share_log

Mistango Commences Goldie Drill Program

Mistango Commences Goldie Drill Program

Mistango 启动 Goldie Drill 计划
newsfile ·  2024/01/08 19:00

Toronto, Ontario--(Newsfile Corp. - January 8, 2024) - Mistango River Resources Inc. (CSE: MIS) ("Mistango" or the "Company") announces the commencement of its Phase II drill program at its 89 square kilometre Goldie Project in the Shebandowan Greenstone Belt, 50 kilometres west of Thunder Bay, Ontario.

安大略省多伦多--(Newsfile Corp.,2024年1月8日)——米斯坦戈河资源公司(CSE:MIS)(“Mistango” 或 “公司”)宣布其位于安大略省桑德贝以西50公里处的谢班多万绿石带的89平方千米的戈尔迪项目开始其第二阶段钻探计划。

Highlights:

亮点:

  • Three holes, totaling 1,430 meters, will test extensions of the adjacent Delta 1 Project mineralization and new target areas.
  • 三个总长 1,430 米的钻孔将测试邻近的 Delta 1 项目矿化和新目标区域的延伸部分。
  • Hole GLD-23-001 is a vertical hole designed to test the north dipping mineralization from the adjacent Delta 1 property.
  • GLD-23-001 洞是一个垂直钻孔,旨在测试邻近的 Delta 1 地产向北倾斜的矿化。
  • Hole GLD-23-002 will test a geophysical target at the south end of the Goldie property.
  • GLD-23-002 洞将测试戈尔迪地产南端的地球物理目标。
  • Hole GLD-23-003 will test an area of previous drilling and high-grade sampling that correlates with interpreted structures and geophysics anomalies.
  • GLD-23-003 洞将测试先前钻探和高等级采样的区域,该区域与解释的结构和地球物理异常有关。

Jamie Spratt, CEO commented: "We are pleased to commence drilling again on our prospective 89 square kilometre Goldie property in the emerging Shebandowan Greenstone Belt. Our exploration team has carefully designed the program to test extensions of interpreted mineralized structures and new target areas. We look forward to advancing our understanding of the district's geology and favourable structural trend. The program is fully funded, and Mistango remains well positioned with a strong balance sheet that allows us to advance our projects in a disciplined fashion."

首席执行官杰米·斯普拉特评论说:“我们很高兴再次开始对位于新兴的谢班多万绿石地带的89平方千米的Goldie地产进行钻探。我们的勘探团队精心设计了该计划,以测试解释的矿化结构和新的目标区域的扩展。我们期待增进对该地区地质状况和有利结构趋势的理解。该计划已获得全额资金,Mistango仍然处于有利地位,资产负债表强劲,这使我们能够以纪律严明的方式推进项目。”

Phase II Drill Program Details

第二阶段钻探计划详情

The Phase II program consists of three holes for a total of 1,430m. The program has been designed through a comprehensive compilation of detailed sampling, geophysical studies and previous drill results in the district. Geophysical targeting is based in part on the 420 lines kilometre high-resolution airborne magnetic survey that Mistango completed in 2023.

第二阶段的项目包括三个洞,总长度为1,430米。该计划是通过全面汇编该地区的详细采样、地球物理研究和先前的钻探结果而设计的。地球物理目标部分基于米斯坦戈在2023年完成的长达420线千米的高分辨率机载磁场测量。

The program aims to confirm and better define the presence of known mineralized structures and test new target areas on the Goldie property.

该计划旨在确认和更好地定义已知矿化结构的存在,并在Goldie地产上测试新的目标区域。

Hole GLD-23-001 is a vertical hole designed to test the north dipping mineralization from the adjacent Delta 1 property. Hole GLD-23-003 will target an area of previous drilling and high-grade sampling that correlates with interpreted structures from the previously completed magnetic survey. The targeted hole will also be drilled underneath an IP anomaly.

GLD-23-001 洞是一个垂直钻孔,旨在测试邻近的 Delta 1 地产向北倾斜的矿化。GLD-23-003 孔将瞄准先前钻探和高等级采样的区域,该区域与先前完成的磁力勘测中解释的结构相关。还将在IP异常下方钻出目标孔。

Hole GLD-23-002 will test interpreted structures from previous geophysical studies at the south end of the Goldie property and on trend from known mineralization.

GLD-23-002 洞将测试先前在 Goldie 地产南端的地球物理研究中解释的结构,以及已知矿化的趋势。

About the Goldie Gold Project
Goldie is within the Shebandowan Greenstone Belt, which also hosts Goldshore Resources Inc.'s (TSXV: GSHR) low-grade, high-tonnage Moss Lake gold deposit, 50 km to the west. Goldie is also adjacent to Delta Resources Limited (TSXV: DLTA) Delta 1 Gold Property.

关于 Goldie Gold 项目
Goldie 位于 Shebandowan Greenstone Belt 内,那里还有 Goldshore Resources Inc.s(多伦多证券交易所股票代码:GSHR)低品位、高吨位的莫斯湖金矿,位于向西50公里处。戈尔迪还毗邻达美资源有限公司(多伦多证券交易所股票代码:DLTA)Delta 1 Gold Property。

QP Statement
The technical information in this news release has been reviewed and approved by Antoine Schwartzmann, P.Geo., a Qualified Person as defined in "National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

QP 声明
本新闻稿中的技术信息已经过P.Geo. Antoine Schwartzmann的审查和批准,他是 “国家仪器43-101——矿业项目披露标准” 中定义的合格人士。

About Mistango River Resources Inc.
Mistango is a Canadian-based exploration company focused on its Goldie project, 50km west of Thunder Bay, within the Shebandowan Greenstone Belt. Mistango has partnered with Agnico Eagle Mines Limited to develop its Kirkland West and Omega projects under a $60M option agreement, whereby Agnico can earn up to 75% of the Projects. Mistango has a strong balance sheet and key strategic investors, including Agnico.

关于米斯坦戈河资源公司
Mistango是一家总部位于加拿大的勘探公司,专注于其位于桑德湾以西50公里处的谢班多万绿石带内的戈尔迪项目。Mistango已与Agnico Eagle Mines Limited合作,根据6000万美元的期权协议开发其柯克兰西部和欧米茄项目,根据该协议,Agnico可以获得高达75%的项目收益。Mistango拥有强劲的资产负债表和包括Agnico在内的主要战略投资者。

For further information, please contact us:

欲了解更多信息,请联系我们:

Mistango River Resources
Jamie Spratt, CEO
416.435.5199
jspratt@oregroup.ca

米斯坦戈河资源
首席执行官杰米·斯普拉特
416.435.5199
jspratt@oregroup.ca

Forward-Looking Statements

前瞻性陈述

Neither the Canadian Securities Exchange nor its Regulation Services Provider accept responsibility for the adequacy or accuracy of this release. Certain information in this press release may contain forward-looking statements. This information is based on current expectations that are subject to significant risks and uncertainties that are difficult to predict. Actual results might differ materially from results suggested in any forward-looking statements. Mistango assumes no obligation to update the forward-looking statements, or to update the reasons why actual results could differ from those reflected in the forward looking-statements unless and until required by securities laws applicable to Mistango. Additional information identifying risks and uncertainties is contained in filings by Mistango with Canadian securities regulators, which filings are available under Mistango profile at .

加拿大证券交易所及其监管服务提供商均不对本新闻稿的充分性或准确性承担责任。本新闻稿中的某些信息可能包含前瞻性陈述。这些信息基于当前的预期,这些预期存在难以预测的重大风险和不确定性。实际结果可能与任何前瞻性陈述中建议的结果存在重大差异。除非适用于Mistango的证券法有要求,否则Mistango没有义务更新前瞻性陈述,也没有义务更新实际业绩可能与前瞻性陈述中反映的结果不同的原因。识别风险和不确定性的其他信息包含在Mistango向加拿大证券监管机构提交的文件中,这些文件可在Mistango简介下查阅,网址为

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发