Grid Metals Corp. Files National Instrument 43-101 Technical Report for MM Copper/Nickel Project in Southeastern Manitoba
Grid Metals Corp. Files National Instrument 43-101 Technical Report for MM Copper/Nickel Project in Southeastern Manitoba
TORONTO, ON / ACCESSWIRE / June 24, 2024 / Grid Metals Corp. (TSXV:GRDM)(OTCQB:MSMGF) ("Grid" or the "Company") today announced that it has filed on SEDAR the technical report for the updated Mineral Resource Estimate ("MRE") for its copper/nickel MM Project in (previously "Makwa Mayville") Project in southeastern Manitoba, prepared in accordance with CIM (2019) Best Practice Guidelines.
2024年6月24日,加拿大多伦多 / ACCESSWIRE / – Grid Metals Corp.(TSXV:GRDM)(OTCQB:MSMGF)(以下简称“Grid”或“公司”)今日宣布,按照CIM(2019)最佳实践指南,已在SEDAR上公布了其位于曼尼托巴东南部的铜/镍MM项目(之前是“Makwa Mayville”项目)的更新矿产资源估算(“MRE”)技术报告。
The MM Project resource comprises two separate deposits, located approximately 35 km apart, and approximately 145 kilometres from Winnipeg, the capital of Manitoba. Makwa is a nickel dominant resource with palladium, platinum and copper credits while Mayville is a copper dominant deposit with significant nickel content as well as platinum group metals. Contained metal content in the indicated open pit category includes 317 million pounds of copper, 263 million pounds of nickel and 452,000 ounces of precious metals ( palladium, platinum and gold). Details of the MRE were contained in the press release of Grid Metals Corp. dated May 6, 2024 and in Table 1A and Table 2 following.
MM项目资源包含两个独立的矿床,位于彼此相距约35公里的地方,距曼尼托巴省省会温尼伯约145公里。玛克瓦是一种镍优先资源,带有钯、铂和铜的贵金属成分,而梅维尔则是一个铜为主的矿床,具有重要的镍含量和铂族金属。按照指示性露天类别测量的金属含量包括3.17亿磅的铜、2.63亿磅的镍和45.2万盎司的贵金属(钯、铂和黄金)。有关MRE的详细信息包含在2024年5月6日Grid Metals Corp.新闻稿中,并在表1A和表2后面列出。
Exploration Drilling Planned - The Company has applied for exploration drill permits in order to enable exploration drilling at the Mayville Property in the area of and along strike of the historical New Manitoba deposit - one of three deposits acquired in the MM Project area which are not part of the current resource. Historical drilling at the New Manitoba yielded copper-nickel-cobalt mineralization with similar metal ratios to that of the Mayville Deposit, also located along the northern arm of the Bird River Greenstone Belt. The exploration program will be financed by existing working capital of the Company and is scheduled to commence during the third quarter of 2024.
计划勘探钻井 - 该公司已申请勘探钻孔许可,以便在梅维尔矿区和新曼尼托巴沉积物的走向和区域进行钻探勘探,新曼尼托巴是MM项目区内三个未包括在当前矿产资源内的采矿区之一。新曼尼托巴的历史钻探获得了铜-镍-钴矿化,其金属比例与梅维尔矿床相似,后者也位于Bird River绿岩带的北部。勘探计划将由公司现有的营运资本资金支持,并计划在2024年第三季度开始实施。
The exploration target/model at MM is to increase the contained tonnage to a range between 75 and 100 million tonnes with similar or higher grade to the current resource. The current resources are conventional sulphide metal deposits which have had extensive metallurgical testwork completed which has demonstrated their ability to produce marketable nickel and copper concentrates that contain associated precious metal by-products. The Company is of the view that there is a scarcity of North American domiciled nickel deposits ( in particular ) with attractive grade/tonnage and capital intensity metrics that can be developed to supply future demand for nickel required in response to the Inflation Reduction Act ( United States ). Located in the attractive ESG friendly mining jurisdiction of Manitoba Canada , the MM Project has the potential to become an important contributor to the North American EV supply chain.
MM项目的勘探目标/模型是将所含吨位区间提高至75至100万吨,与当前资源相似或更高的品位。当前资源是传统硫化物金属矿床,进行了大量冶金试验,证明它们能够生产可销售的镍和铜精矿,其中含有相关的贵金属副产品。公司认为,对于能够开发以供应由《缓解通胀法案》(美国)所需的镍增长的未来需求的有吸引力的品位/吨位和资本强度指标的北美内部镍矿床来说,实际上是相对稀缺的。位于加拿大曼尼托巴省具有吸引力的ESG友好型采矿管辖权的MM项目具有成为北美电动汽车供应链重要贡献者的潜力。
Qualified Persons Statements
合格人员声明
The Grid Metals' MM Project 2024 Mineral Resource Estimate with an effective date of December 31, 2023 was prepared by Messrs. Alan J. San Martin, MAusIMM (CP) and Charley Murahwi, P.Geo. from Micon International Limited, both of whom are Independent Qualified Persons in accordance with the guidelines of the Canadian Securities Administrators' National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").
Grid Metals的MM项目2024年矿产资源估算,截至2023年12月31日,是由Micon International有限公司的Alan J. San Martin,MAusIMM(CP)和Charley Murahwi,P.Geo.制备的,二人均根据加拿大证券监管机构《43-101矿产项目披露标准》("NI 43-101")指南,独立称职人员。
Dr. Dave Peck, P.Geo., is the Qualified Person for purposes of National Instrument 43-101 and has reviewed and approved the technical content of this release.
Dave Peck博士,P.Geo.,是National Instrument 43-101的合格人员,已审查并批准了本次发布的技术内容。
About Grid Metals Corp.
关于Grid Metals Corp.
Grid Metals is focused on both lithium and copper/nickel projects in the Bird River area, approximately 150 km northeast of Winnipeg Manitoba. The Donner Lithium project is a 75% owned property subject to a joint venture agreement. Grid has a lease agreement on the True North mill in order to process feed from Donner. Grid also has an MOU with Tantalum Mining Corporation of Canada Limited who operates the nearby producing Tanco Mine. The MM copper/nickel project is a resource-stage project that is undergoing exploration and development work as reported in this press release.
Grid Metals专注于位于加拿大温尼伯东北约150公里的Bird River地区的锂和铜/镍项目。唐纳锂项目是一项拥有75%所有权的物业,受合资协议约束。Grid在True North矿山上有租赁协议,以处理来自唐纳项目的原料。Grid还与加拿大钽矿业公司签署了谅解备忘录,后者运营附近的Tanco Mine。MM铜/镍项目是一项资源阶段项目,正在进行勘探和开发工作,如本新闻稿所述。
All of the Company's southeastern Manitoba projects are located on the Traditional Lands of the Sagkeeng First Nation with whom the Company maintains an Exploration Agreement.
公司在所有位于曼尼托巴东南部的项目上均位于Sagkeeng First Nation的传统土地上,与该国签署了勘探协议。
Resource Estimate
资源评估
The updated mineral resource estimate for the MM Project is provided in Tables 1 and 2, below.
MM项目的更新矿产资源估算如下表所示。
Table 1A. Mayville Pit Constrained and Underground Resource as of December 31, 2023.
表1A.梅维尔露天矿和地下资源截至2023年12月31日。
Mining |
Category |
Tonnage |
Density |
CuEq |
Cu |
Ni |
Co |
Pd |
Pt |
Au |
SR |
---|---|---|---|---|---|---|---|---|---|---|---|
% |
% |
% |
% |
g/t |
g/t |
g/t |
|||||
OP |
Indicated |
32,019,000 |
3.00 |
0.61 |
0.40 |
0.16 |
0.01 |
0.13 |
0.05 |
0.05 |
3.17 |
Inferred |
- |
- |
- |
- |
- |
- |
- |
- |
- |
||
UG |
Indicated |
322,461 |
3.00 |
1.62 |
0.96 |
0.37 |
0.02 |
0.19 |
0.08 |
0.11 |
NA |
Inferred |
203,323 |
3.00 |
1.50 |
0.96 |
0.32 |
0.02 |
0.16 |
0.08 |
0.11 |
矿业 |
类别 |
吨位 |
密度 |
铜当量(CuEq) |
铜 |
Ni |
Co |
钯 |
铂 |
黄金 |
SR |
---|---|---|---|---|---|---|---|---|---|---|---|
% |
% |
% |
% |
克/吨 |
克/吨 |
克/吨 |
|||||
OP |
指示资源 |
32,019,000 |
3.00 |
0.61 |
0.40 |
0.16 |
0.01 |
0.13 |
0.05 |
0.05 |
3.17 |
详见2024年4月3日新闻稿 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
||
UG |
指示资源 |
322,461 |
3.00 |
1.62 |
0.96 |
0.37 |
0.02 |
0.19 |
0.08 |
0.11 |
NA |
详见2024年4月3日新闻稿 |
203,323 |
3.00 |
1.50 |
0.96 |
0.32 |
0.02 |
0.16 |
0.08 |
0.11 |
*SR = strip ratio
*SR = 剥离比例
Table 1B. Makwa Pit Constrained and Underground Resources as of December 31, 2023
表1B。截至2023年12月31日的Makwa矿坑受限和地下资源
Mining |
Category |
Zone |
Tonnage |
Density |
NiEq |
Ni |
Cu |
Co |
Pd |
Pt |
SR |
---|---|---|---|---|---|---|---|---|---|---|---|
% |
% |
% |
% |
g/t |
g/t |
||||||
OP |
Indicated |
HG1 |
4,846,590 |
2.94 |
1.26 |
0.89 |
0.17 |
0.03 |
0.71 |
0.19 |
4.66 |
LG1 |
9,370,784 |
2.88 |
0.48 |
0.28 |
0.08 |
0.01 |
0.19 |
0.06 |
|||
HG1 + LG1 |
14,217,374 |
2.90 |
0.75 |
0.48 |
0.11 |
0.02 |
0.37 |
0.10 |
|||
Inferred |
LG1 |
18,000 |
2.88 |
0.36 |
0.23 |
0.04 |
0.01 |
0.11 |
0.04 |
||
UG |
Indicated |
HG1 |
437,743 |
2.94 |
1.19 |
0.83 |
0.11 |
0.03 |
0.73 |
0.21 |
NA |
LG1 |
62,783 |
2.88 |
0.53 |
0.30 |
0.08 |
0.01 |
0.27 |
0.08 |
|||
HG1 + LG1 |
500,526 |
2.93 |
1.11 |
0.77 |
0.11 |
0.02 |
0.67 |
0.19 |
|||
Inferred |
HG1 + LG1 |
- |
- |
- |
- |
- |
- |
- |
- |
矿业 |
类别 |
区域 |
吨位 |
密度 |
镍当量 |
Ni |
铜 |
Co |
钯 |
铂 |
SR |
---|---|---|---|---|---|---|---|---|---|---|---|
% |
% |
% |
% |
克/吨 |
克/吨 |
||||||
OP |
指示资源 |
HG1 |
4,846,590 |
2.94 |
1.26 |
0.89 |
0.17 |
0.03 |
0.71 |
0.19 |
4.66 |
LG1 |
9,370,784 |
2.88 |
0.48 |
0.28 |
0.08 |
0.01 |
0.19 |
0.06 |
|||
HG1 + LG1 |
14,217,374 |
2.90 |
固定费用覆盖率 |
0.48 |
0.11 |
0.02 |
0.37 |
0.10 |
|||
详见2024年4月3日新闻稿 |
LG1 |
18,000 |
2.88 |
0.36 |
0.23 |
0.04。 |
0.01 |
0.11 |
0.04。 |
||
UG |
指示资源 |
HG1 |
437,743 |
2.94 |
1.19 |
0.83 |
0.11 |
0.03 |
0.73 |
0.21 |
NA |
LG1 |
62,783 |
2.88 |
0.53 |
0.30 |
0.08 |
0.01 |
0.27 |
0.08 |
|||
HG1 + LG1 |
500,526 |
2.93 |
1.11 |
0.77 |
0.11 |
0.02 |
0.67 |
0.19 |
|||
详见2024年4月3日新闻稿 |
HG1 + LG1 |
- |
- |
- |
- |
- |
- |
- |
- |
*SR = strip ratio
*SR = 剥离比例
Notes to Accompany the Makwa and Mayville Resource Estimate:
Makwa和Mayville资源评估附注:
- The effective date of this Mineral Resource Estimate is December 31, 2023.
- The MRE presented above uses economic assumptions for both, surface mining and underground mining.
- The MRE has been classified in the Indicated and Inferred categories following spatial grade continuity analysis and geological confidence.
- The calculated cut-off grades to report the MRE are dynamic in nature following metallurgical recovery curves, the average COG for Makwa is 0.30 % Ni in surface mining and 0.84 % Ni in underground mining, for Mayville is 0.30 % Cu in surface mining and 1.37 % Cu in underground mining.
- The economic parameters used metal prices of US$9.0/lb Ni, US$3.75/lb Cu, US$23.0/lb Co, US$900/oz Pt, US$1,400/oz Pd and US$1,750/Au with specific metallurgical recovery curves detailed in tables 4.14 and 14.15 of the technical report (copper recoveries of 87% to high grade copper concentrate (28%) & nickel recoveries range from 50% to 68% to 10% nickel concentrate at Mayville and 50-68% nickel recovery to 10% nickel concentrate based on average grades and over 70% recovery for highest grade (+1% Ni) blocks at Makwa), a mining cost of US$3.5/t in surface and US$80.0/t in underground. Processing cost of US$15/t and a General & Administration cost of US$3.2/t.
- For surface mining the open pits at Makwa and Mayville use a slope angle of 53°.
- The block models for Makwa and Mayville are rotated and use a block size of 10 m x 5 m x 5 m with the narrow side across strike (North-South).
- The open pit optimization uses a re-blocked size of 10 m x 10 m x 10 m and for the underground the optimization uses stopes of 20 m long by 20 m high and a minimum mining width of 3 m.
- Messrs. Alan J. San Martin, MAusIMM(CP) and Charley Murahwi, P.Geo. from Micon International Limited are the Qualified Persons (QPs) for this Mineral Resource Estimate (MRE).
- Mineral resources unlike mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.
- The mineral resources have been estimated in accordance with the CIM Best Practice Guidelines (2019) and the CIM Definition Standards (2014).
- Totals may not add correctly due to rounding.
- Equivalent (Eq) Grade Calculations: (a) Makwa NiEq = Ni% + ((Cu% x CuR x CuP) + (Co% x CoR x CoP) + (Pt g/t x PtR x PtP) + (Pd g/t x PdR x PdP))/(NiR x NiP); (b) Mayville CuEq* = Cu% + ((Ni% x NiR x NiP) + (Co% x CoR x CoP) + (Pt g/t x PtR x PtP) + (Pd g/t x PdR x PdP) + (Au g/t x AuR x AuP))/(CuR x CuP). NiEQ = nickel equivalent grade. R = metal recovery. P = metal price.
- The Mayville CuEq calculation assumes the production of separate Cu and Ni concentrates.
- Metallurgical recoveries range as follows using input grades at the cutoff grade (low end) and 2 times the average open pit resource grade (high end): Makwa: Ni: 36 to 86%; Cu: 85.6% (invariant); Co: fixed to nickel recoveries; Pd: 59 to 90% (capped); Pt: 39 to 90% (capped); Mayville: For the copper concentrate model :Cu: 86.5 to 86.9%; Ni: 5% (fixed); Co: (5% - fixed to nickel recovery); Pd: 42% (fixed); Pt: 35% (fixed); Co: 30% (fixed); For the nickel concentrate model: Cu: 5% (fixed); Ni: 42 to 69%;Co: matches nickel recoveries; Pd: 33%; Pt: 21%; Au: 10%.
- 这个矿产资源评估的有效日期是2023年12月31日。
- 上面提供的MRE使用了地表开采和井下开采的经济假设。
- MRE经过了空间品位连续性分析和地质可信度,已分类为指示和暗示类别。
- 报告MRE所用的计算出矿品位是动态的,遵循冶金回收曲线,在Makwa中地表开采的平均COG为0.30%Ni,在井下开采为0.84%Ni,在Mayville中地表开采的平均COG为0.30%Cu,在井下开采为1.37%Cu。
- 经济参数使用了金属价格为US$9.0/lb Ni,US$3.75/lb Cu,US$23.0/lb Co,US$900/oz Pt,US$1,400/oz Pd和US$1,750/Au,具体冶金回收曲线详见技术报告中的表4.14和14.15(铜回收率为87%,高品位铜精矿(28%)和5-7.2%Ni浓缩物针对Mayville,平均Ni品位的50-68%Ni回收到10%Ni浓缩物,高品位(+1%Ni)区块在Makwa可以达到70%以上的Ni回收率),地表的开采成本为US$3.5/t,在井下为US$80.0/t。处理成本为US$15/t,行政费用为US$3.2/t。
- Makwa和Mayville的露天开采使用了53°的坡角。
- Makwa和Mayville的块模型是旋转的,使用了10m x 5m x 5m的块尺寸,狭长的侧面是沿着走向(南北方向)。
- 露天采矿的优化采用了重新块化的尺寸10m x 10m x 10m,井下开采优化则使用了长20m、高20m的采区和3m的最小采矿宽度。
- Alan J. San Martin, MAusIMM(CP)和Charley Murahwi, P.Geo.来自Micon International Limited,是这个矿产资源评估的合格人员(QPs)。
- 与矿床储量不同,矿产资源没有经济可行性的证明。矿产资源的估计可能会受到环境、许可、法律、产权、税收、社会政治、市场营销或其他相关问题的重大影响。
- 该矿产资源估计遵循了CIM最佳实践指南(2019年)和CIM定义标准(2014年)。
- 由于取整的缘故,总数可能不会加准确。
- 等效(Eq)品位计算:(a)Makwa NiEq = Ni% + ((Cu% x CuR x CuP) + (Co% x CoR x CoP) + (Pt g/t x PtR x PtP) + (Pd g/t x PdR x PdP))/(NiR x NiP); (b) Mayville CuEq* = Cu% + ((Ni% x NiR x NiP) + (Co% x CoR x CoP) + (Pt g/t x PtR x PtP) + (Pd g/t x PdR x PdP) + (Au g/t x AuR x AuP))/(CuR x CuP)。NiEQ = 镍当量品位。R = 金属回收率。P = 金属价格。
- Mayville CuEq的计算假设了生产单独的铜和镍精矿。
- 冶金回收率范围如下:采用下限切-捆/吨(t)的输入品位,以及两倍于平均露天资源品位(上限): Makwa:Ni:36%至86%;Cu:85.6%(不变);Co:定为镍回收率;Pd:59%至90%(限制);Pt:39%至90%(限制); Mayville: 对于铜精矿模型:Cu:86.5%至86.9%; Ni:5%(固定); Co: (5% - 定为镍回收率);Pd:42%(固定);Pt:35%(固定);Co: 30%(固定);对于镍精矿模型:Cu:5%(固定);Ni:42%至69%;Co: 匹配镍回收率;Pd: 33%;Pt: 21%;Au:10%。
Table 2. Contained Metal Values for the Open Pit Resources at the Makwa and Mayville Properties (Indicated Category only)
表2. Makwa和Mayville地表资源的含量金属价值(仅指示类别)
Deposit |
CuEq |
NiEq |
Cu |
Ni |
Co |
Pd |
Pt |
Au |
(t) |
(t) |
(t) |
(t) |
(t) |
koz |
koz |
koz |
|
Mayville | 195,316 |
- |
128,076 |
51,230 |
3,202 |
134 |
51 |
51 |
Makwa | - |
106,630 |
15,639 |
68,243 |
2,843 |
169 |
46 |
- |
Combined | 195,316 |
106,630 |
143,715 |
119,474 |
6,045 |
303 |
97 |
51 |
Deposit |
CuEq |
NiEq |
Cu |
Ni |
Co |
Pd |
Pt |
Au |
lbs |
lbs |
lbs |
lbs |
lbs |
oz |
oz |
oz |
|
Mayville | 430,597,339 |
- |
282,358,911 |
112,943,564 |
7,058,973 |
133,826 |
51,472 |
51,472 |
Makwa | - |
235,079,303 |
34,478,298 |
150,450,754 |
6,268,781 |
169,127 |
45,710 |
- |
Combined | 430,597,339 |
235,079,303 |
316,837,209 |
263,394,318 |
13,327,754 |
302,953 |
97,182 |
51,472 |
存入资金 |
铜当量(CuEq) |
镍当量 |
铜 |
Ni |
Co |
钯 |
铂 |
黄金 |
(t) |
(t) |
(t) |
(t) |
(t) |
千盎司(koz) |
千盎司(koz) |
千盎司(koz) |
|
Mayville | 195,316 |
- |
128,076 |
51,230 |
3,202 |
134 |
51 |
51 |
Makwa | - |
106,630 |
15,639 |
68,243 |
2,843 |
169 |
46 |
- |
合并 | 195,316 |
106,630 |
143,715 |
119,474 |
6,045 |
303 |
97 |
51 |
存入资金 |
铜当量(CuEq) |
镍当量 |
铜 |
Ni |
Co |
钯 |
铂 |
黄金 |
磅 |
磅 |
磅 |
磅 |
磅 |
盎司 |
盎司 |
盎司 |
|
Mayville | 430,597,339 |
- |
282,358,911 |
112,943,564 |
7,058,973 |
133,826 |
51,472 |
51,472 |
Makwa | - |
235,079,303 |
34,478,298 |
150,450,754 |
6,268,781 |
169,127 |
45,710 |
- |
合并 | 430,597,339 |
235,079,303 |
316,837,209 |
263,394,318 |
13,327,754 |
302,953 |
97,182 |
51,472 |
On Behalf of the Board of Grid Metals Corp.
代表Grid Corp董事会
For more information about the Company, please see the Company website at or contact:
欲了解更多公司信息,请参阅公司网站 或联系:
Robin Dunbar - President, CEO & Director Telephone: 416-955-4773 Email: rd@gridmetalscorp.com
Brandon Smith - Chief Development Officer - bsmith@gridmetalscorp.com
David Black - Investor Relations Email: info@gridmetalscorp.com
Robin Dunbar - 总裁,CEO和董事电话:416-955-4773 邮箱:rd@gridmetalscorp.com
Brandon Smith - 首席发展官 - bsmith@gridmetalscorp.com
David Black - 投资者关系 邮箱:info@gridmetalscorp.com
We seek safe harbour. This news release contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of the Securities Act (Ontario) (together, "forward-looking statements"). Such forward-looking statements include the Company's closing of the proposed financial transactions, sale of royalty and property interests. the overall economic potential of its properties, the availability of adequate financing and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements expressed or implied by such forward- looking statements to be materially different. Such factors include, among others, risks and uncertainties relating to potential political risk, uncertainty of production and capital costs estimates and the potential for unexpected costs and expenses, physical risks inherent in mining operations, metallurgical risk, currency fluctuations, fluctuations in the price of nickel, cobalt, copper and other metals, completion of economic evaluations, changes in project parameters as plans continue to be refined, the inability or failure to obtain adequate financing on a timely basis, and other risks and uncertainties, including those described in the Company's Management Discussion and Analysis for the most recent financial period and Material Change Reports filed with the Canadian Securities Administrators and available at .
我们正在寻求安全港。本新闻稿包含根据1995年美国《证券诉讼改革法案》意义下的前瞻性说明和《证券法》(安大略省)意义下的前瞻性信息(统称为“前瞻性说明”)。此类前瞻性说明包括公司完成拟议中的金融交易,出售特许权和物业权益,其物业的整体经济潜力,充足融资的可用性,并涉及已知和未知的风险、不确定性及其他因素,这些因素可能导致实际结果、业绩或成果与此类前瞻性声明所表达或暗示的有实质不同。这些因素包括,但不限于,关于潜在政治风险、生产和资本成本估计的不确定性,以及可能出现的意外成本和费用,采矿运营固有的物理风险,冶金风险,货币波动,镍、钴、铜和其他金属价格的波动,经济评估的完成,随着计划继续完善而发生的项目参数的变化,未能及时获得充足融资的无能或失败,以及其他风险和不确定性,包括公司在最近财政周期内的管理讨论和分析以及向加拿大证券管理机构提交的重大变更报告,并在其官网上提供。.
Neither the TSX Venture Exchange nor its Regulations Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.
TSX Venture Exchange及其法规服务提供方(该术语按照TSX Venture Exchange的政策定义)不接受本新闻稿的充分性或准确性的责任。
SOURCE: Grid Metals Corp.
信息来源:Grid Metals Corp.