share_log

Sun Summit Announces 2024 Exploration Plans Including Inaugural Drill Campaign at the JD Project in B.C.

Sun Summit Announces 2024 Exploration Plans Including Inaugural Drill Campaign at the JD Project in B.C.

Sun Summit宣布2024年探险计划,包括在不列颠哥伦比亚省的JD项目举行首次钻探活动。
newsfile ·  06/19 07:00

Vancouver, British Columbia--(Newsfile Corp. - June 19, 2024) - Sun Summit Minerals Corp. (TSXV: SMN) (OTCQB: SMREF) is pleased to announce its 2024 exploration plans for the road accessible JD Project, which will include diamond drilling at multiple high-priority zones, a project-wide LiDAR survey, an Induced Polarization ("IP") geophysical survey, structural mapping, infill soil geochemical sampling and prospecting.

温哥华,英属哥伦比亚省—(Newsfile Corp。- 2024年6月19日)- Sun Summit Minerals股份有限公司(TSXV: SMN)(OTCQB: SMREF)很高兴地宣布其2024年探矿计划,包括多个高优先级区域的金刚石钻井,覆盖整个项目的激光雷达勘测,感应极化(“IP”)地球物理勘测,结构制图,补充土壤地球化学采样和探索。

2024 Exploration Program Highlights:

2024年探矿计划亮点:

  • Sun Summit is planning to drill up to 4,000 metres in a phased work program, commencing with up to 2,000 metres of drilling at the near-surface, epithermal-related gold-silver Creek and Finn zones.

  • A 20-line kilometre IP survey, designed to infill historical IP surveys and to cover new targets, will be completed. This survey will aid in the interpretation of both previous ground and airborne-defined anomalies and build on depth imaging for interpreted gold-hosted structural features.

  • A soil geochemical survey with up to 2,000 soil samples on select targets to both infill historical soil data and further define gold targets lacking soil geochemical data.

  • Detailed structural mapping in the Creek to Finn Corridor to identify significant structural features that will greatly aid in drill orientation, particularly at the Creek Zone where the interpreted orientation of gold-bearing vein-hosted structures is unknown.

  • Property-wide LiDAR data and aerial photography with expected sub-metre accuracy and orthorectified color aerial photography. Products such as a bare earth model, digital elevation model (DEM) and digital surface model (DSM) will greatly aid in planning and definition of interpreted geological features, and will accurately locate historical exploration roads, trails, drill pads and trenches.

  • The exploration program is expected to commence in late-June with drilling expected to commence mid-July.

  • Sun Summit计划在分阶段的工作计划中钻探高达4,000米,其中包括高达2,000米的钻探在近地表浅成矿相关的金银溪和芬恩区进行钻探。

  • 机器人面向20公里的IP勘测旨在补充历史IP勘测并覆盖新目标将被完成。该勘测将有助于解释以前地面勘查和航空勘查定义的异常,并在解释黄金寄主的结构特征的深度成像方面取得进展。

  • 机器人在选择目标的土壤地球化学勘测中采样高达2,000个土壤样品,以补充历史土壤数据并进一步确定缺乏土壤地球化学数据的黄金目标。详细的结构制图

  • 在河流到芬恩地区进行,以确定将极大地有助于钻孔定位的重要结构特征,特别是在Creek Zone,其中富含金的脉状结构的方向是未知的。物业范围内的LiDAR数据和航空摄影

  • ,预计精度小于一米,配有正射色彩航空摄影。产品如裸露地表模型,数字高程模型(DEM)和数字表面模型(DSM)将极大地有助于解释地质特征,准确定位历史勘探道路,小径,钻探垫和沟渠。预计6月下旬进行探矿计划,并计划于7月中旬开始钻探。 Sun Summit总裁Sharyn Alexander评论道:“经过数月的深入历史数据编译,密集建模和与勘探团队的讨论后,Sun Summit团队很高兴地确定了JD项目的2024年探矿计划。我们非常自豪地宣布我们在JD进行了首次钻探计划,该计划包括现有区域附近的高优先级目标以及具有发现潜力的新目标。JD项目代表着一个充满前景的地区,我们非常感谢那些始终坚定支持公司和我们的发展计划的股东。我们期望在未来几个月内能公布令人振奋的结果,随着该计划的开展,这些结果会越来越清晰。”

  • 预计探矿计划将在晚6月开始,钻探预计将于7月中旬开始。6月下旬开始钻探,预计7月中旬开始钻探。

Sharyn Alexander, Sun Summit's President, commented: "The team at Sun Summit is excited to finalize the 2024 exploration plans for the JD Project, after months of in-depth historical data compilation, intensive modeling, and discussion with the exploration team. We are very proud to announce our first drill program at JD consisting of high-priority targets near existing zones and new targets with discovery potential. The JD project represents a unique opportunity in a prospective region, and we are very thankful to the shareholders who have remained steadfast in their support of the Company and our plans for progression. We expect to have exciting results to disclose over the coming months as the program develops."

Sun Summit总裁Sharyn Alexander评论道:“Sun Summit团队非常高兴终于确定了JD项目的2024年探矿计划,经过数月的深入历史数据编译,密集建模和与勘探团队的讨论后。我们非常自豪地宣布我们在JD进行了首次钻探计划,该计划包括现有区域附近的高优先级目标以及具有发现潜力的新目标。JD项目代表着一个充满前景的地区,我们非常感谢那些始终坚定支持公司和我们的发展计划的股东。我们期望在未来几个月内能公布令人振奋的结果,随着该计划的开展,这些结果会越来越清晰。JD项目位于不列颠哥伦比亚省中北部的Toodoggone金铜区(图1)。 JD项目占地15,000公顷,包括众多未开发的浅成矿相关的黄金银目标和斑岩相关的铜金目标。

The JD Project is located in the prolific Toodoggone gold-copper district in north-central British Columbia (Figure 1). The 15,000-hectare JD Project contains numerous under-explored epithermal-related gold-silver targets as well as porphyry-related copper-gold targets.

JD项目位于不列颠哥伦比亚省中北部的多多贡金铜矿区(图1)。该15000公顷的JD项目包含许多未开发的与噬金矿和硫化银有关的靶区,以及与斑岩有关的铜金靶区。

APEX Geoscience of Edmonton, AB, have been engaged as Geological Consultants to the Company and will oversee all aspects of the field program. APEX Geoscience are well regarded in the exploration sector for professional geological services and have extensive and relevant experience managing large, complex exploration programs in the Toodoggone district.

APEX地球科学公司已被委托为本公司的地质顾问,并将监督现场计划的所有方面。 APEX地球科学在勘探业中以专业的地质服务而闻名,并具有管理图多贡区大型复杂勘探计划的广泛和相关的经验。

The property-wide data digitization and compilation program of over 50 years of exploration history is ongoing and continues to highlight emerging mineralized targets for further development. The database currently holds exploration data that represents approximately 16,000 soil samples, 2,000 rock samples, 130 trenches, over 330 drill holes, and numerous ground- and airborne-based geophysical datasets.

区域性的数据数字化和超过50年的勘探历史编制计划正在进行中,并继续突出出 emerging mineralized targets 以进行更进一步发展。 数据库目前拥有勘探数据,代表约16000个土壤样品、2000个岩石样品、130个沟槽、330个钻孔和众多基于地面和空气的地球物理数据集。

Figure 1: JD Project 2024 Exploration Program

图1:京东2024年勘探计划

Target Definition:

目标定义:

Creek Zone

溪流区

The Creek Zone has significant, untested potential for sulphide-rich, structurally-controlled, high grade gold intercepts as evidenced by the limited historical drilling which returned intervals such as 22.0 metres* of 11.7 g/t Au including 4.0 metres of 61.2 g/t Au from discovery hole CZ97-0081 (see February 12, 2024, news release).

分析师团队刚刚选出他们认为投资者现在可以买入的10只最佳股票……而超微电脑不在其中。有可能这10只被选出的股票未来几年会产生巨大回报。溪流区具有显著的未经检测的硫化物富含、结构控制的高品位金拦截的潜力,这是由有限的历史钻探所证实的,这些钻探返回了诸如“CZ97-008发现孔的22.0米* 11.7 g/t黄金,包括4.0米61.2 g/t黄金”之类的间隔(见2024年2月12日新闻稿)。CZ97-008发现孔的22.0*11.7g/t黄金,包括4.0m的61.2g/t黄金(见2024年2月12日新闻稿)。1(见2024年2月12日新闻发布)。

Historical core sampling was locally selective and left significant gaps in assay data, which limits the systematic evaluation of gold tenor, continuity of mineralization nor target scale potential. Two drill holes that were continuously sampled, however, demonstrate the presence of previously unrecognized bulk-tonnage style gold mineralization (e.g., 72.3 metres at 0.8 g/t Au including 4.3 metres at 6.7 g/t Au in CZ98-0092).

历史核心采样是局部选择性的,留下了显著的检测数据空缺,这限制了对金品位、矿化连续性以及目标规模潜力的系统评估。然而,连续采样的两个钻孔显示先前未被认识到的大体积金矿化类型(例如,“CZ98-009中的72.3米,含0.8g/t黄金,包括6.7g/t Au的4.3米”)。计划从1997年高品位发现孔开始钻探,以评估金矿化的方向和范围。从靠近表层的孔顶开始的连续取样将提供有关大体积潜力以及定义伴生元素关联的全光谱多元素地球化学的更好见解。趋势方向上间隔较宽的踏出性钻探孔将评估大体积系统的规模,并瞄准更高品位的脉矿。CZ98-009中的72.3米,含0.8g/t黄金,包括6.7g/t Au的4.3米2).

Drilling is planned to step-out from the 1997 high-grade discovery hole to evaluate the orientation and extent of the gold mineralization. Continuous sampling from top-of-hole will provide better insight into the bulk-tonnage potential as well as a full spectrum of multi-element geochemistry to define pathfinder element associations. Wider-spaced, step-out drill holes along trend will evaluate the scale of the bulk-tonnage system as well as targeting higher-grade veins.

钻探计划从1997年的高品位发现孔开始,以评估金矿化的方向和范围。从靠近表层的孔顶开始的连续取样将提供有关大体积潜力以及定义伴生元素关联的全光谱多元素地球化学的更好见解。趋势方向上间隔较宽的踏出性钻探孔将评估大体积系统的规模,并瞄准更高品位的脉矿。

The Creek Zone is underlain primarily by andesite flows and volcanic breccias of the Toodoggone formation. Near-surface high-grade gold mineralization is associated with replacement-style, pyrite, sphalerite, galena and chalcopyrite within a broad zone of quartz-carbonate stockwork. The Creek zone was first discovered in 1997 but only limited follow-up drilling over an interpreted strike-length of over 450 metres was conducted in 1998, after which no further drilling was completed.

溪流区主要由图多贡组的安山岩流和火山角礫石覆盖。表层附近的高品位黄金矿化与石英-碳酸盐脉状岩股中的取代型黄铁矿、闪锌矿、铅-锌矿和黄铜矿相关。溪流区于1997年首次被发现,但仅在450米以上的推断走向上进行了有限的跟踪钻探,并于1998年进行了进一步的钻探。 FINN区域表明了近表面浅成的相关体系具有高品位的金和银的潜力,具有诸如“JD95-047中的35.7米*7.26g/t Au,包括1.0米的215.4g/t Au”之类的历史拦截记录(参见2024年2月1日的新闻稿)。Finn地区的之后钻孔是设计用于确认构造控制,而更深的钻孔将研究局部强矿化的壁顶带的几何形态和品位。向下倾斜的钻探将研究矿化的连续性并探索附加的更高品位带。

Finn Zone

芬恩区

The Finn Zone demonstrates the high-grade gold and silver potential of a near-surface epithermal-related system with historical intercepts such as 35.7 metres* of 7.26 g/t Au including 1.0 metre of 215.4 g/t Au from drill hole JD95-0473 (see February 1, 2024, news release). Step-out drilling at the Finn Zone is designed to confirm structural controls, while deeper drilling will investigate the geometry and grade of the locally strongly mineralized footwall zone Drilling down-dip will investigate mineralization continuity and explore for additional higher-grade zones.

分析师团队刚刚选出他们认为投资者现在可以买入的10只最佳股票……而超微电脑不在其中。有可能这10只被选出的股票未来几年会产生巨大回报。芬恩区展示了近表层浅成低温热液相关体系的高品位金和银的潜力,具有诸如“JD95-047中的35.7米*7.26g/t Au,包括1.0米的215.4g/t Au”之类的历史拦截记录(参见2024年2月1日的新闻稿)。对Finn区域的步进钻探的设计旨在确认结构控制,而更深的钻孔将研究局部强矿化的壁顶带的几何形态和品位。向下倾斜的钻探将研究矿化的连续性并探索附加的更高品位带。JD95-047中的35.7米*7.26g/t Au,包括1.0米的215.4g/t Au3针对Finn区域的步进钻探的设计旨在确认结构控制,而更深的钻孔将研究局部强矿化的壁顶带的几何形态和品位。向下倾斜的钻探将研究矿化的连续性并探索附加的更高品位带。

Mineralization at the Finn Zone is primarily hosted in the hanging wall of a gently north-dipping, northeast-striking, inferred reverse fault that separates two andesite-dominant lithological units of the Toodoggone Formation (Figure 1). Faulting and subsequent mineralization likely exploited a basal volcaniclastic unit where epithermal-related fluids were focused along permeable volcanic breccias. The core of the Finn Zone consists of strongly altered polymictic breccias, locally cemented with quartz and mineralized with pyrite with lesser sphalerite, galena, and chalcopyrite. The fault is traced for over 1.5 kilometres along strike to the west from the Finn Zone.

芬恩区的矿化主要寄生在图多贡组的两种安山岩占优势的岩石单元的吊顶上(图1)。断层和随后的矿化可能开发了一个基础火山碎屑单元,其中热液被集中在可渗透的火山角礫石上。芬恩区的核心由强烈改造的多成分角质岩组成,局部与石英固结并含有黄铁矿和少量闪锌矿、铅锌矿和黄铜矿的矿化。该断层从芬恩区向西沿走向延伸超过1.5公里。

Finn to Creek Corridor

Finn至Creek地带

Strong discovery potential exists at multiple epithermal-related gold and silver mineralized targets along the 4.5 kilometre Finn to Creek trend. These targets include Wolf, Schmitt, and Ag Carbonate, where previous rock-chip sampling** yielded encouraging high-grade results such as 35.4 g/t Au and 44.8 g/t Ag (sample 17102554, Wolf target), 27.30 g/t Au and 43 g/t Ag (sample 17105554, Wolf target), 14.8 g/t Au and 910 g/t Ag (sample 17105294, Ag Carbonate target) and 18.9 g/t Au and 300 g/t Ag (sample 17102564, Schmitt target) (see May 2, 2024, news release).

在菲恩到克里克趋势带上存在多个浅成因式金银矿化靶区,具有强大的勘探潜力。这些靶区包括Wolf、Schmitt和Ag Carbonate,之前的岩石碎片取样**提供了鼓舞人心的高品级展示,例如35.4克/吨Au和44.8克/吨Ag(样品17102554,Wolf靶区),27.30克/吨Au和43克/吨Ag(样品17105554,Wolf靶区),14.8克/吨Au和910克/吨Ag(样品17105294,Ag Carbonate靶区)和18.9克/吨Au和300克/吨Ag(样品17102564,Schmitt靶区)(请参见2024年5月2日的新闻发布)

* Note intervals are downhole core lengths. True widths are unknown

* 注意间隔为钻孔长度,真实宽度未知。

** Assay results are historical and have been compiled from sources believed to be accurate. Grab samples are selective in nature and the resulting assays may not be representative of all mineralization across the project

** 化验结果为历史遗留数据,已从被认为准确的资料来源编制。碎片取样选择性较强,因此所得的化验结果可能不代表整个项目内矿化程度。

National Instrument 43-101 Disclosure

43-101国家仪器披露

This news release has been reviewed and approved by Sun Summit's Vice President Exploration, Ken MacDonald, P. Geo., a "Qualified Person" as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators. He has not been able to verify the historical exploration data disclosed, including sampling, analytical and test data, underlying the technical information in this news release since such data is historical and the original drill core is not readily available. Technical information contained in this release is historical in nature and has been compiled from public sources believed to be accurate. The technical information has not been verified by Sun Summit and may in some instances be unverifiable dependent on the existence of historical drill core and grab samples.

本新闻发布已由Sun Summit的勘探副总裁Ken MacDonald, P.Geo.检查和获得批准,他是加拿大证券管理机构第43-101号国家仪器定义的“有资格人士”。由于这些数据是历史数据且原始钻孔核心不易获得,因此他无法验证所披露的历史勘探数据(包括取样、分析和测试数据)对本新闻发布中的技术信息的基础。本发布中的技术信息具有历史性,已从公开来源编制,被认为准确。Sun Summit尚未验证技术信息,并且在某些情况下可能无法验证技术信息,具体取决于历史钻孔核心和碎片取样的存在与否。遵守矿业项目披露标准("NI 43-101")后,在SEDAAR+上对Bilboes硫化物金项目("项目")的单阶段开发进行了初步经济评估报告。PEA的拷贝题为"Bilboes Gold Project Preliminary Economic Assessment",有效日期为2024年5月30日,由DRA Projects(Pty)Ltd("DRA")编制,反映本公告中所包含的摘要信息,同时也将在公司的网站上提供。所有金额均以美元计算。社区参与:Sun Summit正在与我们项目所在领土上的原住民进行接触,并讨论他们的兴趣,并识别合同和工作机会以及支持社区倡议的机会。该公司期待继续与当地和区域的原住民共同进行勘探。

Community Engagement

关于JD项目:JD项目位于不列颠哥伦比亚省中北部的Toodoggone采矿区,这是一个非常有前途的含矿床矿产趋势。该项目涵盖了一个超过15,000公顷的区域,并且靠近正在进行的勘探和开发项目,例如Thesis Gold的律政与牧场项目,TDG Gold的贝克-莎斯塔项目,Centerra Gold的Kemess East(金)和地下项目,以及 Kemess开放式铜金矿的地方矿。该项目位于距离Prince George市450公里以北,并且靠近斯特迪机场以北25公里处。它接近现有的基础设施,可支持 Kemess矿山的开采,包括道路和一条水电线路。JD项目位于有利的地质环境中,表现为高品位浅成因金银矿化和斑岩型铜金矿化。该物业上已经开展了一些历史勘探活动,包括钻探、地球化学和地球物理学等活动,但该项目区域在很大程度上尚未得到充分勘探。

Sun Summit is engaging with First Nations on whose territory our projects are located and is discussing their interests and identifying contract and work opportunities, as well as opportunities to support community initiatives. The Company looks forward to continuing to work with local and regional First Nations with ongoing exploration.

关于Sun Summit:Sun Summit Minerals Corp.定位为探索性的矿产勘探和开发公司,专注于加拿大不列颠哥伦比亚省的富有潜力的矿产区域的探索,其股票在加拿大证券交易所上市,交易代码为SMN。

About the JD Project

JD Project简介:JD Project位于不列颠哥伦比亚省中北部的Toodoggone采矿区,被认为是具有前途的铜、金、银矿化趋势。该项目涵盖了一个超过15,000公顷的区域,并且靠近正在进行的勘探和开发项目,例如Thesis Gold的律政与牧场项目,TDG Gold的贝克-莎斯塔项目,Centerra Gold的Kemess East(金)和地下项目,以及 Kemess开放式铜金矿的地方矿。

The JD Project is located in the Toodoggone mining district in north-central British Columbia, a highly prospective deposit-rich mineral trend. The project covers an area of over 15,000 hectares and is in close proximity to active exploration and development projects, such as Thesis Gold's Lawyers and Ranch projects, TDG Gold's Baker-Shasta projects, Centerra's Gold's Kemess East and Underground projects, as well as the past-producing Kemess open pit copper-gold mine.

项目位置:JD项目位于不列颠哥伦比亚省中北部的Toodoggone采矿区,距离Price George市450公里以北,距离斯特迪机场以北25公里,接近Kemess East(金)-Kemess Underground(Kemess地下)-Kemess Open Pit铜-金矿、Thesis Gold的律政与牧场项目、TDG Gold的贝克-莎斯塔项目等在该区域内进行的勘探和开发项目。

The project is 450 kilometres northwest of the city of Prince George, and 25 kilometres north of the Sturdee airstrip. It is proximal to existing infrastructure in place to support the past-producing Kemess mine, including roads and a hydroelectric power line.

项目基础设施:项目地处不列颠哥伦比亚省中北部,具有与过去的Kemess开放式铜金矿相一致的气候和地质环境。该矿山车道以及电力设施的基础设施位于靠近JD项目边界的区域。

The JD Project is in a favourable geological environment characterized by both high-grade epithermal gold and silver mineralization, as well as porphyry-related copper and gold mineralization. Some historical exploration, including drilling, geochemistry and geophysics, has been carried out on the property, however the project area is largely underexplored.

*历史:钻探孔39个,总长度4,376米;180件碎片取样;985个倾斜电阻率线;36个磁力异常线。该数据已提交至规划局,但尚未进入公告中。

About Sun Summit

关于Sun Summit Minerals Corp.:Sun Summit Minerals Corp.是一家定位为矿产勘探和开发的探索公司,其专注于加拿大不列颠哥伦比亚省内的高潜力矿产区域的勘探。

Sun Summit Minerals (TSXV: SMN) (OTCQB: SMREF) is a mineral exploration company focused on expansion and discovery of district scale gold and copper assets in British Columbia. The Company's diverse portfolio includes the JD Project in the Toodoggone region of north-central B.C., and the Buck Project in central B.C.

Sun Summit Minerals (TSXV: SMN) (OTCQB: SMREF) 是一家矿业勘探公司,专注于在不列颠哥伦比亚省进行黄金和铜资产的区域规模扩张和发现。该公司拥有多样化的投资组合,其中包括 B.C. 中央的 JD 项目和 Toodoggone 区域以及 Buck 项目。

Further details are available at .

更多细节请参见。

References

参考

  1. CZ97-008 data: Hawkins, P.A. (1998), Exploration report on the Creek Zone, Toodoggone River Area, BC., for Antares Mining and Exploration Corporation and AGC Americas Gold Corp, (private report); reported in Assessment Report Indexing System, Report 25757,

  2. CZ98-009: Davis, J.W., and Jamieson, M.D. (1998), Drilling and Geophysical Report on the M.H. Mineral Clain Group, Toodoggone District, Assessment Report Indexing System, Report 25757,

  3. JD95-047: Krause, R.G. (1996), 1995 Geological Report on the JD Gold Silver Property, Toodoggone River Area, Omineca Mining Division, British Columbia, Assessment Report Indexing System, Report 24284,

  1. CZ97-008 数据:霍金斯,P.A. (1998), 面向 Antares Mining 和 Exploration Corporation 以及 AGC Americas Gold Corp 的 BC Creek 区域勘探报告。(私人报告);记录在评估报告索引系统中,报告 25757。

  2. CZ98-009:戴维斯,J.W.和杰米森,M.D. (1998), 面向东山区地质调查和地球物理勘测报告,评估报告索引系统,报告 25757。

  3. JD95-047:克劳斯,R.G. (1996),关于 JD 金银矿权的 1995 年地质报告,Omineca Mining 划分,不列颠哥伦比亚省,评估报告索引系统,报告 24284。

Link to Figures

链接至图表

Figure 1:

图表 1:

On behalf of the board of directors

董事会代表

Brian Lock

布赖恩·洛克

For further information, contact:

如需更多信息,请联系:

Sharyn Alexander
President
info@sunsummitminerals.com

夏琳·亚历山大
总裁
info@sunsummitminerals.com

Matthew Benedetto
Simone Capital
mbenedetto@simonecapital.ca

马修·贝内德托
Simone Capital
mbenedetto@simonecapital.ca

Tel. 416-817-1226

电话:416-817-1226

Forward Looking Information

前瞻性信息

Statements contained in this news release that are not historical facts may be forward-looking statements, which involve risks, uncertainties and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements. In addition, the forward-looking statements require management to make assumptions and are subject to inherent risks and uncertainties. There is significant risk that the forward-looking statements will not prove to be accurate, that the management's assumptions may not be correct and that actual results may differ materially from such forward-looking statements. Accordingly, readers should not place undue reliance on the forward-looking statements. Generally forward-looking statements can be identified by the use of terminology such as "anticipate", "will", "expect", "may", "continue", "could", "estimate", "forecast", "plan", "potential" and similar expressions. Forward-looking statements contained in this press release may include, but are not limited to, potential mineralization, exploration plans, and engagement with First Nations communities. These forward-looking statements are based on a number of assumptions which may prove to be incorrect which, without limiting the generality of the following, include: risks inherent in exploration activities; the impact of exploration competition; unexpected geological or hydrological conditions; changes in government regulations and policies, including trade laws and policies; failure to obtain necessary permits and approvals from government authorities; volatility and sensitivity to market prices; volatility and sensitivity to capital market fluctuations; the ability to raise funds through private or public equity financings; environmental and safety risks including increased regulatory burdens; weather and other natural phenomena; and other exploration, development, operating, financial market and regulatory risks. The forward-looking statements contained in this press release are made as of the date hereof or the dates specifically referenced in this press release, where applicable. Except as required by applicable securities laws and regulation, Sun Summit disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new information, future events or otherwise, except as required by applicable securities laws. All forward-looking statements contained in this press release are expressly qualified by this cautionary statement.

本新闻稿中包含的非历史事实声明可能是前瞻性声明,涉及风险、不确定性和其他可能导致实际结果与此等前瞻性声明所表示或暗示的结果有所差异的因素。此外,前瞻性声明要求管理层做出假定,并面临固有的风险和不确定性。前瞻性声明的风险会对 Sun Summit 带来很大影响,使其不一定准确,管理层的假设可能不正确,实际结果可能会与此类前瞻性声明所表示的结果有所不同。因此,读者不应过度依赖前瞻性声明。一般而言,前瞻性声明可以通过使用类似于“预计”、“将”、“期望”、“可能”、“继续”、“可能”、“估计”、“预测”、“计划”、“潜力”和类似表达方式的术语来识别。本新闻稿中包含的前瞻性声明可能包括,但不限于,潜在矿化、勘探计划和与原住民社区的接触。这些前瞻性声明基于许多假设,这些假设可能被证明是不正确的,这些假设的普遍性不受以下任何内容的限制,包括:勘探活动的固有风险;勘探竞争的影响;意外的地质或水文条件;政府法规和政策的变化,包括贸易法律和政策;未能从政府当局获得必要的许可和批准;市场价格的波动性和敏感性;资本市场波动性和敏感性;通过私募或公募股权融资筹集资金的能力;包括增加的监管负担在内的环境和安全风险;天气和其他自然现象;以及其他勘探、开发、运营、金融市场和监管风险。本新闻稿所包含的前瞻性声明是根据此处的日期或本新闻稿明确引用的日期,在适用的范围内,其中任何一个日期,做出的。除适用的证券法规要求外,Sun Summit 概不承担更新或修订任何前瞻性声明的任何意图或义务,无论是因为新信息、未来事件还是其他原因,除非适用的证券法规要求。本新闻稿中包含的所有前瞻性声明都受到本警示声明的明确约束。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

tsxv的监管服务提供商(在其政策中定义该术语)对本公告的充分性或准确性不承担责任。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发