share_log

ATEX Discovers New High-Grade Mineralization at Valeriano Intersecting 68 Metres of 2.02% CuEq Within a Broader Intercept of 356 Metres of 0.98% CuEq

ATEX Discovers New High-Grade Mineralization at Valeriano Intersecting 68 Metres of 2.02% CuEq Within a Broader Intercept of 356 Metres of 0.98% CuEq

ATEX 在瓦莱里亚诺发现了新的高品位矿化区,在 0.98% CueQ 的 356 米宽截距内与 2.02% CueQ 相交
newsfile ·  05/15 07:00

Identifies New, Late-Stage, High-Grade, Overlapping Hydrothermal System Above Porphyry Target and Along Northwest Trending High-Grade Corridor - The Valeriano System Remains Open in All Directions

在西北走向的高品位走廊上,识别了新的、后期的、高品位的、重叠的热液系统,位于斑岩目标上方和沿着高品位甬道 - Valeriano系统在所有方向上均处于未开发状态。

Toronto, Ontario--(Newsfile Corp. - May 15, 2024) - ATEX Resources Inc. (TSXV: ATX) ("ATEX" or the "Company") is pleased to announce complete assay results for drill holes ATXD26 and ATXD17B, the fifth and sixth holes from its Phase IV drill campaign at the Valeriano Copper-Gold Project ("Valeriano" or the "Project") located in Atacama Region, Chile.

安大略省多伦多-(新闻稿Corp。-2024年5月15日)- ATEX资源公司(TSXV:ATX)("ATEX"或"公司宣布了Valeriano铜金项目(“Valeriano”)第四阶段钻探活动的第五和第六个钻探孔ATXD26和ATXD17B的完整化验结果。瓦莱里亚诺"或"项目位于智利阿塔卡马地区(")

Highlights include:

亮点包括:

  • ATXD26 intersected 68.0 metres of 2.02% CuEq (1.39% Cu, 0.60 g/t Au, 3.81 g/t Ag and 473 g/t Mo) from 1,100 metres downhole, within longer intervals of 356.0 m of 0.98% CuEq (0.7% Cu, 0.29 g/t Au, 1.49 g/t Ag and 180 g/t Mo) and 978.0 metres of 0.75% CuEq (0.54% Cu, 0.21 g/t Au, 1.26 g/t Ag and 145 g/t Mo) from 586.0 meters.

    • A high-grade, copper, gold and silver enriched low sulphidation epithermal system, overprinting existing mineralization has been intersected above the projected porphyry target in ATXD26 from 1,108m to 1,208m downhole.

    • ATXD26 was drilled between the Central and Western Trends, and along the northwest striking high-grade trend from ATXD16A in the southeast to ATXD26 in the northwest and remains open along strike.

    • The overprinting high-grade epithermal mineralization is hosted in silicified breccias made up of clasts composed of wall rock and porphyry fragments including Early Porphyry ("EP") fragments. This suggests the presence of mineralized EP below the current hole extents (hole concluded at 1,565.4m) and will be followed up in Phase V.

    • The hole ended in grades of 1.5% CuEq and was terminated 400m above the planned depth.

    • Mineralization intersected in ATXD26 is open at depth and along strike in both directions and is a priority for follow up in Phase V.

  • Additionally, ATXD17B ended at 1,254.0 metres and intersected 504.0m of 0.56% CuEq (0.42% Cu, 0.17 g/t Au, 0.96 g/t Ag and 51 g/t Mo).

    • Sporadic high grades associated with chalcopyrite bearing potassic alteration were intersected in the upper part of the hole from approximately 800m to 1,200m indicates the potential to intersect mineralized EP below and along the southeast continuation of the high-grade mineralization intersected in ATXD16A (594m grading 0.92% CuEq (0.67% Cu, 0.32 g/t Au, 1.13 g/t Ag and 71 g/t Mo) within EP from 1,168m and 112m of 1.42% CuEq (1.01% Cu, 0.57 g/t Au, 2.06 g/t Ag and 46 g/t Mo) from 1,616m). (See Company news dated Feb 22, 2024).

  • ATEX is also pleased to announce it has received an additional CAD$2,170,000 in total proceeds from the exercise of common share purchase warrants ("Warrants") between March 10, 2024, and May 14, 2024. During this period, an aggregate of 6,907,824 Warrants were exercised.

  • ATXD26在钻孔下1,100米处相交68.0米2.02% CuEq(1.39% Cu,0.60克/吨Au,3.81克/吨Ag和473克/吨Mo),更长时段的间隔为在下钻586.0米处的978.0米0.75% CuEq(0.54% Cu,0.21克/吨Au,1.26克/吨Ag和145克/吨Mo)和在1,100.0米获得的356.0米0.98% CuEq(0.7% Cu,0.29克/吨Au,1.49克/吨Ag和180克/吨Mo)。

    • 在ATXD26的预测斑岩目标以上,在钻孔下深度1,108米至1,208米之间遇到了高品位、含铜、金和银的低硫化脉石型热液系统,并与现有矿化相互融合。

    • ATXD26是在中央和西部趋势之间钻探的,在从东南ATXD16A到西北ATXD26的向西北走向的高品位趋势沿线,仍沿着行程未开发。

    • 石英化角砾岩中的超打变质矿化是由壁岩和斑岩碎屑组成的破碎层,包括早期斑岩("EP")碎屑。这表明目前孔位(孔深为1,565.4米)下方存在矿化的EP,并将在第五阶段跟进。

    • 孔底为1.5% CuEq,深度比计划深度浅400米。在ATXD26中,矿化物在深度和走向上均未开发,是第五阶段跟进的优先事项。

    • 此外,ATXD17B在1,254.0米处结束,相交504.0米0.56% CuEq(0.42% Cu,0.17克/吨Au,0.96克/吨Ag和51克/吨Mo)。

  • 在孔的上部,从大约800m到1,200m处交错着与含黄铜黄铜石脉有关的散在高品位区域,并表明了在东南方向的高品位矿化物的接续之下可能会有矿化的EP形成。

    • (594米,0.92% CuEq(0.67% Cu,0.32克/吨Au,1.13克/吨Ag和71克/吨Mo)在1,168米处,以及1,616米处的112米1.42% CuEq(1.01% Cu,0.57克/吨Au,2.06克/吨Ag和46克/吨Mo)。 (请参见2024年2月22日公司新闻)。刚果民主共和国马塔迪项目于4月21日停工,由于刚果矿业部门正式发出的有关到社区中控室和会议室下令停工的通知(从1,168m的EP获得0.92%CuEq(0.67%Cu,0.32 g/t Au,1.13 g/t Ag和71 g/t Mo)的594m,以及从1,616m获得1.42%CuEq(1.01%Cu,0.57 g/t Au,2.06 g/t Ag和46 g/t Mo)的112m)。(请参阅2024年2月22日公司新闻)。

  • ATEX还很高兴地宣布,自2024年3月10日至2024年5月14日期间从普通股购买认股权利("权利证")中获得了额外的加元2,170,000。在这期间,总计行权了6,907,824份权证。ATEX的总裁兼首席执行官Ben Pullinger表示: "孔ATXD26超出了我们的预期,突显了更多高品位化矿化物的潜力,并首次证明了在ATXD16A到ATXD26成长高品位趋势沿线上有多个重叠的系统存在,代表着一个长度约为700m的走向并在两个方向上未开发,深度也有所进展,并指出只要阶段IV计划中尚未定义的系统的限制条件。此外,该计划继续返回到目前为止在项目中看到的最高品位,并为阶段V提供了一个令人兴奋的跳板。"权证在2024年3月10日至2024年5月14日期间行使了总共6,907,824份认股权证(“Warrants”)。

"Hole ATXD26 exceeded our expectations and highlights the potential for more high-grade mineralization and provides first evidence for the presence of multiple overlapping systems yielding higher grades along the growing high-grade trend from ATXD16A through to ATXD26 representing a strike length of approximately 700m and open along strike in both directions, and at depth," stated Ben Pullinger, President and CEO of ATEX. "Equally exciting is that our understanding of the shape and size of the Valeriano Porphyry system and higher-grade EP component has increased dramatically through the Phase IV program. All holes so far in Phase IV have continued to intersect significant mineralized intervals within the yet to be defined limits of the system. Additionally, this program continues to return the highest grades seen at the Project to date and provides an exciting springboard to launch from in Phase V."

表1— ATXD26和ATXD17B的摘要结果

Table 1 - Summary Results for ATXD26 and ATXD17B

Hole ID From To Interval Cu Au Ag Mo CuEq %
MRS
(1)
% g/t g/t g/t
ATXD17B(2) 750.0 1,254.0 504.0 0.42 0.17 0.96 51 0.56
ATXD26**(2) 586.0 1,564.0 978.0 0.54 0.21 1.26 145 0.75
Incl. 1,010.0 1,366.0 356.0 0.70 0.29 1.49 180 0.98
And Incl. 1,086.0 1,208.0 122.0 1.11 0.49 2.71 348 1.60
And Incl. 1,100.0 1,168.0 68.0 1.39 0.60 3.81 473 2.02
(1) CuEq calculated using recoveries assumed in 2023 MRE (90% Cu, 70% Au, 80% Ag and 60% Mo) (See Company news dated September 12, 2023) using the formula stated below:
Copper Equivalent (CuEq) is calculated using the formula CuEq % = Cu % + (6,481.488523 * Au g/t /10,000) + (94.6503085864* Ag g/t /10,000) + (4.2328042328 * Mo g/t /10,000).
*CuEq values reported in historical releases use metals reported in-situ (100% basis). Recoveries for these metals as assumed in the NI 43-101 technical report titled:
"Independent Technical Report for the Valeriano Copper-Gold Project, Atacama Region, Chile" with an effective date of September 1, 2023, available at and are 90% Cu, 70% Au, 80% Ag and 60% Mo.
(2) ATXD17B and ATXD26 were composited at a cut-off of 0.3% CuEq.
**Includes intervals of 22.2m from 804.3m to 826.5m and 8.0m from 854.7m to 862.7m where no core was recovered due to use of a directional drilling tool and 50m of intervals with a below cut-off grade of 0.25% CuEq(1).
孔ID 起点 区间 黄金 Mo 铜当量 %
磁选浓缩
(1)
% 克/吨 克/吨 克/吨
ATXD17B(2) 750.0 1,254.0 504.0 0.42 0.17 0.96 51 0.56
ATXD26**(2) 586.0 1,564.0 978.0 0.54 0.21 1.26 145 固定费用覆盖率
包括。 1,010.0 1,366.0 356.0 0.70 0.29 1.49 180 0.98
包括 1,086.0 1,208.0 122.0 1.11 0.49 2.71 348 1.60
包括 1,100.0 1,168.0 68.0 1.39 0.60 3.81 473 2.02
(1)铜当量是使用2023MRE中假设的回收率计算(Cu90%, Au70%, Ag80%, Mo60%),并使用下面的公式计算得出的。详情请看2023年9月12日的公司新闻。
铜当量 (CuEq)是使用下面的公式计算得出的: CuEq % = Cu % + (6,481.488523 * Au g/t /10,000) + (94.6503085864* Ag g/t /10,000) + (4.2328042328 * Mo g/t /10,000)。
*历史发布的CuEq值使用的是在位金属报告的值(100%计算)。这些金属的回收率是按照名为NI 43-101的技术报告中假设的来计算的。
"Valeriano 铜-黄金项目技术独立报告,智利Atacama 地域板块,有效日期为2023年9月1日,可在 上获取,铜为90%,金为70%,银为80%,钼为60%。"
(2)ATXD17B和ATXD26以0.3%的铜当量为基准进行了合并。
** 包括从804.3m到826.5m的22.2m间隔和从854.7m到862.7m的8.0m间隔,由于使用定向钻进工具而未恢复任何岩心,还有50m的间隔低于0.25%的铜当量切割赚。(1).

Due to the early onset of seasonal storms in the region, the Phase IV program has been concluded totalling approximately 12,000m of diamond drilling. Through utilizing directional drilling allowing for the completion of daughter holes out of existing parent holes drilled from surface, ATEX has been able to realize an effective total of 20,100m drilled in the event all holes had been drilled from surface. ATEX has announced assay results for six complete holes, ATXD16A, ATXD17A, ATXD12A ATXD25, AXTD17B and ATXD26 totalling approximately 9,400m and has three more partial holes, totalling approximately 2,600m to be announced.

由于在该地域早期的季节性暴风雨,第四阶段计划已经完成了大约12,000 m的金刚石钻探。通过利用方向钻进允许完成从地表钻孔出去的子孔位,ATEX已经能够实现总共20,100 m的钻进,即使所有孔都是从地表钻探的情况下。ATEX已经宣布了六个完整的孔的化验结果,包括ATXD16A,ATXD17A,ATXD12A,ATXD25,AXTD17B和ATXD26,其中总计约为9,400m,并且还有三个局部孔,总计约为2,600m等待公布。

Results

结果

Three diamond drill holes were underway when the program was suspended including ATXD25A ((end of hole "EOH") at 1,454.2m), ATXD26A a daughter hole starting at 792m from ATXD26, (EOH 925.5m) and ATXD27 (EOH 944.3m). These holes were testing for continuity of mineralized porphyry between the currently modelled EP trends and extending mineralization further along strike to the northwest (Figure 2). ATXD25A is a daughter hole from ATXD25 and is testing the continuity of mineralization north-west of ATXD23 (964.0m of 0.68% CuEq (0.48% Cu, 0.24 g/t Au, 78 g/t Mo), see Company news dated June 5, 2023 "ATEX Intersects 0.70% CuEq over 964 metres in a 200m Step-Out Along the Recently Discovered High-Grade Western Porphyry Trend"). The hole was shut down at 1,454.2m in potassic altered and mineralized wall rock (Figure 1 & 2).

程序中有三个钻进孔正在进行,包括ATXD25A(孔底"的末端,在1,454.2m处),ATXD26A,一个从ATXD26开始的子孔(EOH 925.5m)和ATXD27(EOH 944.3m)。这些孔是为了测试当前模拟的EP趋势与向西北方向延伸矿化的连续性(图2)。ATXD25A是ATXD25的子孔,正在测试ATXD23以北(964.0m)的矿化连续性,为0.68%的铜当量(0.48%的铜,0.24 g/t Au,78 g/t Mo),请参见2023年6月5日的公司新闻"ATEX在最近发现的高品位西侧斑岩区域沿着200m步进距离交叉点上交叉0.70%CuEQ长达964米"。孔在石英砂岩中止于1,454.2m处(图1&2)。EOHATXD26和ATXD26A是一个父与子的孔,用于测试中心和西部趋势之间EP的连续性。

  • ATXD26 and ATXD26A are a parent and daughter hole testing the continuity of EP between the northern extents of the Central and Western Trends.

    • ATXD26 intersected mineralized porphyritic units and mineralized hydrothermal breccias from approximately 1,100m downhole confirming the potential for mineralized EP below the current hole bottom and in the gap.

    • A newly discovered zone of overprinting hydrothermal mineralization has been intersected in ATXD26, above the porphyry target. This breccia hosted mineralization includes clasts of EP and is associated with enriched, gold, silver and bismuth grades. This zone remains open in all directions and will be a priority for exploration and definition in Phase V.

    • ATXD26 was abandoned, due to in hole conditions, at a depth of 1,565m. (Figure 1 & 2) ATXD26A is a daughter hole being drilled out of ATXD26, to the south. Starting at a depth of 792m it is targeting the extension of the high-grade mineralization intersected in ATXD24 (670.0m of 0.84% CuEq (0.60% Cu, 0.24 g/t Au, 101 g/t Mo including 312m of 1.00% CuEq (0.73% Cu, 0.3 g/t Au and 77 g/t Mo)), see Company news dated July 13, 2023 "ATEX Intersects 0.84% CuEq over 670 metres Widening the Central High-Grade Trend in the Last Drill Hole of Phase III Program.") (Figure 1 & 2).

  • ATXD27 tested the northern extent of mineralization along the Western Trend Porphyry to the north-east of ATXD23 (Figure 2).

  • The three uncompleted drill holes (ATXD25A, ATXD26A and ATXD27) will be extended in the next drilling season.

  • ATXD26从孔底开始,约在1,100 m以下与斑岩状岩体和热液角砾岩相交,证实了矿化EP在目前孔底以下和间隙中的潜力。

    • 在靠近斑岩靶区上方的ATXD26中发现了一个新发现的超打印热液矿化区。这个角砾岩寄主化矿包括EP碎屑,并且与富集的金,银和铋矿化形成关系。这一区域在所有方向上仍然开放,并将是第V阶段勘探和定义的重点。

    • 由于在孔内环境的原因,ATXD26在深度为1,565m处被遗弃。(图1&2)ATXD26A是从ATXD26向南钻出的一个子孔,从深度792m开始,旨在针对在ATXD24中发现的高品位矿化的延伸进行测试,这是0.84%的铜当量(0.60%的铜,0.24 g/t Au,101g/t Mo,包括312m的1.00%的CuEQ(0.73%的Cu,0.3g/t Au和77g/t Mo))(请参阅2023年7月13日的公司新闻"ATEX对第III期计划的最后一钻孔进行了670米,交叉向中心高品位趋势扩大了中央高品位趋势"))(图1&2)。

    • ATXD27测试了西部趋势斑岩矿化的北部极限,位于ATXD23东北部(图2)。

  • 三个未完成的钻孔(ATXD25A,ATXD26A和ATXD27)将在下一个钻探季节中延长。

  • 图1. 穿越趋势的截面图,显示2023年MRE解释 图2. 2024年5月:NNW trending早期斑岩走廊的不断演化解释


Figure 1. Cross-section through trends with 2023 MRE interpretation


表2 - ATXD17B和ATXD26的详细结果 CuEq % MRS 铜当量% 在原处 铜当量%


Figure 2. May 2024: Evolving interpretation of NNW trending Early Porphyry corridor


图2. 2024年5月:NNW走向的早期斑岩走廊演化解释

Table 2 - Detailed Results for ATXD17B and ATXD26

铜当量% MRS 铜当量% 原位 铜当量%

Hole ID From To Interval Cu Au Ag Mo CuEq %
MRS
(1)
CuEq %
In Situ
(2)
CuEq %
Met
(3)
% g/t g/t g/t
ATXD17B(4) 750.0 1,254.0 504.0 0.42 0.17 0.96 51 0.56 0.61 0.60
ATXD26**(4) 586.0 1,564.0 978.0 0.54 0.21 1.26 145 0.75 0.82 0.81
Incl. 1,010.0 1,366.0 356.0 0.70 0.29 1.49 180 0.98 1.07 1.05
And Incl. 1,086.0 1,208.0 122.0 1.11 0.49 2.71 348 1.60 1.77 1.73
And Incl. 1,100.0 1,168.0 68.0 1.39 0.60 3.81 473 2.02 2.23 2.19
(1) CuEq calculated using recoveries assumed in 2023 MRE (90% Cu, 70% Au, 80% Ag and 60% Mo) (See Company news dated September 12, 2023) using the formula stated below:
Copper Equivalent (CuEq) is calculated using the formula CuEq % = Cu % + (6,481.488523 * Au g/t /10,000) + (94.6503085864* Ag g/t /10,000) + (4.2328042328 * Mo g/t /10,000).
(2) CuEq reported in-situ assuming 100% recovery for component metals assuming metal prices of US$1,800 /oz Au, US$3.15 /lb Cu, US$23 /oz Ag, and US$20.00 /lb Mo and using the formula stated below:
Copper Equivalent (CuEq) is calculated using the formula CuEq % = (((Cu % * 3.15 * 22.0462)) + (Au g/t * (1,800/31.1034768))+(Ag g/t * (23/31.1034768)) + ((Mo g/t / 10,000) * (20*22.0462))) / (3.15*22.0462).
(3) CuEq calculated using recoveries reported from metallurgical test work results reported in Company news dated October 18, 2023 (95% Cu, 94% Au, 89% Ag and 83% Mo) using the formula stated below:
Copper Equivalent (CuEq) is calculated using the formula CuEq % = (((Cu % * 3.15 * 22.0462)) + ((0.94/0.95 * Au g/t) * (1,800/31.1034768)) + ((0.89/0.95 * Ag g/t) * (23/31.1034768)) + ((0.83/0.95 * Mo g/t / 10000) * (20*22.0462))) / (3.15*22.0462).
(4) ATXD17B and ATXD26 were composited at a cut-off of 0.3% CuEq.
*CuEq values reported in historical releases use metals reported in-situ (100% basis). Recoveries for these metals as assumed in the NI 43-101 technical report titled "Independent Technical Report for the Valeriano Copper-Gold Project, Atacama Region, Chile" with an effective date of September 1, 2023, available at and are 90% Cu, 70% Au, 80% Ag and 60% Mo.
**Includes intervals of 22.2m from 804.3m to 826.5m and 8.0m from 854.7m to 862.7m where no core was recovered due to use of a directional drilling tool.
孔ID 起点 区间 黄金 Mo CuEq %
MRS
(1)
铜当量%
原位
(2)
铜当量%
完成
(3)
% 克/吨 克/吨 克/吨
ATXD17B(4) 750.0 1,254.0 504.0 0.42 0.17 0.96 51 0.56 0.61 0.60
ATXD26**(4) 586.0 1,564.0 978.0 0.54 0.21 1.26 145 固定费用覆盖率 0.82 0.81
包括。 1,010.0 1,366.0 356.0 0.70 0.29 1.49 180 0.98 1.07 1.05
包括 1,086.0 1,208.0 122.0 1.11 0.49 2.71 348 1.60 1.77 1.73
包括 1,100.0 1,168.0 68.0 1.39 0.60 3.81 473 2.02 2.23 2.19
(1)CuEq计算使用2023年MRE所假定的回收率(90% Cu,70% Au,80% Ag和60% Mo)(请参见公司新闻,日期为2023年9月12日)使用以下公式:
CuEq当量(%)计算公式为CuEq% = Cu% + (6,481.488523 * Au g/t /10,000) + (94.6503085864* Ag g/t /10,000) + (4.2328042328 * Mo g/t /10,000)。
(2)CuEq报告就地估算,假定组分金属的100%回收率,假定金属价格为1,800美元/盎司Au,每磅3.15美元的Cu,每盎司23美元的Ag和每磅20.00美元的Mo,并使用以下公式:
CuEq当量(%)计算公式为CuEq% = (((Cu% * 3.15 * 22.0462)) + (Au g/t * (1,800/31.1034768))+(Ag g/t * (23/31.1034768)) + ((Mo g/t / 10,000) * (20*22.0462))) / (3.15*22.0462)。
(3)CuEq计算使用公司于2023年10月18日报道的冶金试验结果所报告的回收率(95% Cu,94% Au,89% Ag和83% Mo)使用以下公式:
铜当量(CuEq)的计算公式为CuEq % = (((Cu % * 3.15 * 22.0462)) + ((0.94/0.95 * Au g/t) * (1,800/31.1034768)) + ((0.89/0.95 * Ag g/t) * (23/31.1034768)) + ((0.83/0.95 * Mo g/t / 10000) * (20*22.0462))) / (3.15*22.0462).
(4)ATXD17B和ATXD26以0.3% CuEq为截止值合成。
*历史发布的CuEq值采用原位金属数据(100%基础)。这些金属的回收率在NI 43-101技术报告中假定为"瓦莱里亚诺铜金矿项目独立技术报告,智利阿塔卡马地区",有效日期为2023年9月1日,可在和 上获得,分别为90% Cu、70% Au、80% Ag和60% Mo。
**包括804.3m至826.5m间隔的22.2m和854.7m至862.7m间隔的8.0m没取到取心,是由于使用定向钻进工具的原因。

Outlook

展望

With the early onset of seasonal storms affecting many operators in the region, ATEX is currently executing a staged shut down of the Phase IV program to safely demobilize personnel and equipment, marking the end of the Phase IV program. The Phase V program, which will follow on from the success of Phase IV, is anticipated to commence in H2 2024.

受季节性风暴的早期影响,该地区的许多操作商目前正在执行计划关闭IV期项目,以安全地解体人员和设备,标志着IV期项目的结束。接下来的V期项目,将继续IV期项目的成功,预计将于2024年下半年开始。

Final drill results from the remaining Phase IV drill holes are expected to be released through June of 2024. These results and the associated geological information will be integrated into planning for Phase V. The success of this drill program has positively impacted the Company's understanding of the Valeriano Porphyry system. Specifically, results from the Phase IV program have led to an increase in the target size for the EP component through demonstrating continuity along a 1.2 km strike length and proving that the three previously modelled trends are likely to be connected. The Phase V program is expected to focus on drilling within the EP trend to confirm continuity of the higher-grade corridor within the larger EP target and on significant step-outs to the northwest and southeast where the EP trend remains open. ATEX believes this program could continue to grow the deposit significantly and provide the foundation for an eventual preliminary economic study.

剩余的第四阶段钻孔的最终钻探结果预计将在2024年6月发布。这些结果及相关的地质信息将被整合进入V阶段的计划中。IV期项目的成功对Valeriano斑岩系统的理解产生了积极影响。具体而言,IV期项目的结果通过在1.2公里的走向上展示连续性和证明先前建模的三个趋势可能相互连接,导致EP模块的目标大小增加。预计V期项目将专注于EP趋势内的钻探,以确认大型EP目标内的高品位廊道的连续性以及向西北和东南方向的重要跨步,其中EP趋势仍然保持开放状态。ATEX认为这个项目可以继续显著增加资源量,并为最终制定初步经济学研究奠定基础。

QAQC

QAQC

Drill holes are collared with a PQ drill bit, reduced to HQ and, sequentially, to NQ as the drill holes progressed deeper. Drill core produced by the drill rigs was extracted from the core tubes by the drill contractor under the supervision of ATEX employees, marked for consistent orientation and placed in core boxes with appropriate depth markers added. Full core boxes were then sealed before being transported by ATEX personnel to the Valeriano field camp. Core at the field camp is processed, quick logged, checked for recovery, photographed, and marked for specific gravity, geotechnical studies and for assays. From camp, the core is transferred to a secure core-cutting facility in Vallenar, operated by IMG, a third-party consultant. Here, the core trays are weighed before being cut using a diamond saw under ATEX personnel oversight. ATEX geologists working at this facility double-check the selected two-metre sample intervals, placing the samples in seal bags and ensuring that the same side of the core is consistently sampled. Reference numbers are assigned to each sample and each sample is weighed. The core trays with the remaining half-core are weighed and photographed. Additionally, core logs are updated, and specific gravity and geotechnical samples are collected. The remaining core is stored in racks at the Company's secure facility in Vallenar.

钻孔用PQ钻头打板,钻孔越深,逐渐减小到HQ和NQ大小。由钻机生产的钻芯由钻承包商在ATEX职员的监督下从钻芯管中取出,标记为统一的方向,并放在带有适当深度标记的钻芯箱中。钻芯箱完整封闭后,由ATEX职员运往瓦莱里亚诺野外营地。营地的岩心将被加工、快速日志记录、检查回收率、拍照并标记为比重、地质研究和化验样品。岩石芯样从野外营地转移到IMG运营的瓦连纳一个安全的岩心切割设施。空芯盘在称重后,由ATEX职员监督下使用金刚石锯进行切割。在这个设施工作的ATEX地质学家将两米的样品间隔再次检查,并将样品放入密封袋中,并确保样品始终采样相同的侧面。为每个样品分配参考编号,并称重每个样品箱。剩余的半芯核心将被称重并拍照。此外,核心日志将更新,并收集比重和岩土技术样品。其余芯岩在ATEX的瓦连纳安全设施中存放。

From Vallenar samples are sent to an ALS preparation facility in La Serena. ALS is an accredited laboratory which is independent of the Company. The prepared samples were sent to the ALS assay laboratories in either Santiago, Chile and Lima, Peru for gold (Au-AA24), copper (Cu-AA62), molybdenum (Mo-AA62) and silver (Ag-AA62) assays as well as and multi-element ICP (ME-MS61) analysis. No data quality problems were indicated by the QA/QC program.

从巴伦纳尔开始,样品将被送往位于拉塞雷纳的ALS制备设施。ALS是一家获得认证的独立实验室,与公司无关。制备好的样品被送往ALS的化验实验室,分别在智利圣地亚哥和秘鲁利马进行金(Au-AA24)、铜(Cu-AA62)、钼(Mo-AA62)和银(Ag-AA62)化验以及多元素ICP(ME-MS61)分析。QA/QC程序没有发现数据质量问题。

Qualified Person

合格人士

Mr. Ben Pullinger, P.Geo., registered with the Professional Geoscientists Ontario, is the Qualified Person, as defined by National Instrument 43-101 - Standards for Disclosure for Mineral Projects, for the Valeriano Copper Gold Porphyry Project. Mr. Pullinger is not considered independent under NI 43-101 as he is President and CEO of ATEX. He has reviewed and approved the disclosure of the scientific and technical information contained in this press release.

贝·普林格(Ben Pullinger)先生是安大略省专业地质科学家注册人员,是《国家43-101号法规》的合格人,《铜金斑岩项目独立技术报告,智利阿塔卡马地区》(有效日期为2023年9月1日),因为他是ATEX总裁兼首席执行官,所以不被视为独立人士。他已经审查并批准了本新闻稿所包含的科学技术信息的披露。矿产项目披露的标准

About ATEX

瓦莱里亚诺是一个大型铜金斑岩资源:14.10亿吨,铜当量为0.67%(铜为0.50%,金为0.20 g/t,银为0.96 g/t,钼为63.80 g/t),其中包括高品位核心,总计2.00亿吨,铜当量为0.84%(铜为0.62%,金为0.29 g/t,银为1.25 g/t,钼为55.7 g/t),报告时间为2023年9月

ATEX is exploring the Valeriano Copper Gold Project which is located within the emerging copper gold porphyry mineral belt linking the prolific El Indio High-Sulphidation Belt to the south with the Maricunga Gold Porphyry Belt to the north. This emerging belt, informally referred to as the Link Belt, hosts several copper gold porphyry deposits at various stages of development including, Filo del Sol (Filo Mining), Josemaria (Lundin Mining), Los Helados (NGEX Minerals/JX Nippon), La Fortuna (Teck Resources/Newmont) and El Encierro (Antofagasta/Barrick Gold).

本·普林格(Ben Pullinger)

Valeriano hosts a large copper gold porphyry resource: 1.41 billion tonnes at 0.67% CuEq (0.50% Cu, 0.20 g/t Au, 0.96 g/t Ag and 63.80 g/t Mo), which includes a higher-grade core totaling 200 million tonnes at 0.84% CuEq (0.62% Cu, 0.29 g/t Au 1.25 g/t Ag and 55.7 g/t Mo), reported in September 20231.

总裁兼首席执行官 Email:bpu1.

For further information, please contact:

如需更多信息,请联系:

Ben Pullinger,
President and CEO
Email: bpullinger@atexresources.com

本·普林格
总裁兼首席执行官
电子邮件:bpullinger@atexresources.com

Aman Atwal,
Vice President, Business Development and Investor Relations
Email: aatwal@atexresources.com

Aman Atwal,业务发展和投资者关系副总裁。发送邮件至:aatwal@atexresources.com,或访问ATEX网站。
业务发展和投资者关系副总裁
电子邮件:aatwal@atexresources.com

1-647-287-3778
or visit ATEX's website at

1-647-287-3778
或访问ATEX的网站

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS:

关于前瞻性声明的警告:本新闻稿包含前瞻性声明,包括预测、投影和预测。通常,但并非总是如此,前瞻性声明可以通过使用诸如“计划”、“计划”、“预计”或“不预期”、“持续”、“定期”、“估计”、“预测”、“意图”、“潜在”、“预计”、“不预计”或描述“目标”的单词或短语的变化或表明将采取某些行动、事件或结果“可能”、“可能”、“将”被采取、发生或实现。前瞻性声明涉及已知和未知的风险、未来事件、条件、不确定性和其他因素,它们可能导致实际结果、绩效或成就与任何未来结果、预测、投影、绩效或成就不同,这些结果、预测、投影、绩效或成就是前瞻性声明所表达的或暗示的。

This news release contains forward-looking statements, including predictions, projections, and forecasts. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "planning", "expects" or "does not expect", "continues", "scheduled", "estimates", "forecasts", "intends", "potential", "anticipates", "does not anticipate", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, prediction, projection, forecast, performance or achievements expressed or implied by the forward-looking statements.

本新闻稿包含对未来的预测、投射和预测的前瞻性声明。通常,但并非总是,可以通过使用“计划”、“计划”、“预计”或“不预期”、“继续”、“计划”、“估计”、“预测”、“意图”、“潜在”、“预期”、“不预期”或描述“目标”的单词或这样的单词和短语的变化或说明某些行动、“事件”或“结果”“可能”、“可能”、“可能”或“将要”被采取、发生或实现来识别前瞻性声明。前瞻性声明涉及已知和未知风险、未来事件、条件、不确定因素和其他可能导致实际结果、预测、投射、预测、表现或成就与前瞻性陈述所表达或暗示的任何未来结果、预测、投射、预测、表现或成就实质上不同的因素。这些前瞻性声明包括,但不限于:在行使股票期权或结算RSUs,包括任何归属权益方面,发行普通股或进行现金支付;以及ATEX的公开文件中披露的因素。

Such forward-looking statements include, among others: plans for the evaluation of exploration properties including the Project; the success of evaluation plans; the success of exploration activities especially to the significant expansion of the high-grade corridor; mine development prospects; potential for future metals production; changes in economic parameters and assumptions; all aspects related to the timing and extent of exploration activities including the Phase IV and Phase V drill programs contemplated in this press release; the timing or nature of a preliminary economic study; timing of receipt of exploration results; the interpretation and actual results of current exploration activities and mineralization; changes in project parameters as plans continue to be refined; the results of regulatory and permitting processes; future metals price; possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; labour disputes and other risks of the mining industry; the results of economic and technical studies; delays in obtaining governmental and local approvals or financing or in the completion of exploration; timing of assay results; as well as those factors disclosed in ATEX's publicly filed documents.

这些前瞻性声明包括,但不限于:评估勘探性质的计划,包括该项目,计划的成功,勘探活动的成功,特别是对高品位廊道的显著扩展,开采前景,未来金属生产的潜力,经济参数和假设的变化,所有与计划中的勘探活动相关的方面,包括本新闻稿中提到的IV期和V期钻孔计划的时间和程度;初步经济学研究的时间或性质,接收勘探结果的时间,对当前勘探活动和矿化的解释和实际结果的变化,随着计划的继续逐步完善而产生的项目参数的变化,监管和许可程序结果,未来的金属价格,可能的品位或回收率变化;设备或进程不能按预期操作导致的故障;矿业劳工争议和矿业行业其他风险;经济和技术研究的结果;获得政府和当地批准或融资或勘探完成的延迟,评估结果的时间;以及ATEX公开披露文件披露的那些因素。

Although ATEX has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

TSX Venture Exchange及其监管服务提供商未审核或接受本新闻稿内容的充分性或准确性。

Neither the TSX Venture Exchange nor its regulation services provider has reviewed or accepts
responsibility for the adequacy or accuracy of the content of this news release.

TSX 创业公司交易所及其监管服务提供者未审查或审核本新闻发布中内容的充分性或准确性。
对于本新闻发布中内容的充分性或准确性,TSX 创业公司交易所及其监管服务提供商不承担任何责任。


1 Please see NI 43-101 technical report titled "Independent Technical Report for the Valeriano Copper-Gold Project, Atacama Region, Chile" by Joled Nur, CCCRRM-Chile, and David Hopper, CGeol, with an effective date of September 1, 2023, available at and for additional details on the 2023 Mineral Resource Estimate for the Valeriano project.

1请参阅NI 43-101技术报告,题为"铜金斑岩项目独立技术报告,智利阿塔卡马地区",由Joled Nur、CCCRRM-Chile和David Hopper、CGeol编写,有效日期为2023年9月1日,详细了解瓦莱里亚诺项目2023年矿产资源估计。该报告可在和 上获得。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发