share_log

KORE Appoints Barry Brandon as Director

KORE Appoints Barry Brandon as Director

KORE 任命巴里·布兰登为董事
newsfile ·  04/10 20:00

KORE Announces Options Grant to New Directors

KORE宣布向新董事授予期权

Vancouver, British Columbia--(Newsfile Corp. - April 10, 2024) - KORE Mining Ltd. (TSXV: KORE) ("KORE" or the "Company") is pleased to announce the appointment of Barry Brandon as a director of the Company, effective immediately.

不列颠哥伦比亚省温哥华--(Newsfile Corp.,2024 年 4 月 10 日)-KORE Mining Ltd.(TSXV:KORE)(”KORE“或者”公司“)很高兴地宣布任命巴里·布兰登为公司董事,立即生效。

Mr. Brandon is a graduate of the University of Washington School of Law, a member of the Washington State Bar Association, the Washington D.C. Bar Association, the Oklahoma Bar Association, and a former founding board member of the Native American Bar Association of Washington D.C., and former board member of the Native American Bar Association. Mr. Brandon is currently the Commissioner of the Muscogee Nation - Office of Public Gaming and consults with a diverse client base which includes federally recognized Indian tribes, national developers, construction contractors, investors, and manufacturers. Mr. Brandon has been a director of numerous companies, past and present, General Counsel for the National Indian Gaming Commission, Seneca Gaming Corporation, and the Seneca Development Corporation, and was a partner at both Akin, Gump, Strauss, Hauer & Feld, L.L.P. in Washington, D.C., and Doerner Saunders Daniel & Anderson in Tulsa, Oklahoma, specializing in Native American law. Mr. Brandon has also worked for the United States Department of the Interior, Office of the Secretary, Washington, DC, Deputy Director - Secretary's Indian Water Rights Office, and United States Department of Justice, Environment & Natural Resources Division, Indian Resources Section, Washington, DC as a Senior Trial Attorney. Mr. Brandon is a citizen of the Muscogee (Creek) Nation.

布兰登先生毕业于华盛顿大学法学院,华盛顿州律师协会、华盛顿特区律师协会、俄克拉荷马州律师协会会员,曾任华盛顿特区美洲原住民律师协会创始董事会成员,美洲原住民律师协会前董事会成员。布兰登先生目前是马斯科吉民族公共博彩办公室的专员,他为包括联邦认可的印第安部落、国家开发商、建筑承包商、投资者和制造商在内的多元化客户群提供咨询。布兰登先生过去和现在都曾担任多家公司的董事,全国印第安博彩委员会、塞内卡博彩公司和塞内卡开发公司的总法律顾问,并且是华盛顿特区的Akin、Gump、Strauss、Hauer & Feld, L.P. 和俄克拉荷马州塔尔萨的Doerner Saunders Daniel & Anderson律师事务所的合伙人,专门研究美洲原住民法。布兰登先生还曾在美国内政部华盛顿特区国务卿办公室任印第安水权办公室副主任,以及美国司法部环境与自然资源司华盛顿特区印第安资源科担任高级出庭律师。布兰登先生是马斯科吉(克里克)民族的公民。

Grant of Options

授予期权

As part of the Company's long-term incentive plan, KORE has granted an aggregate of 1,500,000 stock options ("Stock Options") to the new directors of the company in accordance with the Company's Option Plan. The Stock Options are exercisable at $0.05 per share for a five-year term, and vest immediately on the date of grant. All Stock Options remain subject to the approval of the TSX Venture Exchange.

作为公司长期激励计划的一部分,KORE共授予了150万份股票期权(”股票期权“)根据公司的期权计划,分配给公司的新董事。股票期权可按每股0.05美元的价格行使,为期五年,并在授予之日立即归属。所有股票期权仍需获得多伦多证券交易所风险交易所的批准。

About the Imperial Gold Project

关于帝国黄金项目

KORE owns 100% of the Mesquite-Imperial-Picacho District which captures the entire 28-kilometer trend from the operating Mesquite mine (Equinox Gold) to the closed Picacho mine and including KORE's Imperial project. In the District, gold is hosted in local fault structures related to a series of regional faults connecting the known District deposits. Those three District deposits (Mesquite, Imperial, and Picacho) were discovered in exposed outcrops and from placer workings. The rest of the District is covered by alluvium and has never been systematically explored.

KORE拥有梅斯基特-帝国-皮卡乔区100%的股份,该地区记录了从运营中的梅斯基特矿(Equinox Gold)到封闭的皮卡乔矿山的整个28公里路线,包括KORE的帝国项目。在该地区,黄金存在于局部断层结构中,这些断层结构与连接已知地区矿床的一系列区域断层有关。这三个地区矿床(梅斯基特、帝国矿和皮卡乔)是在裸露的露头和砂矿作业中发现的。该地区的其余部分由冲积层覆盖,从未进行过系统的勘探。

The Mesquite-Imperial-Picacho District centers on KORE's Imperial project. Imperial is a structurally controlled intermediate sulfidation epithermal gold deposit. The 100% oxide gold deposit is currently defined at 2.44 kilometers long and up to 0.75 kilometers wide and is open both along strike and downdip. It is hosted in a shallowly southwest dipping, amphibolite grade metamorphic rock suite along a west-northwest trending low-angle regional thrust fault system which controls the regional geometry of mineralization. East-west striking, post-mineralization normal faults control the property scale geometry of mineralization. Geophysical characterization of the deposit and regional controlling structures is an essential component of exploration for additional resources.

梅斯基特-帝国-皮卡乔区以韩国帝国项目为中心。Imperial是一个结构受控的中间硫化超热液金矿床。目前,100% 氧化金矿床的定义长度为 2.44 千米,宽度可达 0.75 千米,沿走向和向下均处于开放状态。它位于西南向浅倾斜的闪石级变质岩组中,沿着控制区域矿化的区域几何形状,沿着西北向的低角度区域推力断层系统延伸。东西向冲击的矿化后的正常断层控制着矿化的特性尺度几何形状。矿床和区域控制结构的地球物理特征是勘探额外资源的重要组成部分。

Imperial has a mineral resource estimate and a positive preliminary economic assessment effective April 6, 2020, with the following highlights:

帝国航空的矿产资源估计和积极的初步经济评估将于2020年4月6日生效,其亮点如下:

  • US$ 590 million NPV5% post-tax with 64% IRR at US$ 1,800 per ounce gold
  • US$ 729 million NPV5% at post-tax with 75% IRR at US$ 2,000 per ounce gold
  • Low capital intensity project with only US$ 143 million pre-production capital cost
  • Average 146,000 ounces of gold per year over 8 years for 1.2 million ounces of total production
  • Technically simple project: shallow open pit, run-of-mine heap leach with existing infrastructure
  • Value enhancement through Mesquite-Imperial-Picacho District exploration and resource expansion
  • 净现值为5.9亿美元,税后净现值为5%,内部收益率为64%,每盎司黄金为1,800美元
  • 7.29亿美元净现值税后为5%,内部收益率为75%,按每盎司黄金2,000美元计算
  • 低资本密集度项目,预生产资本成本仅为1.43亿美元
  • 8 年内平均每年生产 146,000 盎司黄金,总产量为 120 万盎司
  • 技术简单的项目:浅层露天矿坑,利用现有基础设施进行原矿堆浸出
  • 通过Mesquite-Imperial-Picacho地区的勘探和资源扩张来提高价值

Economic Model Sensitivity to Gold Price

经济模型对黄金价格的敏感度

The Company's NI 43-101 compliant resource and preliminary economic assessment is titled "Preliminary Economic Assessment - Technical Report Imperial Gold Project" effective as of April 6, 2020, and revised and amended on June 10, 2021, prepared by Terre Lane and Todd Harvey of Global Resource Engineering and Glen Cole of SRK Consulting (Canada) Inc. can be found under the Company's profile on SEDAR at and on the Company's website.

该公司符合NI 43-101标准的资源和初步经济评估标题为 “初步经济评估——帝国黄金项目技术报告”,自2020年4月6日起生效,并于2021年6月10日进行了修订和修订,由全球资源工程公司的Terre Lane和Todd Harvey以及SRK咨询(加拿大)公司的格伦·科尔编写,可在SEDAR的公司简介下和公司网站上找到。

About Kore's Long Valley Gold Project

关于韩国长谷黄金项目

Long Valley is a 100% owned epithermal gold and silver project located in Mono County, California. The large land package is district in scale and covers all deep-rooted fault structures of similar genesis to the Hilton Creek fault, the primary 'conduit' for the current Long Valley deposit.

长谷是位于加利福尼亚州莫诺县的100%所有权的超热金和白银项目。 大的 土地一揽子计划是区域性的,涵盖了所有根深蒂固的断层结构,其起源与希尔顿溪断层相似,希尔顿溪断层是当前长谷矿床的主要 “管道”。

The Long Valley deposit is an intact low sulphidation epithermal Au-Ag deposit with a large 2.5 km by 2 km oxide footprint, hosted within a melange of fine to coarse volcanogenic sedimentary lithologies. Mineralization at Long Valley has developed due to a combination of deep-rooted fault structures and a resurgence of rhyolite within an active caldera. The Hilton Creek Fault structure transects and serves as a fluid conduit for interaction with the underlying hydrothermal system, while the rhyolite resurgence caused brittle fracturing of sediments and created voids or traps for mineralization and gold deposition. The combination of these factors yields strongly altered kaolin and quartz-hematite zones that are the primary host for gold mineralization.

长谷矿床是一个完好无损的低硫化超热液金银矿床,其氧化物足迹为2.5 km x 2 km,分布在从细到粗的火山成因沉积岩性质中。长谷的矿化是由于根深蒂固的断层结构和活跃的火山口中流纹岩的再现。希尔顿溪断层结构横断并充当与底层热液系统相互作用的流体管道,而流纹岩的复苏导致沉积物脆性压裂,为矿化和金沉积形成空隙或陷阱。这些因素的结合产生了强烈变化的高岭土和石英赤铁矿带,这些区域是金矿化的主要宿主。

The Hilton Creek Fault remains underexplored on-strike north and south and several parallel structures have been defined using geophysics, the eastern one hosting some of the current mineral resources and the western one being unexplored. Long Valley is therefore open to potential new oxide discoveries in all directions. More details on the deposit geology and exploration potential can be found in KORE's January 30, 2020, and March 24, 2020 news releases.

希尔顿溪断层在向北和向南冲击时仍未得到充分开发,已经使用地球物理学定义了几种平行结构,东部的断层拥有一些当前的矿产资源,西部的断层尚未开发。因此,长谷对全方位潜在的新氧化物发现持开放态度。有关矿床地质和勘探潜力的更多细节可以在KORE于2020年1月30日发布的文章中找到,和2020年3月24日新闻发布。

A total of 896 holes have been drilled on the Project, the majority being completed by reverse circulation with lesser core, rotary, and air track. The current mineral resource estimate is 1,217,000 ounces of Indicated gold and 456,000 ounces of Inferred gold from 63.7 million tonnes of 0.58 grams per tonne and 22.0 million tonnes of 0.65 grams per tonne, respectively. The mineral resource consists of oxide, transition, and sulphides. The estimate was prepared by Neil Prenn, P.E. of Mine Development Associates with an effective date of September 15, 2020.

该项目共钻了896个孔,其中大部分是通过反循环完成的,包括较小的岩心、旋转和空中轨道。目前的矿产资源估计为121.7万盎司指示黄金和45.6万盎司推断黄金,分别为6,370万吨每吨0.58克和2,200万吨每吨0.65克。矿产资源由氧化物、过渡和硫化物组成。该估算由矿业开发协会总裁尼尔·普伦恩编制,生效日期为2020年9月15日。

A Preliminary Economic Assessment for a shallow, low-strip heap leach Au-Ag project was filed on October 27, 2020, with the following highlights:

2020年10月27日提交了浅层低带堆浸Au-Ag项目的初步经济评估,其重点如下:

  • US $351.7 million NPV5% post-tax with IRR of 58% at US$ 1,800 per ounce gold;
  • US$ 437.8 million NPV5% post-tax with IRR of 67% at US$ 2,000 per ounce gold;
  • 102,000 ounces of gold per year over 7 years of mine life;
  • Technically simple: shallow open pit, heap leach with nearby infrastructure;
  • Unmodelled silver potential from metallurgical test-work; and
  • Shallow oxide and sulfide feeder exploration potential to further enhance the project.
  • 3.517亿美元净现值税后5%,内部收益率为58%,按每盎司黄金1,800美元计算;
  • 净现值4.378亿美元,税后净现值为5%,内部收益率为67%,按每盎司黄金2,000美元计算;
  • 在 7 年的矿山寿命中,每年可获得 102,000 盎司的黄金;
  • 技术简单:浅层露天矿坑,利用附近的基础设施进行堆浸处理;
  • 冶金试验工作中未建模的白银潜力;以及
  • 浅层氧化物和硫化物馈线勘探潜力进一步加强该项目。

After Tax NPV@5% and IRR Sensitivity to Gold Price (US $)

税后 NPV @5% 和 IRR 对黄金价格的敏感度(美元)

Gold Price $/tr oz NPV 5% (millions) IRR
1000 3.8 6%
1100 50.0 17%
1200 96.7 25%
1300 142.6 32%
1400 187.4 38%
1500 228.6 43%
1600 272.6 48%
1700 308.6 53%
1800 351.7 58%
1900 394.7 63%
2000 437.8 67%
2100 480.9 72%
2200 523.9 76%
2300 567.0 81%
2400 610.0 85%
2500 653.1 90%
2600 696.1 94%
2700 739.2 98%
2800 782.2 102%
2900 825.3 107%
3000 868.4 111%
黄金价格 $/tr oz 净现值 5%(百万) IRR
1000 3.8 6%
1100 50.0 17%
1200 96.7 25%
1300 142.6 32%
1400 187.4 38%
1500 228.6 43%
1600 272.6 48%
1700 308.6 53%
1800 351.7 58%
1900 394.7 63%
2000 437.8 67%
2100 480.9 72%
2200 523.9 76%
2300 567.0 81%
2400 610.0 85%
2500 653.1 90%
2600 696.1 94%
2700 739.2 98%
2800 782.2 102%
2900 825.3 107%
3000 868.4 111%

More information is available in the technical report filed on SEDAR at and on KORE's website at .

更多信息可在SEDAR和KORE网站上提交的技术报告中找到。

Technical information with respect to the Imperial Gold Project and Long Valley Gold Project has been reviewed and approved by Terre Lane, MMSA, registered member SME, and is a qualified person under National Instrument 43-101 responsible for the technical matters of this news release.

有关帝国黄金项目和长谷黄金项目的技术信息已由注册成员中小企业MMSA的Terre Lane审查和批准,并且是National Instrument 43-101规定的合格人员,负责本新闻稿的技术事务。

About KORE Mining

关于 KORE Mining

KORE Mining is focused on responsibly creating value from its portfolio of gold assets in California, USA. The Company is advancing the Imperial project towards development while continuing to explore across both district-scale gold assets.

KORE Mining专注于以负责任的方式从其在美国加利福尼亚的黄金资产组合中创造价值。该公司正在推进帝国项目的开发,同时继续探索这两个地区规模的黄金资产。

Further information on Imperial and KORE can be found on the Company's website at or by contacting us as info@koremining.com or by telephone at (888) 407-5450.

有关Imperial和KORE的更多信息,可在公司的网站上找到,或通过以下方式联系我们 info@koremining.com 或致电 (888) 407-5450。

On behalf of KORE Mining Ltd.

代表 KORE 矿业有限公司

"James Hynes"
Executive Chairman and CEO
(888) 407-5450

詹姆斯·海因斯”
执行董事长兼首席执行官
(888) 407-5450

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所风险投资交易所及其监管服务提供商(该术语在多伦多证券交易所风险投资交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

Cautionary Statement Regarding Forward-Looking Information

关于前瞻性信息的警示声明

This news release contains forward-looking statements relating to the future operations of the Company and other statements that are not historical facts. Forward-looking statements are often identified by terms such as "will", "may", "should", "anticipate", "expects", "intends", "indicates" and similar expressions. All statements other than statements of historical fact, included in this release, including, without limitation, statements regarding the future plans and objectives of the Company are forward-looking statements.

本新闻稿包含与公司未来运营有关的前瞻性陈述以及其他非历史事实的陈述。前瞻性陈述通常由 “将”、“可能”、“应该”、“预期”、“期望”、“打算”、“表示” 等术语和类似表述来识别。除历史事实陈述外,本新闻稿中包含的所有陈述,包括但不限于有关公司未来计划和目标的陈述,均为前瞻性陈述。

Forward‐looking statements in this news release include, but are not limited to, statements with respect to: approval from the TSXV regarding the grant of Stock Options; the ability to advance exploration activities at the Imperial gold deposit; potential actions, behavior or position of the BLM; and the underexplored and prospective nature of the Imperial Regional Exploration Drilling area. Such forward‐looking statements, and any assumptions upon which they are based, are made in good faith and reflect our current judgment regarding the direction of our business. In connection with the forward‐looking information contained in this presentation, the Company has made numerous assumptions, including, among others: there being no significant change to current geotechnical, metallurgical, hydrological and other physical conditions at the Imperial Project; exploration, permitting, and development of the Imperial Project being consistent with current expectations and planning; the geological, permitting and economic advice that the Company has received is reliable and is based upon practices and methodologies which are consistent with industry standards; and other planning assumptions. While the Company considers these assumptions to be reasonable, these assumptions are inherently subject to significant uncertainties and contingencies.

本新闻稿中的前瞻性声明包括但不限于以下方面的声明:多伦多证券交易所批准股票期权;推进帝国金矿勘探活动的能力;BLM的潜在行动、行为或立场; 以及帝国地区勘探钻探区的未充分开发和前景展望。此类前瞻性陈述及其所依据的任何假设都是本着诚意做出的,反映了我们目前对业务方向的判断。关于本演示文稿中包含的前瞻性信息,公司做出了许多假设,其中包括:帝国项目目前的岩土工程、冶金、水文和其他物理条件没有重大变化;帝国项目的勘探、许可和开发符合当前的预期和规划;公司收到的地质、许可和经济建议是可靠的,基于一致的做法和方法符合行业标准;以及其他规划假设。尽管公司认为这些假设是合理的,但这些假设本质上会受到重大的不确定性和偶发性的影响。

Forward looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward‐looking information. Known risk factors include, among others: the outcome of BLM's review processes for permitting, including the final outcome(s) of BLM's mineral claim validity examination(s) and administrative review process(es) with respect to the Imperial Zone, including a change to the findings from the mineral claim validity examination conducted in 2002 for the mill sites at the Imperial Zone, resulting in the Company having to move its future Imperial Zone project support facilities to areas that are not within the Indian Pass mineral withdrawal area; the possibility that BLM may require and/or conduct further mineral claim validity examinations with respect to the Imperial project, and the outcome and final determination of such examination could, among other things, invalidate one or more mining claims; the possibility that BLM or other governmental authority review of the Regional Exploration Drilling program, delays or changes the Company's plan for Regional Exploration Drilling permitting, which could result, among other things, in delays, additional project requirements, additional costs and uncertainty of meeting anticipated program milestones; the exploration drill program may not be completed as planned; the need to obtain additional financing; uncertainty as to the availability and terms of future financing; the possibility of delay in exploration or development programs and uncertainty of meeting anticipated program milestones; uncertainty as to timely availability of permits and other government approvals.

前瞻性信息涉及已知和未知的风险、不确定性和其他因素,这些因素可能导致公司的实际业绩、业绩或成就与前瞻性信息所表达或暗示的任何未来业绩、业绩或成就存在重大差异。已知的风险因素包括:BLM的许可审查程序的结果,包括BLM对帝国区的矿产索赔有效性审查和行政复议程序的最终结果,包括对2002年对帝国区工厂场地进行的矿产索赔有效性审查结果的更改,导致该公司不得不将其未来的帝国区项目支持设施迁至非帝国区项目支持设施的地区在印第安山口矿产开采区内;这种可能性BLM可能要求和/或对帝国项目进行进一步的矿产索赔有效性审查,除其他外,此类审查的结果和最终决定可能会使一项或多项采矿索赔无效;BLM或其他政府机构可能对区域勘探钻探计划进行审查,推迟或更改公司的区域勘探钻探许可计划,这可能导致延误、额外项目要求、额外成本和满足预期的不确定性等计划里程碑;勘探钻探计划可能无法按计划完成;需要获得额外融资;未来融资可用性和条款的不确定性;勘探或开发计划延迟的可能性以及实现预期计划里程碑的不确定性;及时获得许可证和其他政府批准的不确定性。

In addition to the above summary, additional risks and uncertainties are described in the "Risks" sections of the Company's Management's Discussion and Analysis for the year ended December 31, 2022 prepared as of April 19, 2023 available under the Company's issuer profile on SEDAR at .

除了上述摘要外,截至2023年4月19日编制的公司管理层讨论与分析的 “风险” 部分还描述了其他风险和不确定性,该部分可在SEDAR的公司发行人简介下查阅。

Forward-looking statements contained herein are made as of the date of this news release and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results, except as may be required by applicable securities laws. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information.

此处包含的前瞻性陈述自本新闻稿发布之日起作出,除非适用的证券法另有要求,否则公司不承担任何更新任何前瞻性陈述的义务,无论这些陈述是由于新信息、未来事件还是业绩造成的。无法保证前瞻性信息会被证明是准确的,因为实际结果和未来事件可能与此类陈述中的预期存在重大差异。因此,读者不应过分依赖前瞻性信息。

GalaxyThere is no certainty that all or any part of the mineral resource will be converted into mineral reserve. It is uncertain if further exploration will allow improving the classification of the Indicated or Inferred mineral resource. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

Galaxy不确定矿产资源的全部或任何部分都会转化为矿产储量。目前尚不确定进一步的勘探是否可以改善指示或推断的矿产资源的分类。矿产资源不是矿产储量,没有显示出经济可行性。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发