share_log

European Energy Metals Central Finland Exploration Licences Granted

European Energy Metals Central Finland Exploration Licences Granted

欧洲能源金属芬兰中部勘探许可证已颁发
newsfile ·  02/15 09:00

Vancouver, British Columbia--(Newsfile Corp. - February 15, 2024) - European Energy Metals (TSXV: FIN) (FSE: W28) ("European Energy Metals" or the "Company") is pleased to report that the Nabba and Nabba 2 Exploration Licences (ELs) which were applied for in September and October 2023 have been granted by TUKES (Finnish Chemical and Safety Agency). The licences are located within the Company's Central Finland Lithium Project and cover 2,780 and 1,740 hectares (ha) respectively.

不列颠哥伦比亚省温哥华--(Newsfile Corp.,2024年2月15日)-欧洲能源金属(TSXV:FIN)(FSE:W28)(”欧洲能源金属“或者”公司“)高兴地向大家报告,2023年9月和10月申请的Nabba和Nabba 2勘探许可证(EL)已由TUKES(芬兰化学与安全局)授予。这些许可证位于该公司的芬兰中部锂项目内,分别覆盖2780公顷和1,740公顷(公顷)。

"European Energy Metals is grateful to TUKES for expediting these licence applications," commented CEO Jeremy Poirier. "With exploration licenses in place we will be able to advance the targets already generated with more advanced exploration including diamond drilling this year. European Energy Metals is poised for continued success in 2024," he concluded.

首席执行官杰里米·普瓦里尔评论说:“欧洲能源金属公司感谢TUKES加快了这些许可证的申请。”“有了勘探许可证,我们将能够推进今年通过更先进的勘探(包括钻石钻探)已经制定的目标。欧洲能源金属有望在2024年继续取得成功,” 他总结道。

Under the Finnish Mineral Act the licences are granted for a period of four years after which extensions can be granted for a total of 15 years. These licences permit advanced exploration, including trenching and diamond drilling. The Company is in the process of finalizing its 2024 exploration plans however it is anticipated that prospecting, geological mapping, ground geophysics, trenching and diamond drilling will be conducted this year.

根据芬兰矿产法,许可证的发放期限为四年,之后总共可以延期15年。这些许可证允许进行高级勘探,包括挖沟和钻石钻探。该公司正在敲定其2024年的勘探计划,但预计今年将进行勘探、地质测绘、地面地球物理学、挖沟和钻石钻探。

Property Highlights

房产亮点

Prospecting during 2023 identified multiple occurrences of lithium bearing spodumene pegmatite mineralization on the underlying Nabba Reservation. The highlight was the discovery of the Kyrola Prospect, a 350m long by 110m wide spodumene-bearing boulder field, where 49 rock chip grab samples were assayed from 3.84% Li2O to 0.003% Li2O, with 15 of the 49 samples returning grades in excess of 0.50% Li2O (Li2O = lithium oxide). The extent of the boulder field is constrained only by low-lying overburden covered areas and farm fields. The mean assay of these samples was 0.53% Li2O. Fifteen samples assayed greater than 0.50% Li2O, eleven assayed greater than 1.00% Li2O, 4 assayed greater than 2.00% Li2O and 1 assayed greater than 3.00% Li2O. The boulders are generally angular and range in size from small hand size cobbles up to +1.5m in diameter. The boulders are also weakly anomalous in cesium, tantalum, beryllium and tin.

2023 年的勘探发现,在地下的 Nabba 保留地上多次出现含锂的锂辉石伟晶岩矿化。亮点是发现了 Kyrola Prospect,这是一个长 350 米、宽 110 米的含有锂辉石的巨石场,在那里分析了来自 3.84% Li 的 49 个岩屑采集样本2O 到 0.003% Li2O,在 49 个样本中,有 15 个样本返回的分数超过 0.50% Li2O (Li)2O = 氧化锂)。巨石场的范围仅受低洼覆盖区域和农田的限制。这些样本的平均测定值为 0.53% Li2O. 十五个样本经检测的锂含量大于 0.50%2O,有十一人测出大于 1.00% Li2O,4 测定值大于 2.00% Li2O 和 1 的测定值大于 3.00% Li2O. 巨石通常呈棱角分明,大小从手工大小的小鹅卵石到直径 +1.5 米不等。这些巨石中的铯矿、钽、铍和锡也存在微弱的异常。

The boulders are comprised mineralogically of albite-spodumene-quartz-muscovite pegmatite with lesser accessory minerals such as tourmaline, garnet and beryl. They are typically massive to weakly zoned and appear to be mineralogically similar to the known Keliber deposits in the region, suggesting they may be part of the same mineralizing event.

这些巨石在矿物学上由阿尔比特-锂辉石-石英-白云母伟晶岩和较少的辅助矿物组成,例如碧玺、石榴石和绿柱石。它们通常是块状到弱分区,在矿物学上似乎与该地区已知的凯利伯矿床相似,这表明它们可能是同一个矿化事件的一部分。

Based on the known glacial history of the area and glacial dispersion of pegmatite boulders at the Keliber deposits (Ahtola et al, 2015) it is interpreted that the source of the boulders is likely to be to the northwest of the boulder field, and possibly within 300 m-500 m. Further studies will be required to confirm and define targets for drilling.

根据该地区已知的冰川历史和凯利伯矿床伟晶岩巨石的冰川分布(Ahtola等人,2015年),可以解释说,巨石的来源很可能在巨石场的西北部,可能在300米至500米以内。需要进一步研究以确认和确定钻探目标。

The Nabba ELs lie <8 km west of Keliber's Spodumene Concentrator Plant and several previously known lithium-spodumene pegmatite prospects/deposits occur within 1 km of the Nabba ELs, including the Emmes Deposit which hosts NNW-SSE trending Li-bearing, spodumene pegmatites, and a resource of 1.08 Mt grading 1.22% Li2O (source: Finnish Geological Survey).

Nabba EL 位于 Keliber 锂辉石选矿厂以西 2O(来源:芬兰地质调查局)。

European Energy Metals cautions investors grab samples are selective samples by their nature and are not necessarily indicative of mineralization on the Nabba ELs. The Company further cautions the presence of lithium mineralization on Keliber Oy's properties is not necessarily indicative of similar mineralization on the Company's mineral reservations.

欧洲能源金属公司警告说,投资者抽取的样本就其性质而言是选择性样本,不一定表示Nabba EL的矿化情况。该公司进一步警告说,Keliber Oy的房产中存在锂矿化并不一定表示该公司的矿产储量中存在类似的矿化现象。

QA/QC Statement

质量保证/质量控制声明

Samples were submitted to ALS Laboratories in Sodankyla Finland. ALS inserted internal standards, blanks and pulp duplicates within each sample batch as part of their own internal monitoring of quality control protocols. European Energy Metals monitors precision and bias performance by inserting certified lithium standards (OREAS 750 and OREAS 753) as well as blanks into each batch submitted to ALS at a rate of 1:25.

样本已提交给芬兰索丹屈莱的ALS实验室。ALS 在每个样品批次中插入了内部标准、空白和纸浆副本,这是他们自己对质量控制协议的内部监控的一部分。欧洲能源金属公司以 1:25 的比率将经认证的锂标准(OREAS 750 和 OREAS 753)和空白插入提交给 ALS 的每批次中,来监控精度和偏差性能。

The major element oxides and trace elements including Li, Cs, Ta and Be were analysed by ALS analytical package ME-MS89L + B-MS89L involving digestion by Na2O2 fusion followed by ALS's super trace ICP-MS methodology. QAQC results to date do not indicate any analytical accuracy issues with all standards returning values Li values within 3 standard deviations of their certified mean and blanks returning expected values.

ALS 分析包 ME-MS89L + B-MS89L 分析了主要元素氧化物和微量元素,包括锂、钴、钽和铍分析,包括通过钠氧融合进行消解,然后采用 ALS 的超痕量 ICP-MS 方法。迄今为止,QAQC 的结果并未显示任何分析精度问题,所有标准返回与其认证均值相差不超过 3 个标准差的 Li 值,空格返回预期值。

Mike Basha, P.Eng., P.Geo. (NL), VP Exploration of European Energy Metals Corp., a Qualified Person as defined by National Instrument 43-101, has prepared the scientific and technical information contained in this press release.

迈克·巴沙,P.Eng.,P.Geo。(荷兰)欧洲能源金属公司勘探副总裁(National Instrument 43-101定义为合格人员)已经准备了本新闻稿中包含的科学和技术信息。

About European Energy Metals Corp.

关于欧洲能源金属公司

European Energy Metals Corp. is a junior mining company currently focussed on the Lithium-Cesium-Tantalum Finnish Pegmatite Project in central Finland. Governing bodies in Europe and Finland are legislating environmentally friendly and energy independent laws and policies. One of the key components is access to REE and, specifically, lithium. The company's concessions are located within 15 kms of the Keliber mine and production complex, currently under construction and expected to begin production in H2 2025.

欧洲能源金属公司是一家初级矿业公司,目前专注于芬兰中部的锂-铯-钽芬兰伟晶岩项目。欧洲和芬兰的管理机构正在制定环境友好和能源独立的法律和政策。关键组成部分之一是获得稀土元素,特别是锂。该公司的特许权位于距离凯利伯矿山和生产综合体不到15公里的地方,该矿山和生产综合体目前正在建设中,预计将于2025年下半年开始生产。

An estimated €600 million investment by Keliber's parent company Sibanye-Stillwater Limited in partnership with the Finnish Minerals Group () is underway in the Kautinen Region and will see the development of open-pit and underground mining from several deposits, construction of a central spodumene concentrator plant and a lithium hydroxide chemical plant at tidewater in Kokkola. When completed, this complex will comprise a complete hard-rock spodumene pegmatite lithium supply chain (source: ).

据估计,凯利伯的母公司Sibanye-Stillwater Limited与芬兰矿业集团()合作投资6亿欧元,将在考蒂宁地区开发露天和地下采矿,在科科拉的潮水区建造锂辉石中央浓缩厂和氢氧化锂化工厂。建成后,该综合体将包括完整的硬岩锂辉石伟晶岩锂供应链(来源:)。

Pursuant to an earn-in agreement with Capella Minerals Ltd (TSXV: CMIL), European Energy Metals has the right to earn an 80% interest in the Finnish Lithium Project by issuing 2,000,000 shares, paying Cdn$500,000 and incurring Cdn$2,500,000 dollars in exploration expenditures staged over a 4 year earn in period. A detailed assessment of the historic and government exploration data compiled by the Finnish Geological Survey ("GTK") identified a series of permissive tracts for LCT pegmatites. The concessions comprising the Finnish Lithium Project were identified as a result of this pegmatite research.

根据与Capella Minerals Ltd(多伦多证券交易所股票代码:CMIL)达成的收益协议,欧洲能源金属公司有权通过发行200万股股票、支付50万加元以及分期支付250万加元的勘探支出分4年的收益获得芬兰锂矿项目80%的权益。对芬兰地质调查局(“GTK”)汇编的历史和政府勘探数据的详细评估确定了一系列允许存放LCT伟晶岩的区域。包括芬兰锂矿项目的特许权是这项伟晶岩研究的结果而确定的。

FOR FURTHER INFORMATION PLEASE CONTACT:

欲了解更多信息,请联系:

Jeremy Poirier, CEO
Telephone: 604-722-9842
Email: info@europeanenergymetals.com

首席执行官杰里米·普瓦里尔
电话:604-722-9842
电子邮件:info@europeanenergymetals.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所风险投资交易所及其监管服务提供商(该术语在多伦多证券交易所风险投资交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

Cautionary Statements Regarding Forward-Looking Information

关于前瞻性信息的警示声明

This news release contains forward-looking information within the meaning of applicable securities legislation. Forward-looking information is typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar expressions, or are those, which, by their nature, refer to future events. Such statements include, without limitation, statements regarding the future results of operations, performance and achievements of the Company, including the presence of lithium mineralization at, and the exploration and development potential of, the Finland Pegmatite Project as well as any future exploration at the Finland Pegmatite Project. Although the Company believes that such statements are reasonable, it can give no assurances that such expectations will prove to be correct. All such forward-looking information is based on certain assumptions and analyses made by the Company in light of their experience and perception of historical trends, current conditions and expected future developments, as well as other factors management believes are appropriate in the circumstances. This information, however, is subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. Important factors that could cause actual results to differ from this forward-looking information include the costs of any anticipated work programs and the ability to fund such costs, required approvals in connection with any work programs and the ability to obtain such approvals, risks inherent in exploration as well as those described under the heading "Risks and Uncertainties" in the Company's most recently filed MD&A. The Company does not intend, and expressly disclaims any obligation to, update or revise the forward-looking information contained in this news release, except as required by law. Readers are cautioned not to place undue reliance on forward-looking information.

本新闻稿包含适用证券立法所指的前瞻性信息。前瞻性信息通常由以下词语来识别:相信、期望、预测、打算、估计、假设和类似表达,或者是那些本质上指未来事件的词语。此类声明包括但不限于有关公司未来经营业绩、业绩和成就的陈述,包括在和公司存在锂矿化情况 芬兰伟晶岩项目的勘探和开发潜力以及芬兰伟晶岩项目的任何未来勘探。尽管该公司认为此类陈述是合理的,但它无法保证此类期望会被证明是正确的。所有这些前瞻性信息均基于公司根据其经验和对历史趋势、当前状况和预期未来发展的看法,以及管理层认为适合具体情况的其他因素做出的某些假设和分析。但是,这些信息受各种风险和不确定性以及其他因素的影响,这些因素可能导致实际事件或结果与前瞻性信息中的预测存在重大差异。可能导致实际结果与这些前瞻性信息不同的重要因素包括任何预期工作计划的成本和为此类费用提供资金的能力、任何工作计划所需的批准和获得此类批准的能力、勘探固有的风险以及公司最近提交的MD&A中 “风险和不确定性” 标题下描述的风险。公司无意更新或修改所包含的前瞻性信息,也明确表示不承担任何义务在这则新闻中释放,除非法律要求。提醒读者不要过分依赖前瞻性信息。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发