share_log

IMetal Resources Extends Digitally Enhanced Prospecting Survey on Its Gowganda West Project

IMetal Resources Extends Digitally Enhanced Prospecting Survey on Its Gowganda West Project

iMetal Resources 延长了对其 Gowganda West项目的数字增强勘探调查
Accesswire ·  2023/11/01 06:00

VANCOUVER, BC / ACCESSWIRE / November 1, 2023 / iMetal Resources Inc. (TSXV:IMR)(OTCQB:IMRFF)(FRANKFURT:A7V) (" iMetal " or the " Company ") announces an extension of the Digitally Enhanced Prospecting (DEP) survey at the Company's Gowganda West project, which lies within the prolific Abitibi Greenstone Gold Belt. This extension will push further to the west of the known zones of mineralization into previously unexplored areas, supplementing the recently completed 2,385 hectares of LiDAR and sampling which identified a new gold zone (See News Release dated 2023-October-27).

温哥华,卑诗省/ACCESSWIRE/2023年11月1日/ IMetal Resources Inc.(多伦多证券交易所股票代码:IMR)(OTCQB:IMRFF)(法兰克福:A7V)(“IMetals“或”公司“)宣布本公司位于多产的Abitibi Greenstone金矿带内的Gowganda West项目的数字增强勘探(DEP)调查的扩展。这一扩展将进一步向已知矿化区以西推进,进入以前未勘探的区域,补充最近完成的2,385公顷激光雷达和采样,确定了一个新的金矿带(见日期为2023年10月至27日的新闻稿)。

Saf Dhillon, Chief Executive Officer, stated: "We are excited by the prospects our recent DEP survey has uncovered, including a 5.6 g/t Au grab sample in a new area with high geological prospectivity. Our recent drill intersection of 48.5m of 0.85 g/t Au in hole IMGW-23-04 announced on June 6 th of this year, strongly support our belief mineralization increases toward the southwest. As a result, we have extended our DEP program to the western portion of our claims in a further effort to increase our mineralization footprint. We continue to believe in the potential for new discoveries at this historically underexplored property."

首席执行官SAF Dhillon表示:“我们对我们最近的DEP调查发现的前景感到兴奋,包括在一个具有高地质前景的新区采集5.6克/吨的Au样本。我们最近在IMGW-23-04孔宣布的48.5米0.85 g/t Au的钻探交叉点这是今年,有力地支持了我们的观点,即矿化向西南方向增加。因此,我们已将我们的DEP计划扩展到我们索赔的西部部分,以进一步努力增加我们的矿化足迹。我们继续相信,在这块历史上未被开发的土地上有可能发现新的发现。“

Waring Minerals Inc. completed the recent DEP programs at Gowganda West and will also complete the new extension. The target area for the extension is approximately 1,135 hectares of Archean metasediments and metavolcanics of the Abitibi greenstone belt, an area which has had very limited historical exploration work. UAV LiDAR will be flown in order to locate outcrops on the property for the purposes of sampling and mapping. The DEP results will be combined with previous IP, VTEM, and drilling results to guide the next stage of exploration which will include follow-up drilling programs. Surface samples will be reviewed by company geologists and select samples will be submitted to ALS Laboratories in Sudbury for analysis.

Wering Minerals Inc.完成了最近在Gowganda West的DEP项目,并将完成新的扩建项目。扩建的目标区域约为Abitibi绿岩带的太古界变质沉积和变质火山岩,该地区的历史勘探工作非常有限。无人机激光雷达将飞行,以确定该财产的露头位置,以便进行采样和测绘。DEP结果将与以前的激电、垂直瞬变电磁和钻井结果相结合,以指导下一阶段的勘探,其中将包括后续钻井计划。表面样本将由公司地质学家审查,选定的样本将提交给萨德伯里的ALS实验室进行分析。

Gowganda West is an exploration-stage gold project about 100 km south-southeast of Timmins, Ontario; contiguous to Aris Mining's Juby Project in the Shining Tree Camp of the southern part of the Abitibi Greenstone Gold Belt; and also contiguous to the Knight project that is part of the Strategic Partnership between Orecap Invest Corp. and Agnico Eagle Mines Ltd. iMetal recently completed a 2,611 m drilling program in the fall of 2022 which intersected a new gold trend and resulted in the company announcing it's first 'Discovery Hole' (See NR dated June 6 th , 2023). The Property also has multiple-ounce grab samples from trends that have yet to be drill tested. iMetal cautions that grab samples are select samples and not necessarily indicative of similar mineralization on the Property.

Gowganda West是一个勘探阶段的金矿项目,位于安大略省蒂明斯东南偏南约100公里处;毗邻Abitibi Greenstone金矿带南部闪亮树营的Aris矿业公司的Juby项目;也毗邻作为Orecap Invest Corp.和Agnico Eagle Mines Ltd.战略合作伙伴关系一部分的Knight项目。iMetals最近于2022年秋季完成了2611米的钻探计划,该项目与新的黄金趋势相交,导致该公司宣布其第一个“发现孔”(见6月6日的NR这是,2023年)。这处房产还拥有来自趋势的多盎司抓取样本,这些样本尚未进行钻探测试。IMetals提醒,抓取的样本是精选样本,不一定表明该物业存在类似的矿化作用。

The scientific and technical information contained in this news release has been reviewed and approved by Scott Zelligan, P. Geo (Ontario), VP Exploration of iMetal and a qualified person as defined in National Instrument 43-101.

本新闻稿中包含的科学和技术信息已由iMetals勘探副总裁Scott Zelligan、P.Geo(安大略省)和National Instrument 43-101中定义的合格人员审查和批准。

Figure 1 - Plan Map of Gowganda West showing planned DEP Extension

图1-Gowganda West平面图,显示计划中的DEP扩展

About iMetal Resources Inc.
iMetal is a Canadian-based junior exploration company focused on the exploration and development of its portfolio of resource properties in Ontario and Quebec. The Flagship property Gowganda West, is an exploration-stage gold project with a recent discovery hole of 48.5m at 0.85 g/t gold that borders the Juby Deposit and is located within the Shining Tree Camp area in the southern part of the Abitibi Greenstone Gold Belt about 100 km south-southeast of the Timmins Gold Camp. The 837-hectare Kerrs Gold deposit comprises a series of gold-bearing pyritized quartz vein replacement breccias with a 2011 historic resource, 90 kilometres ENE of Timmins. The 131-hectare Ghost Mountain property, 42 kilometres NE of Kirkland Lake, lies 5 kilometres W of Agnico Eagle's Holt and Holloway Mine.

关于iMetals Resources Inc.
IMetals是一家总部位于加拿大的初级勘探公司,专注于勘探和开发其在安大略省和魁北克的资源资产组合。旗舰项目Gowganda West是一个勘探阶段的金矿项目,最近发现了一个48.5米的洞,黄金质量为0.85g/t,毗邻Juby矿床,位于Abitibi Greenstone金矿带南部的闪亮树营区域内,位于Timmins金矿营地东南偏南约100公里处。837公顷的Kerrs金矿由一系列含金黄铁矿石英脉交代角砾岩组成,具有2011年的历史资源,位于Timmins东北偏东90公里处。占地131公顷的幽灵山,位于柯克兰湖东北42公里处,位于Agnico Eagle的Holt和Holloway矿以西5公里处。

ON BEHALF OF THE BOARD OF DIRECTORS,

我代表董事会

Saf Dhillon
President & CEO

苏丹武装部队迪隆
总裁兼首席执行官

iMetal Resources Inc.
info@imetalresources.ca
Tel. (604-484-3031)
Suite 550, 800 West Pender Street, Vancouver, British Columbia, V6C 2V6.

IMetal Resources Inc.
邮箱:Info@imetalresource ces.ca
电话。(604-484-3031)
不列颠哥伦比亚省温哥华西彭德街800号550号套房,V6C 2V6。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所创业板交易所及其监管服务提供商(该术语在多伦多证券交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

This news release may include forward-looking statements that are subject to risks and uncertainties. All statements within, other than statements of historical fact, are to be considered forward-looking. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include results of exploration, variations in results of mineralization, relationships with local communities, market prices, continued availability of capital and financing, and general economic, market or business conditions. There can be no assurances that such statements will prove accurate and, therefore, readers are advised to rely on their own evaluation of such uncertainties. We do not assume any obligation to update any forward-looking statements except as required under the applicable laws.

本新闻稿可能包括受风险和不确定性影响的前瞻性陈述。除有关历史事实的陈述外,本文中的所有陈述均应被视为前瞻性陈述。尽管公司认为这些前瞻性陈述中表达的预期是基于合理的假设,但这些陈述并不能保证未来的业绩,实际结果或发展可能与前瞻性陈述中的大不相同。可能导致实际结果与前瞻性陈述中的结果大不相同的因素包括勘探结果、矿化结果的变化、与当地社区的关系、市场价格、资本和融资的持续可获得性以及总体经济、市场或商业状况。不能保证这样的陈述将被证明是准确的,因此,建议读者依靠自己对这种不确定性的评估。除适用法律要求外,我们不承担任何更新任何前瞻性陈述的义务。

SOURCE: iMetal Resources, Inc.

资料来源:IMetal Resources,Inc.


View source version on accesswire.com:
在accesswire.com上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发