Mundoro Provides FY-2023 Financial Results and 2024 Outlook
Mundoro Provides FY-2023 Financial Results and 2024 Outlook
Vancouver, British Columbia--(Newsfile Corp. - April 30, 2024) - Mundoro Capital Inc. (TSXV: MUN) (OTCQB: MUNMF) () ("Mundoro" or the "Company") announces the operating and financial results for the quarter and year ended December 31, 2023. The audited Financial Statements (FS), and Management's Discussion and Analysis (MD&A) for 2023 are filed on SEDAR+, and are available on Mundoro's website at under the heading "Investors."
不列颠哥伦比亚省温哥华--(Newsfile Corp.-2024 年 4 月 30 日)- Mundoro Capital Inc.(多伦多证券交易所股票代码:MUN)(OTCQB:MUNMF)() (”蒙多罗“或者”公司“) 公布截至2023年12月31日的季度和年度的经营和财务业绩。经审计的2023年财务报表(FS)和管理层的讨论与分析(MD&A)已在SEDAR+上提交,可在Mundoro网站的 “投资者” 标题下查阅。
Teo Dechev, CEO and President commented: "In 2023, the portfolio of partner funded programs had ~13,900 meters of drilling and 11 geophysical surveys completed over 9 projects in Serbia, Bulgaria and Arizona which amounted to $13.3 million in exploration expenditures. The outcomes of the exploration programs demonstrated a new mineralized system in Arizona at Dos Cabezas that merits additional drilling, as well as follow up targets for drill testing in Serbia and new targets in Bulgaria and Arizona.
首席执行官兼总裁 Teo Dechev 评论道: “2023年,合作伙伴资助的项目组合在塞尔维亚、保加利亚和亚利桑那州完成了约13,900米的钻探和11次地球物理调查,共完成了9个项目,勘探支出为1,330万美元。勘探计划的结果表明,亚利桑那州多斯卡贝萨斯有一个新的矿化系统,值得进一步钻探,塞尔维亚钻探测试的后续目标以及保加利亚和亚利桑那州的新目标。
Mundoro completed 2023 with positive cash-flow, which strengthened the cash position and resulted in the Company not needing to raise equity in 2024. As we enter 2024, Mundoro will be reinvesting the cash generated in 2023, to redeploy into generating projects, advancing targets for testing on the 6 existing projects available for new partnerships and actively pursuing new partners for these projects."
芒多罗在2023年结束时实现了正现金流,这巩固了现金状况,使公司无需在2024年筹集股权。在我们进入2024年之际,Mundoro将对2023年产生的现金进行再投资,重新部署到发电项目中,推进对可供新合作伙伴使用的6个现有项目进行测试的目标,并积极为这些项目寻找新的合作伙伴。”
Follow Mundoro's weekly updates from the field on: LinkedIn and X @Mundoro.
关注 Mundoro 的每周现场最新消息:LinkedIn 和 X @Mundoro。
Financial Highlights and 2024 Outlook
财务摘要和2024年展望
(All amounts are expressed in Canadian dollars unless otherwise indicated.)
(除非另有说明,否则所有金额均以加元表示。)
Cash Position: As of December 31, 2023, the Company held $6.5 million in cash and cash equivalents and no long-term debt. As a result, the Company does not anticipate a need for capital raising in 2024.
Fees Earned and Net Option Payments Received: During the year-end December 31, 2023, the Company generated $3,015,408 in Fees earned and Net Option Payments, compared to $886,887, which represents a 240% increase, compared to the comparable period in 2022.
Corporate Expenses: During the year-end December 31, 2023, the Company incurred Corporate Expenses of $1,364,642, compared to $1,248,273, which represents a 9% increase, compared to the comparable period in 2022. Corporate Expenses include accounting and audit, regulatory and corporate governance, corporate communication, and general and administrative expenses.
Net Income: During the year-end December 31, 2023, the Company's net income was $1,398,323, compared to a net loss of $1,593,211, which represents a 187% increase, compared to the comparable period in 2022.
Cash flow from Operating Activities: During the year-end December 31, 2023, cash flow from operating activities is $1,009,300, compared to $1,203,915 in 2022.
Exploration and Project Evaluation Expenditures: During the year-ended December 31, 2023, the exploration and project evaluation expenditures, primarily for 10 partner funded exploration programs, were higher at $13,091,014, compared to $5,108,607, during the year-end 2022, due to higher budgeted exploration expenditures across the various partner funded programs. Recoveries of exploration expenditures during the year-end December 31, 2023 were $13,282,884 compared to $4,275,666, during the year-end 2022, resulting in year-end net exploration costs of ($191,870) and $832,941, respectively.
Corporate and Portfolio Outlook: In 2024, the Company estimates receiving Operator Fees and Option Payments of approximately $1.4 million while Corporate Expenses for 2024 are estimated to be $1.1 million and the Portfolio Generative Expenditures are estimated at $1.4 million. For 2024, the Company anticipates 4 partner funded exploration programs with exploration expenditures to be approximately $6 to $8 million. The Company is pursuing new partners for 6 exploration projects in 2024.
现金状况: 截至2023年12月31日,公司持有650万澳元的现金及现金等价物,没有长期债务。因此,该公司预计2024年不需要筹集资金。
所得费用和收到的期权付款净额: 在2023年12月31日年底,公司产生的费用和净期权支付额为3,015,408美元,而期权支付净额为886,887美元, 表示增长了 240%,与2022年的同期相比。
公司开支: 2023年12月31日年底,公司产生的公司支出为1,364,642美元,而公司支出为1,248,273美元, 表示增长了9%,与2022年的同期相比。公司费用包括会计和审计、监管和公司治理、公司沟通以及一般和管理费用。
净收入: 2023年12月31日年底,该公司的净收入为1,398,323美元,而净亏损为1,593,211美元, 增长了187%,与2022年的同期相比。
来自经营活动的现金流: 在2023年12月31日年底,来自经营活动的现金流为1,009,300美元,而2022年为1,203,915美元。
勘探和项目评估支出: 在截至2023年12月31日的年度中,勘探和项目评估支出,主要用于10个合作伙伴资助的勘探计划,从2022年底的5,108,607美元增加到13,091,014美元,这是由于各种合作伙伴资助计划的预算勘探支出增加。2023年12月31日年底的勘探支出回收额为13,282,884美元,而2022年底为4,275,666美元,年终净勘探成本分别为(191,870美元)和832,941美元。
企业和投资组合展望: 该公司估计,2024年的运营商费用和期权付款约为140万美元,而2024年的公司支出估计为110万美元,投资组合生成支出估计为140万美元。该公司预计,到2024年,将有4个合作伙伴资助的勘探计划,勘探支出约为600万至800万美元。该公司将在2024年为6个勘探项目寻找新的合作伙伴。
Operational Highlights from Q4-2023
Q4-2023 的运营要点
Mundoro commenced drill program in Dos Cabezas, Arizona: In 2023, Mundoro commenced a drill program at the Dos Cabezas Project Project. This drill program tested four target areas (Mescal Canyon, Mineral Park, Northwest Pediment, Southeast Pediment) with 4 diamond drill holes for a total of 2145 meters. A fifth target, Casey Copper Canyon, has been permitted for future drilling. The results from Mescal Canyon and Mineral Park indicate a rare opportunity in Arizona for new porphyry copper systems. For further information see press release dated April 18, 2024.
Advancing Exploration at the JOGMEC Funded EE1 Project in Bulgaria: During Q4-2023, the Company advanced in the permitting process for drilling and submitted for permitting additional prospective areas identified within the EE-1 license, to allow for flexibility in the 2024 drill program.
Advancing Exploration at the BHP Funded Projects in Serbia: During Q4-2023, at the Trstenik license the company completed a passive seismic survey covering the project area, with geophysical processing and interpretation expected in H1-2024. In Q4-2023, at the South Corridor Project a grid-based soil geochemical survey was completed within the Ponor license area. Geochemical assay results are being interpreted as they become available from the lab. In Q4-2023, at the Lipovica license area, a reconnaissance mapping and rock sampling program commenced and will be ongoing into H1-2024.
Completion of Drilling at BHP-Mundoro Project in Serbia: In Q4-2023, a drill hole of 458.2 m was completed to test the volcanic stratigraphy package in part of the Vitanovac license area. Drill core logging confirmed the presence of volcanic units with similar characteristics to volcanic units hosting known ore deposits in the Timok Magmatic Complex.
Advanced Exploration at the Mundoro owned licenses in central Timok, Serbia: Funded by the Vale earn-in agreement, in Q4-2023 a passive seismic survey was carried out over part of the Skorusa and Oblez license areas, with interpretation from the survey expected in Q2-2024. Additionally, a soil geochemical survey was carried out to cover a sector of the western extension of the Skorusa license area.
Completion of drilling at multiple Mundoro owned licenses in central Timok, Serbia: Funded by the Vale earn-in agreement, in Q4-2023 a Phase I drilling program at Branik to follow up on mineralized ore clasts intersected in a previous drilling campaign was completed for a total of 753.3 meters over 4 drill holes with the assays received in Q1-2024. Additionally, in Q4-2023, 738.4 m of drilling at the Markov Kamen South target was completed within the Phase II drill program to follow up on potential extensions to mineralization intersected during previous drilling campaigns, with assays received in Q1-2024. Lastly, in Q4-2023, 1022.1 m of diamond drilling was completed on a drill hole at the Bacevica North target testing a geophysical anomaly. With interpretation of the drill results, the company is developing follow on drilling programs.
Advancing Exploration at Mundoro owned GT7 Property in Serbia: Funded by the Kinross earn-in agreement, during H2-2023 work focused on permitting and community engagement in preparation for future drilling.
Advancing Exploration at Mundoro owned Picacho Project in Arizona: While this project was funded by the Vale earn-in agreement, in Q4-2023, geophysical results were integrated with mapping and geochemical sampling work completed earlier in the year to develop targets in the shallow pediment cover to be drill tested after permitting.
Mundoro 在亚利桑那州的多斯卡贝萨斯开始了钻探计划: 2023年,芒多罗在多斯卡贝萨斯项目启动了钻探计划。该钻探计划测试了四个目标区域(梅斯卡尔峡谷、矿物公园、西北山脉、东南山脉),共有4个钻石钻孔,总长度为2145米。第五个目标——凯西铜峡谷——已获准用于未来的钻探。梅斯卡尔峡谷和矿物公园的结果表明,在亚利桑那州,新的斑岩铜系统有难得的机会。欲了解更多信息,请参阅2024年4月18日的新闻稿。
推进由JOGMEC资助的保加利亚EE1项目的勘探工作: 在 Q4-2023 期间,该公司推进了钻探许可程序,并提交了在 EE-1 许可证中确定的其他潜在区域的许可,以便在 2024 年钻探计划中保持灵活性。
推进必和必拓资助的塞尔维亚项目的勘探: 在 Q4-2023 期间,凭借 Trstenik 许可证,该公司完成了涵盖该项目区域的被动地震调查,预计将在 H1-2024 中进行地球物理处理和解释。在 Q4-2023 中,在南走廊项目中,在 Ponor 许可区内完成了基于网格的土壤地球化学调查。在实验室获得地球化学分析结果时,正在对其进行解释。在 Q4-2023 中,在利波维察许可区,侦察测绘和岩石采样计划开始并将持续到 H1-2024。
塞尔维亚 BHP-Mundoro 项目的钻探工作完成: 在 Q4-2023 中,完成了一个长达 458.2 米的钻孔,用于测试维塔诺瓦茨许可区部分区域的火山地层学套件。钻芯测井证实,存在与蒂莫克岩浆群中拥有已知矿床的火山单元具有相似特征的火山单元。
Mundoro 的 Advanced Exploration 在塞尔维亚蒂莫克中部拥有许可证: 在淡水河谷收益协议的资助下,在 Q4-2023 中,对斯科鲁萨和奥布雷兹的部分许可区域进行了被动地震调查,预计将在 Q2-2024 中对调查进行解释。此外,还进行了土壤地球化学调查,以覆盖Skorusa许可区西部延伸部分的一部分。
在塞尔维亚蒂莫克中部Mundoro拥有的多个许可证的钻探工作已经完成: 在淡水河谷收益协议的资助下,在 Q4-2023 中,Branik 的第一阶段钻探计划已经完成,该项目旨在跟踪先前钻探活动中相交的矿化矿石碎片,总钻孔长度为 753.3 米,总长度为 753.3 米,采用 Q1-2024 获得的化验结果。此外,在 Q4-2023 中,在第二阶段钻探计划内完成了在马尔科夫卡门南部目标的738.4米的钻探,以跟踪之前钻探活动中可能出现的矿化延伸部分,在 Q1-2024 中得到了化验。最后,在 Q4-2023 中,在 Bacevica North 目标的钻孔上完成了 1022.1 米的钻石钻探,测试了地球物理异常。通过对钻探结果的解释,该公司正在制定后续钻探计划。
推进塞尔维亚蒙多罗拥有的GT7物业的勘探工作: 由 Kinross 盈利协议资助,在 H2-2023 期间,工作重点是许可和社区参与,为未来的钻探做准备。
推进亚利桑那州蒙多罗拥有的皮卡乔项目的勘探工作: 虽然该项目由淡水河谷收益协议资助,但在 Q4-2023 中,地球物理结果与今年早些时候完成的测绘和地球化学采样工作相结合,以在浅层山墙覆盖层中开发目标,在获得许可后进行钻探测试。
Qualified Persons
合格人员
The scientific and technical information described in this MD&A have been prepared in accordance within National Instrument 43-101. The scientific and technical information for Serbia exploration programs was reviewed and approved by Thomas Sant, FGS (EurGeol, CGeol) a Qualified Person as defined by NI 43-101 and Exploration Director to the Company. The scientific and technical information for Bulgaria exploration programs was reviewed and approved by, R. Jemielita, PhD, MIMMM, a Qualified Person as defined by NI 43-101 and Chief Geologist to the Company. The scientific and technical information for the USA exploration programs has been reviewed and approved by T. Dechev, P.Eng (PEO, APEGBC), a Qualified Person as defined by NI 43-101, and the Company's Chief Executive Officer.
本MD&A中描述的科学和技术信息是根据National Instrument 43-101编制的。塞尔维亚勘探计划的科学和技术信息已由FGS(EurGeol,CGeol)的审查和批准,他是NI 43-101定义的合格人员,也是该公司的勘探董事。保加利亚勘探计划的科学和技术信息由MIMMM R. Jemielita博士、NI 43-101定义的合格人员和公司首席地质学家的审查和批准。美国勘探计划的科学和技术信息已经过T. Dechev、P.Eng(PEO,APEGBC)、NI 43-101定义的合格人员和公司首席执行官的审查和批准。
About Mundoro Capital Inc.
关于 Mundoro Capital Inc.
Mundoro is a publicly listed company on the TSX-V in Canada and OTCQB in the USA with a portfolio of mineral properties focused primarily on base and precious metals. To drive value for shareholders, Mundoro's asset portfolio generates near-term cash payments to Mundoro and creates royalties attached to each mineral property optioned to partners. The portfolio of mineral properties is currently focused on predominantly copper in two mineral districts: Western Tethyan Belt in Eastern Europe and the Laramide Belt in the southwest USA.
Mundoro是一家在加拿大多伦多证券交易所和美国OTCQB的上市公司,其矿产资产组合主要集中在基本金属和贵金属上。为了提高股东的价值,Mundoro的资产组合向Mundoro产生了短期的现金支付,并为合作伙伴选择的每处矿产产生特许权使用费。目前,矿产地产投资组合主要集中在两个矿产区的铜矿产上:东欧的西特提安带和美国西南部的拉拉米德带。
For further information about Mundoro, please contact Teo Dechev, Chief Executive Officer, President and Director, +1-604-669-8055, and Shamil Devji, Investor Relations Manager at +1-604-669-8055. You can also visit Mundoro's website .
有关Mundoro的更多信息,请致电+1-604-669-8055与首席执行官兼总裁兼董事泰奥·德切夫以及+1-604-669-8055联系投资者关系经理沙米尔·德维吉。您也可以访问 Mundoro 的网站。
Caution Concerning Forward-Looking Statements
关于前瞻性陈述的警告
This News Release contains forward-looking statements. Forward-looking statements can be identified by the use of forward-looking words such as "will", "expect", "intend", "plan", "estimate", "anticipate", "believe" or "continue" or similar words or the negative thereof, and include the following: completion of earn-in expenditures, options and completion of a definitive agreement by the parties. The material assumptions that were applied in making the forward-looking statements in this News Release include expectations as to the mineral potential of the Company's projects, the Company's future strategy and business plan and execution of the Company's existing plans. We caution readers of this News Release not to place undue reliance on forward-looking statements contained in this News Release, as there can be no assurance that they will occur and they are subject to a number of uncertainties and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements. These factors include general economic and market conditions, exploration results, commodity prices, changes in law, regulatory processes, the status of Mundoro's assets and financial condition, actions of competitors and the ability to implement business strategies and pursue business opportunities. The forward-looking statements contained in this News Release are expressly qualified in their entirety by this cautionary statement. The forward-looking statements included in this News Release are made as of the date of this News Release and the Board undertakes no obligation to publicly update such forward-looking statements, except as required by law. Shareholders are cautioned that all forward-looking statements involve risks and uncertainties and for a more detailed discussion of such risks and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements, refer to the Company's filings with the Canadian securities regulators available on .
本新闻稿包含前瞻性陈述。前瞻性陈述可以通过使用 “将”、“期望”、“打算”、“计划”、“估计”、“预期”、“相信” 或 “继续” 等前瞻性词语或其否定词语来识别,包括以下内容:完成收益支出、期权和双方达成最终协议。在本新闻稿中作出前瞻性陈述时采用的重大假设包括对公司项目矿产潜力的预期、公司的未来战略和业务计划以及公司现有计划的执行。我们提醒本新闻稿的读者不要过分依赖本新闻稿中包含的前瞻性陈述,因为无法保证这些陈述会发生,而且它们受到许多不确定性和其他因素的影响,这些因素可能导致实际业绩与此类前瞻性陈述所表达或暗示的结果存在重大差异。这些因素包括总体经济和市场状况、勘探结果、大宗商品价格、法律变化、监管程序、Mundoro的资产状况和财务状况、竞争对手的行为以及实施业务战略和寻求商机的能力。本警示声明对本新闻稿中包含的前瞻性陈述进行了明确的全部限定。本新闻稿中包含的前瞻性陈述自本新闻稿发布之日起作出,除非法律要求,否则董事会没有义务公开更新此类前瞻性陈述。提醒股东,所有前瞻性陈述都涉及风险和不确定性,要更详细地讨论此类风险和其他可能导致实际业绩与此类前瞻性陈述所表达或暗示的结果存在重大差异的因素,请参阅公司向加拿大证券监管机构提交的文件。
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
多伦多证券交易所风险投资交易所及其监管服务提供商(该术语在多伦多证券交易所风险交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。