share_log

Lahontan Announces 3,000 Metre Drill Program for Santa Fe

Lahontan Announces 3,000 Metre Drill Program for Santa Fe

Lahontan 宣布圣达菲的 3,000 米钻探计划
Accesswire ·  05/08 07:00

TORONTO, ON / ACCESSWIRE / May 8, 2024 / Lahontan Gold Corp (TSXV:LG)(OTCQB:LGCXF) (the " Company " or " Lahontan "), is pleased to announce that it is planning a 3,000 metre drill program at its flagship Santa Fe Mine project in the Walker Lane of mining friendly Nevada. The program will consist of approximately 15 reverse-circulation drill holes in the Slab-Calvada and Santa Fe pit areas. Following last year's very successful drill campaign totaling 3,700 metres of reverse-circulation drilling, the Company reviewed all drill data and determined that there were multiple clear targets to potentially expand mineral resources prior to completing the recently announced Preliminary Economic Assessment ("PEA") for the project. This year's drilling will be integrated with the 2023 drill data and the combined near 7,000 metres of new drilling will be used to update the project's Mineral Resource Estimate ("MRE") that forms the basis of the PEA.

2024年5月8日,Lahontan Gold Corp(TSXV:LG)(OTCQB:LGCXF)(“公司”或“Lahontan”)很高兴地宣布,计划在矿业友好的内华达州沃克车道的旗舰项目Santa Fe矿山进行3000米的钻探方案。该方案将包括在Slab-Calvada和Santa Fe采矿区域进行约15个倒置循环钻孔。经过去年非常成功的3,700米倒置循环钻探,公司审查了所有钻探数据,并确定在完成最近宣布的项目初步经济评估(“PEA”)之前,有多个明确目标可以潜在扩大矿产资源。今年的钻探将与2023年的钻探数据整合,合并近7,000米的新钻探将用于更新项目的矿产资源估算(“MRE”),这是PEA的基础。

Kimberly Ann, Lahontan Founder, CEO, President, and Director commented: "The Company is excited to announce our 2024 drill program for Santa Fe. The areas being targeted have the potential to greatly expand the projects MRE and help support a robust PEA. We will be announcing the mobilization of the drill rig shortly. All the drill sites are on previously permitted locations and/or on patented lode mining claims".

Lahontan创始人、CEO、总裁和董事Kimberly Ann表示:"公司很高兴宣布我们的2024年Santa Fe钻探计划。目标区域有潜力大大扩展项目的MRE并有助于支撑强大的PEA。我们将很快公布钻井设备的动员时间。所有钻井地点都位于之前获得许可的位置和/或拥有专利的巷道采矿权"。

As illustrated in the cross section below, the drill holes will target areas were previously defined Mineral Resources* extend below the conceptual pit shells used to constrain the MRE. The drilling also allows the Company to fine-tune its geologic, structural, and metallurgical domain models in anticipation of the PEA.

如下剖面图所示,钻探孔将针对先前定义的矿产资源延伸至概念开采外形的区域。钻探也允许公司调整其地质、结构和冶金领域模型,以期望PEA。

Section through proposed drill holes at the Calvada East target. Proposed drill holes are shown in black, previous drill holes with gold grade are also illustrated. Note that the conceptual pit (shown in red) which constrains the project's MRE does not capture the deeper resource blocks. Successful drilling will extend mineralization deeper, and potentially, the conceptual pit shell as well.

Calvada East目标预期钻探孔段。黑色部分展示了预期的钻探孔,同时也展示了先前钻探的黄金等级。请注意,限制项目MRE的概念采矿外形(红色显示)并未捕获更深层次的资源块。成功的钻孔将延伸矿化作用区,并可能延伸概念采矿外形。

About Lahontan Gold Corp.
Lahontan Gold Corp. is a Canadian mine development and mineral exploration company that holds, through its US subsidiaries, four top-tier gold and silver exploration properties in the Walker Lane of mining friendly Nevada. Lahontan's flagship property, the 26.4 km 2 Santa Fe Mine project, had past production of 345,000 ounces of gold and 711,000 ounces of silver between 1988 and 1995 from open pit mines utilizing heap-leach processing (Nevada Bureau of Mines and Geology, 1995). The Santa Fe Mine has a Canadian National Instrument 43-101 compliant Indicated Mineral Resource of 1,112,000 oz Au Eq (grading 1.14 g/t Au Eq) and an Inferred Mineral Resource of 544,000 oz Au Eq (grading 1.00 g/t Au Eq), all pit constrained (Au Eq is inclusive of recovery, please see Santa Fe Project Technical Report*). The Company will continue to aggressively explore Santa Fe during 2024 and complete a Preliminary Economic Assessment evaluating development scenarios to bring the Santa Fe Mine back into production. Quentin J. Browne, P.Geo., Consulting Geologist to Lahontan Gold Corp., is the Qualified Person for the Company and approved the technical content of this news release. For more information, please visit our website:

关于Lahontan Gold Corp。
关于Lahontan Gold Corp。2Lahontan Gold Corp.是一家加拿大矿业开发和矿产勘探公司,通过其子公司在美国拥有四个顶级金银勘探物业,这些物业都位于矿业友好的内华达沃克巷(Walker Lane)。Lahontan的旗舰物业,26.4千米的Santa Fe矿项目,在1988年至1995年间进行了开放式淘汰处理开采,产量达到345,000盎司黄金和711,000盎司银(内华达矿山和地质局,1995年)。Santa Fe矿在符合加拿大43-101标准的指示矿产资源中具有1,112,000盎司Au Eq(平均1.14 g / t Au Eq)和544,000盎司Au Eq品位为1.00 g / t Au Eq的推测矿产资源,都是控制在露天矿井内的(Au Eq包括恢复,请参阅Santa Fe项目技术报告*)。该公司将继续积极探索Santa Fe并完成初步经济评估,以评估将Santa Fe矿重新投入生产的发展情况。Quentin J. Browne,P.Geo.,Lahontan Gold Corp.的采矿地质顾问,是本公司的合格人员,并批准了本新闻发布的技术内容。Lahontan Gold Corp.是一家加拿大矿业开发和矿产勘探公司,通过其子公司在美国拥有四个顶级金银勘探物业,这些物业都位于矿业友好的内华达沃克巷(Walker Lane)。Lahontan的旗舰物业,26.4千米的Santa Fe矿项目,在1988年至1995年间进行了开放式淘汰处理开采,产量达到345,000盎司黄金和711,000盎司银(内华达矿山和地质局,1995年)。Santa Fe矿在符合加拿大43-101标准的指示矿产资源中具有1,112,000盎司Au Eq(平均1.14 g / t Au Eq)和544,000盎司Au Eq品位为1.00 g / t Au Eq的推测矿产资源,都是控制在露天矿井内的(Au Eq包括恢复,请参阅Santa Fe项目技术报告*)。该公司将继续积极探索Santa Fe并完成初步经济评估,以评估将Santa Fe矿重新投入生产的发展情况。Quentin J. Browne,P.Geo.,Lahontan Gold Corp.的采矿地质顾问,是本公司的合格人员,并批准了本新闻发布的技术内容。

* Please see the Santa Fe Project Technical Report, Authors: Trevor Rabb and Darcy Baker, P. Geos. Effective Date: December 7, 2022, Report Date: March 2, 2023. The Technical Report is available on the Company's website and SEDAR.

*请参阅Santa Fe项目技术报告,作者:Trevor Rabb和Darcy Baker,P. Geos。有效日期:2022年12月7日,报告日期:2023年3月2日。技术报告可在公司网站和SEDAR上获得。

On behalf of the Board of Directors

谨代表董事会

Kimberly Ann
Founder, CEO, President, and Director

Kimberly Ann
创始人,CEO,总裁和董事

FOR FURTHER INFORMATION, PLEASE CONTACT:
Lahontan Gold Corp.
Kimberly Ann
Founder, Chief Executive Officer, President, Director
Phone: 1-530-414-4400
Email: Kimberly.ann@lahontangoldcorp.com

如需进一步信息,请联系:
Lahontan Gold Corp.
Kimberly Ann
创始人,首席执行官,总裁,董事
电话:1-530-414-4400
邮件:Kimberly.ann@lahontangoldcorp.com

Cautionary Note Regarding Forward-Looking Statements:
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Except for statements of historical fact, this news release contains certain "forward-looking information" within the meaning of applicable securities law. Forward-looking information is frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking statements are based on the opinions and estimates at the date the statements are made and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those anticipated in the forward-looking statements including, but not limited to delays or uncertainties with regulatory approvals, including that of the TSXV. There are uncertainties inherent in forward-looking information, including factors beyond the Company's control. The Company undertakes no obligation to update forward-looking information if circumstances or management's estimates or opinions should change except as required by law. The reader is cautioned not to place undue reliance on forward-looking statements. Additional information identifying risks and uncertainties that could affect financial results is contained in the Company's filings with Canadian securities regulators, which filings are available at

关于前瞻性声明的注意事项:
TSX Venture Exchange及其监管服务提供商(如TSX Venture Exchange政策中定义的那样)对此发布的内容的充分性或准确性不承担任何责任。除了历史事实陈述外,本新闻发布包含某些适用证券法的“前瞻性信息”。前瞻性信息经常以“计划”,“期望”,“项目”,“打算”,“相信”,“预测”,“估计”和其他类似的词语,或者陈述某些事件或情况“可能”或“将”发生。前瞻性陈述基于陈述时的意见和估计,并且受到各种风险和不确定性以及可能导致实际事件或结果与前瞻性陈述有所不同的其他因素的影响,包括但不限于拖延或不确定性的监管批准,包括TSXV的审核。前瞻性信息存在不确定性,包括公司无法控制的因素。除法律规定外,本公司无义务更新前瞻性信息,除非情况或管理的估计或意见发生变化。读者应当注意不要过度依赖前瞻性陈述。有关可能影响财务结果的风险和不确定性的其他信息,请参阅公司在加拿大证券监管机构提交的文件,这些文件可在

SOURCE: Lahontan Gold Corp.

来源:Lahontan Gold Corp。


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发