share_log

Metal Energy Receives $200,000 From the Ontario Junior Exploration Program to Advance SourceRock

Metal Energy Receives $200,000 From the Ontario Junior Exploration Program to Advance SourceRock

金属能源从安大略省青少年勘探计划获得20万加元用于推进SourceRock的发展
newsfile ·  01/04 06:00

Toronto, Ontario--(Newsfile Corp. - January 4, 2024) - Metal Energy Corp. (TSXV: MERG) (OTCQB: MEEEF) (the "Company" or "Metal Energy") is pleased to announce that it has been selected to receive up to $200,000 from the Ontario Junior Exploration Program ("OJEP") to further advance its exploration efforts at the SourceRock lithium brine project near Thunder Bay, Ontario.

安大略省多伦多--(Newsfile Corp.,2024 年 1 月 4 日)——金属能源公司(TSXV:MERG)(场外交易代码:MEEEF)(the”公司“或”金属能量“)很高兴地宣布,它已被选中从安大略省青少年探索计划中获得高达20万加元的资助(“OJEP”)进一步推进其在安大略省桑德贝附近的SourceRock锂盐水项目的勘探工作。

"We are thrilled to receive this OJEP non-dilutive grant to help initiate our exploration efforts on SourceRock, Ontario's first lithium brine project. The OJEP funds leverage our recently completed financing, and we are days away from initiating our permitted and fully funded drill program. This funding demonstrates Ontario's commitment to developing a critical minerals strategy with the junior mining sector. We're happy SourceRock was recognized for its potential to be a key project within that strategy," commented James Sykes, CEO of Metal Energy.

“我们很高兴获得这笔OJEP非稀释补助金,以帮助我们启动对安大略省第一个锂盐水项目SourceRock的勘探工作。OJEP的资金利用了我们最近完成的融资,我们距离启动允许和资金充足的钻探计划还有几天的时间。这笔资金表明安大略省致力于与初级采矿业一起制定关键矿产战略。我们很高兴SourceRock因其成为该战略中的关键项目的潜力而获得认可。” 金属能源首席执行官詹姆斯·赛克斯评论道。

"Our government is committed to building a made-in-Ontario supply chain for electric vehicles by connecting critical minerals producers in the north with the manufacturing might in the south," said George Pirie, Minister of Mines. "But it all starts with mining and there is no mining without exploration, which is why through programs like the Ontario Junior Exploration Program, our government is proud to support early exploration ventures like Metal Energy's lithium brine project."

矿业部长乔治·皮里说:“我们的政府致力于通过将北部的关键矿产生产商与南部的制造实力联系起来,建立安大略省制造的电动汽车供应链。”“但这一切都始于采矿,没有勘探就没有采矿,这就是为什么通过安大略省初级勘探计划等计划,我们的政府很自豪能够支持早期的勘探企业,例如Metal Energy的锂盐水项目。”

SourceRock Exploration Plans

SourceRock 勘探计划

SourceRock is a drill-ready project with an exploration permit from the Ontario Ministry of Mines for up to 20 drill pads. Historic drilling and geophysical data have identified saline brine drill targets on the Project, however, the brines have never been tested for lithium or other elements. The Company remains engaged with local Indigenous groups, communities, and stakeholders, and anticipates a drill program to commence shortly in January.

SourceRock 是一个可进行钻探的项目,拥有安大略省矿业部的勘探许可,最多可容纳 20 个钻台。历史钻探和地球物理数据已经确定了该项目的盐水钻探目标,但是,盐水从未经过锂或其他元素的测试。该公司继续与当地土著团体、社区和利益相关者保持接触,并预计演习计划将于1月不久开始。

About the SourceRock Li Brine Project

关于 SourceRock Li Brine 项目

SourceRock is highly prospective for lithium ("Li") brines in the Thunder Bay-Nipigon area of northwestern Ontario. The Project is exceptionally large, covering 913 square kilometres within an area measuring approximately 10 to 20 km wide by 95 km long (Figure 1), a size equivalent to the World's second largest Li producing jurisdiction; Chile's Salar de Atacama's Central Salt Belt.

SourceRock 对锂有很大的前景(”“) 盐水位于安大略省西北部的桑德贝-尼皮贡地区。该项目规模极大,占地913平方千米,宽约10至20千米,长约95千米(图1),面积相当于世界第二大锂产区;智利阿塔卡马盐带。

SourceRock encompasses 91,477 hectares within the Proterozoic Sibley sedimentary basin, Thunder Bay-Nipigon area, Ontario. The Project has excellent access to infrastructure and capacity that has supported previous exploration programs and mine development, including year-round highway, railroad, and seaport access, with power and natural gas lines crossing the Project.

SourceRock占地91,477公顷,位于安大略省桑德湾-尼皮贡地区的元古代西布利沉积盆地。该项目拥有良好的基础设施和容量,为先前的勘探计划和矿山开发提供了支持,包括全年通用的公路、铁路和海港通道,以及横穿该项目的电力和天然气管线。

For the latest videos from Metal Energy and other Ore Group companies, subscribe to our YouTube channel: youtube.com/@theoregroup.

要了解金属能源和其他矿石集团公司的最新视频,请订阅我们的 YouTube频道:youtube.com/ @theoregroup。

About Metal Energy Corp.

关于金属能源公司

Metal Energy is a battery metal exploration company with two projects in politically stable Canadian jurisdictions; Manibridge (Ni-Cu-Co-PGE) in Manitoba, and SourceRock (Li-Na-K) in Ontario. The Manibridge Project is 85% owned by Metal Energy and 15% owned by Mistango River Resources Inc. (CSE: MIS). SourceRock is subject to earn-in agreement where the Company can acquire 100% exploration rights to the project.

金属能源是一家电池金属勘探公司,在政治稳定的加拿大司法管辖区有两个项目:曼尼托巴省的Manibridge(NI-CU-CO-PGE)和安大略省的SourceRock(Li-Na-K)。Manibridge项目由金属能源公司持有85%的股权,米斯坦戈河资源公司(CSE:MIS)拥有15%的股权。SourceRock受盈利协议的约束,根据该协议,公司可以获得该项目的100%的勘探权。

For further information, please contact:

欲了解更多信息,请联系:

Metal Energy Corp.
MERG on the TSXV
info@metalenergy.ca

金属能源公司
在多伦多证券交易所上市 MERG
info@metalenergy.ca

James Sykes, CEO
jsykes@oregroup.ca
306-221-8717

首席执行官詹姆斯·赛克斯
jsykes@oregroup.ca
306-221-8717

Reader Advisory

读者咨询

Certain information set forth in this news release contains forward-looking statements or information ("forward-looking ‎statements"), including details about the business of the Company. By their nature, forward-looking statements are subject to numerous risks ‎and uncertainties, some of which are beyond the Company's control, including the impact of general economic conditions, ‎industry conditions, volatility of commodity prices, currency fluctuations, environmental risks, operational risks, competition from ‎other industry participants, stock market volatility. Although the ‎Company believes that the expectations in its forward-looking statements are reasonable, its forward-looking statements have ‎been based on factors and assumptions concerning future events which may prove to be inaccurate. Those factors and ‎assumptions are based upon currently available information. Such statements are subject to known and unknown risks, ‎uncertainties and other factors that could influence actual results or events and cause actual results or events to differ materially ‎from those stated, anticipated or implied in the forward-looking statements. Accordingly, readers are cautioned not to place undue ‎reliance on the forward-looking statements, as no assurance can be provided as to future results, levels of activity or achievements. ‎Risks, uncertainties, material assumptions and other factors that could affect actual results are discussed in our public disclosure ‎documents available at including the Filing Statement dated November 15, 2021. Furthermore, the forward-looking statements contained in this document are made as of ‎the date of this document and, except as required by applicable law, the Company does not undertake any obligation to publicly ‎update or to revise any of the included forward-looking statements, whether as a result of new information, future events or ‎otherwise. The forward-looking statements contained in this document are expressly qualified by this cautionary statement.‎

本新闻稿中列出的某些信息包含前瞻性陈述或信息(”前瞻性陈述“),包括有关公司业务的详细信息。就其性质而言,前瞻性陈述受许多风险和不确定性的影响,其中一些是公司无法控制的,包括总体经济状况、行业状况、大宗商品价格波动、货币波动、环境风险、运营风险、来自其他行业参与者的竞争、股市波动的影响。尽管公司认为其前瞻性陈述中的预期是合理的,但其前瞻性陈述基于有关未来事件的因素和假设,这些因素和假设可能被证明是不准确的。这些因素和假设以现有信息为基础。此类陈述受已知和未知的风险、不确定性和其他因素的影响,这些因素可能会影响实际业绩或事件,并导致实际业绩或事件与前瞻性陈述中陈述、预期或暗示的结果或事件存在重大差异。因此,提醒读者不要过分依赖前瞻性陈述,因为无法保证未来的业绩、活动水平或成就。我们的公开披露文件中讨论了风险、不确定性、重大假设和其他可能影响实际业绩的因素,网址为 包括日期为2021年11月15日的申报声明。此外,本文件中包含的前瞻性陈述自本文件发布之日起作出,除非适用法律要求,否则公司不承担任何公开更新或修改所含任何前瞻性陈述的义务,无论是由于新信息、未来事件还是其他原因。本警示声明对本文件中包含的前瞻性陈述进行了明确限定。

Neither the TSX Venture Exchange Inc. nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX Venture Exchange Inc. 及其监管服务提供商(该术语在多伦多证券交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。


FIGURE 1 - SourceRock project location map


图 1-SourceRock 项目位置图

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发