share_log

DLP Resources Announces Commencement of 2024 Drilling at Aurora

DLP Resources Announces Commencement of 2024 Drilling at Aurora

DLP 资源宣布 2024 年开始在 Aurora 进行钻探
newsfile ·  04/30 06:00

Cranbrook, British Columbia--(Newsfile Corp. - April 30, 2024) - DLP Resources Inc. (TSXV: DLP) (OTCQB: DLPRF) ("DLP" or the "Company") is pleased to announce that drilling of the fourteenth diamond drill hole, on the Aurora porphyry copper-molybdenum project in Peru, has commenced.

不列颠哥伦比亚省克兰布鲁克--(Newsfile Corp.-2024 年 4 月 30 日)- DLP Resources Inc.(多伦多证券交易所股票代码:DLP)(场外交易代码:DLPRF) (”DLP“或者”公司“)很高兴地宣布,秘鲁Aurora斑岩铜钼项目的第14个钻石钻孔的钻探已经开始。

Aurora Project (Porphyry Cu-Mo Target)

极光项目(斑岩铜钼靶材)

Aurora is a porphyry copper-molybdenum project in Southern Peru with the potential to host a significant copper-molybdenum mineralized system (Figures 1, 2, 3, 4 and 5). Drilling of thirteen diamond drillholes was completed in December 2023 and results have been released for all thirteen holes (see DLP news release dated January 04, 2024). A summary of results for the 2022-23 drilling are highlighted in Table 1 below.

Aurora是秘鲁南部的一个斑岩铜钼项目,有可能拥有重要的铜钼矿化系统(图1、2、3、4和5)。十三个钻石钻孔的钻探已于2023年12月完成,所有13个钻孔的钻探结果已经公布(见2024年1月4日DLP新闻稿)。下表 1 突出显示了 2022-23 年的钻探结果摘要。

Continued drilling along extensions of known copper-molybdenum mineralization to the northeast and southeast will be done during 2024 (Figures 2 and 3). Diamond drillhole A24-014 commenced on April 24 on an azimuth of 050 degrees with an inclination of -70 degrees. A23-014 will be drilled approximately 270m to the northeast of A23-013 to a planned depth of 1000m.

2024年,将继续沿已知铜钼矿化向东北和东南延伸部分进行钻探(图2和3)。钻石钻孔 A24-014 于 4 月 24 日开工,方位角为 050 度,倾角为 -70 度。A23-014 将在 A23-013 东北部大约 270 米处钻探,计划深度为 1000 米。

Mr. Gendall, President and CEO commented: "A23-014 will be drilled on the NE limit of our 2023 drilling to expand copper and molybdenum mineralization into the NE area. It was to the NE in late 2023 that we encountered veined, brecciated rock samples on surface which reported anomalous copper and molybdenum mineralization in assay results received. We are extremely excited with the initiation of this 2024 drill program with a planned 10,000m of drilling and look forward to results in early June."

总裁兼首席执行官根德尔先生评论说:“A23-014 将在我们 2023 年钻探的东北极限上钻探,以将铜和钼的矿化范围扩大到东北地区。正是在2023年底,我们在东北部遇到了地表的脉状角砾岩样本,这些样本在收到的化验结果中报告了异常的铜和钼矿化。我们对2024年钻探计划的启动感到非常兴奋,计划钻探10,000米,并期待在6月初取得成果。”

Table 1. Summary of significant drill results for diamond drillholes A22-01 to A23-013. All grades are length-weighted averages of samples within the interval reported.

表 1。A22-01 至 A23-013 金刚石钻孔的重要钻探结果摘要。所有成绩均为报告间隔内样本的长度加权平均值。

Hole From To Interval1 Description Cu (total) Mo Ag Cueq*
ID m m m
% % g/t %
A22-001 22.45 145.80 123.35 Oxidized/Mixed 0.49 0.0036 4.20 0.51
Includes 100.35 145.80 45.45 Enriched 0.64 0.0017 3.40 0.65

100.35 124.30 23.95 Enriched 0.87 0.0024 3.43 0.88

108.65 124.30 15.65 Enriched 1.09 0.0033 3.00 1.11
A22-002 208.00 422.40 214.40 Oxidized/Mixed/Primary 0.35 0.0114 3.95 0.41
Includes 244.00 296.00 52.00 Primary 0.52 0.0131 4.53 0.59
A22-003 38.00 702.30 664.30 Partially leached /Mixed/Enriched/Primary 0.33 0.0483 3.23 0.58
Includes 132.00 350.00 218.00 Mixed sulphides/Enrichment 0.69 0.0162 5.65 0.77

206.00 350.00 144.00 Enriched 0.75 0.0097 5.87 0.80

258.00 350.00 92.00 Enriched 0.83 0.0071 6.81 0.87

522.00 702.30 180.30 Primary (Moly rich) 0.07 0.1284 0.73 0.74
A23-004 0.00 700.90 700.90 Leached/Mixed/Enriched/
Primary
0.18 0.142 2.47 0.92
Includes 110.90 333.00 222.10 Mixed/Enriched/Primary 0.46 0.056 5.88 0.75

110.90 264.00 153.10 Mixed/Enriched 0.53 0.058 7.07 0.83

421.00 502.00 81.00 Primary (Molybdenum rich) 0.12 0.152 0.84 0.91

502.00 700.90 198.90 Primary (Molybdenum rich) 0.02 0.273 0.17 1.44
A23-005 130.00 188.00 58.00 Mixed/Enriched 0.43 0.054 3.38 0.71

188.00 302.00 114.00 Primary 0.14 0.076 1.38 0.54

302.00 472.00 170.00 Primary (Molybdenum rich) 0.1 0.11 1.05 0.67

472.00 693.40 221.40 Primary (Molybdenum rich) 0.03 0.259 0.95 1.38
A23-006 91.00 708.50 617.50 Mixed/Enriched/Primary 0.17 0.148 1.82 0.94
Includes 91.00 127.00 36.00 Mixed/Enriched 0.62 0.031 9.10 0.78

321.00 708.55 387.55 Primary (Molybdenum rich) 0.07 0.205 0.74 1.14
A23-007 0.00 708.25 708.25 Partially Leached/Primary/Hornfels 0.25 0.0137 3.07 0.32
Includes 206.00 406.00 200.00 Primary/Hornfels 0.37 0.003 3.83 0.39

206.00 254.00 48.00 Primary/Hornfels 0.57 0.002 5.33 0.58

272.00 306.00 34.00 Primary/Hornfels 0.48 0.003 6.33 0.50
A23-008 3.10 703.65 700.55 Primary/Hornfels+Porphyry 0.10 0.0852 1.18 0.54
Includes 402.00 703.65 301.65 Primary/Porphyry 0.03 0.1548 0.26 0.84
A23-009 0.40 790.55 790.15 Primary/Hornfels+Breccia+
Porphyry
0.27 0.0095 2.39 0.32
Includes 303.00 617.00 314.00 Primary/Hornfels+Breccia+
Porphyry
0.37 0.0144 2.86 0.45

561.00 617.00 56.00 Primary/Porphyry + Breccia 0.52 0.0144 3.46 0.60
A23-010 0 1002.55 1002.55 Leached/Mixed/Enriched/
Primary
0.20 0.0838 2.19 0.66
Includes 190.00 218.00 28.00 Mixed/Enriched 0.86 0.0015 8.41 0.94

190.00 315.00 125.00 Mixed/Enriched/Primary 0.43 0.0082 4.65 0.51

543.00 625.00 82.00 Primary - Breccia zone 0.37 0.0618 3.51 0.72

543.00 1002.55 459.55 Primary 0.09 0.1754 0.9 1.01
A23-011 3.10 1081.70 1078.60 Leached+Mixed & Primary Mineralization/Hornfels+
Porphyry
0.16 0.0606 1.69 0.49
Includes 111.00 1081.70 970.70 Mixed & Primary Mineralization/Hornfels+
Porphyry
0.17 0.0667 1.81 0.53
Includes 111.00 524.00 413.00 Mixed & Primary Mineralization /Hornfels+Porphyry 0.28 0.0112 2.40 0.36
Includes 183.00 215.00 32.00 Mixed & Primary Mineralization/Hornfels+
Porphyry
0.44 0.0125 3.69 0.54

524.00 1081.70 557.70 Primary Mineralization/Porphyry 0.09 0.1078 1.38 0.66
Includes 716.00 1081.70 365.70 Primary Mineralization/Porphyry 0.07 0.1403 0.66 0.81
A23-012 0.00 5.65 5.65 Overburden (not sampled) - - - -

5.65 887.60 881.95 Primary Mineralization/Hornfels + Porphyry 0.18 0.0514 1.68 0.46
Includes 5.65 22.00 16.35 Primary Mineralization + Enriched/Breccia 0.49 0.0499 6.53 0.80
Includes 5.65 192.00 186.35 Primary Mineralization/Hornfels + Porphyry 0.15 0.0643 1.74 0.50
Includes 406.00 544.00 138.00 Primary Mineralization/Porphyry 0.45 0.0390 3.08 0.68
Includes 600.00 887.60 287.60 Primary Mineralization/Porphyry 0.07 0.0962 0.93 0.58
Includes 692.00 887.60 195.60 Primary Mineralization/Porphyry 0.06 0.1083 0.37 0.62
A23-013 0.00 208.00 208.00 Leached and partially leached porphyry 0.11 0.0038 1.46 0.14

208.00 981.20 773.20 Leached and partially leached/weak enrichment/ primary mineralization in porphyry and breccia 0.17 0.1221 1.91 0.82
Includes 208.00 530.00 322.00 Weak copper enrichment/Primary mineralization in porphyry 0.34 0.0278 3.43 0.51
Includes 208.00 360.00 152.00 Weak copper enrichment/Primary mineralization in porphyry 0.38 0.0056 4.13 0.44

360.00 530.00 170.00 Primary mineralization in breccia and porphyry 0.30 0.0490 2.78 0.57

530.00 981.20 451.20 Primary mineralization in Porphyry 0.05 0.1883 0.72 1.04
来自 间隔1 描述 铜(总计) Mo Ag Cueq*
身份证 m m m
% % g/t %
A22-001 22.45 145.80 123.35 氧化/混合 0.49 0.0036 4.20 0.51
包括 100.35 145.80 45.45 丰富 0.64 0.0017 3.40 0.65

100.35 124.30 23.95 丰富 0.87 0.0024 3.43 0.88

108.65 124.30 15.65 丰富 1.09 0.0033 3.00 1.11
A22-002 208.00 422.40 214.40 氧化/混合/初级 0.35 0.0114 3.95 0.41
包括 244.00 296.00 52.00 小学 0.52 0.0131 4.53 0.59
A22-003 38.00 702.30 664.30 部分浸出/混合/浓缩/初级 0.33 0.0483 3.23 0.58
包括 132.00 350.00 218.00 混合硫化物/富集 0.69 0.0162 5.65 0.77

206.00 350.00 144.00 丰富 0.75 0.0097 5.87 0.80

258.00 350.00 92.00 丰富 0.83 0.0071 6.81 0.87

522.00 702.30 180.30 初级(Moly rich) 0.07 0.1284 0.73 0.74
A23-004 0.00 700.90 700.90 浸出/混合/浓缩/
小学
0.18 0.142 2.47 0.92
包括 110.90 333.00 222.10 混合型/强化型/初级 0.46 0.056 5.88 0.75

110.90 264.00 153.10 混合/浓缩 0.53 0.058 7.07 0.83

421.00 502.00 81.00 初级(富含钼) 0.12 0.152 0.84 0.91

502.00 700.90 198.90 初级(富含钼) 0.02 0.273 0.17 1.44
A23-005 130.00 188.00 58.00 混合/丰富 0.43 0.054 3.38 0.71

188.00 302.00 114.00 小学 0.14 0.076 1.38 0.54

302.00 472.00 170.00 初级(富含钼) 0.1 0.11 1.05 0.67

472.00 693.40 221.40 初级(富含钼) 0.03 0.259 0.95 1.38
A23-006 91.00 708.50 617.50 混合型/强化型/初级 0.17 0.148 1.82 0.94
包括 91.00 127.00 36.00 混合/浓缩 0.62 0.031 9.10 0.78

321.00 708.55 387.55 初级(富含钼) 0.07 0.205 0.74 1.14
A23-007 0.00 708.25 708.25 部分浸出/主要/Hornfels 0.25 0.0137 3.07 0.32
包括 206.00 406.00 200.00 小学/霍恩费尔斯 0.37 0.003 3.83 0.39

206.00 254.00 48.00 小学/霍恩费尔斯 0.57 0.002 5.33 0.58

272.00 306.00 34.00 小学/霍恩费尔斯 0.48 0.003 6.33 0.50
A23-008 3.10 703.65 700.55 初级/Hornfels+Porphyry 0.10 0.0852 1.18 0.54
包括 402.00 703.65 301.65 初级/斑岩 0.03 0.1548 0.26 0.84
A23-009 0.40 790.55 790.15 小学/霍恩费尔斯+角砾岩+
斑岩
0.27 0.0095 2.39 0.32
包括 303.00 617.00 314.00 小学/霍恩费尔斯+角砾岩+
斑岩
0.37 0.0144 2.86 0.45

561.00 617.00 56.00 Primary/Porphyry + 角砾岩 0.52 0.0144 3.46 0.60
A23-010 0 1002.55 1002.55 浸出/混合/浓缩/
小学
0.20 0.0838 2.19 0.66
包括 190.00 218.00 28.00 混合/浓缩 0.86 0.0015 8.41 0.94

190.00 315.00 125.00 混合型/强化型/初级 0.43 0.0082 4.65 0.51

543.00 625.00 82.00 主要-角砾区域 0.37 0.0618 3.51 0.72

543.00 1002.55 459.55 小学 0.09 0.1754 0.9 1.01
A23-011 3.10 1081.70 1078.60 浸出+混合和初级矿化/Hornfels+
斑岩
0.16 0.0606 1.69 0.49
包括 111.00 1081.70 970.70 混合矿化和初级矿化/Hornfels+
斑岩
0.17 0.0667 1.81 0.53
包括 111.00 524.00 413.00 混合矿化和初级矿化 /霍恩费尔斯+斑岩 0.28 0.0112 2.40 0.36
包括 183.00 215.00 32.00 混合矿化和初级矿化/Hornfels+
斑岩
0.44 0.0125 3.69 0.54

524.00 1081.70 557.70 初级矿化/斑岩 0.09 0.1078 1.38 0.66
包括 716.00 1081.70 365.70 初级矿化/斑岩 0.07 0.1403 0.66 0.81
A23-012 0.00 5.65 5.65 过载(未抽样) - - - -

5.65 887.60 881.95 初级矿化/霍恩费尔斯 + 斑岩 0.18 0.0514 1.68 0.46
包括 5.65 22.00 16.35 初级矿化 + 浓缩/角砾岩 0.49 0.0499 6.53 0.80
包括 5.65 192.00 186.35 初级矿化/霍恩费尔斯 + 斑岩 0.15 0.0643 1.74 0.50
包括 406.00 544.00 138.00 初级矿化/斑岩 0.45 0.0390 3.08 0.68
包括 600.00 887.60 287.60 初级矿化/斑岩 0.07 0.0962 0.93 0.58
包括 692.00 887.60 195.60 初级矿化/斑岩 0.06 0.1083 0.37 0.62
A23-013 0.00 208.00 208.00 浸出和部分浸过的斑岩 0.11 0.0038 1.46 0.14

208.00 981.20 773.20 斑岩和角砾岩中浸出和部分浸出/富集度较弱/初级矿化 0.17 0.1221 1.91 0.82
包括 208.00 530.00 322.00 斑岩中的弱铜富集/初级矿化 0.34 0.0278 3.43 0.51
包括 208.00 360.00 152.00 斑岩中的弱铜富集/初级矿化 0.38 0.0056 4.13 0.44

360.00 530.00 170.00 角砾岩和斑岩中的初级矿化 0.30 0.0490 2.78 0.57

530.00 981.20 451.20 斑岩中的初级矿化 0.05 0.1883 0.72 1.04

Note: *Copper equivalent grades (CuEq) are for comparative purposes only. Mo, Cu and Ag values are uncut, and core recovery is assumed to be 100% for the entire drilled lengths of A23-01 to A23-013. The project is at an early stage of exploration and conceptual recoveries of Cu 85%, Mo 82%, and Ag 75% are assigned to the CuEq calculations. Conversion of metals to an equivalent copper grade based on these metal prices is relative to the copper price per unit mass factored by conceptual recoveries for those metals normalized to the conceptualized copper recovery. The metal equivalencies for each metal are added to the copper grade. The formula for this is: CuEq % = Cu% + (Mo% * (Mo recovery / Cu recovery) * (Mo $ per lb / Cu $ per lb) + (Ag g/t * (Ag recovery / Cu recovery) * (Ag $ per oz/ 31.1034768) / (Cu $ per lb* 22.04623)).

注意:*铜当量等级 (CueQ) 仅用于比较目的。钼值、铜值和银值未切割,假设 A23-01 至 A23-013 的整个钻孔长度的岩心回收率为 100%。该项目处于勘探初期,概念回收率为 85%,钼含量 82%,银 75% 被分配给 CueQ 计算。根据这些金属价格将金属转换为同等铜品位是相对于单位质量铜价格的相关的,该价格是按概念化铜回收率标准化的金属的概念回收率计算得出的。将每种金属的金属当量添加到铜等级中。计算公式为:CueQ% = Cu% +(Mo% *(钼回收率/铜回收率)*(每磅钼美元/每磅铜美元)+(Ag g/t *(银回收率/铜回收率)*(每盎司银美元/ 31.1034768)/(每磅铜美元* 22.04623))。

*Copper equivalent calculations use metal prices of Cu - US$3.34/lb, Mo - US$18/lb and Ag - US$21.87/oz.

*铜当量计算使用铜——3.34美元/磅、钼——18美元/磅和银——21.87美元/盎司的金属价格。

1Intervals are downhole drilled core lengths. Drilling data to date is insufficient to determine true width of mineralization. Mo, Cu and Ag values are uncut.

1间隔是指井下钻孔的岩心长度。迄今为止的钻探数据不足以确定矿化的真实宽度。Mo、Cu 和 Ag 值未切割。

Quality Control and Quality Assurance

质量控制和质量保证

DLP Resources Peru S.A.C, a subsidiary of DLP Resources Inc., supervises drilling and carries out sampling of HTW, NTW and BTW core. Logging and sampling are completed at a secured Company facility situated on the project site. Sample intervals are nominally 1.5 to 3m in length. Drill core is cut in half using a rotary diamond blade saw and samples are sealed on site before transportation to the ALS Peru S.A.C. sample preparation facility in Arequipa by Company vehicles and staff. Prepared samples are sent to Lima by ALS Peru S.A.C. for analysis. ALS Peru S.A.C. is an independent laboratory. Samples are analyzed for 48 elements using a four-acid digestion and ICP-MS analysis (ME-MS61). In addition, sequential copper analyses are done where secondary copper mineralization is observed and reports, soluble copper using sulphuric acid leach, soluble copper in cyanide leach, residual copper and total copper. ALS meets all requirements of International Standards ISO/IEC 17025:2005 and ISO 9001:2015 for analytical procedures.

DLP Resources Peru S.A.C是DLP资源公司的子公司,负责监督钻探并对HTW、NTW和BTW岩心进行采样。记录和采样工作在位于项目现场的公司安全设施中完成。样本间隔的长度名义上为 1.5 到 3m。使用旋转式金刚石刀片锯将钻芯切成两半,样品在现场密封,然后由公司的车辆和工作人员运送到位于阿雷基帕的ALS Peru S.A.C. 样品制备设施。ALS Peru S.A.C. 将制备好的样本送往利马进行分析。ALS 秘鲁 S.A.C. 是一家独立实验室。使用四酸消解和 ICP-MS 分析 (ME-MS61) 对样品中有 48 种元素进行分析。此外,对铜进行连续分析,观察并报告铜的二次矿化,使用硫酸浸出液进行可溶性铜,氰化物浸出液中的可溶性铜,残留的铜和总铜。ALS 符合国际标准 ISO/IEC 17025:2005 和 ISO 9001:2015 对分析程序的所有要求。

DLP Resources independently monitors quality control and quality assurance ("QA/QC") through a program that includes the insertion of blind certified reference materials (standards), blanks and pulp duplicate samples. The company is not aware of any drilling, sampling, recovery or other factors that could materially affect the accuracy or reliability of the data reported from all thirteen drillholes.

DLP Resources 通过一项计划独立监控质量控制和质量保证(“QA/QC”),该计划包括插入盲目认证参考材料(标准)、空白样本和纸浆副本。该公司不知道有任何钻探、取样、回收或其他因素可能会对所有13个钻孔报告的数据的准确性或可靠性产生重大影响。

Aurora Project History

Aurora 项目历史

Aurora Project is an advanced stage porphyry copper-molybdenum exploration project in the Province of Calca, SE Peru (Figure 1). The Aurora Project was previously permitted for drilling in 2015 but was never executed. Thirteen historical drillholes, drilled in 2001 and 2005 totaling 3,900m were drilled over an area of approximately 1000m by 800m, cut significant intervals of copper and molybdenum mineralization. From logging of the only three remaining holes DDA-01, DDA-3A and DDA-3 and data now available, it appears that only three of the thirteen holes tested the enriched copper zone and only one hole drilled deep enough to test the primary copper and molybdenum zone (see DLP Resources Inc. news release of May 18, 2021).

Aurora 项目是秘鲁东南部卡尔卡省的后期斑岩铜钼勘探项目(图 1)。Aurora项目此前曾在2015年获准钻探,但从未执行。在 2001 年和 2005 年钻探了 13 个历史钻孔,总计 3,900 米,在大约 1000 米 x 800 米的区域内钻探了大量的铜和钼矿化。从仅存的三个孔 DDA-01、DDA-3A 和 DDA-3 的记录以及现在可用的数据来看,十三个孔中似乎只有三个测试了富集铜区,只有一个钻得足够深以测试初级铜和钼区(见DLP Resources Inc. 2021年5月18日发布的新闻稿)。

Salient historic drillhole data of the Aurora Project are:

Aurora项目的重要历史钻孔数据是:

• 190m @ 0.57% Cu, 0.008% Mo in DDA-1 with a high-grade intercept of 20m @ 1.01% Cu related to a supergene enrichment zone of secondary chalcocite;

• DDA-1 中 190m @ 0.57% Cu,0.008% Mo,高品位截距为 20m @ 1.01% Cu,与次生辉石的超基因富集区有关;

• 142m @ 0.5% Cu, 0.004% Mo in DDA-3;

• DDA-3 中的 142m @ 0.5% 铜,0.004% Mo;

• 71.7m @ 0.7% Cu, 0.007% Mo in DDA-3A (see historical Focus Ventures Ltd. news release July 11, 2012); and

• DDA-3A 中含有 7170 万个 @ 0.7% 的铜,0.007% 的钼含量(参见 Focus Ventures Ltd. 2012 年 7 月 11 日发布的历史新闻稿);以及

• One of the historical holes ABC-6 drilled on the edge of the system intersected 78m @ 0.45% Cu and 0.107% Mo (Figure 2).

• ABC-6 在系统边缘钻探的一个历史孔与 78m @ 0.45% 的铜和 0.107% 的钼相交(图 2)。

A review of the historical drilling indicates that the majority of the thirteen holes were drilled in the leached and partially leached zones of the porphyry system. Ten of the thirteen holes never fully tested the oxide and secondary enrichment zone and/or the primary copper zone at depth encountered in DDA-01. Copper-molybdenum mineralization is hosted by quartz-feldspar porphyries intruded into slates-hornfels and pelitic sandstones belonging to the Ordovician (439 - 463 ma) Sandia Formation.

对历史钻探的回顾表明,十三个孔中的大多数是在斑岩系统的渗滤区和部分渗滤区钻探的。十三个孔中有十个从未全面测试过 DDA-01 中遇到的深度氧化物和二次富集区和/或初级铜区。铜钼矿化是由侵入奥陶纪(439-463 ma)桑迪亚组的石板角岩和泥质砂岩中的石英长石斑岩主导。

Figure 1: Aurora Location.

图 1:奥罗拉的位置。

Figure 2: Aurora Project - Plan view showing drilling by DLP in 2022-2023 with A23-013 and current drillhole A24-014.

图 2:Aurora 项目——规划视图显示 DLP 在 2022-2023 年使用 A23-013 和当前钻孔 A24-014 进行钻探。

Figure 3: Aurora Project - Magnetics-analytic signal plan with downhole values for copper (%) shown on drillholes with molybdenum (ppm) shown as bar graphs to right of drillholes. A23-014 drillhole shown with projection in yellow.

图 3:Aurora 项目-磁学分析信号计划,含钼钻孔 (ppm) 的井下铜值 (%) 显示在钻孔右侧的条形图中。A23-014 钻孔以黄色投影显示。

Figure 4: Aurora Project - Grab samples from NE Zone

图 4:Aurora 项目-从 NE 区域获取样本

Figure 5: Aurora Project - Grab samples from NE Zone. Copper-oxides and sulphides of pyrite and chalcopyrite on fractures and in veinlets of hornfels and siltstones.

图 5:Aurora 项目-从 NE 区域获取样本。角质和粉砂岩的裂缝和静脉中的黄铁矿和黄铜矿的氧化铜和硫化物。

Qualified Person

合格人员

David L. Pighin, consulting geologist and co-founder of DLP Resources, is the qualified person of the Company as defined by National Instrument 43-101. Mr. Pighin has reviewed and approved the technical contents of this news release.

根据National Instrument 43-101的定义,咨询地质学家兼DLP Resources的联合创始人大卫·皮金是公司的合格人士。Pighin 先生已审查并批准了本新闻稿的技术内容

About DLP Resources Inc.

关于 DLP Resources Inc.

DLP Resources Inc. is a mineral exploration company operating in Southeastern British Columbia and Peru, exploring for Base Metals and Cobalt. DLP is listed on the TSX-V, trading symbol DLP and on the OTCQB, trading symbol DLPRF. Please refer to our web site for additional information.

DLP Resources Inc. 是一家矿产勘探公司,在不列颠哥伦比亚省东南部和秘鲁开展业务,勘探基本金属和钴。DLP在TSX-V上市,交易代码为DLP,在OTCQB上市,交易代码为DLPRF。请参阅我们的网站以获取更多信息。

FOR FURTHER INFORMATION PLEASE CONTACT:

欲了解更多信息,请联系:

DLP RESOURCES INC.
Ian Gendall, CEO & President
Jim Stypula, Executive Chairman
Robin Sudo, Office & Land Manager/Corporate Secretary
Maxwell Reinhart, Investor Relations

DLP 资源公司
伊恩·根德尔,首席执行官兼总裁
吉姆·斯蒂普拉,执行主席
Robin Sudo,办公室和土地经理/公司秘书
麦克斯韦尔·莱因哈特,投资者关系

Telephone: 250-426-7808

电话:250-426-7808

Email: iangendall@dlpresourcesinc.com
Email: jimstypula@dlpresourcesinc.com
Email: robinsudo@dlpresourcesinc.com
Email: maxreinhart@dlpresourcesinc.com

电子邮件: iangendall@dlpresourcesinc.com
电子邮件: jimstypula@dlpresourcesinc.com
电子邮件: robinsudo@dlpresourcesinc.com
电子邮件: maxreinhart@dlpresourcesinc.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所风险投资交易所及其监管服务提供商(该术语在多伦多证券交易所风险投资交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

Cautionary Note Regarding Forward-Looking Information

关于前瞻性信息的警示说明

This release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements relate to future events or future performance and reflect the expectations or beliefs of management of the Company regarding future events. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would" or "occur". This information and these statements, referred to herein as "forward‐looking statements", are not historical facts, are made as of the date of this news release and include without limitation, statements regarding discussions of future plans, estimates and forecasts and statements as to management's expectations and intentions with respect to drilling on the Aurora Project in Peru.

本新闻稿包含某些陈述和信息,这些陈述和信息可能构成适用的加拿大证券法所指的前瞻性信息。前瞻性陈述与未来事件或未来业绩有关,反映了公司管理层对未来事件的期望或信念。通常,前瞻性陈述和信息可以通过使用前瞻性术语来识别,例如 “打算” 或 “预期”,或者某些行动、事件或结果 “可能”、“应该”、“将” 或 “发生” 的词语和短语或陈述的变体。这些信息和这些陈述(此处称为 “前瞻性陈述”)不是历史事实,是截至本新闻稿发布之日作出的,包括但不限于有关未来计划、估计和预测讨论的声明,以及管理层对秘鲁奥罗拉项目钻探的预期和意图的陈述。

These forward‐looking statements involve numerous risks and uncertainties and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things drill results expected from the Aurora Project in Peru.

这些前瞻性陈述涉及许多风险和不确定性,实际结果可能与任何前瞻性陈述中建议的结果存在重大差异。除其他外,这些风险和不确定性包括秘鲁奥罗拉项目预期的钻探结果。

Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial out-look that are incorporated by reference herein, except in accordance with applicable securities laws. We seek safe harbor.

尽管公司管理层试图确定可能导致实际业绩与前瞻性陈述或前瞻性信息中包含的业绩存在重大差异的重要因素,但可能还有其他因素导致业绩与预期、估计或预期不符。无法保证此类陈述会被证明是准确的,因为实际结果和未来事件可能与此类陈述中的预期存在重大差异。因此,读者不应过分依赖前瞻性陈述和前瞻性信息。提醒读者,依赖此类信息可能不适合用于其他目的。除非根据适用的证券法,否则公司不承诺更新此处以引用方式纳入的任何前瞻性陈述、前瞻性信息或财务展望。我们寻求安全港。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发