share_log

Gossan Resources 2023 Year in Review, 2024 Strategic Plans, 2023 AGM Results, and Grant of Options

Gossan Resources 2023 Year in Review, 2024 Strategic Plans, 2023 AGM Results, and Grant of Options

Gossan Resources 2023 年回顾、2024 年战略计划、2023 年股东大会业绩和期权授予
newsfile ·  02/26 16:30

Winnipeg, Manitoba--(Newsfile Corp. - February 26, 2024) - Gossan Resources Limited (TSXV: GSS) (FSE: GSR) (XETRA: GSR) (the "Company" or "Gossan") is pleased to give a general update to shareholders including a review of the work performed in 2023 and the Company's strategic plans for 2024. In addition, the Company announces results of its Annual and Special General Meeting and a stock option grant.

曼尼托巴省温尼伯--(Newsfile Corp.-2024 年 2 月 26 日)- 高山资源有限公司 (TSXV: GSS) (FSE: GSR) (XETRA: GSR) (”公司“或”Gossan”)很高兴向股东通报最新情况,包括对2023年工作以及公司2024年的战略计划的回顾。此外,公司还公布了年度和特别股东大会的结果以及股票期权授予。

2023 Year in Review

2023 年年度回顾

Sale of Bird River Nickel PGM Project: In April 2023 Gossan agreed to sell to a third party a three-year option to purchase 100% of the title and interest in and to the Bird River Claims held by Gossan. The purchase value was assigned to be up to $1,610,000, and Gossan would also retain a 2% NSR royalty.

出售伯德河镍业PGM项目: 2023年4月,Gossan同意向第三方出售为期三年的期权,以购买Gossan持有的Bird River Claims和Bird River Claims的100%所有权和权益。收购价值最高为161万美元,Gossan还将保留2%的NSR特许权使用费。

Gander Gold Project: During Q4 2023, the Company conducted a new visit to the site to follow up on the results from the previous years' geophysical and detailed sampling programs. The Company engaged a contractor to conduct a 16-day field program, which included prospecting and till sampling of both the b-horizon and c-horizon. This till chemistry was conducted as a follow-up check survey to validate the previous years' results, and to improve understanding on the areas of greater prospectivity. Collections of bedrock and outcrops samples which consist of vein material, selvages of host rock, and minor sulphides also took place.

甘德黄金项目: 在2023年第四季度,该公司对该地点进行了新的访问,以跟踪前几年的地球物理和详细采样计划的结果。该公司聘请了一家承包商进行为期16天的实地勘探项目,其中包括对b地平线和c地平线进行勘探和直到采样。该直升机化学是作为后续检查调查进行的,目的是验证前几年的结果,并增进对前景更大的领域的理解。还收集了基岩和露头样本,这些样本包括矿脉材料、宿主岩块和少量硫化物。

The target areas for this survey consisted primarily of areas that had previously been determined to be of higher prospectivity. In total 55 samples were collected (Figure 1), including geochemistry samples, heavy mineralogy till samples, country rock samples, and mineralized rock samples. At the main Gander Property, mineralized samples were typically quartz veins with trace to 1-2% fine grained sulphides of pyrite, arsenopyrite, and chalcopyrite.

本次调查的目标区域主要包括先前确定具有更高前景的区域。总共收集了55个样品(图1),包括地球化学样本、重矿物学样品、乡村岩石样本和矿化岩石样品。在主要的甘德地产,矿化样品通常是石英脉,含有 1-2% 的黄铁矿、亚硫铁矿和黄铜矿的细颗粒硫化物。

At the satellite Island Pond Property, mineralized samples were collected of brecciated quartz-carbonate veining containing pyrite and galena, within felsic volcanic rocks. The analytical results from these samples and geological observations will support the validation and refinement of existing soil geochemistry anomalies. Final assay results and conclusions are pending.

在 Island Pond Property 卫星,在长英质火山岩中采集了含有黄铁矿和方铅矿的角砾岩石英碳酸盐矿脉的矿化样品。这些样本的分析结果和地质观测结果将支持对现有土壤地球化学异常的验证和完善。最终的化验结果和结论尚待确定。

Figure 1: Gander till and bedrock sample locations.

图 1:甘德矿和基岩样本位置。

Separation Rapids Lithium Project: Following the quick advancement of Avalon Advanced Materials' property ("Avalon") during 2023, which sits contiguously and directly along strike to Gossan's property, the Company determined to re-visit the property for validation of its earlier work programs. During Q4 2023, the Company planned a sampling program intended to perform infill sampling within historically sampled outcrops, to sample mapped and unsampled pegmatites, and to collect samples for XRD analysis to gain a better understanding of the mineral phases present in the pegmatites. The program was ultimately completed in the first days of 2024.

分离急流锂项目: 随着阿瓦隆先进材料的财产(“阿瓦隆”)在2023年迅速发展,该地产与Gossan财产的罢工直接相连,该公司决定重新访问该物业,以验证其先前的工作计划。在 2023 年第四季度,公司计划了一项采样计划,旨在对历史采样的露头进行填充采样,对已绘制和未采样的伟晶岩进行采样,并收集样本进行 XRD 分析,以更好地了解伟晶岩中存在的矿物相。该计划最终在2024年的头几天完成。

Preliminary results show pegmatite mineralogy was seen to be relatively homogenous, being mostly dominated by sugary to granular coarse-grained albite and quartz with lesser accessory medium-grained muscovite and rare biotite and phlogopite. Lepidolite was seen in a few samples and was distinguished by a deep purple hue and basal cleavage (Figure 2). Several, previously unmapped pegmatite bodies were discovered. These pegmatite bodies were seen to extend the "Pegmatite Zone" to the west (toward Avalon) and follow the reported structural alignment of ~100 degrees strike and ~80 degrees dip.

初步结果显示,伟晶岩矿物学被认为相对均匀,主要以含糖到颗粒状的粗颗粒长石和石英为主,以及次要的中粒白云母和稀有黑云母和金云母。在一些样本中发现了锂云母,其特点是深紫色色调和基底裂解(图 2)。发现了几具以前未绘制的伟晶岩遗体。据观察,这些伟晶岩体将 “伟晶岩区” 向西(向阿瓦隆)延伸,并遵循所报告的走向约100度,倾角约80度的结构方向。

In total, 19 samples were taken. All samples were sent for sodium peroxide fusion and seven samples were selected for additional semi-quantitative X-ray Diffraction. The assay certificates and final report are pending completion.

总共采集了19个样本。所有样本均送去进行过氧化钠融合,并选择了七个样本进行额外的半定量X射线衍射。化验证书和最终报告尚待完成。

Figure 2: Sample found within an unmapped pegmatite outcrop on the west end of the "Pegmatite Zone." Lepidolite visible.

图 2:在西端未绘制的伟晶岩露头中发现的样本 “伟晶岩区。”锂云母可见。

Samuel Pelaez, the Company's President and CEO, stated: "The work carried out in Gander over the past three seasons allows us to better refine areas for further exploration. The Company looks forward to defining drill target areas this year, and to identify the adequate source of financing for that next phase of exploration. Similarly, our Separation Rapids property, has generated renewed interest after Gossan's neighbors did a terrific job in 2023 by moving their property swiftly to a development stage and by engaging credible and reputable partners to put the asset into production. At Gossan, we are continuing to advance these properties while pursuing all avenues to create value for shareholders."

该公司总裁兼首席执行官塞缪尔·佩莱兹表示:“过去三个季节在甘德开展的工作使我们能够更好地精炼区域以进行进一步的勘探。该公司期待在今年确定钻探目标区域,并为下一阶段的勘探确定足够的融资来源。同样,我们的Separation Rapids房产再次引起了人们的兴趣,此前Gossan的邻居们在2023年做得非常出色,他们迅速将房产转移到了开发阶段,并聘请了可靠和信誉良好的合作伙伴将该资产投入生产。在Gossan,我们将继续推进这些物业的发展,同时寻求各种途径为股东创造价值。”

2024 Corporate Plans

2024 年企业计划

Royalty Sub-Co: The Company is advancing plans to create a wholly-owned subsidiary to hold the Company's royalty portfolio. The royalty portfolio currently consists of four royalties, including the per ton royalty on Canadian Premium Sand Inc. Manigotagan deposit which is currently making advance royalty payments. The Company also holds a right to repurchase a percentage of a royalty on its Gander Property. In addition, it is the intention of the Company to create new royalty agreements on its remaining exploration and development properties, and to assign them to the newly created royalty subsidiary. The process is ongoing and the Company will make further announcements as milestones are completed.

特许权使用费子公司: 该公司正在推进创建全资子公司的计划,以持有公司的特许权使用费组合。特许权使用费组合目前由四项特许权使用费组成,其中包括加拿大优质砂业公司Manigotagan矿床的每吨特许权使用费,该公司目前正在预付特许权使用费。该公司还拥有回购其甘德地产一定比例的特许权使用费的权利。此外,公司打算就其剩余的勘探和开发物业签订新的特许权使用费协议,并将其分配给新成立的特许权使用费子公司。该过程仍在进行中,随着里程碑的完成,公司将发布进一步的公告。

Exploration Activities:

勘探活动:

Gander Gold Project: Gossan intend to continue to advance its Gander Property to a drill ready state. Final conclusions from the 2023 work program are pending, and new explorations plans will follow these recommendations.

甘德黄金项目: Gossan打算继续将其甘德地产推向钻探就绪状态。2023年工作计划的最终结论尚待确定,新的勘探计划将遵循这些建议。

Glitter VMS Project: The Company has been planning to conduct downhole EM surveys on its last set of drill holes. The Company will continue to look for the opportune time to commit the resources to this project as it plans to continue to advance the project, as funding allows.

Glitter VMS 项目: 该公司一直计划对其最后一组钻孔进行井下电磁勘测。该公司将继续寻找合适的时机为该项目投入资源,因为该公司计划在资金允许的情况下继续推进该项目。

Separation Rapids Lithium Project: The Company is looking to complete an airborne geophysical survey of the property. Together with the recent sampling, these results will allow the Company to better determine further explorations plans. These plans may include a mechanized program to better expose the widths and strike lengths of the mapped pegmatites.

分离急流锂项目: 该公司正在寻求完成对该物业的航空地球物理调查。加上最近的抽样,这些结果将使公司能够更好地确定进一步的勘探计划。这些计划可能包括一个机械化程序,以更好地暴露测绘的伟晶岩的宽度和走向长度。

Pipestone Critical Metals Project: The Company is encouraged by the launch of the Canadian Critical Minerals Infrastructure Fund ("CIMF"), looking to "unlock new critical mineral resources, support improved environmental performance at mine sites, promote reconciliation with Indigenous partners, and strengthen critical minerals supply and value chains." The Company believes that its large indicated and inferred titanium dioxide and vanadium resource could become a leading supplier of minerals and materials for clean energy technologies. (Please refer to the Company's Pipestone 43-101 for details).

Pipestone 关键金属项目: 公司对加拿大关键矿产基础设施基金(“CIMF”)的启动感到鼓舞,该基金希望 “释放新的关键矿产资源,支持改善矿场的环境绩效,促进与土著合作伙伴的和解,加强关键矿产供应和价值链。”该公司认为,其大量指示和推断的二氧化钛和钒资源可能成为清洁能源技术矿产和材料的主要供应商。(详情请参阅该公司的Pipestone 43-101)。

Currently, the Company is exploring a scenario involving the local community, a leading educational institution, and a technical consultant for engineering and environment to partner with the intention to secure CIMF funding to develop the Pipestone project through to completion of pre-feasibility.

目前,该公司正在探索一个涉及当地社区、领先的教育机构和工程与环境技术顾问合作的方案,目的是获得CIMF的资金,用于开发Pipestone项目直至预可行性完成。

2023 AGM Results

2023 年股东大会结果

The Company is pleased to announce the results of its Annual and Special Meeting of Shareholders (the "Meeting"), held on December 14, 2023. At the Meeting, incumbent directors MaryAnn Myhichuk, Hamid M. Mumin, and George N. Mannard were re-elected as directors of Gossan. All other items put forth at the Meeting were also approved, including the re-appointment of the Company's auditors, as well as the approval of a change to the Company's by-laws.

公司很高兴地宣布其于2023年12月14日举行的年度和特别股东大会(“会议”)的结果。在会议上,现任董事玛丽安·米希丘克、哈米德·穆明和乔治·曼纳德再次当选为Gossan的董事。会议上提出的所有其他项目也获得批准,包括重新任命公司审计师以及批准对公司章程的修改。

Grant of Options

授予期权

On February 26, 2024 the Board of Directors of the Company granted 1,700,000 incentive stock options to Directors, Officers, Advisors and Consultants. The options are subject to the Corporation's stock option plan. The options have an exercise price of $0.05 per share and expire on February 26, 2029. The options vest in tranches over a period of 2-years from the date of grant. In addition, 80,000 previously issued stock options to advisors have been cancelled. As of the date of this press release the Corporation has 68,801,471 shares outstanding, and 3,330,000 stock options outstanding.

2024 年 2 月 26 日,公司董事会向董事、高级管理人员、顾问和顾问授予了 1,700,000 份激励性股票期权。期权受公司的股票期权计划约束。这些期权的行使价为每股0.05美元,将于2029年2月26日到期。自授予之日起,期权在2年内分批归属。此外,先前向顾问发行的80,000份股票期权已被取消。截至本新闻稿发布之日,该公司有68,801,471股已发行股票,333万股已发行股票期权。

Qualified Person:

合格人员:

The technical content of this release has been reviewed and approved by Hamid Mumin, Ph.D., P.Eng., P.Geo., a Director of the Company and a 'Qualified Person' as defined under Canadian National Instrument 43-101.

本新闻稿的技术内容已经过哈米德·穆明博士、工程学硕士、P.Geo.、公司董事和加拿大国家仪器43-101定义的 “合格人员” 的审查和批准。

About Gossan Resources:

关于 Gossan 资源:

Gossan Resources Limited holds mineral exploration and development properties located in Manitoba, Northwestern Ontario and Newfoundland. The Company's focus is to advance exploration and drilling of its Glitter Property, located in the zinc-copper-silver rich polymetallic Sturgeon Lake Greenstone Belt of Northwestern Ontario. The Company is also advancing its Gander Gold Property in Newfoundland. The company also holds a broadly diversified portfolio of multi-element properties, prospective for hosting gold, base metals and platinum group elements, as well as specialty "green-battery metals", nickel, cobalt, vanadium, titanium, tantalum, lithium and chromium. Gossan also has a deposit of high-purity, magnesium-rich dolomite, and holds advance and production royalty interests in a high-purity silica sand deposit. The Company trades on the TSX Venture and the Frankfurt/Freiverkehr & Xetra Exchanges and currently has 66,801,471 Common Shares outstanding.

Gossan Resources Limited持有位于曼尼托巴省、安大略省西北部和纽芬兰的矿产勘探和开发物业。该公司的重点是推进其Glitter地产的勘探和钻探,该地产位于安大略省西北部富含锌铜银的多金属鲟湖绿石带。该公司还在推进其位于纽芬兰的甘德黄金地产。该公司还拥有广泛多元化的多元素资产组合,有望储存黄金、基本金属和铂族元素,以及特种 “绿色电池金属”、镍、钴、钒、钛、钽、锂和铬。Gossan 还拥有高纯度、富含镁的白云石矿床,并持有高纯度硅砂矿床的预付款和生产特许权使用费权益。该公司在多伦多证券交易所风险投资和法兰克福/Freiverkehr和Xetra交易所交易,目前已发行普通股66,801,471股。

For further information, please bookmark or contact:

欲了解更多信息,请加入书签或联系:

Samuel Pelaez, President & CEO
Gossan Resources Limited
Tel: (202) 677-8513
E-Mail: info@gossan.ca

总裁兼首席执行官塞缪尔·佩莱兹
高山资源有限公司
电话:(202) 677-8513
电子邮件:info@gossan.ca

Kathy Ringland, Office Manager
Tel: (204) 943-1990

凯西·林兰,办公室经理
电话:(204) 943-1990

Cautionary Statement on Forward -Looking Information

关于前瞻性信息的警示声明

Neither the TSX Venture Exchange ("TSXV") nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release.

都不是多伦多证券交易所风险交易所(”TSXV“)其监管服务提供商(该术语在多伦多证券交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, uncertainty over the outcome of any litigious matters, the Company's objectives, goals or future plans, statements regarding exploration results and exploration plans. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, fluctuations in commodity prices, delays in the development of projects and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

没有任何证券交易所、证券委员会或其他监管机构批准或不批准此处包含的信息。本新闻稿包含不包含历史事实的前瞻性信息。前瞻性信息涉及风险、不确定性和其他因素,这些因素可能导致实际事件、结果、业绩、前景和机会与此类前瞻性信息所表达或暗示的内容存在重大差异。本新闻稿中的前瞻性信息包括但不限于任何诉讼事项结果的不确定性、公司的目标、目标或未来计划、有关勘探结果的声明和勘探计划。可能导致实际结果与此类前瞻性信息存在重大差异的因素包括但不限于与估计值相差很大的资本和运营成本、冶金测试结果的初步性质、延迟获得或未能获得所需的政府、环境或其他项目批准、与未来所需融资的可用性和成本相关的不确定性、股票市场的变化、通货膨胀、大宗商品价格波动、项目开发延迟等矿产勘探和开发行业所涉及的风险,以及公司在SEDAR上提交的公开文件中列出的风险。尽管公司认为在本新闻稿中准备前瞻性信息时使用的假设和因素是合理的,但不应过分依赖此类信息,这仅适用于本新闻稿发布之日,也无法保证此类事件将在披露的时间范围内发生或根本无法保证。除非法律要求,否则公司不打算或义务更新或修改任何前瞻性信息,无论这些信息是由于新信息、未来事件还是其他原因造成的。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发