share_log

ACME Lithium Announces Results of Exploration Program at Bailey Lake Lithium Project in Saskatchewan, Canada

ACME Lithium Announces Results of Exploration Program at Bailey Lake Lithium Project in Saskatchewan, Canada

ACME Lithium公布加拿大萨斯喀彻温省贝利湖锂项目的勘探计划结果
newsfile ·  2023/11/30 08:30

Vancouver, British Columbia--(Newsfile Corp. - November 30, 2023) - ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") is pleased to announce the recently received sample results from the August surface sampling and prospecting program at its Bailey Lake pegmatite project in northeastern Saskatchewan. The program has successfully identified numerous boulder and outcrop samples exhibiting anomalous lithium grades as well as other elevated LCT (lithium-cesium-tantalum) pegmatite indicator elements. The results are the highest ever sampled in the region and highlight the significant potential for high-grade mineralization within the project area.

不列颠哥伦比亚省温哥华--(新闻文件公司-2023 年 11 月 30 日)- ACME Lithium Inc 案例:ACME) (OTCQX:ACLHF) (“公司” 或 “ACME”)很高兴地宣布,最近收到的萨斯喀彻温省东北部贝利湖伟晶岩项目8月地表采样和勘探计划的样本结果。该项目已成功鉴定出大量表现出异常锂等级的巨石和露头样本以及其他较高的 LCT(锂-铯-钽)伟晶岩指示元素。结果是该地区有史以来最高的采样结果,凸显了该项目区域内高品位矿化的巨大潜力。

Highlights:

亮点:

  • Samples grading up to 1.14% Li2O in boulders along trend of anomalous lithium values up to 0.73% Li2O identified in outcrop (Figure 1).
  • Anomalous rare earth indicator elements with samples grading up to 413 ppm Tantalum (Ta) and 2242 ppm Tin (Sn).
  • Highest grading lithium samples coincident with magnetic low.
  • Additional area to the southwest hosting pegmatites exhibiting anomalous Tantalum values (Figure 2).
  • Detailed Airborne Magnetic+Radiometric+Lidar survey completed over 7975 Ha of the property which will assist in further defining priority areas.
  • 样本分级最高为 1.14% Li2沿锂值异常趋势的巨石中的氧含量最高可达 0.73% Li2露出时发现了 O(图 1)。
  • 异常稀土指示元素,样品分级高达 413 ppm 钽 (Ta) 和 2242 ppm 锡 (Sn)。
  • 最高等级的锂样品与磁性低位一致。
  • 西南地区其他有表现出异常钽值的伟晶岩的区域(图 2)。
  • 详细的机载磁学+辐射测量+激光雷达调查已完成该物业超过7975公顷的测量,这将有助于进一步确定优先区域。

"We are encouraged by the results from this initial field program," says ACME Lithium President and CEO Steve Hanson. "The focus of the campaign was to confirm and expand on the limited historic data based on lithium bearing samples reported in 2017. We exceeded these expectations by not only confirming and improving on the historic grades but identifying additional areas hosting LCT pegmatites to the northeast and southwest. We believe this phase 1 exploration effort has only just scratched the surface as to the potential for high-grade lithium on the property. Northern Saskatchewan is underexplored for critical minerals, and the results of this program reinforce the potential of this area of the province to become a new lithium area of discovery."

ACME Lithium总裁兼首席执行官史蒂夫·汉森说:“这项初始实地项目的结果令我们感到鼓舞。”“该活动的重点是确认和扩展基于2017年报告的含锂样本的有限历史数据。我们超出了这些预期,不仅确认和提高了历史等级,还确定了东北和西南地区有LCT伟晶岩的其他区域。我们认为,第一阶段的勘探工作只是对该物业上高品位锂的潜力浮出水面。萨斯喀彻温省北部的关键矿产勘探不足,该计划的结果增强了该省这一地区成为新的锂矿发现区的潜力。”

ACME Lithium has acquired or in under option to acquire a 100% interest in 18 contiguous mineral claims encompassing approximately 41,694 hectares (or 416 square kms).

ACME Lithium已收购或已选择收购18个毗连矿产索赔的100%权益,占地约41,694公顷(或416平方千米)。


Figure 1: 2023 Surface sample assay highlights


图 1:2023 年表面样本分析要点

Table 1: Assay highlights from 2023 Bailey Lake Rock Samples

表 1:2023 年贝利湖岩石样本的分析要点

Sample ID Li2O % Ta ppm Sn ppm Sample Type Lithology
365649 1.14 75.3 <50 Float Pegmatite
365653 1.02 30.6 <50 Float Pegmatite
365677 1.00 29.4 <50 Float Pegmatite
365647 0.93 70.5 <50 Float Pegmatite
365652 0.75 23.4 <50 Float Pegmatite
365570 0.73 55.2 <50 Outcrop Pegmatite
365713 0.65 63 <50 Float Pegmatite
365829 0.63 95.8 <50 Float Pegmatite
365532 0.63 25.7 <50 Float Pegmatite
365516 0.59 24.2 <50 Float Pegmatite
365679 0.58 46 <50 Float Pegmatite
365678 0.54 22.4 <50 Float Pegmatite
365506 0.53 28.8 <50 Float Pegmatite
365701 0.43 58.5 <50 Float Pegmatite
365571 0.39 57.6 <50 Outcrop Pegmatite
365712 0.38 115 <50 Float Pegmatite
365623 0.38 31.3 <50 Outcrop Pegmatite
365622 0.33 18.9 <50 Outcrop Pegmatite
365621 0.31 28.4 <50 Outcrop Pegmatite
365628 0.06 245 <50 Outcrop Pegmatite
365522 0.05 105 2242 Float Pegmatite
365598 0.01 413 <50 Float Pegmatite
365801 0.01 225 <50 Outcrop Pegmatite
样本编号 2O% Tag ppm Sn ppm 样本类型 岩性学
365649 1.14 75.3 浮动 伟晶岩
365653 1.02 30.6 浮动 伟晶岩
365677 1.00 29.4 浮动 伟晶岩
365647 0.93 70.5 浮动 伟晶岩
365652 0.75 23.4 浮动 伟晶岩
365570 0.73 55.2 露头 伟晶岩
365713 0.65 63 浮动 伟晶岩
365829 0.63 95.8 浮动 伟晶岩
365532 0.63 25.7 浮动 伟晶岩
365516 0.59 24.2 浮动 伟晶岩
365679 0.58 46 浮动 伟晶岩
365678 0.54 22.4 浮动 伟晶岩
365506 0.53 28.8 浮动 伟晶岩
365701 0.43 58.5 浮动 伟晶岩
365571 0.39 57.6 露头 伟晶岩
365712 0.38 115 浮动 伟晶岩
365623 0.38 31.3 露头 伟晶岩
365622 0.33 18.9 露头 伟晶岩
365621 0.31 28.4 露头 伟晶岩
365628 0.06 245 露头 伟晶岩
365522 0.05 105 2242 浮动 伟晶岩
365598 0.01 413 浮动 伟晶岩
365801 0.01 225 露头 伟晶岩


Figure 2: 2023 surface sample results with Airborne Magnetics (TMI RTP)


图 2:2023 年使用机载磁学 (TMI RTP) 的表面样本结果

The geological prospecting program was conducted from August 28th to September 15th by the companies' technical consultants Axiom Exploration Group Ltd. ("Axiom"). The program included 336 samples (including 5% quality control samples) collected around the area of historically reported Li-bearing pegmatite boulder samples collected in the Bailey Lake area (Figure 1). The samples collected from the 2023 program consisted of exposed boulder and outcropping pegmatites, as well as country rock. Mineralogical, alteration, and structural data (where possible) was also collected at these sample sites.

地质勘探计划于8月28日至9月15日由两家公司的技术顾问Axiom Exploration Group Ltd.(“Axiom”)进行。该计划包括在贝利湖地区采集的历史上报告的含锂伟晶岩巨石样本区域收集的336份样本(包括5%的质量控制样本)(图1)。从 2023 年计划中收集的样本包括裸露的巨石和露头的伟晶岩以及乡村岩石。还在这些样本地点收集了矿物学、变化和结构数据(如果可能)。

The results obtained from the 2023 sampling and prospecting program have confirmed and expanded on the lithium potential of the Property. Pegmatites showing high lithium values have been identified ~300 m up ice flow direction (NE) of the 2017 Li-bearing boulder samples (GemOil, 2017 - Ramaekers et al.). The initial data has indications that these Li-bearing boulders are near source and elevated Li and Ta values in outcrop samples further support this theory. About 5 km to the southwest, sampling has identified another prospective area showing high Ta values in the pegmatites with numerous samples over 100 ppm Ta (Figure 2). The company's technical team will be further analyzing and interpreting the data from the assay results in combination with the recently received geophysics to further refine exploration targets for further work.

2023年取样和勘探计划获得的结果证实并扩大了该物业的锂潜力。已在2017年含锂巨石样本(Gemoil,2017年——Ramaekers等人)的冰流方向(东北)上方约300米处发现了锂值较高的伟晶岩。初步数据表明,这些含锂巨石位于水源附近,露出样本中锂和钽值的升高进一步支持了这一理论。在西南约5公里处,采样发现了另一个显示伟晶岩中Ta值较高的前景区域,大量样本的Ta值超过100 ppm Ta(图 2)。该公司的技术团队将结合最近收到的地球物理学数据,进一步分析和解释化验结果中的数据,以进一步完善勘探目标,以进一步开展工作。


Figure 3: Source pegmatite boulder of sample #365649 grading 1.14% Li2O


图 3:样本 #365649 的来源伟晶岩巨石等级 1.14% Li2O


Figure 4: Source pegmatite boulder of sample #365677 grading 1.0% Li2O


图 4:样本 #365677 的源伟晶岩巨石等级 1.0% Li2O

Saskatchewan is a highly prospective region for critical mineral development. The Government of Saskatchewan recently announced an expansion to its existing investment and innovation incentive programs to include eligible lithium projects with the aim to become one of the best resource development jurisdictions in the world.

萨斯喀彻温省是一个非常有前景的关键矿产开发地区。萨斯喀彻温省政府最近宣布扩大其现有的投资和创新激励计划,将符合条件的锂项目包括在内,目的是成为世界上最好的资源开发管辖区之一。

Analytical methods and QA\QC protocols

分析方法和 QA\ QC 协议

A thorough chain-of-custody and quality assurance and quality control ("QA/QC") program was carried out during the field program. Samples were obtained by rock hammer and rock saw. Sample locations were recorded by handheld Garmin GPS and samples were photographed, then placed in poly sample bags and zip tied. All rock samples were submitted to SGS Canada Inc. for Sodium Peroxide Fusion / ICP-AES and ICP-MS analysis with a focus on Lithium, Tantalum, and Cesium.

在实地计划期间,实施了全面的监管链、质量保证和质量控制(“QA/QC”)计划。样品是用岩锤和岩锯获得的。手持式 Garmin GPS 记录了样品位置,并对样品进行了拍照,然后放入聚乙烯样品袋中并系上拉链。所有岩石样本均已提交给加拿大地质调查局进行过氧化钠融合/ICP-AES和ICP-MS分析,重点是锂、钽和铯分析。

The Company's implemented QA/QC procedures included the routine insertion of LCT (lithium-cesium-tantalum) pegmatite certified standard control samples, lab duplicates, and silica blanks in accordance with industry recommended practices. This was used to test for natural variability, sampling bias, and homogeneity during sample preparation processes within the lab as well as testing the precision of the sample and any possible contamination from the lab and ensure proper calibration of lab equipment. Analytical results of certified reference materials were verified graphically and determined to be within the allowable error of 2 standards deviations of the certified lithium values.

该公司实施的质量保证/质量控制程序包括按照行业建议的做法常规插入 LCT(锂铯-钽)伟晶岩认证的标准对照样品、实验室副本和二氧化硅空白。这用于测试实验室样品制备过程中的自然变异性、采样偏差和均匀性,以及测试样品的精度和实验室可能产生的污染,并确保对实验室设备进行适当校准。经认证的参考材料的分析结果经过图形验证,并确定在与认证锂值相差2个标准差的允许误差范围内。

Qualified Person

合格人员

The technical information in this news release has been reviewed and approved by Lynde Guillaume, P.Geo. (Senior Geologist, Axiom Exploration Group Ltd.), a "Qualified Person" as defined in NI 43-101 -Standards for Disclosure for Mineral Projects.

本新闻稿中的技术信息已由P.Geo的Lynde Guillaume审查和批准。(Axiom Exploration Group Ltd. 高级地质学家),NI 43-101《矿业项目披露标准》中定义的 “合格人员”。

About ACME Lithium Inc.

关于 ACME Lithium Inc.

Led by an experienced team, ACME Lithium is a mineral exploration Company focused on acquiring, exploring, and developing battery metal projects in partnership with leading technology and commodity companies. ACME has acquired or is under option to acquire a 100-per-cent interest in projects located in Clayton Valley and Fish Lake Valley, Esmeralda County Nevada, at Shatford, Birse, and Cat-Euclid Lakes in southeastern Manitoba, and at Bailey Lake in northern Saskatchewan.

ACME Lithium 是一家矿产勘探公司,由经验丰富的团队领导,专注于与领先的科技和大宗商品公司合作收购、勘探和开发电池金属项目。ACME已经收购或可以选择收购位于内华达州埃斯梅拉达县克莱顿谷和鱼湖谷、曼尼托巴省东南部的沙特福德、比尔斯和卡特-欧几里德湖以及萨斯喀彻温省北部的贝利湖的项目的100%权益。

On behalf of the Board of Directors

代表董事会

Steve Hanson
Chief Executive Officer, President and Director
Telephone: (604) 564-9045
info@acmelithium.com

史蒂夫·汉森
首席执行官、总裁兼董事
电话:(604) 564-9045
info@acmelithium.com

For Investor Inquiries:
Anthony Simone
Simone Capital
Telephone: (416) 881-5154
asimone@simonecapital.ca

投资者查询:
安东尼西蒙尼
西蒙妮资本
电话:(416) 881-5154
asimone@simonecapital.ca

Neither the CSE nor its regulations service providers accept responsibility for the adequacy or accuracy of this news release. This news release contains certain statements which may constitute forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur and in this news release include but are not limited to the attributes of, timing for and expected benefits to be derived from exploration, drilling or development at ACME's project properties. Information inferred from the interpretation of drilling, sampling and other technical results may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. ACME's project location adjacent to or nearby lithium projects does not guarantee exploration success or that mineral resources or reserves will be defined on ACME's properties. Exploration, development, and activities conducted by regional companies provide assistance and additional data for exploration work being completed by ACME. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from the Company's operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Unless otherwise indicated, the market and industry data contained herein is based upon information from industry and other publications and the knowledge and experience of management. While we believe that this data is reliable, market and industry data is subject to variations and cannot be verified with complete certainty due to limits on the availability and reliability of raw data, the voluntary nature of the data gathering process and other limitations and uncertainties inherent in any statistical survey. We have not independently verified any of the data from third-party sources referred to in this news release or ascertained the underlying assumptions relied upon by such sources. All technical and scientific disclosure pertaining to our mineral property interests in this news release have been reviewed by a Qualified Person, meaning an individual who is an engineer or geoscientist with at least five years of experience in mineral exploration, mine development or operation or mineral project assessment, or any combination of these; has experience relevant to the subject matter of the mineral project and the technical report; and is a member or licensee in good standing of a professional association.

CSE及其监管服务提供商均不对本新闻稿的充分性或准确性承担责任。本新闻稿包含某些可能构成适用证券法所指的前瞻性信息的陈述(“前瞻性陈述”)。前瞻性陈述不是历史事实的陈述,通常但并非总是用 “预期”、“计划”、“预期”、“相信”、“打算”、“估计”、“项目”、“潜在” 和类似的表达方式来标识,或者事件或条件 “将”、“将”、“可能” 或 “应该” 发生,在本新闻稿中,包括但不限于 ACME项目物业的勘探、钻探或开发的属性、时机和预期收益。从对钻探、取样和其他技术结果的解释中推断出的信息也可以被视为前瞻性陈述,因为它构成了对项目实际开发时间和是否实际开发时可能出现的内容的预测。ACME的项目位置与锂项目相邻或附近,并不能保证勘探成功,也不能保证矿产资源或储量将在ACME的房产上确定。区域公司开展的勘探、开发和活动为ACME正在完成的勘探工作提供了援助和其他数据。这些前瞻性陈述受到各种风险和不确定性的影响,这些风险和不确定性可能导致实际事件或结果与前瞻性陈述中反映的事件或结果存在重大差异,包括但不限于:与金属价格波动相关的风险;与及时筹集足够资金以按可接受的条件为计划的工作提供资金相关的不确定性;天气、物流、技术或其他因素导致的计划工作发生变化;工作结果可能无法达到预期;以及意识到公司财产的潜在价值;发生事故、设备故障和劳资纠纷或其他意想不到的困难或中断的风险;工作计划中可能出现成本超支或意外支出;公司运营造成的环境污染或破坏风险以及其他风险和不确定性。任何前瞻性陈述仅代表截至其发表之日,除非适用的证券法另有要求,否则公司不承担更新任何前瞻性陈述的任何意图或义务,无论是由于新信息、未来事件或业绩还是其他原因。除非另有说明,否则此处包含的市场和行业数据基于来自行业和其他出版物的信息以及管理层的知识和经验。尽管我们认为这些数据是可靠的,但由于原始数据的可用性和可靠性的限制、数据收集过程的自愿性质以及任何统计调查固有的其他限制和不确定性,市场和行业数据可能会有所不同,无法完全确定地进行验证。我们尚未独立验证本新闻稿中提及的来自第三方来源的任何数据,也未确定此类来源所依赖的基本假设。本新闻稿中与我们的矿产权益有关的所有技术和科学披露均已由合格人员审查,即工程师或地球科学家,在矿产勘探、矿山开发或运营或矿产项目评估或其任何组合方面至少有五年的经验;具有与矿产项目主题和技术报告相关的经验;并且是专业协会的成员或被许可人。

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发