Cranbrook, British Columbia--(Newsfile Corp. - June 25, 2024) - DLP Resources Inc. (TSXV: DLP) (OTCQB: DLPRF) ("DLP" or the "Company") announces receipt of complete drill results for drillhole, A24-014 on the Aurora porphyry copper-molybdenum-silver project in southern Peru. (Figure 1). In addition, a second drill rig is on site to assist with the expansion drilling in 2024.
不列颠哥伦比亚省克兰布鲁克--(Newsfile Corp.-2024 年 6 月 25 日)- DLP Resources Inc.(多伦多证券交易所股票代码:DLP)(场外交易代码:DLPRF) (”DLP“或者”公司“) 宣布收到了秘鲁南部奥罗拉斑岩铜钼银项目的 A24-014 钻孔的完整钻探结果。(图 1)。此外,第二台钻机也在现场,以协助2024年的扩建钻探。
Results for the first thirteen drillholes, A22-001, A22-002, A22-003, A23-004, A23-005, A23-006, A23-007, A23-008, A23-009, A23-010, A23-011, A23-012 and A23-013 were last released on January 04, 2023. (see DLP Resources Inc., news release of January 04, 2024, for results for the thirteen drillholes).
前十三个钻孔(A22-001、A22-002、A22-003、A23-004、A23-005、A23-006、A23-007、A23-008、A23-009、A23-010、A23-011、A23-012 和)的结果最后一次公布于2023年1月4日。A23-013(有关13个钻孔的结果,请参阅DLP资源公司,2024年1月4日的新闻稿)。
Highlights
亮点
-
Drillhole A24-014 was drilled approximately 250m northeast of drillhole A23-013 and intersected copper and silver mineralization throughout the hole to a depth of 641.30m. The hole was stopped at 641.30m due to faulting and fracturing between 273m and 332m and did not get into the planned molybdenum zone at depth. Mineralized intervals are indicated below.
534.30m at 0.14% Cu and 2.09g/t Ag from 107.00m to 641.30m.
202.00m at 0.25% Cu and 2.93g/t Ag from 107.00m to 309.00m.
66m at 0.42% Cu and 4.89g/t Ag from 219.00m to 285.00m.
-
钻孔 A24-014 在 A23-013 钻孔东北大约 250 米处钻探,并将铜和银矿化层贯穿整个钻孔,深度为 641.30 米。由于273米至332米之间的断层和裂缝,该孔在641.30米处停了下来,并且没有进入计划深的钼区。矿化间隔如下所示。
53430m,铜含量为 0.14%,银含量为 2.09g/t 从 107.00m 到 641.30m。
2.00m 在 0.25% 铜和 2.93g/t Ag 条件下 从 107.00m 到 309.00m。
66m,铜含量为 0.42%,银含量为 4.89g/t 从 219.00m 到 285.00m。
The complete set of results for A24-014 are summarized in Table 1 below.
A24-014 的完整结果汇总在下表 1 中。
- A second drill rig is currently on site and drilling the NE target.
- 第二台钻机目前正在现场钻探东北目标。
Mr. Gendall, President and CEO commented: "A24-014 was the first step-out hole to the NE to extend copper mineralization into the undrilled NE zone where previously reported reconnaissance mapping and sampling identified copper and molybdenum mineralization in rock samples on surface. This hole was drilled at a higher elevation to intersect greater copper mineralization in the upper levels of the drillhole. Unfortunately, the hole did not get into the molybdenum zone due to faulting which resulted in the hole being stopped short of the planned 1000m depth. We are very encouraged with the copper results from drillhole A24-014 and will continue to trace the copper enrichment to the northeast and southeast with continued drilling with two drill rigs in 2024."
总裁兼首席执行官根德尔先生评论说:“A24-014 是通往东北的第一个跨出式钻孔,旨在将铜矿化延伸到未钻探的东北区域,此前报告的侦察测绘和取样发现了地表岩石样本中的铜和钼矿化。这个洞是在更高的海拔上钻的,目的是与钻孔上层更大的铜矿化层相交。不幸的是,由于断层,该孔没有进入钼区,导致钻孔停留在计划的 1000 米深度以下。A24-014 钻孔的铜矿结果令我们深受鼓舞,并将在 2024 年继续使用两台钻机进行钻探,继续追踪东北和东南部的铜浓缩情况。”
Aurora Cu-Mo Project - Summary of Drill Results for A24-014
Aurora 铜钼项目-A24-014 钻探结果摘要
-
Drill hole A24-014 (Figures 2,3 and 4) commenced on April 24 on an azimuth of 050 degrees with an inclination of -70 degrees and ended on May 21st at 641.30m due to faulting in the hole. Summary geology is as follows:
0-3.50m: Overburden
3.5-107.00m: Leached zone of hornfels and Intermineral porphyry.
107.00m - 140.00m: Mineralized hornfels with chalcopyrite, chalcocite and covellite - weak enrichment zone.
140.00m - 172.90m: Brecciated and mineralized hornfels with pyrite, chalcopyrite, chalcocite and covellite - weak enrichment zone.
172.90 - 202.00m: Hornfels with disseminated and veined sulphides of chalcopyrite, pyrite and trace molybdenum.
202.00 - 350.00m: Mineralized hornfels and intense fracturing from 273m to 332m. Within a fault zone.
350 - 520m: Mineralized hornfels with chalcopyrite and pyrrhotite.
520 - 641.30m: Mineralized hornfels with chalcopyrite. End of hole on May 21st, 2024.
-
钻孔 A24-014 (图 2,3 和 4) 4月24日开始,方位角为050度,倾角为-70度,由于洞中断层,于5月21日在641.30米处结束。地质概要如下:
0-3.50m:覆盖层
3.5-107.00 米:角质和矿物间斑岩的浸出区。
107.00m-140.00m:含有黄铜矿、辉石和方晶岩的矿化角岩——弱富集区。
140.00m-172.90m:含有黄铁矿、黄铜矿、辉石和方晶岩的角炉和矿化角质——弱富集区。
172.90-202.00m:黄铜矿、黄铁矿和微量钼的浸染和脉状硫化物的霍恩费尔斯。
202.00-350.00m:矿化角岩和从 273 米到 332 米的强烈压裂。在断层区域内。
350-520m:含有黄铜矿和铁矿的矿化角石。
520-641.30m:含有黄铜矿的矿化角石。5 月 21 日洞结束st,2024。
Table 1. Summary of Drill Results for Diamond Drillhole A24-014. All grades are length-weighted averages of samples within the interval reported.
表 1。钻石钻孔 A24-014 的钻孔结果摘要。所有成绩均为报告间隔内样本的长度加权平均值。
Hole | From | To | Interval1 | Description | Cu (total) | Mo | Ag | Cueq* |
ID | m | m | m | % | % | g/t | % | |
A24-014 | 0.00 | 3.50m | 3.50m | No core recovered - overburden | ||||
3.50 | 107.00 | 103.50 | Leached zone within hornfels and porphyry dykes | 0.04 | 0.0225 | 0.87 | 0.17 | |
107.00 | 641.30 | 534.30 | Mineralized hornfels | 0.14 | 0.0036 | 2.09 | 0.18 | |
Includes | 107.00 | 309.00 | 202.00 | Hornfels with copper enrichment | 0.25 | 0.0068 | 2.93 | 0.31 |
Includes | 219.00 | 285.00 | 66.00 | Enriched copper zone in hornfels | 0.42 | 0.0022 | 4.89 | 0.47 |
Includes | 477.00 | 513.00 | 36.00 | Primary chalcopyrite mineralization in hornfels | 0.10 | 0.0062 | 2.17 | 0.15 |
洞 | 来自 | 至 | 间隔1 | 描述 | 铜(总计) | Mo | Ag | Cueq* |
身份证 | m | m | m | % | % | g/t | % | |
A24-014 | 0.00 | 3.50 米 | 3.50 米 | 没有回收内核-负担过重 | ||||
3.50 | 107.00 | 103.50 | 牛角岩和斑岩堤内的浸出区 | 0.04 | 0.0225 | 0.87 | 0.17 | |
107.00 | 641.30 | 534.30 | 矿化牛角 | 0.14 | 0.0036 | 2.09 | 0.18 | |
包括 | 107.00 | 309.00 | 202.00 | 富含铜的霍恩费尔斯 | 0.25 | 0.0068 | 2.93 | 0.31 |
包括 | 219.00 | 285.00 | 66.00 | 霍恩费尔斯中的富铜区 | 0.42 | 0.0022 | 4.89 | 0.47 |
包括 | 477.00 | 513.00 | 36.00 | 角燃料中的初级黄铜矿矿化作用 | 0.10 | 0.0062 | 2.17 | 0.15 |
Note: *Copper equivalent grades (CuEq) are for comparative purposes only. Mo, Cu and Ag values are uncut, and core recovery is assumed to be 100% for the entire drilled length of A24-014 except for intervals from 58.00m to 60.00m, 79.00m to 83.00m, 273.00m to 275.00m and 329.00m to 332.00m where core recovery was below 50% due to leaching and faulting. The project is at an early stage of exploration and conceptual recoveries of Cu 85%, Mo 82%, and Ag 75% are assigned to the CuEq calculations. Conversion of metals to an equivalent copper grade based on these metal prices is relative to the copper price per unit mass factored by conceptual recoveries for those metals normalized to the conceptualized copper recovery. The metal equivalencies for each metal are added to the copper grade. The formula for this is: CuEq % = Cu% + (Mo% * (Mo recovery / Cu recovery) * (Mo $ per lb / Cu $ per lb) + (Ag g/t * (Ag recovery / Cu recovery) * (Ag $ per oz/ 31.1034768) / (Cu $ per lb* 22.04623)).
注意:*铜当量等级 (CueQ) 仅用于比较目的。钼值、铜值和银值未切割,假定 A24-014 整个钻探长度的岩心回收率为 100%,但58.00米至60.00米、79.00米至83.00米、273.00米至275.00米以及329.00米至332.00米的间隔除外,其岩心回收率由于渗滤和断层而低于50%。该项目处于勘探初期,概念回收率为 85%,钼含量 82%,银 75% 被分配给 CueQ 计算。根据这些金属价格将金属转换为同等铜品位是相对于单位质量铜价格的相关的,该价格是按概念化铜回收率标准化的金属的概念回收率计算得出的。将每种金属的金属当量添加到铜等级中。计算公式为:CueQ% = Cu% +(Mo% *(钼回收率/铜回收率)*(每磅钼美元/每磅铜美元)+(Ag g/t *(银回收率/铜回收率)*(每盎司银美元/ 31.1034768)/(每磅铜美元* 22.04623))。
*Copper equivalent calculations use metal prices of Cu - US$3.34/lb, Mo - US$18/lb and Ag - US$21.87/oz.
*铜当量计算使用铜——3.34美元/磅、钼——18美元/磅和银——21.87美元/盎司的金属价格。
1 Intervals are downhole drilled core lengths. Drilling data to date is insufficient to determine true width of mineralization. Mo, Cu and Ag values are uncut.
1 间隔是指井下钻孔的岩心长度。迄今为止的钻探数据不足以确定矿化的真实宽度。Mo、Cu 和 Ag 值未切割。
Table 2: A24-014 Diamond drillhole location, depth, orientation and inclination.
表 2: A24-014 金刚石钻孔的位置、深度、方向和倾角。
Hole | Easting | Northing | Elevation | Length | Azimuth | Inclination |
ID | m | m | m | m | Degrees | Degrees |
A24-014 | 190,113 | 8,566,088 | 2978 | 641.30 | 050 | -70 |
洞 | 向东 | 北方 | 海拔 | 长度 | 方位角 | 倾角 |
身份证 | m | m | m | m | 学位 | 学位 |
A24-014 | 190,113 | 8,566,088 | 2978 | 641.30 | 050 | -70 |
Co-ordinates are in WGS84 Zone 19S.
坐标位于 WGS84 区域 19S 中。
Quality Control and Quality Assurance
质量控制和质量保证
DLP Resources Peru S.A.C, a subsidiary of DLP Resources Inc., supervises drilling and carries out sampling of HTW, NTW and BTW core. Logging and sampling are completed at a secured Company facility situated on the project site. Sample intervals are nominally 1.5 to 3m in length. Drill core is cut in half using a rotary diamond blade saw and samples are sealed on site before transportation to the ALS Peru S.A.C. sample preparation facility in Arequipa by Company vehicles and staff. Prepared samples are sent to Lima by ALS Peru S.A.C. for analysis. ALS Peru S.A.C. is an independent laboratory. Samples are analyzed for 48 elements using a four-acid digestion and ICP-MS analysis (ME-MS61). In addition, sequential copper analyses are done where secondary copper mineralization is observed and reports, soluble copper using sulphuric acid leach, soluble copper in cyanide leach, residual copper and total copper. ALS meets all requirements of International Standards ISO/IEC 17025:2005 and ISO 9001:2015 for analytical procedures.
DLP Resources Peru S.A.C是DLP资源公司的子公司,负责监督钻探并对HTW、NTW和BTW岩心进行采样。记录和采样工作在位于项目现场的公司安全设施中完成。样本间隔的长度名义上为 1.5 到 3m。使用旋转式金刚石刀片锯将钻芯切成两半,样品在现场密封,然后由公司的车辆和工作人员运送到位于阿雷基帕的ALS Peru S.A.C. 样品制备设施。ALS Peru S.A.C. 将制备好的样本送往利马进行分析。ALS 秘鲁 S.A.C. 是一家独立实验室。使用四酸消解和 ICP-MS 分析 (ME-MS61) 对样品中有 48 种元素进行分析。此外,对铜进行连续分析,观察并报告铜的二次矿化,使用硫酸浸出液进行可溶性铜,氰化物浸出液中的可溶性铜,残留的铜和总铜。ALS 符合国际标准 ISO/IEC 17025:2005 和 ISO 9001:2015 对分析程序的所有要求。
DLP Resources independently monitors quality control and quality assurance ("QA/QC") through a program that includes the insertion of blind certified reference materials (standards), blanks and pulp duplicate samples. The company is not aware of any drilling, sampling, recovery or other factors that could materially affect the accuracy or reliability of the data reported from 3.5m to 641.30m in A24-014 except for intervals from 58.00m to 60.00m, 79.00m to 83.00m, 273.00m to 275.00m and 329.00m to 332.00m where core recovery was below 50% due to leaching and faulting.
DLP Resources 通过一项计划独立监控质量控制和质量保证(“QA/QC”),该计划包括插入盲目认证参考材料(标准)、空白样本和纸浆副本。该公司没有发现任何可能对 A24-014 中350米至641.30米报告的精度或可靠性产生重大影响的钻探、采样、回收或其他因素,但58.00米至60.00米、79.00米至83.00米、273.00米至275.00米和329.00米至332.00米的间隔除外,其中由于渗滤和断层,岩心回收率低于50%。
Aurora Project
奥罗拉项目
Aurora Project is an advanced stage porphyry copper-molybdenum exploration project in the Province of Calca, SE Peru (Figure 1). The Aurora Project was previously permitted for drilling in 2015 but was never executed. Thirteen historical drillholes, drilled in 2001 and 2005 totaling 3,900m were drilled over an area of approximately 1000m by 800m, cut significant intervals of copper and molybdenum mineralization. From logging of the only three remaining holes DDA-01, DDA-3A and DDA-3 and data now available, it appears that only three of the thirteen holes tested the enriched copper zone and only one hole drilled deep enough to test the primary copper and molybdenum zone (see DLP Resources Inc. news release of May 18, 2021).
Aurora 项目是秘鲁东南部卡尔卡省的后期斑岩铜钼勘探项目(图 1)。Aurora项目此前曾在2015年获准钻探,但从未执行。在 2001 年和 2005 年钻探了 13 个历史钻孔,总计 3,900 米,在大约 1000 米 x 800 米的区域内钻探了大量的铜和钼矿化。从仅存的三个孔 DDA-01、DDA-3A 和 DDA-3 的记录以及现在可用的数据来看,十三个孔中似乎只有三个测试了富集铜区,只有一个钻得足够深以测试初级铜和钼区(见DLP Resources Inc. 2021年5月18日发布的新闻稿)。
Salient historic drillhole data of the Aurora Project are:
Aurora项目的重要历史钻孔数据是:
190m @ 0.57% Cu, 0.008% Mo in DDA-1 with a high-grade intercept of 20m @ 1.01% Cu related to a supergene enrichment zone of secondary chalcocite;
142m @ 0.5% Cu, 0.004% Mo in DDA-3;
71.7m @ 0.7% Cu, 0.007% Mo in DDA-3A (see historical Focus Ventures Ltd. news release July 11, 2012); and
One of the historical holes ABC-6 drilled on the edge of the system intersected 78m @ 0.45% Cu and 0.107% Mo (Figure 2).
DDA-1 中的 190m @ 0.57% Cu,0.008% Mo,高级截距为 20m @ 1.01% Cu,与次生方解石的超基因富集区有关;
DDA-3 中的 142m @ 0.5% Cu,0.004% Mo;
DDA-3A 中的 7170 万 @ 0.7% Cu,0.007% Mo(见 Focus Ventures Ltd. 2012 年 7 月 11 日发布的历史新闻稿);以及
ABC-6 在系统边缘钻出的一个历史洞与 78 米 @ 0.45% 铜和 0.107% 钼相交(图 2)。
A review of the historical drilling indicates that the majority of the thirteen holes were drilled in the leached and partially leached zones of the porphyry system. Ten of the thirteen holes never fully tested the oxide and secondary enrichment zone and/or the primary copper zone at depth encountered in DDA-01. Copper-molybdenum mineralization is hosted by quartz-feldspar porphyries intruded into slates-hornfels and pelitic sandstones belonging to the Ordovician (439 - 463 ma) Sandia Formation.
对历史钻探的回顾表明,十三个孔中的大多数是在斑岩系统的渗滤区和部分渗滤区钻探的。十三个孔中有十个从未全面测试过 DDA-01 中遇到的深度氧化物和二次富集区和/或初级铜区。铜钼矿化是由侵入奥陶纪(439-463 ma)桑迪亚组的石板角岩和泥质砂岩中的石英长石斑岩主导。
Stock Options and RSU's
股票期权和 RSU
The Company also announces that a total of 400,000 restricted share units ("RSUs") have been granted to founders pursuant to the Company's long-term incentive plan. Each RSU entitles the holder to acquire one common share of the Company on vesting. All RSUs will vest one year from the date of grant.
公司还宣布,根据公司的长期激励计划,共向创始人授予了40万个限制性股票单位(“RSU”)。每个 RSU 赋予持有人在归属时收购公司的一股普通股的权利。所有限制性股票单位将自授予之日起一年的归属。
Figure 1: DLP Project areas in Peru with Aurora Project Shown.
图 1:秘鲁的 DLP 项目区域,显示了 Aurora 项目。
Figure 2: Aurora Project - Plan view showing historic drilling and drilling by DLP in 2022-2023 with A24-014 and A24-015 in yellow lettering and proposed holes in red lettering. Blue = Mo >500ppm and Brown = Cu>0.2%.
图 2:Aurora 项目——平面图显示了 DLP 在 2022-2023 年间的历史钻探和钻探情况,A24-014 和 A24-015 以黄色字母显示,拟议的钻孔以红色字母表示。蓝色 = 钼> 500ppm,棕色 = 铜> 0.2%。
Figure 3: Aurora Project - Simplified SW-NE geological section showing DLP and historic drillholes.
图 3:Aurora 项目-显示了 DLP 和历史钻孔的简化 SW-NE 地质部分。
Figure 4: Aurora Project - Drill core from A24-014.
图 4:Aurora 项目-来自 A24-014 的钻探岩心。
Qualified Person
合格人员
David L. Pighin, consulting geologist and co-founder of DLP Resources, is the qualified person of the Company as defined by National Instrument 43-101. Mr. Pighin has reviewed and approved the technical contents of this news release.
根据National Instrument 43-101的定义,咨询地质学家兼DLP Resources的联合创始人大卫·皮金是公司的合格人士。Pighin 先生已审查并批准了本新闻稿的技术内容。
About DLP Resources Inc.
关于 DLP Resources Inc.
DLP Resources Inc. is a mineral exploration company operating in Southeastern British Columbia and Peru, exploring for Base Metals and Cobalt. DLP is listed on the TSX-V, trading symbol DLP and on the OTCQB, trading symbol DLPRF. Please refer to our web site for additional information.
DLP Resources Inc. 是一家矿产勘探公司,在不列颠哥伦比亚省东南部和秘鲁开展业务,勘探基本金属和钴。DLP在TSX-V上市,交易代码为DLP,在OTCQB上市,交易代码为DLPRF。请参阅我们的网站以获取更多信息。
FOR FURTHER INFORMATION PLEASE CONTACT:
DLP RESOURCES INC.
Ian Gendall, CEO & President
Jim Stypula, Executive Chairman
Robin Sudo, Corporate Secretary
Maxwell Reinhart, Investor Relations
Telephone: 250-426-7808
Email: iangendall@dlpresourcesinc.com
Email: jimstypula@dlpresourcesinc.com
Email: robinsudo@dlpresourcesinc.com
Email: maxreinhart@dlpresourcesinc.com
欲了解更多信息,请联系:
DLP 资源公司
伊恩·根德尔,首席执行官兼总裁
吉姆·斯蒂普拉,执行主席
Robin Sudo,公司秘书
麦克斯韦尔·莱因哈特,投资者关系
电话:250-426-7808
电子邮件:iangendall@dlpresourcesinc.com
电子邮件: jimstypula@dlpresourcesinc.com
电子邮件: robinsudo@dlpresourcesinc.com
电子邮件: maxreinhart@dlpresourcesinc.com
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
多伦多证券交易所风险投资交易所及其监管服务提供商(该术语在多伦多证券交易所风险投资交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。
Cautionary Note Regarding Forward-Looking Information
关于前瞻性信息的警示说明
This release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements relate to future events or future performance and reflect the expectations or beliefs of management of the Company regarding future events. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would" or "occur". This information and these statements, referred to herein as "forward‐looking statements", are not historical facts, are made as of the date of this news release and include without limitation, statements regarding discussions of future plans, estimates and forecasts and statements as to management's expectations and intentions with respect to drilling on the Aurora Project in Peru.
本新闻稿包含某些陈述和信息,这些陈述和信息可能构成适用的加拿大证券法所指的前瞻性信息。前瞻性陈述与未来事件或未来业绩有关,反映了公司管理层对未来事件的期望或信念。通常,前瞻性陈述和信息可以通过使用前瞻性术语来识别,例如 “打算” 或 “预期”,或者某些行动、事件或结果 “可能”、“应该”、“将” 或 “发生” 的词语和短语或陈述的变体。这些信息和这些陈述(此处称为 “前瞻性陈述”)不是历史事实,是截至本新闻稿发布之日作出的,包括但不限于有关未来计划、估计和预测讨论的声明,以及管理层对秘鲁奥罗拉项目钻探的预期和意图的陈述。
These forward‐looking statements involve numerous risks and uncertainties, and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things drill results expected from the Aurora Project in Peru.
这些前瞻性陈述涉及许多风险和不确定性,实际结果可能与任何前瞻性陈述中建议的结果存在重大差异。除其他外,这些风险和不确定性包括秘鲁奥罗拉项目预期的钻探结果。
Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial out-look that are incorporated by reference herein, except in accordance with applicable securities laws. We seek safe harbor.
尽管公司管理层试图确定可能导致实际业绩与前瞻性陈述或前瞻性信息中包含的业绩存在重大差异的重要因素,但可能还有其他因素导致业绩与预期、估计或预期不符。无法保证此类陈述会被证明是准确的,因为实际结果和未来事件可能与此类陈述中的预期存在重大差异。因此,读者不应过分依赖前瞻性陈述和前瞻性信息。提醒读者,依赖此类信息可能不适合用于其他目的。除非根据适用的证券法,否则公司不承诺更新此处以引用方式纳入的任何前瞻性陈述、前瞻性信息或财务展望。我们寻求安全港。