Thunder Mountain Gold, Inc. Updated 43-101 Mineral Resource Estimate at South Mountain Shows Significant Increase

Thunder Mountain Gold, Inc. Updated 43-101 Mineral Resource Estimate at South Mountain Shows Significant Increase

Thunder Mountain Gold, Inc. 更新的南山矿产资源估算值显示出显著增长
newsfile ·  2023/12/21 09:01
  • 7.7% increase to the Measured & Indicated tonnage, including a significant increase in zinc, silver, gold, and copper.
  • 15.1% increase in the Inferred tonnage, including a 14% increase in zinc and silver.
  • The DMEA Zone extended an additional 250 feet.
  • 测量和指示吨位增加7.7%,包括锌、银、金和铜的显著增加。
  • 推断吨位增加了15.1%,包括锌和银增加了14%。
  • DMEA 区域又延伸了 250 英尺。

Boise, Idaho--(Newsfile Corp. - December 21, 2023) - Thunder Mountain Gold, Inc. (OTCQB: THMG) (TSXV: THM) (the "Company" or "THMG") is pleased to report a newly filed NI 43-101 Mineral Resource Estimate ("43-101 43-101 MRE") incorporating results from surface diamond drilling program conducting in 2021 at the South Mountain Project ("South Mountain" or "South Mountain Project" or the "Property") in southwestern Idaho, U.S.A. The updated 43-101 MRE includes an increased resource for the Project while maintaining the high-grade mineralization.

爱达荷州博伊西--(Newsfile Corp.,2023年12月21日)——Thunder Mountain Gold, Inc.(OTCQB:THM)(“公司” 或 “THMG”)欣然报告新提交的北爱尔兰43-101矿产资源估算报告(“43-101 43-101 MRE”),其中纳入了2021年在南山项目(“南山” 或 “南山” 或 “南山”)进行的地表金刚石钻探项目的结果位于美国爱达荷州西南部的山地项目” 或 “地产”)。更新后的43-101 MRE在保持高品位矿化的同时,增加了该项目的资源。

The updated Independent 43-101 MRE, which has an effective date of October 16, 2023, was prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI-43-101") by Hard Rock Consulting, LLC, based in the U.S.A. More details are included in Table 1 below.

更新后的独立报告43-101 MRE的生效日期为2023年10月16日,由总部位于美国的Hard Rock Consulting, LLC根据国家仪器43-101矿产项目披露标准(“NI-43-101”)编写。更多细节载于下表1。

HIGHLIGHTS OF UPDATED MINERAL RESOURCE

最新矿产资源亮点

  • Measured & Indicated ("M&I"): 223,000 tons grading 9.02% Zinc ("Zn"), 4.27 ounces per ton ("opt") Silver ("Ag"), 0.059 opt Gold ("Au"), 0.64% Copper ("Cu"), and 0.94% Lead ("Pb").

  • This represents a 7.7% increase to the M&I tonnage from the previous 2021 43-101 MRE, with a 18.82% Zn equivalent grade ("ZnEq"), or a 20.55opt Ag equivalent grade ("AgEq")

  • Inferred: 959,000 tons grading 7.56% Zn (14% increase in Zn lbs), 5.67 opt Ag (14.10% increase in Ag ounces), 0.037 opt Au (3.3% increase in Au ounces), 0.80% Cu (14.5% increase in Cu lbs), and 1.06% Pb (25.4% increase in Pb lbs).

  • This represents a 15.1% increase in the Inferred tonnage from the previous 2021 43-101 MRE with an 17.2% ZnEq or a 19.30 opt AgEq.

  • The DMEA Zone in the model was extended an additional 250 feet down dip and remains open.

  • 测量与指示(“M&I”): 223,000 吨锌(“锌”)品位为 9.02%,每吨(“可选”)银(“银”)品位为 0.059 盎司(“金”),0.059 精选金(“金”),铜(“铜”)0.64%,铅(“铅”)0.94%。

  • 这意味着M&I吨位比之前的2021年43-101 MRE增加了7.7%,锌当量品位(“ZneQ”)或20.55ppt的银当量品位(“AgeQ”),或20.55ppt的银当量品位(“AgeQ”)

  • 推断: 959,000 吨锌品位增加 7.56%(锌磅增加 14%)、5.67 opt Ag(银盎司增加 14.10%)、0.037 opt Au(金盎司增加 3.3%)、铜 0.80%(铜磅增加 14.5%)和 1.06% Pb(铅磅增加 25.4%)。

  • 这意味着推断吨位比之前的2021年43-101 MRE增长了15.1%,ZneQ为17.2%,AgeQ为19.30%。

  • 模型中的 DMEA 区域向下延伸了 250 英尺,并且仍然处于开放状态。

"We are extremely pleased by the results of the revised 43-101 MRE. These deep surface core holes placed to determine the continued downdip potential of the mineralization displayed positive results on our resource. Our independent engineering firm - Hard Rock Consulting, LLC - did a great job with the data. This new data supports previously reported model and results confirming the continuation of all mineralized zones extending down-plunge, and that they continue to remain open at depth," commented Eric T. Jones, President and CEO of Thunder Mountain Gold Inc. "It is still our opinion that South Mountain has the potential to be one of the lowest cost producers of zinc, silver, and gold in north America."

“我们对修订后的43-101 MRE的结果感到非常满意。这些为确定矿化的持续向下倾潜力而放置的深层地表岩心孔对我们的资源显示了积极的结果。我们的独立工程公司——Hard Rock Consulting, LLC——在数据方面做得非常出色。这些新数据支持先前报告的模型和结果,这些模型和结果证实了所有矿化区继续向下倾斜,并且继续保持深度开放,” Thunder Mountain Gold Inc.总裁兼首席执行官埃里克·琼斯评论说,“我们仍然认为,南山有可能成为北美最低成本的锌、银和黄金生产国之一。”

MINERAL RESOURCE ESTIMATE

矿产资源估计

This latest round of drilling completed during the late fall of 2021 proves the continuation of the down plunge extension of the DMEA zone at depth. This zone remains open in both directions. All the of the drill results have now been in incorporated into the updated 43-101 MRE for the South Mountain deposit. The increase in Measured and Indicated tons are the result of updated metal prices and mining costs. Surface drilling completed in 2021 accounts for approximately 8% of the increase in Inferred tons, while the remaining 7% increase is due to updated metal prices and mining costs.

最新一轮钻探于2021年秋末完成,证明了DMEA区域在深度向下延伸的延续。该区域保持双向开放。所有钻探结果现已纳入更新后的南山矿床43-101 MRE中。实测和指示吨数的增加是金属价格和采矿成本更新的结果。2021 年完成的露天钻探约占推断吨位增长量的 8%,其余 7% 的增长归因于最新的金属价格和采矿成本。

Table 1 below provides the Mineral Resource Statement for the Project in U.S. units with details of the modelling methodology and cut-off grades applied to the mineral resource. Figure 1 illustrates the principal areas where the South Mountain deposit has been expanded from the historical 43-101 MRE that was completed in 2021. The historical Technical Report for the Mineral Resource Estimate for the South Mountain Project Owyhee County, Idaho USA Report Date: June 15, 2021 - is filed on SEDAR.

下表1提供了以美国单位表示的项目矿产资源报表,详细说明了适用于矿产资源的建模方法和临界等级。图 1 说明了南山矿床从 2021 年完工的历史上的 43-101 MRE 扩建的主要区域。美国爱达荷州奥威希县南山项目矿产资源估算历史技术报告报告日期:2021年6月15日——已在SEDAR上提交。

Table 1. South Mountain Mineral Resource Statement (U.S. Units)

表 1.南山矿产资源声明(美制单位)

Metallurgical Domain Massive Sulfide Type
Classification Measured Indicated Measured + Indicated Inferred
Short Tons 54,000 122,000 176,000 868,000
NSR ($/sh. Ton) 343.35 370.05 361.92 307.62
Zinc (%) 11.51 11.15 11.26 8.25
Zinc (lb.) 12,300,000 27,300,000 39,600,000 143,200,000
Silver (t. oz/ sh. Ton) 3.62 4.74 4.39 5.96
Silver (t. oz) 194,000 580,000 774,000 5,177,000
Gold (t. oz/ sh. Ton) 0.070 0.074 0.073 0.040
Gold (t. oz) 3,800 9,100 12,900 34,700
Copper (%) 0.45 0.55 0.52 0.74
Copper (lb.) 500,000 1,300,000 1,800,000 12,800,000
Lead (%) 0.79 1.32 1.16 1.16
Lead (lb.) 850,000 3,240,000 4,080,000 20,200,000
ZnEq (%) 19.54 20.93 20.51 17.69
ZnEq (lb.) 20,900,000 51,200,000 72,200,000 307,200,000
Metallurgical Domain Skarn Type
Classification Measured Indicated Measured + Indicated Inferred
Short Tons 15,000 32,000 47,000 91,000
NSR ($/sh. Ton) 196.71 149.31 164.73 166.76
Zinc (%) 0.99 0.44 0.62 1.02
Zinc (lb.) 300,000 300,000 600,000 1,900,000
Silver (t. oz/ sh. Ton) 4.61 3.44 3.82 2.86
Silver (oz/ sh. Ton) 70,000 109,000 179,000 261,000
Gold (t. oz/ sh. Ton) 0.017 0.005 0.009 0.005
Gold (oz/ sh. Ton) 300 100 400 400
Copper (%) 1.12 1.12 1.12 1.41
Copper (lb.) 300,000 700,000 1,000,000 2,600,000
Lead (%) 0.27 0.07 0.13 0.04
Lead (lb.) 80,000 40,000 120,000 70,000
ZnEq (%) 14.83 11.38 12.50 12.65
ZnEq (lb.) 4,500,000 7,200,000 11,700,000 23,100,000
Metallurgical Domain Total
Classification Measured Indicated Measured + Indicated Inferred
Short Tons 69,000 154,000 223,000 959,000
NSR ($/sh. Ton) 310.88 324.73 320.46 294.21
Zinc (%) 9.18 8.95 9.02 7.56
Zinc (lb.) 12,600,000 27,600,000 40,200,000 145,000,000
Silver (t. oz/ sh. Ton) 3.84 4.47 4.27 5.67
Silver (oz/ sh. Ton) 264,000 688,000 953,000 5,438,000
Gold (t. oz/ sh. Ton) 0.058 0.060 0.059 0.037
Gold (oz/ sh. Ton) 4,000 9,300 13,300 35,200
Copper (%) 0.60 0.66 0.64 0.80
Copper (lb.) 800,000 2,000,000 2,900,000 15,400,000
Lead (%) 0.67 1.06 0.94 1.06
Lead (lb.) 930,000 3,280,000 4,210,000 20,270,000
ZnEq (%) 18.50 18.97 18.82 17.21
ZnEq (lb.) 25,500,000 58,400,000 83,900,000 330,300,000
  1. The effective date of the mineral resource estimate is October 16, 2023. The QP for the estimate Mr. Richard A. Schwering, SME-RM, P.G., of Hard Rock Consulting, LLC. is independent of South Mountain Mining, LLC.
  2. Mineral resources are not mineral reserves and do not have demonstrated economic viability such as diluting materials and allowances for losses that may occur when material is mined or extracted; or modifying factors including but not restricted to mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and governmental factors.
  3. Inferred mineral resources are part of a mineral resource for which the grade or quality are estimated on the basis of limited geological evidence and sampling. Inferred mineral resources do not have demonstrated economic viability and may not be converted to mineral reserves. It is reasonably expected, though not guaranteed, that the majority of Inferred mineral resources could be upgraded to Indicated mineral resources with continued exploration.
  4. The mineral resource is reported at an underground mining cut-off of $97.50 U.S. Net Smelter Return ("NSR") within coherent wireframe models. The NSR calculation and cut-off is based on the following assumptions: an Au price of $1,800/oz, a Ag price of $23.50/oz, a Pb price of $1.00/lb., a Zn price of $1.35/lb. and a Cu price of $4.00/lb.; Massive Sulfide type metallurgical recoveries and payables of 52.25% for Au, 71.25% for Ag, 71.40% for Zn, 66.50% for Pb, and 49.00% for Cu and a total smelter cost of $33.29; Skarn type metallurgical recoveries and payables of 71.25% for Au, 80.75% for Ag, 51.00% for Zn, 47.50% for Pb, and 87.70% for Cu and a smelter cost of $7.24; assumed mining cost of $65/ton, process costs of $25/ton, general and administrative costs of $7.50/ton. Based on the stated prices and recoveries the NSR formula is calculated as follows; NSR = (Ag grade * Ag price * Ag Recovery and Payable) + (Au grade * Au price * Au Recovery and Payable) + (Pb grade * 20 * Pb Price * Pb Recovery and Payable) + (Cu grade * 20 * Cu Price * Cu Recovery and Payable) + (Zn grade * 20 * Zn Price * Zn Recovery and Payable) for each metallurgical domain. The zinc equivalent grades were calculated as Zn Grade + (((Pb Price * Pb Recovery and Payable) / (Zn Price*Zn Recovery and Payable)) * Pb Grade) + (((Cu Price * Cu Recovery and Payable) / (Zn Price * Zn Recovery and Payable)) * Cu Grade) + (((Ag Price * Ag Recovery and Payable) / (Zn Price * 20 * Zn Recovery and Payable)) * Ag Grade) + (((Au Price * Au Recovery and Payable) / (Zn Price * 20 * Zn Recovery and Payable)) * Au Grade) for each metallurgical domain.
  5. Rounding may result in apparent differences when summing tons, grade and contained metal content. Tonnage and grade are in U.S. Customary units.
冶金领域 大量硫化物类型
分类 已测量 已指明 已测量 + 已指示 推断
短吨 54,000 122,000 176,000 868,000
NSR ($/sh。吨) 343.35 370.05 361.92 307.62
锌 (%) 11.51 11.15 11.26 8.25
锌(磅) 12,300,000 27,300,000 39,600,000 143,200,000
银(吨盎司/英寸吨) 3.62 4.74 4.39 5.96
银(吨盎司) 194,000 580,000 774,000 5,177,000
黄金(吨 oz/sh.吨) 0.070 0.074 0.073 0.040
黄金(吨盎司) 3,800 9,100 12,900 34,700
铜 (%) 0.45 0.55 0.52 0.74
铜(磅) 50 万 1,300,000 1,800,000 12,800,000
铅 (%) 0.79 1.32 1.16 1.16
铅(磅) 850,000 3240,000 4,080,000 20,200,000
zneQ (%) 19.54 20.93 20.51 17.69
zneQ(磅) 20,900,000 51,200,000 72,200,000 307,200,000
冶金领域 Skarn 类型
分类 已测量 已指明 已测量 + 已指示 推断
短吨 15000 32,000 47,000 91,000
NSR ($/sh。吨) 196.71 149.31 164.73 166.76
锌 (%) 0.99 0.44 0.62 1.02
锌(磅) 300 300 60万 1,900,000
银(吨盎司/英寸吨) 4.61 3.44 3.82 2.86
银(盎司/英寸)吨) 7000 109,000 179,000 261,000
黄金(吨 oz/sh.吨) 0.017 0.005 0.009 0.005
黄金(盎司/sh.吨) 300 100 400 400
铜 (%) 1.12 1.12 1.12 1.41
铜(磅) 300 700,000 1,000,000 2,600,000
铅 (%) 0.27 0.07 0.13 0.04
铅(磅) 8000 40,0000 12万 7000
zneQ (%) 14.83 11.38 12.50 12.65
zneQ(磅) 4500,000 7200,000 11,700,000 23,100,000
冶金领域 总计
分类 已测量 已指明 已测量 + 已指示 推断
短吨 69,000 154,000 223,000 959,000
NSR ($/sh。吨) 310.88 324.73 320.46 294.21
锌 (%) 9.18 8.95 9.02 7.56
锌(磅) 12600,000 27,600,000 40,200,000 145,000,000
银(吨盎司/英寸吨) 3.84 4.47 4.27 5.67
银(盎司/英寸)吨) 264,000 688,000 95.3万 5,438,000
黄金(吨 oz/sh.吨) 0.058 0.060 0.059 0.037
黄金(盎司/sh.吨) 4,0 9,300 13,300 35,200
铜 (%) 0.60 0.66 0.64 0.80
铜(磅) 800,000 2,000,000 2,900,000 15,400,000
铅 (%) 0.67 1.06 0.94 1.06
铅(磅) 930,000 3,280,000 4,210,000 20,270,000
zneQ (%) 18.50 18.97 18.82 17.21
zneQ(磅) 25,500,000 58,400,000 83,900,000 330,300,000
  1. 矿产资源估算的生效日期为2023年10月16日。Hard Rock Consulting, LLC.,SME-RM,P.G. Richard A. Schwering先生的估算合格人独立于南山矿业有限责任公司。
  2. 矿产资源不是矿产储量,没有显示出经济可行性,例如稀释材料和抵消开采或开采材料时可能发生的损失;或修改因素,包括但不限于采矿、加工、冶金、基础设施、经济、营销、法律、环境、社会和政府因素。
  3. 推断的矿产资源是矿产资源的一部分,其品位或质量是根据有限的地质证据和抽样估算的。推断的矿产资源没有显示出经济可行性,因此不得转化为矿产储量。有理由预计,通过持续勘探,大多数推断矿产资源可以升级为指示矿产资源,但不能保证。
  4. 据报道,在连贯的线框模型中,矿产资源的地下采矿截止点为97.50美元的熔炼厂净回报率(“NSR”)。NSR的计算和截止值基于以下假设:金价为1,800美元/盎司,银价格为23.50美元/盎司,铅价格为1.00美元/磅,锌价格为1.35美元/磅,铜价格为4.00美元/磅;金的大规模硫化物类冶金回收率和应付账款为52.25%,银为71.25%,锌为71.40%,61.40% 铅为6.50%,铜为49.00%,熔炼厂总成本为33.29美元;锡卡恩型冶金回收率和应付账款为71.25%,银为80.75%,锌为51.00%,铅为47.50%,铜为87.70%,冶炼厂成本为7.24美元;假设采矿成本为65美元/吨,加工成本为25美元/吨,一般和管理费用为7.50美元/吨。根据规定的价格和回收率,NSR 计算公式如下:NSR =(Ag 等级 * Ag 价格 * Ag 回收和应付账款)+(金级 * Au 价格 * Au 回收和应付款)+(Pb 等级 * 20 * Pb 价格 * Pb 回收和应付款)+(铜等级 * 20 * 锌价格 * 锌回收和应付款)+(铜品位 * 20 * 锌价格 * 锌回收和应付款)+(铜品位 * 20 * 锌价格 * 锌回收和应付款)+(铜品位 * 20 * 锌价格 * 锌回收和应付款)+(铜品位 * 20 * 锌价格 * 锌回收和应付款)冶金领域。锌当量等级计算方法为:锌等级 +(((铅价格 * 铅回收和应付款)/(锌价格*锌回收和应付款))* 铅等级)+(((铜价格 * 铜回收和应付款)/(锌价格 * 锌回收和应付款))* 铜品位)+(((银价 * Ag 回收和应付款))* Ag 等级)+(((金价格 * 金回收和应付款)/(锌价格 * 20 * 锌回收和应付款))* 金等级)(每个冶金域)。
  5. 四舍五入在计算吨数、等级和所含金属含量时可能会产生明显的差异。吨位和等级采用美国惯用单位。

Qualified Person Statement for the Mineral Resource Estimate

矿产资源估算合格人员声明

Mr. Richard A. Schwering, P.G., SME-RM, a Resource Geologist with Hard Rock Consulting, LLC, is responsible for the South Mountain Project Mineral Resource Estimate with an effective date of October 16, 2023. Mr. Schwering is a Qualified Person as defined by NI43-101 and is independent of Thunder Mountain Gold Inc., and South Mountain Mines, Inc. Mr. Schwering estimated the mineral resources based on drill hole and channel sample data constrained by geologic boundaries using an Ordinary Krige algorithm. The Geologic Model and Mineral Resource Estimate were completed using Leapfrog Geo Software version 2023.1.1. Hard Rock Consulting also completed the previous resource estimate.

Hard Rock Consulting, LLC的资源地质学家Richard A. Schwering先生,P.G.,SME-RM,负责南山项目矿产资源估算,其生效日期为2023年10月16日。Schwering 先生是 NI43-101 定义的合格人员,独立于 Thunder Mountain Gold Inc. 和 South Mountain Mines, Inc.。施韦林先生使用普通克里格算法,根据受地质边界限制的钻孔和通道样本数据估算了矿产资源。地质模型和矿产资源估算是使用Leapfrog Geo软件版本2023.1.1完成的。Hard Rock Consulting还完成了先前的资源估算。

QUALITY ASSURANCE AND QUALITY CONTROL PROCEDURES

质量保证和质量控制程序

The project employs a rigorous QC/QA program that includes blanks, duplicates, and appropriate certified standard reference material. All samples are introduced into the sample stream prior to sample handling/crushing to monitor analytical accuracy and precision. The insertion rate for the combined QA/QC samples is 10 percent or more depending upon batch sizes. ALS Global completed the analytical work with the core samples processed at their preparation facility in Reno, Nevada, U.S.A. All analytical and assay procedures are conducted in the ALS facility in North Vancouver, BC. The samples are processed by the following methods as appropriate to determine the grades; Au-AA23-Au 30g fire assay with AA finish, ME-ICP61-33 element four acid digest with ICP-AES finish, ME-OG62-ore grade elements, four acid with ICP-AES finish, Pb-OG62-ore grade Pb, four acid with ICP-AES finish, Zn-OG62-ore grade Zn, four acid digestion with ICP-AES finish, Ag-GRA21-Ag 30g fire assay with gravimetric finish.

该项目采用了严格的质量控制/质量保证计划,其中包括空白、重复项和相应的认证标准参考资料。在样品处理/粉碎之前,将所有样品引入样品流,以监测分析的准确性和精度。合并的 QA/QC 样本的插入率为 10% 或以上,具体取决于批次大小。ALS Global在其位于美国内华达州里诺的制备设施完成了核心样本的分析工作。所有分析和化验程序均在不列颠哥伦比亚省北温哥华的ALS设施中进行。样品通过以下适当方法进行处理以确定等级:AU-AA23-AU 30g 火试验,AA 表面处理,ME-ICP61-33 元素四酸消解法,ICP-AES 表面处理的四种酸,ICP-AES 表面处理的四种酸,Pb-OG62 矿石级铅,四种带有 ICP-AES 表面处理的酸,Zn-OG62 矿石级锌,ICP-AES 表面处理的四种酸,AG-AES 表面处理的四种酸 Gra21-Ag 30g 火焰试验,采用重量法完成。

The technical information in this news release has been reviewed and approved by Richard A. Schwering, SME-RM, P.G., Principal Resource Geologist, Hard Rock Consulting, LLC a "Qualified Person" as defined by National Instrument 43-101 standards.

本新闻稿中的技术信息已由美国国家仪器43-101标准定义的 “合格人员”,SME-RM,P.G.,Hard Rock Consulting, LLC首席资源地质学家理查德·施韦林的审查和批准。

The South Mountain Project

南山项目

The South Mountain Mine is a polymetallic development project containing high-grade zinc, silver, gold, and copper, and is located approximately 70 miles southwest of Boise, Idaho (See Figure 2). The Project was intermittently mined from the late 1800s to the late 1960s and its existing underground workings remain intact and well maintained. Thunder Mountain Gold Inc. purchased and advanced the project from 2007 through 2022, with expenditures into the project of approximately US$20 million. Historic production at the Project has largely come from high-grade massive sulfide bodies that remain open at depth and along strike. According to historical smelter records, approximately 53,642 tons of mineralized material has been mined to date. These records also indicate average grades; 14.5% Zn, 10.6 o.p.t. Ag (363.42 g/t Ag), 0.058 o.p.t. Au (1.98 g/t Au), 1.4% Cu, and 2.4% Pb were realized (See NI 43-101 Technical Report: Updated Mineral Resource Estimate for the South Mountain Project, dated December 15, 2023, Section 6.4 - Table 6-3 for more details. Available on the Thunder Mountain Gold Inc. website and at ).

南山矿是一个含有高品位锌、银、金和铜的多金属开发项目,位于爱达荷州博伊西西南约70英里处(见图 2)。从1800年代末到1960年代末,该项目断断续续地开采,其现有的地下作业完好无损,维护良好。从2007年到2022年,Thunder Mountain Gold Inc.收购并推进了该项目,该项目的支出约为2000万美元。该项目的历史产量主要来自于高品位的块状硫化物体,这些矿体在深度和走向沿线保持开放状态。根据冶炼厂的历史记录,迄今为止已经开采了大约53,642吨矿化材料。这些记录还显示平均成绩; 14.5% 锌,10.6 o.p.t. Ag(363.42 g/t Ag),0.058 o.p.t. Au1.98 g/t Au)、1.4% 的铜和 2.4% 的铅 被实现了 (更多细节请参阅 NI 43-101 技术报告:南山项目最新矿产资源估算,2023 年 12 月 15 日,第 6.4 节-表 6-3。可在雷山金业公司网站和网址获得)

Regarding Thunder Mountain Gold, Inc.

关于雷山黄金公司

Thunder Mountain Gold Inc., a junior exploration company founded in 1935, owns interests in base and precious metals projects in the western U.S. The Company's principal asset is The South Mountain Mine, a historic former producer of zinc, silver, gold, lead, and copper, located on private land in Owyhee County Idaho. Thunder Mountain Gold also owns 100% of the Trout Creek Project - a gold exploration project located along the western flank of the Shoshone Mountain Range in the Reese River Valley, adjacent to and surrounded by Nevada Gold Mines, a joint operating agreement between Barrick and Newmont Gold, Inc. private mineral lands. For more information on Thunder Mountain Gold, please visit the Company's website at .

Thunder Mountain Gold Inc. 是一家成立于1935年的初级勘探公司,在美国西部拥有基本金属和贵金属项目的权益。该公司的主要资产是位于爱达荷州奥威希县私人土地上的前锌、银、金、铅和铜的历史性前生产商。Thunder Mountain Gold还拥有Trout Creek Project的100%股份。Trout Creek项目是一个黄金勘探项目,位于里斯河谷肖肖尼山脉西侧,毗邻内华达金矿并被内华达金矿所包围,是巴里克和纽蒙特黄金公司的私人矿产地联合运营协议。有关 Thunder Mountain Gold 的更多信息,请访问该公司的网站,网址为。

Forward-Looking Statements

前瞻性陈述

This press release contains forward-looking statements that are based on the beliefs of management and reflect the Company's current expectations. Generally, forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", "believes" or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotation thereof. The forward-looking statements are based on certain assumptions which could change materially in the future. By their nature, forward-looking information involves known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Investors should refer to THMG's Form 10-K, Form 10-Q reports, for a more detailed discussion of risks that may impact future results. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, investors should not place undue reliance on forward-looking information. Forward-looking information is provided as of the date of this press release, and the Company assumes no obligation to update or revise them to reflect new events or circumstances, except as required in accordance with applicable laws.

本新闻稿包含前瞻性陈述,这些陈述基于管理层的信念,反映了公司当前的预期。通常,可以通过使用前瞻性术语来识别前瞻性陈述,例如 “计划”、“期望”、“预期”、“预期”、“估计”、“预测”、“打算”、“预期”、“相信”,或者某些行动、事件或结果 “可能”、“可能” 或 “将要采取” 的词语和短语或陈述的变体,“发生” 或 “实现” 或其负面含义。前瞻性陈述基于某些假设,这些假设将来可能会发生重大变化。就其性质而言,前瞻性信息涉及已知和未知的风险、不确定性和其他因素,这些因素可能导致实际业绩、业绩或成就与前瞻性信息所表达或暗示的任何未来业绩、业绩或成就存在重大差异。投资者应参阅THMG的10-K表格,即10-Q表报告,以更详细地讨论可能影响未来业绩的风险。无法保证前瞻性信息会被证明是准确的,因为实际结果和未来事件可能与此类陈述中的预期存在重大差异。因此,投资者不应过分依赖前瞻性信息。前瞻性信息自本新闻稿发布之日起提供,除非适用法律有要求,否则公司没有义务对其进行更新或修改以反映新的事件或情况。

Cautionary Note to Investors

给投资者的警示说明

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所风险投资交易所及其监管服务提供商(该术语在多伦多证券交易所风险投资交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

For further information, please contact:

欲了解更多信息,请联系:

Thunder Mountain Gold, Inc.
Eric T. Jones
President and Chief Executive Officer
Eric@thundermountaingold.com
Office: (208) 658-1037

雷山金业有限公司
埃里克·T·琼斯
总裁兼首席执行官
Eric@thundermountaingold.com
办公室:(208) 658-1037

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发