share_log

Baselode Starts Drill Program on Bear Uranium Project : Begins Fleet Space Technologies' ANT Survey Over ACKIO

Baselode Starts Drill Program on Bear Uranium Project : Begins Fleet Space Technologies' ANT Survey Over ACKIO

Baselode启动熊铀项目的钻探计划:开始舰队太空技术公司ANT对ACKIO的调查
newsfile ·  05/01 06:11
  • 1,500 metre inaugural Bear drill program has started targeting 3 areas with 6 to 8 drill holes
  • Bear 的首个 1,500 米钻探计划已开始瞄准 3 个区域,有 6 到 8 个钻孔
  • Fleet Space Technologies' Ambient Noise Tomography ("ANT") survey, a passive, seismic method for generating 3D subsurface models is being deployed over ACKIO
  • Fleet Space Technologies的环境噪声断层扫描(“ANT”)测量正在ACKIO上部署,这是一种用于生成三维地下模型的被动地震方法

Toronto, Ontario--(Newsfile Corp. - May 1, 2024) - Baselode Energy Corp. (TSXV: FIND) (OTCQB: BSENF) ("Baselode" or the "Company") is pleased to announce the starts of an inaugural drill program and ANT geophysical survey on its Bear ("Bear") and Hook ("Hook") uranium projects, respectively, in the Athabasca Basin area, northern Saskatchewan (see Figure 1).

安大略省多伦多--(Newsfile Corp.,2024 年 5 月 1 日)——Baselode Energy Corp.(TSXV:FIND)(OTCQB:BSENF)(”Baselode“或者”公司“)很高兴地宣布其Bear的首个钻探计划和ANT地球物理调查已经开始(”“) 和 Hook (”挂钩“) 分别位于萨斯喀彻温省北部阿萨巴斯卡盆地地区的铀项目(见图1)。

"We're excited to start this drill campaign on Bear. Our target generation has identified areas of potential structural disruption and hydrothermal fluid alteration along the uranium-fertile Wollaston-Mudjatik transition zone that hosts numerous high-grade uranium deposits. We've identified 3 main targets areas we'll be drilling at the intersection points of NE-SW-trending layers and cross-cutting NW-SE-oriented structures (Figure 2). We believe the latter structures may have controlled anomalous uranium intersected in historic drill holes.

“我们很高兴能在Bear上开始这次演习活动。我们的目标一代已经确定了拥有大量高品位铀矿床的铀肥沃拉斯顿-穆贾蒂克过渡区潜在的结构破坏和热液流体蚀变区域。我们已经确定了三个主要目标区域,我们将在NE-SW趋势层和面向NWSE的横向结构的交叉点处进行钻探(图 2)。我们认为,后一种结构可能控制了历史钻孔中相交的异常铀。

We're also happy to announce we've started laying out and acquiring data from Fleet Space Technologies' ANT survey deployed over ACKIO. We hope to map out the extent of ACKIO's Athabasca sandstone outlier and the deep structural roots of the uranium mineralization system. We believe ACKIO continues at depth, including mineralization along the sandstone-basement fault zone. We look forward to testing these targets when we begin our next ACKIO drill program in June," stated James Sykes, CEO, President, and Director of Baselode.

我们还高兴地宣布,我们已经开始规划和获取舰队太空技术公司在ACKIO上部署的ANT调查的数据。我们希望绘制出ACKIO的阿萨巴斯卡砂岩异常值的范围以及铀矿化系统的深层结构根源。我们认为,ACKIO仍在深度上继续,包括沿砂岩基底断层带的矿化。我们期待在6月份开始下一个ACKIO钻探计划时测试这些目标。” Baselode首席执行官、总裁兼董事James Sykes表示。

Please watch the Company's video (below) to understand the target generation ideas for the Bear drill program.

请观看公司的视频(见下文),了解Bear钻探计划的目标生成想法。

Bear - 2024 Exploration Targets Defined

Bear-2024 年勘探目标已确定

Bear Drill Program Details
The recently started Bear drill program is planned for 1,500 metres with 6 to 8 drill holes targeting 2 to 3 different target areas. The helicopter-support program allows expedient drill targeting and lessens environment impacts. The Company has received the necessary permits to complete the program.

Bear Drill 计划详情
最近启动的 Bear 钻探计划在 1,500 米处钻探 6 到 8 个钻孔,目标区域为 2 到 3 个不同的目标区域。直升机支持计划允许快速进行演习,并减少对环境的影响。该公司已获得完成该计划的必要许可。

Hook ANT Program Details
"Fleet Space Technologies has developed an innovative high-resolution, ground-based, satellite-connected ambient noise tomography ("ANT") survey to produce a 3D model of the subsurface. The survey will be completed over ACKIO and other areas of interest, with data expected to be received and interpreted prior to starting diamond drilling on Hook in June. The Company has received the necessary permits to complete the program.

Hook ANT 计划详情
“Fleet Space Technologies开发了一种创新的高分辨率、地基、卫星连接的环境噪声断层扫描(”蚂蚁“) 进行调查以生成地下三维模型。该调查将在ACKIO和其他感兴趣的领域完成,预计将在6月开始胡克钻石钻探之前收到和解释数据。该公司已获得完成该计划的必要许可。

About Baselode Energy Corp.
Baselode controls 100% of approximately 272,804 hectares for exploration in the Athabasca Basin area of northern Saskatchewan, Canada. The land package is free of any option agreements or underlying royalties.

关于基洛德能源公司
加拿大萨斯喀彻温省北部阿萨巴斯卡盆地约272,804公顷的勘探用地,Baselode完全控制着。土地一揽子计划不含任何期权协议或基础特许权使用费。

The Company discovered the ACKIO near-surface, uranium prospect in September 2021. ACKIO measures greater than 375 m along strike, greater than 150 m wide, comprised of at least 9 separate uranium Pods, with mineralization starting as shallow as 28 m and 32 m beneath the surface in Pods 1 and 7, respectively, and down to approximately 300 m depth beneath the surface with the bulk of mineralization occurring in the upper 120 m. ACKIO remains open at depth, and to the north, south and east.

该公司于2021年9月发现了ACKIO近地表铀矿勘探区。ACKIO 的走向长度超过 375 米,宽度大于 150 米,由至少 9 个独立的铀舱组成,1 号和第 7 号舱的矿化区分别从地表以下 28 米和 32 米处开始,一直到地表下约 300 米的深度,大部分矿化发生在 120 米以上。ACKIO 在深度、向北、向南和向东仍处于开放状态。

Baselode's Athabasca 2.0 exploration thesis focuses on discovering near-surface, basement-hosted, high-grade uranium orebodies outside the Athabasca Basin. The exploration thesis is further complemented by the Company's preferred use of innovative and well-understood geophysical methods to map deep structural controls to identify shallow targets for diamond drilling.

Baselode的Athabasca 2.0勘探论文侧重于发现阿萨巴斯卡盆地以外的近地表、地下室托管的高品位铀矿体。该公司首选使用创新且广为人知的地球物理方法绘制深层结构控制图,以确定钻石钻探的浅层目标,进一步补充了勘探论点。

QP Statement
The technical information contained in this news release has been reviewed and approved by Cameron MacKay, P.Geo., Vice-President, Exploration & Development for Baselode Energy Corp., who is considered to be a Qualified Person as defined in "National Instrument 43-101, Standards of Disclosure for Mineral Projects."

QP 声明
本新闻稿中包含的技术信息已由Baselode Energy Corp. 勘探与开发副总裁P.Geo. 审查和批准,他被认为是 “国家仪器43-101,矿业项目披露标准” 中定义的合格人员。

For further information, please contact:

欲了解更多信息,请联系:

James Sykes, CEO, President and Director
Baselode Energy Corp.
jsykes@oregroup.ca
306-221-8717

James Sykes,首席执行官、总裁兼董事
Baselode Energy
jsykes@oregroup.ca
306-221-8717

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the TSX Venture Exchange policies) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所风险交易所及其监管服务提供商(该术语在多伦多证券交易所风险交易所政策中定义)均不对本新闻稿的充分性或准确性承担责任。

Certain information in this press release may contain forward-looking statements. This information is based on current expectations that are subject to significant risks and uncertainties that are difficult to predict. Actual results might differ materially from results suggested in any forward-looking statements. Baselode Energy Corp. assumes no obligation to update the forward-looking statements, or to update the reasons why actual results could differ from those reflected in the forward looking-statements unless and until required by securities laws applicable to Baselode Energy Corp. Additional information identifying risks and uncertainties is contained in the Company's filings with Canadian securities regulators, which filings are available under Baselode Energy Corp. profile at .

本新闻稿中的某些信息可能包含前瞻性陈述。这些信息基于当前的预期,这些预期受到难以预测的重大风险和不确定性的影响。实际结果可能与任何前瞻性陈述中建议的结果存在重大差异。除非适用于Baselode Energy Corp. 的证券法有要求,否则Baselode Energy Corp. 没有义务更新前瞻性陈述或更新实际业绩可能与前瞻性陈述中反映的结果不同的原因。其他识别风险和不确定性的信息包含在公司向加拿大证券监管机构提交的文件中,这些文件可在Baselode Energy Corp. 的简介下查阅。

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act") or any state securities laws and may not be offered or sold within the United States or to, or for the account or benefit of, U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws, unless an exemption from such registration is available.

本新闻稿不构成在美国出售或征求购买任何证券的要约。这些证券过去和将来都不会根据经修订的1933年《美国证券法》(“美国证券法”)或任何州证券法进行注册,除非根据美国证券法和适用的州证券法注册,否则不得在美国境内发行或出售,也不得向美国人发行或出售,或为美国人提供账户或利益,除非此类注册可获得豁免。

FIGURE 1 - Baselode projects location map. ACKIO uranium prospect identified with yellow circle.

图 1-Baselode 项目位置图。ACKIO 铀矿前景用黄色圆圈确定。



FIGURE 2 – Bear Project Compilation Map.



图 2 — Bear 项目编译图。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发