share_log

OROCO ANNOUNCES PRIVATE PLACEMENT

OROCO ANNOUNCES PRIVATE PLACEMENT

OROCO 宣布私募发行
GlobeNewswire ·  2023/11/20 08:00

Vancouver, Canada, Nov. 20, 2023 (GLOBE NEWSWIRE) -- Oroco Resource Corporation. ("Oroco" or the "Company") (TSXV: OCO; OTCQB: ORRCF, BF: OR6) is pleased to announce a non-brokered private placement to raise gross proceeds of up to $2,500,000 (the "Private Placement") through the issuance of up to 6,250,000 units (each a "Unit") at a price of $0.40 per Unit. Each Unit is comprised of one common share in the equity of the Company (each, a "Share") and one share purchase warrant entitling the holder to acquire one additional Share for a period of 18 months from the closing date for $0.65.

加拿大温哥华,2023年11月20日(GLOBE NEWSWIRE)——Oroco Resource Corporation。(”奥罗科“或者”公司“)(多伦多证券交易所股票代码:OCO;OTCQB:ORRCF,BF:OR6)很高兴地宣布进行非经纪私募融资,筹集高达250万美元的总收益(”私募配售“) 通过发行多达 6,250,000 个单位(每个 a)”单元“)价格为每单位0.40美元。每个单位由公司权益中的一股普通股组成(每个单位为”分享“)以及一份股票购买权证,授权持有人自截止日起18个月内以0.65美元的价格再收购一股股票。

The Company intends to use the net proceeds of the Private Placement for working capital to advance its Santo Tomas project and for general corporate purposes. The Company may pay finder's fees consisting of cash, share purchase warrants and Shares to certain qualified individuals in accordance with the policies of the TSX-V Exchange and applicable securities laws.

该公司打算将私募的净收益用作营运资金,以推进其圣托马斯项目和一般公司用途。根据多伦多证券交易所的政策和适用的证券法,公司可以向某些合格个人支付包括现金、股票购买权证和股票在内的发现者费用。

Closing of the proposed private placement is subject to obtaining all required approvals, including the approval of the TSX-V and any other regulatory approval. All securities issued pursuant to the Private Placement will be subject to a hold period of four months from the closing date. The securities have not been, and will not be, registered under the United States Securities Act, or any state securities laws, and accordingly may not be offered or sold within the United States except pursuant to exemptions therefrom. This press release does not constitute an offer to sell or a solicitation to buy any securities in any jurisdiction.

完成拟议的私募需要获得所有必要的批准,包括TSX-V的批准和任何其他监管部门的批准。根据私募发行的所有证券将自截止日起四个月的持有期。这些证券过去和将来都没有根据《美国证券法》或任何州证券法进行注册,因此,除非有豁免,否则不得在美国境内发行或出售。本新闻稿不构成任何司法管辖区的卖出要约或购买任何证券的邀请。

ABOUT OROCO:

关于奥罗科:

The Company holds a net 85.5% interest in those central concessions that comprise 1,173 hectares "the Core Concessions" of The Santo Tomas Project, located in northwestern Mexico. The Company also holds an 80% interest in an additional 7,861 hectares of mineral concessions surrounding and adjacent to the Core Concessions (for a total Project area of 9,034 hectares, or 22,324 acres). The Project is situated within the Santo Tomas District, which extends up to the Jinchuan Group's Bahuerachi Project, approximately 14 km to the northeast. The Project hosts significant copper porphyry mineralization defined by prior exploration spanning the period from 1968 to 1994. During that time, the Project area was tested by over 100 diamond and reverse circulation drill holes, totalling approximately 30,000 meters. Commencing in 2021, Oroco conducted a drill program (Phase 1) at Santo Tomas, with a resulting total of 48,481 meters drilled in 76 diamond drill holes. In October of 2023, the Company announced the results of a preliminary economic assessment which included an updated mineral resource identifying Indicated and Inferred resources of 561 Mt @ 0.37% CuEq and 549 Mt @ 0.34% CuEq, respectively.

该公司在这些中央特许权中净持有85.5%的权益,这些特许权包括位于墨西哥西北部的圣托马斯项目1,173公顷的 “核心特许权”。该公司还持有核心特许权周围和附近的另外7,861公顷矿产特许权的80%权益(项目总面积为9,034公顷,合22,324英亩)。该项目位于圣托马斯区,该区一直延伸到金川集团的Bahuerachi项目,向东北方向约14公里。该项目拥有大量的铜斑岩矿化区,这些矿化是由1968年至1994年期间的先前勘探确定的。在此期间,该项目区域经过了100多个钻石和反循环钻孔的测试,总长约30,000米。从2021年开始,奥罗科在圣托马斯进行了钻探计划(第一阶段),结果在76个金刚石钻孔中总共钻探了48,481米。2023年10月,该公司公布了初步经济评估的结果,其中包括最新的矿产资源,确定指示和推断的资源量分别为5.61亿吨CueQ和5.49亿吨(0.34%CueQ)和5.49亿吨(0.34% CUeQ)。

The Santo Tomas Project is located within 160 km of the Pacific deep-water port at Topolobampo and is serviced via highway and proximal rail (and parallel corridors of trunk grid power lines and natural gas) through the city of Los Mochis to the northern city of Choix. The property is reached, in part, by a 32 km access road originally built to service Goldcorp's El Sauzal Mine in Chihuahua State.

圣托马斯项目位于托波洛班波太平洋深水港不到160公里处,通过高速公路和近距离铁路(以及干网电线和天然气的平行走廊)提供服务,穿过洛斯莫奇斯市到达北部城市乔伊克斯。该物业部分由一条32公里的通道到达,该道路最初是为Goldcorp位于奇瓦瓦州的El Sauzal矿提供服务而修建的。

Additional information about Oroco can be found on its website at and by reviewing its profile on SEDAR at .

有关Oroco的更多信息,可以在其网站上找到,也可以通过在SEDAR上查看其个人资料,网址为。

For further information, please contact:

欲了解更多信息,请联系:

Richard Lock, CEO
Oroco Resource Corp.
Tel: 604-688-6200
Email: info@orocoresourcecorp.com

首席执行官理查德·洛克
Oroco 资源公司
电话:604-688-6200
电子邮件:info@orocoresourcecorp.com

CONTACT: Christy Fabros Oroco Resource Corp.  (604) 688-6200 info@orocoresourcecorp.com 
联系人:Christy Fabros Oroco Resource Corp. (604) 688-6200 info@orocoresourcecorp.com 

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发