share_log

Slave Lake Zinc Update

Slave Lake Zinc Update

奴隶湖锌更新
newsfile ·  2023/12/20 09:00

Vancouver, British Columbia--(Newsfile Corp. - December 20, 2023) - Slave Lake Zinc Corp. (CSE: SLZ) (the "Company") recently acquired additional historical information dating from the 1950s on the Company's large-scale O'Connor Lake high-grade Critical Metals zinc-lead property. The Company continuously updates its database as new information becomes available. As a result, several highly prospective new areas have been outlined that will form part of next season's fieldwork. These new targets lie within the Company's main structural corridor centered over the MWK Headframe Deposit. These newly acquired results are summarized in the company's update ().

不列颠哥伦比亚省温哥华--(Newsfile Corp.,2023年12月20日)——奴隶湖锌业公司(CSE:SLZ)(“公司”)最近获得了有关该公司大型奥康纳湖高品位关键金属锌铅矿产的更多历史信息,这些信息可追溯到20世纪50年代。随着新信息的出现,公司会不断更新其数据库。因此,已经概述了几个极具前景的新领域,这些领域将成为下赛季实地考察的一部分。这些新目标位于公司以MWK机身矿床为中心的主要结构走廊内。这些新获得的业绩在公司更新中进行了总结()

The new information from a 1952 trench, documents mineralization within the MCO structure, which occurs 7 kilometers west of the Headframe Deposit and returned a trench assay of 0.97 ounces of gold per ton, 21% lead, 6.7% zinc and 1.2 ounces of silver per ton. Another historical sample at MCO from 1965 assayed 11.6 ounces of silver per ton, 0.40% lead and 1.1% zinc. This result indicates silver may occur in its natural state or as distinct silver minerals. Historic 1952 sampling at the BSM claims, approximately 5 kilometers northwest of the Headframe Deposit, reported a trench sample assaying 0.88 ounces of gold per ton,4.2% lead and 19.4% zinc. These new targets lie along strike of the main deposit structures. Lakes or swamps cover most of the intervening area. These are historic results and require verification.

来自1952年一条沟槽的新信息记录了MCO结构内的矿化作用,该结构位于Headframe矿床以西7公里处,并返回了每吨0.97盎司黄金、21%的铅、6.7%的锌和1.2盎司的银的测定。1965年MCO的另一个历史样本测定了每吨11.6盎司的银,0.40%的铅和1.1%的锌。该结果表明,银可能以其自然状态存在,也可能作为不同的银矿物存在。1952年在Headframe矿床西北约5公里处的BSM索赔处进行了历史性的采样,其中一个沟槽样本测定了每吨0.88盎司的黄金,4.2%的铅和19.4%的锌。这些新目标位于主要矿床结构的罢工期间。湖泊或沼泽覆盖了大部分中间区域。这些都是历史性结果,需要验证。

The nature of the base metal mineralization is considered to be from a common, deep-seated hydrothermal source. The distribution of the precious metal showings indicates the possibility of regional-scale depositional zoning, a prospecting tool overlooked by the early zinc-lead explorers.

基本金属矿化的性质被认为来自一种常见的深层热液来源。贵金属展出的分布表明了区域规模沉积分区的可能性,这是早期锌铅勘探者所忽视的勘探工具。

During the 2023 field season forest fires forced the closure of much of the NWT and prevented Slave Lake, and all other regional explorers, from accessing their project. The Company looks forward to detailed field work for the 2024 exploration season including the verification of these historic results and expanding the known resource by drilling priority targets at O-Connor Lake. Mr. Gary Vivian, P. Geol and Qualified Person, of Aurora Geosciences, has reviewed the contents of this release.

在2023年的野外活动季节,森林大火迫使西北地区的大部分地区关闭,使奴隶湖和所有其他区域探险家无法访问他们的项目。该公司期待2024年勘探季节的详细实地工作,包括验证这些历史成果,以及通过在O-Connor Lake钻探优先目标来扩大已知资源。Aurora Geosciences的P.Geol兼合格人员Gary Vivian先生审查了本新闻稿的内容。

Slave Lake CEO Ritch Wigham commented, "The Company continues to integrate historic information and expand our database. We intend to systematically pursue our inventory of highly prospective exploration targets. The application of modern exploration techniques will be used to evaluate the historical showings and new "yet-to-be-discovered" targets. The O'Connor Lake land package is under-explored. The Company is working toward a drill plan for late 2024, or early 2025."

Slave Lake首席执行官里奇·威格姆评论说:“公司继续整合历史信息并扩大我们的数据库。我们打算系统地清点极具前景的勘探目标。现代勘探技术的应用将用于评估历史展示和新的 “尚未发现” 的目标。奥康纳湖土地一揽子计划尚未得到充分开发。该公司正在制定2024年底或2025年初的钻探计划。”

The Company also announces the resignation of Steve Zadka as Director, for personal reasons. The Company wishes Mr. Zadka the best in his future endeavors.

该公司还宣布,出于个人原因,史蒂夫·扎德卡辞去董事职务。公司祝愿扎德卡先生在未来的工作中一切顺利。

About Slave Lake Zinc

关于《奴隶湖锌》

Slave Lake Zinc Corp. is a company that aims to unlock the potential of its O'Connor Lake property, a historic site rich in zinc, lead, and copper, situated in Canada's Northwest Territories. This property, found to the south of the Great Slave Lake and east of the Pine Point project, was initially developed post-World War II. However, it was abandoned in 1952 due to the collapse of zinc and lead prices after the war. Slave Lake Zinc Corp. is confident in its abilities to develop this project and significantly enhance the historic potential of the property. More information is available at .

Slave Lake Zinc Corp. 是一家旨在释放其奥康纳湖地产潜力的公司,该地产位于加拿大西北地区,是一处富含锌、铅和铜的历史遗迹。该物业位于大奴湖以南和派恩波因特项目以东,最初是在第二次世界大战后开发的。但是,由于战后锌和铅价格暴跌,它于1952年被废弃。Slave Lake Zinc Corp. 对自己开发该项目的能力充满信心,并显著增强了该物业的历史潜力。更多信息可在以下网址获得。

On Behalf of the Board of Directors,
Slave Lake Zinc Corp.
Per:
Ritch Wigham CEO & Director
Phone: 604-396-5762
Email: rwigham@zinccorp.ca

我代表董事会,
奴隶湖锌业公司
每个:
Ritch Wigham 首席执行官兼董事
电话:604-396-5762
电子邮件:rwigham@zinccorp.ca

Neither the Canadian Securities Exchange nor its regulation services provider has reviewed or accepted responsibility for the adequacy or accuracy of the content of this news release

加拿大证券交易所及其监管服务提供商均未对本新闻稿内容的充分性或准确性进行审查或承担责任

Forward-Looking Statement

前瞻性陈述

Statements in this news release that are forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed here and elsewhere in both Slave Lake Zinc's periodic filings with Canadian securities regulators. When used in this news release, words such as "will", "plan", "estimate", "expect", "intend", "potential", "should," and similar expressions, are forward-looking statements. Information provided in this document is necessarily summarized and may not contain all available material information. Forward-looking statements include, without limitation, statements regarding the progress of a definitive offtake agreement, potential development and production at the Company's O'Connor Lake project, future oriented events and other statements that are not facts. Forward-looking statements are based on a few assumptions and estimates that, while considered reasonable by management based on the business and markets in which Slave Lake Zinc operates, are inherently subject to significant operational, economic, and competitive uncertainties and contingencies. Such forward-looking statements should therefore be construed in light of such factors. Although Slave Lake Zinc has attempted to identify important factors that could cause actual results, performance or achievements to differ materially from those contained in the forward-looking statements, there can be other factors that cause results, performance or achievements not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate or that management's expectations or estimates of future developments, circumstances or results will materialize. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements in this news release are made as of the date of this news release, and Slave Lake Zinc disclaims any intention or obligation to update or revise such information, except as required by applicable law, and Slave Lake Zinc does not assume any liability for disclosure relating to any other company.

本新闻稿中的前瞻性陈述受到与Slave Lake Zinc向加拿大证券监管机构提交的定期文件中此处和其他地方披露的具体因素相关的各种风险和不确定性影响。在本新闻稿中使用时,诸如 “将”、“计划”、“估计”、“期望”、“打算”、“潜力”、“应该” 等词语以及类似的表述均为前瞻性陈述。本文档中提供的信息必须经过概述,可能不包含所有可用的实质性信息。前瞻性陈述包括但不限于有关最终承购协议的进展、公司奥康纳湖项目的潜在开发和生产、面向未来的活动以及其他非事实的陈述。前瞻性陈述基于一些假设和估计,尽管根据Slave Lake Zinc运营的业务和市场,管理层认为这些假设和估计是合理的,但本质上会受到重大的运营、经济和竞争不确定性和突发事件的影响。因此,应根据这些因素来解释此类前瞻性陈述。尽管Slave Lake Zinc试图确定可能导致实际业绩、业绩或成就与前瞻性陈述中包含的结果存在重大差异的重要因素,但可能还有其他因素导致结果、业绩或成就不如预期、估计或预期的那样。无法保证此类信息会被证明是准确的,也无法保证管理层对未来发展、情况或结果的期望或估计会成为现实。因此,读者不应过分依赖前瞻性陈述。本新闻稿中的前瞻性陈述自本新闻稿发布之日起作出,除非适用法律要求,否则Slave Lake Zinc不表示有任何更新或修改此类信息的意图或义务,并且Slave Lake Zinc对与任何其他公司有关的披露不承担任何责任。

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发