息是基于公司做出的某些关键预期和假设。尽管公司认为这些前瞻性陈述和信息所基于的预期和假设是合理的,但不应过度依赖前瞻性陈述和信息,因为公司不能保证它们将被证明是正确的。由于前瞻性陈述和信息涉及未来的事件和情况,它们本身就具有内在的风险和不确定性。由于一些因素和风险,实际结果可能与目前预期的结果大不相同。这些因素包括但不限于以下风险:额外融资的需要;与矿产勘探相关的运营风险;大宗商品价格的波动;所有权问题;以及在公司的年度信息表或提交给多伦多证券交易所和加拿大证券监管机构的其他报告和文件中确定的其他风险。提醒读者,前面列出的因素并不是详尽的。本新闻稿中包含的前瞻性陈述明确地受到本警示性声明的限制。本新闻稿中包含的前瞻性陈述和信息是截至本新闻稿发布之日作出的,公司没有义务公开更新或修改任何前瞻性陈述或信息,除非适用的证券法要求公开更新或修改任何前瞻性陈述或信息,无论是由于新信息、未来事件还是其他原因。

Neither the TSX-V nor its Regulation Services Provider (as that term is defined in policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所及其监管服务提供商(该术语在多伦多证券交易所-V的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发