share_log

Canuc Announces Natural Gas Production Workover in West Texas

Canuc Announces Natural Gas Production Workover in West Texas

Canuc 宣布在西德克萨斯州进行天然气生产改造
newsfile ·  05/22 09:00

Toronto, Ontario--(Newsfile Corp. - May 22, 2024) - Canuc Resources Corporation (TSXV: CDA) (OTCQB: CNUCF) ("Canuc" or the "Company") announces that the Company is undertaking repair and workover operations for the natural gas producing wells held by the Company's 100% owned subsidiary MidTex Oil and Gas Corporation ("MidTex"). MidTex has ownership and lease rights for (8) producing natural gas wells in Stephens County, West Texas and also holds rights for further in field developments.

加拿大安大略省--(新闻稿公司. - 2024年5月22日)--Canuc Resources Corporation (TSXV:CDA)(OTCQB:CNUCF)("Canuc"或"公司")宣布,该公司正在对公司全资子公司MidTex Oil and Gas公司("MidTex")持有的产气井进行修复和完井作业。MidTex在德克萨斯州西部的斯蒂芬斯县拥有(8)个产气井的所有权和租赁权,并且还拥有更进一步的油田开发权。

The Big Saline Formation is a natural gas bearing zone which is located at approximately 3,700-feet true vertical depth ("TVD") in the Company's operating natural gas wells. The Company's Coody-Morales Trac 3-3 well has been producing from the Big Saline for more than 13 years. The well was drilled in 2011, with a drilling and completion cost of $153K USD, and to date has produced a gross revenue of $1.04M USD ($1.43M CAD). The well has exhibited low decline rates and in 2023 produced 35,246 MCF of natural gas at an average sale price of $3.27 USD ($4.48 CAD) per MCF. The currently scheduled repairs are expected to return the well to its historical gas production rates.

Big Saline Formation是位于公司经营的天然气井中,约3700英尺的真实垂直深度("TVD")的天然气产层。Coody-Morales Trac 3-3井已经从Big Saline产层中产生了超过13年的产出。该井于2011年钻探,钻井和完井成本为153K美元,迄今为止已经产生了104万美元的总收入(1.43百万加元)。2023年井产出天然气35246 MCF,平均售价为3.27美元(4.48加元)/ MCF。预计当前安排的修复工作将使得该井回到历史上的天然气产出水平。

Logs for the Company's Coody-Morales Trac 3-3 well indicate that above the Big Saline Formation there are two further hydrocarbon zones which are prospective for production. The Caddo Limestone is a potential oil-bearing zone located at approximately 3,200' TVD and the Strawn Sands is a potential gas-bearing zone located at approximately 1,700' TVD.

该公司Coody-Morales Trac 3-3井的记录表明,在Big Saline产层之上,有两种进一步开发的烃类区,即Caddo Limestone(大约3200' TVD的潜在油产层)和Strawn Sands(大约1700' TVD的潜在天然气产层)。

The Company expects to move up hole to complete and test both the Caddo Limestone (oil) and the Strawn Sands (natural gas) respectively at some point in the future, after economic depletion of the Big Saline.

在Big Saline被开采老化之后,该公司计划上部(up hole)进一步进行开采,即完成和测试Caddo Limestone(油)和Strawn Sands(天然气)。

An AFE (Authorization For Expenditure) for workover operations on the Coody-Morales Trac 3-3 well has been received from the Company's operator in Breckenridge, Texas. Work on the well will commence imminently and resumption of natural gas production is expected to begin soon thereafter.

来自公司位于得克萨斯州布雷肯里奇市的运营商的工作授权(AFE)已经收到,将即刻开始对Coody-Morales Trac 3-3井的作业修复,并预计很快恢复天然气产出。

"The Big Saline Formation in the Coody-Morales Trac 3-3 well has been producing cash flow for Canuc since 2011 and has already paid out several times over the drilling and completion costs of the well. We expect to continue producing this zone until it is depleted. Above this zone, and behind pipe, are two further zones which are prospective for hydrocarbon production, the Caddo Limestone (oil-bearing zone) and the Strawn Sands (natural gas-bearing zone). In addition to this, the company also holds rights for further in field developments." Stated Christopher Berlet, President & CEO of Canuc.

"Coody-Morales Trac 3-3井中的Big Saline产层自2011年以来一直为Canuc提供现金流,已经支付了钻井和完井成本的几倍。我们期望会持续开采该产层,直到耗尽为止。该产层之上及管柱之后,有两种进一步开发的烃类区,即Caddo Limestone(潜在油产层)和Strawn Sands(潜在天然气产层)。此外,该公司还持有更进一步的油田开发权。" Canuc总裁兼首席执行官Christopher Berlet表示。

"In developing the company's cash flow from smaller projects in safe jurisdictions, we seek to protect shareholders from unnecessary dilution and to minimize share issuance."

"在稳定的司法管辖区域中发展公司现金流的小型项目,我们寻求保护股东免受不必要的稀释,并尽量减少股票发行。"

The repair and workover operation is expected to be completed in the next 2-4 weeks and the Company will report further when results are received.

修复和完井作业预计将在未来2-4周内完成,公司将在接收到结果后进一步报告。

About Canuc

关于Canuc

Canuc is a junior resource company focusing on its San Javier Silver-Gold Project in Sonora State, Mexico. The Company also generates cash flow from natural gas production at its MidTex Energy Project in Central West Texas, USA where Canuc has an interest in eight (8) producing natural gas wells and has rights for further in field developments.

Canuc是一家初级资源公司,专注于其位于Sonora State,Mexico的San Javier银金项目。该公司还通过其位于美国德克萨斯州中西部的MidTex Energy项目的天然气产出创造现金流,Canuc在八个(8)产气井中具有利益,并拥有进一步油田开发的权利。

For further information please contact:

要了解更多信息,请联系:

Canuc Resources Corporation.
(416) 525 - 6869
cberlet@canucresources.ca

Canuc Resources Corporation.
(416) 525 - 6869
cberlet@canucresources.ca

Forward Looking Information

前瞻性信息

This news release contains forward-looking information. All information, other than information of historical fact, constitute "forward-looking statements" and includes any information that addresses activities, events or developments that the Corporation believes, expects or anticipates will or may occur in the future including the Corporation's strategy, plans or future financial or operating performance.

本新闻稿包含前瞻性信息,除历史事实信息外,所有信息均构成“前瞻性陈述”,包括涉及公司认为、期望或预计将来发生的活动、事件或发展,包括公司的策略、计划或未来的财务或运营绩效。

When used in this news release, the words "estimate", "project", "anticipate", "expect", "intend", "believe", "hope", "may" and similar expressions, as well as "will", "shall" and other indications of future tense, are intended to identify forward-looking information. The forward-looking information is based on current expectations and applies only as of the date on which they were made. The factors that could cause actual results to differ materially from those indicated in such forward-looking information include, but are not limited to, the ability of the Corporation to fund the exploration expenditures required under the Agreement. Other factors such as uncertainties regarding government regulations could also affect the results. Other risks may be set out in the Corporation's annual financial statements, MD&A and other publicly filed documents.

在本新闻稿中使用的“估计”、“项目”、“预期”、“期望”、“打算”、“相信”、“希望”、“可能”及类似表达未来时态的词汇,以及“将”、“应该”等其他未来时态表明的词汇,旨在识别前瞻性信息。前瞻性信息基于目前的预期,并仅适用于其发布日期。可能导致实际结果与前瞻性信息不符的因素包括,但不限于,该公司筹集协议所需的勘探支出能力。其他因素,如政府监管的不确定性,也可能影响结果。公司的其他风险可能会在公司的年度财务报表、MD&A和其他已公开文件中披露。

The Corporation cautions that there can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, investors should not place undue reliance on forward-looking information. Except as required by law, the Corporation does not assume any obligation to release publicly any revisions to forward-looking information contained in this press release to reflect events or circumstances after the date hereof.

该公司提醒,前瞻性信息并不一定准确,因为实际结果和未来事件可能与预期的结果不同。因此,投资者不应过度依赖前瞻性信息。除法律规定外,公司不承担发布本新闻稿中包含的前瞻性信息所做的任何更新,以反映此后发生的事件或情况的义务。

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.

TSXV及其监管服务提供商(如TSXV政策中定义)对本新闻稿的充分性或准确性不承担任何责任。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发