share_log

Basin Uranium Stakes Uranium Project in the Great Divide Basin, Wyoming

Basin Uranium Stakes Uranium Project in the Great Divide Basin, Wyoming

Basin Uranium 在怀俄明州大分水岭盆地投资铀项目
newsfile ·  05/16 03:05

Vancouver, British Columbia--(Newsfile Corp. - May 16, 2024) - BASIN URANIUM CORP. (CSE: NCLR) (CNSX: NCLR.CN) ("Basin Uranium" or the "Company") is pleased to announce it has acquired the Great Divide Basin Uranium Project (the "Project" or "GDB") located in Sweetwater County, Wyoming, USA. The Project, which was acquired through direct staking by the Company, is comprised of 104 unpatented mineral lode claims totaling approximately 1,880 acres located in south-central Wyoming and within the Great Divide Basin (Figure 1). The claims are located contiguous with Premier American Uranium's Cyclone Project which hosts an exploration target ranging from 6.5 million short tons averaging 0.06% U3O8 (7.9 million lbs. U3O8) to 10.5 million short tons averaging 0.06% U3O8 (12.6 million lbs. U3O8)1. Wyoming is home to both the largest uranium reserves and top producing uranium state in US2, with the Great Divide Basin representing the least exploited of Wyoming's basins estimated to contain over 270 million pounds of uranium3.

温哥华,不列颠哥伦比亚省——(Newsfile Corp. ——2024年5月16日)——盆地铀(CSE:NCLR)(CNSX:NCLR.CN)("盆地铀"或"公司很高兴宣布已收购位于美国怀俄明州Sweetwater县的Great Divide Basin铀矿项目(“GDB”)。该项目通过公司直接建站收购,由104个未取得专利的矿区申请组成,总共约1880英亩,位于怀俄明州南部和中部的Great Divide Basin(图1)内。这些矿区与Premier American Uranium的Cyclone项目相鄰,其勘探目标范围从65万吨短吨中平均含0.06%铀(7.9万磅铀)到105万短吨中平均含0.06%铀(126万磅铀)。怀俄明州拥有美国最大的铀储量和排名第一的铀生产州。"GDB物业的固定标志着我们在美国的继续扩张和Wyoming州内部产生的第二个项目。我们继续以获得和开发位于盛产采矿区的战略资产为目标,这些区域进行了广泛的历史勘探,"这是Basin Uranium首席执行官Mike Blady的评论。"GDB项目和周围地区一直是探险家的聚集地,从20世纪50年代的美国政府到最近的Tournigan Energy Ltd在2000年代中期。对于GDB的吸引力和潜力,具有良好理解的地质学,历史勘探和与UR Energy's Lost Creek ISR矿山和处理设施的接近距离也增加了吸引力。怀俄明州是美国铀探矿和采矿法律的主要发源地之一,为许可和开发提供了明确定义和快速的路径。项目计划议程今天天气不错 今天天气不错Premier American Uranium的Cyclone项目紧邻GDB项目,位于怀俄明州美国,由该公司直接用申请赢得,由104个未获专利的矿区申请组成,总共约1880英亩,位于怀俄明州南部和中部的Great Divide Basin内。其中包含了一项勘探目标,其范围从65万吨短吨中平均含0.06%铀(7.9万磅铀)到105万短吨中平均含0.06%铀(126万磅铀)。3O87.9万磅铀3O83O812.6万磅铀。3O8)12怀俄明州是美国拥有最大铀储量和产量最大的州之一。其中只开采了怀俄明州盆地中最少的Great Divide盆地估计拥有超过2.7亿磅的铀量。3.

"The staking of the GDB property represents our continued expansion into the USA and second internally generated project in Wyoming. We continue to execute on acquiring and developing strategic assets located in prolific mining districts with extensive historical exploration," commented Mike Blady, CEO of Basin Uranium. "The GDB Project and surrounding area have played host to a plethora of explorers, starting with the U.S. government in the 1950's and most recently Tournigan Energy Ltd. in the mid 2000's. The well understood geology, historic exploration, and proximity to UR Energy's Lost Creek ISR mine and processing facility add to the appeal and potential of GDB. Wyoming represents one of the premiere exploration and mining jurisdictions for uranium within the USA which provides for a clearly defined and expedient pathway for permitting and development."

怀俄明州既拥有美国最大的铀储量,也是美国排名第一的铀生产州。

The Great Divide Basin (GDB) Project, Wyoming

Great Divide Basin(GDB)项目,怀俄明州

The GDB Project is comprised of approximately 1,880 acres of contiguous claims (104 unpatented mineral lode claims) located south and west of Jeffrey City and north and west of Wamsutter, Wyoming. The Project adjoins Premier American Uranium's Cyclone Project and is readily accessible by gravel and dirt roads maintained by the Bureau of Land Management (BLM). The Project has seen extensive historical drilling dating back to the 1970's with many of the pads identifiable on the western half of the project. More recently, Tournigan Energy drilled a number of wells with grade-thickness or GT (grade U3O8 X thickness in feet) in excess of 0.25GT from a grid located about 500 - 1,000 feet to the southwest of the project, further highlighting the potential for economic grade uranium mineralization within the immediate vicinity.

GDB项目由位于怀俄明州杰弗里城以南和西部,万赛特以北和西部约1880英亩的相邻矿区(104个未获专利的矿区)组成。该项目与Premier American Uranium的Cyclone项目相邻,由美国国土管理局(BLM)维护的碎石路和土路可以轻松到达。该项目历经从20世纪70年代开始的广泛历史钻探,其中许多钻井平台可以在项目的西半边识别出来。最近,Tournigan Energy从位于项目西南约500-1,000英尺的网格中钻探了许多井,其中含量厚度GT(岩浆中铀的含量与厚度之积,以英尺为单位)超过0.25GT,进一步突显了该地区经济级别铀矿化的潜力。3O8


Figure 1 - GDB Project Location


图1 GDB项目位置

Qualified Person

合格人士

R. Tim Henneberry, PGeo (B.C.), a technical advisor to the Company, is the Qualified Person as defined by National Instrument 43-101 who has reviewed and approved the technical data in this news release.

本新闻稿中的技术数据经过国际43-101号文件规定的合格人员R. Tim Henneberry,PGeo(B.C.)的审查和批准。

About Basin Uranium Corp.

关于盆地铀公司

Basin Uranium is a Canadian junior exploration company focused on mineral exploration and development in the green energy sector. The company has five advanced-stage uranium projects located in the United States, namely the Chord and Wolf Canyon projects in South Dakota, the South Pass and Great Divide Basin projects in Wyoming, and the Wray Mesa project in Utah. All five projects have seen extensive historical exploration and located in prospective development areas. The Company also has the Mann Lake uranium project, located in the world-class Athabasca basin of Northern Saskatchewan, Canada, in addition to the CHG gold project in south-central British Columbia.

盆地铀是一家加拿大初创勘探公司,专注于绿色能源领域的矿产勘探和开发。该公司在美国拥有五个先进级别的铀项目,分别是南达科他州的弦铀矿和狼峡谷项目、怀俄明州的南通道和大分水岭盆地项目,以及犹他州的雷梅萨项目。这五个项目均有广泛的历史开发探测,并位于有前途的开发区域。该公司还拥有位于加拿大北部萨斯喀彻温省世界级的Athabasca盆地的曼湖铀项目,以及位于不列颠哥伦比亚省中南部的CHG黄金项目。

For further information, please contact Mr. Mike Blady or view the Company's filings at .

欲了解更多信息,请联系麦克·布拉迪先生或查看公司的备案。

On Behalf of the Board of Directors
Mike Blady
Chief Executive Officer
info@basinuranium.ca
604-722-9842

Carl Esprey
Mike Blady
首席执行官
info@basinuranium.ca
604-722-9842

Neither the Canadian Securities Exchange nor its regulation services provider accepts responsibility for the adequacy or accuracy of this news release.

加拿大证券交易所及其监管服务提供商对本新闻发布的充分性或准确性不承担任何责任。.

FORWARD-LOOKING STATEMENTS:

前瞻性声明:

Cautionary Note Regarding Forward-Looking Statements: This news release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts, including statements regarding future estimates, plans, objectives, timing, assumptions or expectations of future performance are forward-looking statements and contain forward-looking information. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would" or "occur". Forward-looking statements are based on certain material assumptions and analysis made by the Company and the opinions and estimates of management as of the date of this news release. These forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking statements or forward-looking information. Important factors that may cause actual results to vary include, without limitation, uncertainties affecting the expected use of proceeds. Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial out-look that are incorporated by reference herein, except in accordance with applicable securities laws.

关于前瞻性声明的警示说明:本新闻发布中包含某些可能构成适用的加拿大证券法规的前瞻性信息和陈述。本新闻发布中的所有陈述,除了历史事实陈述外,都是前瞻性陈述,包含前瞻性信息。通常,前瞻性陈述和信息可以通过使用前瞻性术语(如“打算”或“预计”)或这类词汇和短语的变体,或陈述某些行动、事件或结果“可能”、“可以”、“应该”、“将”或“发生”。前瞻性陈述基于公司所做的某些基本假设和分析,以及管理层在本新闻发布日期的意见和估计。这些前瞻性陈述受到已知和未知的风险、不确定性和其他因素的影响,这些因素可能导致公司的实际结果、活动水平、业绩或成就与这样的前瞻性陈述或前瞻性信息所表达的不同。导致实际结果发生变化的重要因素包括但不限于,对所预期的收益使用不确定性。尽管公司管理人员已尽力识别可能导致实际结果与前瞻性陈述或前瞻性信息所表达的结果不同的重要因素,但可能还存在其他因素导致结果未如预期、估计或计划。因此,读者不应过分依赖前瞻性陈述和前瞻性信息。读者应被告知,对于其他目的,依赖此类信息可能是不恰当的。在适用的证券法律规定下,公司不承诺更新任何已引入的前瞻性陈述、前瞻性信息或财务预期。


1 Technical Report on the Cyclone Rim Uranium Project Great Divide Basin Wyoming, USA. June 30, 2023.
2 Domestic Uranium Production Report - Q2/2023, US Energy Information Administration
3 Applied Exploration Geology and Uranium Resources of Great Divide Basin, Wyoming

1Wyoming州 Great Divide Basin 铀边缘项目技术报告,美国, 2023年6月30日。
2美国能源信息管理局,2023年铀国内生产报告-Q2。
3怀俄明州大分水岭盆地的应用勘探地质学和铀资源

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发