Independence Gold Commences Spring Drill Program at 3Ts Project, BC
Independence Gold Commences Spring Drill Program at 3Ts Project, BC
Vancouver, British Columbia--(Newsfile Corp. - March 19, 2024) - Independence Gold Corp. (TSXV: IGO) (OTCQB: IEGCF) (the "Company") is pleased to announce the commencement of a diamond drill program at its 100% owned 3Ts Project, located approximately 185 kilometres ("km") southwest of Prince George, British Columbia and situated 16 km southwest of Artemis Gold Inc.'s Blackwater Project.
不列颠哥伦比亚省温哥华--(Newsfile Corp.-2024 年 3 月 19 日)- 独立黄金公司(多伦多证券交易所股票代码:IGO)(场外交易代码:IEGCF) (“公司”)很高兴地宣布,其 100% 所有权的3Ts项目启动了钻石钻探计划,该项目位于不列颠哥伦比亚省乔治王子市西南约185千米(“km”)处,位于Artemis Gold Inc.西南16公里处。”s Blackwater 项目。
The spring drill program will consist of approximately 20 planned drill holes totaling a minimum 4,200 metres ("m") and will focus on the underexplored sections of the Ted-Mint and Tommy Vein Systems, especially at depth where there is the potential for high-grade intercepts that will be used to expand the existing mineral resource (see report titled "Technical Report on the Mineral Resource Estimate Update for the 3Ts Gold Project, Omineca Mining Division, British Columbia, Canada" authored by Armitage and Miller, effective August 18th, 2022; please see news release dated August 18, 2022 for further details).
弹簧钻探计划将包括大约20个计划钻孔,总长度至少为4,200米(“m”),并将重点关注Ted-Mint和Tommy Vein Systems未开发的部分,特别是在有可能使用高品位截获来扩大现有矿产资源的深度(见题为 “加拿大不列颠哥伦比亚省奥米内卡矿业部3Ts黄金项目矿产资源估算更新技术报告” 的报告)由 Armitage 和 Miller 撰写,8 月 18 日生效第四,2022年;请参阅2022年8月18日的新闻稿了解更多详情)。
The drill budget will also allow for the testing of several geophysical targets located 400m west of the Tommy Vein, collectively known as the "Balrog" anomaly, and further testing of the Johnny and Ian veins and the Ootsa copper-silver target. The estimated budget for the spring drill program is $1.9 million.
钻探预算还将允许测试位于汤米矿脉以西400米处的几个地球物理目标,统称为 “Balrog” 异常,并进一步测试约翰尼和伊恩矿脉以及Ootsa铜银目标。弹簧钻探计划的估计预算为190万美元。
The 3Ts Project is comprised of seventeen mineral claims covering approximately 8,840 hectares in the Nechako Plateau region of central British Columbia. The 3Ts Project covers a low-sulphidation epithermal quartz-carbonate vein district within which more than a dozen individual mineralized veins, ranging from 50 m to more than 1,100 m in length and true widths up to 25 m, have been identified.
3Ts项目由17个矿产索赔组成,占地约8,840公顷,位于不列颠哥伦比亚省中部的内查科高原地区。3Ts项目涵盖了一个低硫化的超热石英碳酸盐岩脉区,在该矿脉中,已经确定了十几个单独的矿化矿脉,长度从50米到1,100多米不等,真实宽度可达25 m。
About Independence
关于独立性
Independence Gold Corp. is a well-financed mineral exploration company with holdings ranging from early-stage grassroots exploration to advanced-stage resource expansion in British Columbia and Yukon. The Company is positioned to add shareholder value through systematic project advancement, while management continues to evaluate additional gold and silver projects for possible acquisition. For additional information, visit the Company's website .
Independence Gold Corp. 是一家资金充足的矿产勘探公司,其持股范围从早期的基层勘探到不列颠哥伦比亚省和育空地区的后期资源扩张。公司有望通过系统的项目推进增加股东价值,同时管理层将继续评估其他黄金和白银项目以进行可能的收购。欲了解更多信息,请访问公司的网站。
Andy Randell, P.Geo., the Company's Qualified Person as defined by National Instrument 43-101, has reviewed and approved the technical information in this news release.
根据美国国家仪器43-101的定义,P.Geo. 的安迪·兰德尔已审查并批准了本新闻稿中的技术信息。
ON BEHALF OF THE BOARD OF INDEPENDENCE GOLD CORP.
代表独立黄金公司董事会
"Randy Turner"
“兰迪·特纳”
Randy Turner, President and CEO
兰迪·特纳,总裁兼首席执行官
Suite 580 – 625 Howe, Vancouver, British Columbia V6C 2T6
Telephone: 604-687-3959
Facsimile: 604-687-1448
E-Mail: info@ingold.ca
580 套房 — 625 Howe,温哥华,不列颠哥伦比亚省 V6C 2T6
电话:604-687-3959
传真:604-687-1448
电子邮件:info@ingold.ca
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
多伦多证券交易所风险交易所及其监管服务提供商(该术语在多伦多证券交易所风险交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。
All statements in this press release, other than statements of historical fact, are "forward-looking information" with respect to Independence within the meaning of applicable securities laws, including statements with respect to the Company's planned drilling and exploration activities. The Company provides forward-looking statements for the purpose of conveying information about current expectations and plans relating to the future and readers are cautioned that such statements may not be appropriate for other purposes. By its nature, this information is subject to inherent risks and uncertainties that may be general or specific and which give rise to the possibility that expectations, forecasts, predictions, projections or conclusions will not prove to be accurate, that assumptions may not be correct and that objectives, strategic goals and priorities will not be achieved. These risks and uncertainties include but are not limited to those identified and reported in Independence's public filings under Independence Gold Corp.'s SEDAR profile at . Although Independence has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Independence disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise unless required by law.
本新闻稿中的所有陈述,除历史事实陈述外,均为适用证券法所指的与独立性有关的 “前瞻性信息”,包括与公司计划中的钻探和勘探活动有关的陈述。公司提供前瞻性陈述的目的是传达有关当前预期和未来计划的信息,并提醒读者,此类陈述可能不适合用于其他目的。就其性质而言,这些信息面临固有的风险和不确定性,这些风险和不确定性可能是一般性的,也可能是具体的,这些风险和不确定性可能导致预期、预测、预测或结论不准确,假设可能不正确,目标、战略目标和优先事项可能无法实现。这些风险和不确定性包括但不限于独立黄金公司向独立黄金公司提交的公开文件中发现和报告的风险和不确定性。”s SEDAR 的个人资料位于 。尽管 Independence 试图确定可能导致实际行动、事件或结果与前瞻性信息中描述的存在重大差异的重要因素,但可能还有其他因素导致行动、事件或结果与预期、估计或预期不符。无法保证此类信息会被证明是准确的,因为实际结果和未来事件可能与此类声明中的预期存在重大差异。除非法律要求,否则Independence不打算或没有义务更新或修改任何前瞻性信息,无论是由于新信息、未来事件还是其他原因。